We Bring Energy to

# Power Possibilities

![]()

Annual Report and Accounts 2025/26

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
|  |  |  |  |  |  |
|  |  |  |  |  |  |
| Welcome to National Grid |  |  |  |  |  |

#### We Bring

#### Energy to Power

#### Possibilities

We are driven by our mission, safely and reliably

connecting millions of people to the energy they

use, while investing at scale to meet rising

demand, power economic growth and deliver

system resilience and energy security.

|  |  |
| --- | --- |
|  |  |
| Read-more-arrow-white.gif | Read more on page [10](#i9481148b69324eb8a31d6c1c8e04e605_327217) |

![]()

|  |  |  |
| --- | --- | --- |
|  |  |  |
|  | Strategic Report | |
|  | [1](#i2193c7e7fbee4753bdbe2d16888565c8_10) | 2025/26 performance highlights |
|  | [4](#i2193c7e7fbee4753bdbe2d16888565c8_16) | National Grid at a glance |
|  | [6](#i2193c7e7fbee4753bdbe2d16888565c8_17592186051697) | Chair’s statement |
|  | [8](#i2193c7e7fbee4753bdbe2d16888565c8_17592186051706) | Chief Executive’s review |
|  | [12](#i2193c7e7fbee4753bdbe2d16888565c8_31) | Our business model |
|  | [14](#i2193c7e7fbee4753bdbe2d16888565c8_4723) | Our business environment |
|  | [16](#i2193c7e7fbee4753bdbe2d16888565c8_4819) | Performance against our strategic priorities |
|  | [18](#i2193c7e7fbee4753bdbe2d16888565c8_5161) | Our business units |
|  | [23](#i2193c7e7fbee4753bdbe2d16888565c8_4697) | Our stakeholders |
|  | [26](#i2193c7e7fbee4753bdbe2d16888565c8_49) | Our key performance indicators |
|  | [30](#i2193c7e7fbee4753bdbe2d16888565c8_61) | Internal control and risk management |
|  | [31](#i51fd979336404373b4e2f7eb6ab80680_18307) | Our Group Principal Risks |
|  | [38](#i2193c7e7fbee4753bdbe2d16888565c8_4644) | Responsible Business review |
|  | [53](#i2193c7e7fbee4753bdbe2d16888565c8_88) | TCFD |
|  | [69](#i2193c7e7fbee4753bdbe2d16888565c8_127) | Financial review |
|  | [85](#i2193c7e7fbee4753bdbe2d16888565c8_118) | Section 172 and NSIS statement |
|  | [86](#i2193c7e7fbee4753bdbe2d16888565c8_130) | Viability statement |
|  |  |  |

|  |  |  |
| --- | --- | --- |
|  |  |  |
|  | Corporate Governance | |
|  | [88](#i2193c7e7fbee4753bdbe2d16888565c8_136) | Chair’s statement |
|  | [89](#i2193c7e7fbee4753bdbe2d16888565c8_142) | Governance overview |
|  | [91](#i2193c7e7fbee4753bdbe2d16888565c8_145) | Our Board |
|  | [94](#i2193c7e7fbee4753bdbe2d16888565c8_151) | Key Board activities |
|  | [95](#i2193c7e7fbee4753bdbe2d16888565c8_154) | Culture and workforce engagement |
|  | [96](#i2193c7e7fbee4753bdbe2d16888565c8_157) | Board evaluation |
|  | [97](#i2193c7e7fbee4753bdbe2d16888565c8_160) | Directors’ induction,  development and training |
|  | [98](#i2193c7e7fbee4753bdbe2d16888565c8_163) | Nomination Committee report |
|  | [100](#i2193c7e7fbee4753bdbe2d16888565c8_166) | Audit & Risk Committee report |
|  | [105](#i2193c7e7fbee4753bdbe2d16888565c8_169) | Safety & Operations Committee report |
|  | [106](#i2193c7e7fbee4753bdbe2d16888565c8_172) | Responsible Business Committee report |
|  | [107](#i2193c7e7fbee4753bdbe2d16888565c8_175) | Directors’ Remuneration report |
|  |  |  |
|  |  |  |
|  |  |  |
|  |  |  |

|  |  |  |
| --- | --- | --- |
|  |  |  |
|  | Financial Statements | |
|  | [128](#i2193c7e7fbee4753bdbe2d16888565c8_193) | Statement of Directors’ responsibilities |
|  | [129](#i2193c7e7fbee4753bdbe2d16888565c8_196) | Independent Auditor’s report |
|  | [137](#i2193c7e7fbee4753bdbe2d16888565c8_199) | Consolidated financial statements |
|  | [212](#i2193c7e7fbee4753bdbe2d16888565c8_328) | Company financial statements |
|  |  |  |
|  | Additional Information | |
|  | [220](#i2193c7e7fbee4753bdbe2d16888565c8_385) | The business in detail |
|  | [226](#i2193c7e7fbee4753bdbe2d16888565c8_388) | Internal control and risk factors |
|  | [233](#i2193c7e7fbee4753bdbe2d16888565c8_394) | Other disclosures |
|  | [236](#i2193c7e7fbee4753bdbe2d16888565c8_400) | Other unaudited financial information |
|  | [248](#i2193c7e7fbee4753bdbe2d16888565c8_403) | Commentary on consolidated financial  statements |
|  | [250](#i2193c7e7fbee4753bdbe2d16888565c8_391) | Shareholder information |
|  | [256](#i2193c7e7fbee4753bdbe2d16888565c8_409) | Definitions and glossary of terms |
|  | [262](#i2193c7e7fbee4753bdbe2d16888565c8_415) | Cautionary statement |

![]()

|  |  |  |  |  |
| --- | --- | --- | --- | --- |
|  |  |  |  |  |
|  | Our reporting | | |  |
|  | Online content  In this report there are QR codes you can scan to view  further content online. Simply open the camera app on  your smartphone to scan the code. | | | |
|  |  | |  |  |
|  | Further reading  Throughout this report you can find links to further detail  within this document. | | | |
|  |  |  |  |  |
|  |  | |  |  |
|  | Online report and other web content  The PDF of our Annual Report and Accounts 2025/26  includes a full search facility. You can find the document  by visiting our website nationalgrid.com/investors/  resources/reports-plc or by scanning the QR code below. | | | |
|  |  |  |  |  |
|  |  | | Read this report online | |

![]()

![read this report ifc.jpg]()

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 1 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| 2025/26 performance highlights |  |  |  |  |  |

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
|  |  |  |  |  |  |
| Statutory  operating profit  2024/25: £4,934m  +10% y-on-y | | £5,431m | | | |
|  |  |  |  |  |  |
| Statutory  earnings per share  2024/25: 60.0p  +9% y-on-y | | | 65.5p | | |
|  |  |  |  |  |  |
| Capital  investment  2024/25:  £9.85bn  +18% y-on-y | £11.58bn | | | | |
|  |  |  |  |  |  |
| Dividend per share  2024/25: 46.72p  +3.8% y-on-y | | | 48.49p | | |
|  |  |  |  |  |  |

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
|  |  |  |  |  |  |
| Underlying  operating profit  2024/25:  £5,357m  +6% y-on-y | £5,680m | | | | |
|  |  |  |  |  |  |
| Underlying  earnings per share  2024/25: 73.3p  +6% y-on-y | 78.0p | | | | |
|  |  |  |  |  |  |
| Asset growth  2024/25: 9.0%  +190bps y-on-y | 10.9% | | | | |
|  |  |  |  |  |  |
| Alternative performance measure  In addition to International Financial Reporting Standards (IFRS)  figures, management also uses a number of alternative measures  to assess performance. Definitions and reconciliations to  statutory financial information can be found on pages [236](#i2193c7e7fbee4753bdbe2d16888565c8_400) –  [247](#i4d298f0c87f34766961e584275cfa183_101315).  These measures are highlighted with the symbol above. | |  | Reporting currency  Our financial results are reported in sterling. We convert our US  business results at the weighted average exchange rate during the  year, which for 2025/26 was $1.34 to £1 (2024/25: $1.27 to £1). | | |
|  |  |  |  |  |  |

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 2 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| 2025/26 performance highlights cont. |  |  |  |  |  |

![NG_Sellindge_170425-182_pp2 new.jpg]()

|  |  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |  |
|  |  |  |  |  |  |  |
| Network reliability  2024/25: 99.9%  in line with prior year | 99.9% | | | | | |
|  |  |  |  |  |  |  |
| Lost time injury frequency rate  per 100,000 hours worked  2024/25: 0.10  +10% y-on-y | |  | 0.11 | |  | |
|  |  |  |  |  |  |  |
| Scope 1 and 2 GHG  emissions in mtCO2e  2024/25: 7.4  +1.2% y-on-y | |  | 7.5 | |  | |
|  |  |  |  |  |  |  |
| Employee engagement in our  twice annual Grid:Voice survey  2024/25: 80%  +100bps | |  | 81% | | | |
|  |  |  |  |  |  |  |
| 2024/25 Deloitte assured data | |  | 2025/26 Deloitte assured data | | | |
| Denotes information subject to limited assurance (see pages [26](#i2193c7e7fbee4753bdbe2d16888565c8_49)) | | | | | |  |

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 3 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
|  |  |  |  |  |  |

|  |  |  |  |  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |  |  |  |  |
|  | We Bring Energy  to Power Possibilities | | | | | | | |  |

#### Chair’s statement page

[6](#i2193c7e7fbee4753bdbe2d16888565c8_17592186051697)

Technology changes our existence –

and is inextricably linked to energy

National Grid is in the right place at the right time to take part

in the evolving energy landscape, with extensive grids in the

UK and US primed for expansion. We have announced our

intention to invest at least £70 billion over the next five years

to enhance our networks. This is an ambitious effort and

demands that we increase our agility, our productivity, and

our speed of technology adoption.

#### Chief Executive’s review page

[8](#i2193c7e7fbee4753bdbe2d16888565c8_17592186051706)

Energy is the foundation of modern economies and the

grid is the platform that makes energy usable at scale

The networks we plan, build and operate today will serve

customers for decades. The choices we make now,

on sequencing, design, capital discipline and system

architecture, will shape investment, resilience and

economic growth for a generation.

![]()

#### Responsible Business review

#### page

[38](#i2193c7e7fbee4753bdbe2d16888565c8_4644)

Responsible business is important to us and

our stakeholders

Over the past year, we have navigated a complex landscape

characterised by significant economic and political uncertainty.

In this environment, energy security and affordability remain

priorities. Part of being a responsible business is taking account

of, and responding to, the expectations of our customers,

communities, colleagues and other stakeholders.

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 4 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| National Grid at a glance |  |  |  |  |  |

![Main image NEW.jpg]()

|  |  |  |
| --- | --- | --- |
|  |  |  |
|  |  |  |
| Infrastructure  at the heart of  energy systems | |  |
|  |  |  |
| National Grid businesses play a vital role in energy  systems in the UK and US, connecting sources of  power to the customers that use them and shaping  the future of our critical energy networks. |  |  |

![At_A_Glance_UK_ET_7May.jpg]()

|  |  |
| --- | --- |
|  |  |
|  | See our business model on page [12](#i2193c7e7fbee4753bdbe2d16888565c8_31) – [13](#ia57179db9bea4811911634226a0dbb53_868) |

|  |  |  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |  |  |
| Our businesses | | |  |  |  |  |  |
|  |  |  |  |  |  |  |  |
|  |  |  |  |  |  |  |  |
|  |  |  |  |  |  |  |  |
| UK | | |  |  |  |  |  |
| UK Electricity Transmission  (UK ET/NGET)  We own and operate the high-voltage electricity  transmission network in England and Wales. This  connects and transmits electricity between  generators, storage, large customers and distribution  networks while delivering the major strategic  infrastructure for a resilient and clean power grid. | | |  | UK Electricity Distribution  (UK ED/NGED)  We own and operate the UK's largest electricity  distribution network, serving a population of 20  million people across the East Midlands, West  Midlands, South West and South Wales. This  includes a Distribution System Operator overseen  by an independent panel. | | | |
|  |
|  |  | Read more on page [18](#i049406fc5d1e43409e76ecc1cfea6354_378212) |  |  |  | Read more on page [19](#i049406fc5d1e43409e76ecc1cfea6354_378213) |  |
|  |  |  |  |  |  |  |  |

![At_A_Glance_UK_ED_7May.jpg]()

#### Our values

|  |  |  |  |  |
| --- | --- | --- | --- | --- |
|  |  |  |  |  |
|  |  |  |  |  |
| Do the right thing |  | Find a better way |  | Make it happen |
| – Stand up for safety every day  – Put our customers first  – Be inclusive, supporting and  caring for each other  – Speak up, challenge and act  where something doesn’t  feel right |  | – Embrace the power and  opportunity of diversity  – Increase efficiency to help  with customer affordability  – Work with others to find  solutions for customers  – Commit to learning and  new ideas |  | – Take personal ownership for  delivering results  – Be bold and act with passion  and purpose  – Focus on progress over  perfection  – Follow the problem through  to the end |

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 5 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| National Grid at a glance cont. |  |  |  |  |  |

|  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |
| Our businesses | | |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |
|  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |
|  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |
|  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |
| US | | |  |  |  |  |  |  | International | | | | | | | |  |
| New York (NY)  We own and operate electricity transmission,  electricity distribution and gas distribution  networks in Upstate and Downstate New York,  delivering energy to 4.2 million customers  (1.7 million electric and 2.5 million gas). | | |  | New England (NE)  We own and operate electricity and gas  distribution networks in Massachusetts, serving  2.3 million customers. We also own and operate  electricity transmission networks across  Massachusetts, New Hampshire and Vermont. | | | |  | National Grid Ventures (NGV)  We develop and operate large-scale energy  projects across the UK and US. They represent a  broad mix of energy assets and businesses,  including six electricity interconnectors between  the UK and Europe, US competitive transmission,  power generation and battery storage. | | | |  | Other activities  Primarily National Grid Partners, the corporate  venture capital and innovation arm of National  Grid, plus UK property, insurance and corporate  activities. | | | |
|  |  |  |
|  |  | Read more on page [20](#i049406fc5d1e43409e76ecc1cfea6354_378214) |  |  |  | Read more on page [21](#i049406fc5d1e43409e76ecc1cfea6354_378215) |  |  |  |  | Read more on page [22](#i049406fc5d1e43409e76ecc1cfea6354_378218) |  |  |  |  | Read more on page [22](#i049406fc5d1e43409e76ecc1cfea6354_378218) |  |
|  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |

![At_A_Glance_US_NY_7May.jpg]()

![At_A_Glance_US_NE_21 May.jpg]()

![NGV_Sellinge_130924_JA-41 pp5.jpg]()

![Inter_Other_020.jpg]()

|  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |
|  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |
| 2025/26 Regulatory asset value (RAV), rate base  and other assets (% of Group) | | | | | |  | 2025/26 Underlying operating profit (% of Group) | | | | | |  | 2025/26 Capital investment (% of Group) | | | | | | |
|  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |
|  |  | n | UK Electricity  Transmission  34% |  | n | New  England  14% |  |  |  | n | UK Electricity  Transmission  30% |  | n | New  England  15% |  |  |  | n | UK Electricity  Transmission  38% |  | n | New  England  17% |
|  |  | n | UK Electricity  Distribution  18% |  | n | National Grid  Ventures  4% |  |  |  | n | UK Electricity  Distribution  22% |  | n | National Grid  Ventures  6% |  |  |  | n | UK Electricity  Distribution  14% |  | n | National Grid  Ventures  1% |
|  |  | n | New York  27% |  | n | Other activities  3% |  |  |  | n | New York  30% |  | n | Other activities  (3)% |  |  |  | n | New York  30% |  |  |  |
|  | Alternative performance measure | | | | | |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |

![7146825580680]()

![7146825580749]()

![7146825580767]()

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 6 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Chair’s statement |  |  |  |  |  |

![Chair's statement.jpg]()

![]()

Paula Rosput Reynolds

#### Technology changes our existence – and is inextricably linked to energy

|  |  |
| --- | --- |
|  |  |
|  |  |
| National Grid is in the right place at  the right time in this evolving landscape. |  |

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 7 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Chair’s statement cont. |  |  |  |  |  |

|  |  |
| --- | --- |
|  |  |
| “National Grid is a guardian  of the integrity and capability  of the energy system. It’s our  job to ensure that energy  grids in our regions – both  electricity and natural gas –  have the capability to  move energy to where it is  needed, when it is needed.” | |

Dear fellow shareholder,

At the very moment you are reading this letter,

more than five billion people around the world are

using the internet. In fact, three-quarters of the

global population are internet users. Yet there are

still two billion people, primarily in Central and

Eastern Africa and South Asia, who have yet to

experience what most of us take for granted. But

whether you are in New York or London, or in rural

Myanmar or on a remote island in Indonesia,

progress only moves one way. Technology

changes our existence – and is inextricably linked

to energy.

Technology saves energy, but it also creates the

need for energy. Artificial intelligence (AI) is the

classic example of both. AI has been years in

development, and it already operates within every

domain of the digital world. But it relies on

increasingly sophisticated microchips, which

consume more energy than early generations of

chips. Concerns about the proliferation of data

centres and how existing utility customers’ bills

might be affected are among the issues yet to be

fully resolved.

Against this backdrop, National Grid is a guardian

of the integrity and capability of the energy system.

We design, build and operate long lead-time,

capital-intensive infrastructure. It’s our job to

ensure that energy grids in our regions – both

electricity and natural gas – have the capability to

move energy to where it is needed, when it is

needed. Whether it’s connecting a wind farm in the

North Sea or providing natural gas to a new chip

fabricator in central New York, it’s our job to plan

for the future.

National Grid is in the right place at the right time in

|  |  |
| --- | --- |
|  |  |
|  |  |
| At least  £70bn |  |
| capital investment over the  next five years |  |

this evolving landscape. We have extensive land-

based electric power and natural gas grids in the

UK and US. With years of planning well underway,

these grids are primed for expansion. In addition,

we operate the most extensive subsea network of

high-voltage direct current (HVDC) interconnectors

in the world, linking the UK with Europe, with

further expansions planned. Given the complexity

of our networks, we are an early adopter of

technologies to make our grids more efficient.

Through sensors, automated controls, unmanned

surveillance, and AI, we are changing how

infrastructure operates. We both support the

energy requirements of AI and are a major user of

its capabilities.

National Grid has announced its intention to invest

at least £70 billion over the next five years to

enhance our networks. This is an ambitious effort

but, rest assured, our focus on safety and reliability

does not waver. The enormity of the challenge

demands that we increase our agility, our

productivity, and our speed of adoption. To this

end, in November 2025, National Grid welcomed a

new Chief Executive, Zoë Yujnovich, who

succeeded our long-serving leader, John

Pettigrew.

In this report, you’ll hear Zoë’s voice on how she is

bringing new perspectives, discipline, and energy

to National Grid.

No annual report issued by an energy company in

May 2026 would be complete without some

commentary on the situation in the Middle East.

The global disruption in the movement of

hydrocarbons through the Strait of Hormuz affects

all participants in the energy value chain.

Affordability for our customers remains a concern.

Efficiency – like the kind that Zoë is driving – is the

most powerful tool that we have to deploy.

Though we can debate the merits of how much AI,

and how quickly it is adopted, technology will

create opportunities we can only begin to imagine.

The geopolitics of the moment are troubling, but

the future is still bright.

Your ownership in National Grid underpins our

ability to deliver critical new transmission and

distribution infrastructure on two continents. On

behalf of the Board, I thank you for your continued

support of our company and our mission.

#### Paula Rosput Reynolds

Chair

13 May 2026

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 8 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Chief Executive’s review |  |  |  |  |  |

![CEO statement Image 1_NEW v3.jpg]()

![]()

Zoë Yujnovich

#### Energy is the foundation of modern economies and the grid is the platform that makes energy usable at scale

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 9 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Chief Executive’s review cont. |  |  |  |  |  |

Energy is the foundation of modern economies,

and the grid is the platform that makes energy

usable at scale. For decades, it operated largely

out of sight. Today, it sits firmly at the centre of

national economic strategy, and it is not

moving back.

Across the UK and the north‑eastern United

States, there has been a fundamental shift.

Electricity demand is rising again after years of low

or negative growth. The large‑scale build‑out of

low‑carbon generation and storage, the

electrification of transport and industry, advanced

manufacturing and the rapid growth of artificial

intelligence are reshaping how and where energy is

produced and consumed. These shifts are also

influencing natural gas demand, particularly as

systems balance resilience with transition.

What has not changed is our responsibility: to

move energy safely, reliably, at scale and in real

time, from where it is produced to where it is

needed. What has changed is the urgency, and the

recognition that networks can either be an

essential catalyst for growth or a constraint.

The connection between supply and demand

depends on networks, that’s why National Grid sits

at the centre of national economic strategy.

National Grid is well positioned for this moment.

We operate extensive electricity and natural gas

networks across the UK and the north‑eastern US,

regions where demand is growing and the pace of

change is accelerating. Our networks are ready to

support expansion and modernisation. The

essential nature of what we do defines both our

responsibility and our opportunity.

Our value proposition is clear. We build, own and

operate high‑quality, regulated infrastructure that

supports economic growth, strengthens energy

security and delivers tangible benefits to the

communities we serve.

![]()

Our model offers investors exposure to sustained

long‑term growth in energy demand, without the

day‑to‑day volatility that can characterise other

sectors. The strategic nature of our assets is well

understood in investment circles, often described

as HALO: heavy assets, low obsolescence.

We are investing at unprecedented scale to

expand and modernise the networks that will

underpin this next phase of economic growth. At

the same time, we are determined to make better

use of the networks we already have and connect

customers faster.

As Chief Executive, I am clear about what this

moment demands: disciplined capital allocation,

excellence in execution and a culture that values

accountability as much as ambition. Growth

matters, but never at the expense of safety,

reliability, affordability or trust.

|  |  |  |
| --- | --- | --- |
|  |  |  |
|  | 2025/26 financial  performance highlights |  |
|  |  |  |
|  | Capital investment 1 |  |
|  | £11.58bn |  |
|  | 2025: £9.54bn +21% |  |
|  |  |  |
|  |  |  |
|  | Asset growth |  |
|  | 10.9% |  |
|  | 2025: 9.0% +190bps |  |
|  |  |  |
|  |  |  |
|  | Return on Equity |  |
|  | 9.8% |  |
|  | 2024/25: 9.0% +80bps |  |
|  |  |  |
|  |  |  |
|  | Underlying operating profit |  |
|  | £5.7bn |  |
|  | 2024/25: 5.2bn +9% |  |
|  |  |  |
|  |  |  |
|  | Underlying EPS1 |  |
|  | 78.0p |  |
|  | 2024/25:  72.0p +8% |  |
|  |  |  |
|  |  |  |
|  | Dividend growth in line with policy |  |
|  | 48.49p |  |
|  | 2024/25: 46.72p +3.8% |  |
|  |  |  |
|  | 1.  Underlying results from continuing operations excluding  exceptional items, remeasurements, deferrable major  storm costs (when greater than $100m), timing, and the  impact of deferred tax in the UK regulated businesses  (NGET and NGED). Underlying EPS and  capital investment calculated at constant currency. |  |

#### National Grid offers growth and resilience

|  |  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |  |
|  |  |  |  |  |  |  |
|  |  |  |  |  |  |  |
|  |  |  |  |  |  |  |
|  |  |  |  | c.8-10%  underlying EPS CAGR |  |  |
|  |  | High visibility growth  – Unmatched visibility of investment and  earnings  – Multiple growth drivers  – Critical infrastructure assets  – Long-duration cash flows and low-risk  returns |  | + |  | Resilient business model  – Strong regulatory capabilities  – Clear delivery track record  – Strong balance sheet  – Resilient to macro-economic volatility |
|  |  |  | Progressive dividend |  |
|  |  |  | = |  |
|  |  |  | Aiming to deliver double-digit  investor returns |  |
|  |  |  |  |  |
|  |  |  |  |  |  |  |

![CEO_groth and resiliance.jpg]()

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 10 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Chief Executive’s review cont. |  |  |  |  |  |

Over the past six months, I have mobilised our

senior leaders in a rigorous review of the business,

testing our ambition against industry-leading peers

and customers’ rising expectations of us. This

culminated in a refreshed strategic framework – not

a change in direction, but a clearer and more

effective way of translating strategy into delivery

across a complex organisation.

At its core is our mission:

#### we bring energy to power possibilities.

First, we are focusing on the operational

fundamentals: delivering our capital programme on

time and on budget; maximising asset

performance and reliability; providing a consistently

strong customer experience; and functions that

support the businesses effectively. We call these

the “brilliant basics” – where credibility is earned

and trust is built, because execution is what turns

investment into impact.

Second, we are driving three “big shifts” that will

improve performance and enhance delivery

capacity: strengthening leadership, capability and

performance management; scaling technology,

data and AI to unlock productivity and faster

connections; and stepping up our external

positioning and policy engagement to help

shape outcomes that work for our customers

and investors.

As system needs evolve, regulatory and policy

frameworks must evolve too. We are being more

focused and deliberate in shaping outcomes that

support affordability, resilience and growth for

customers, communities and investors, building

coalitions and taking clearer positions.

Affordability is central to everything we do. We

recognise the pressure that energy bills place on

households and businesses, and we take seriously

our responsibility to deliver our part of the system

as efficiently as possible. How we invest and

operate has a direct impact on what customers

pay, both today and over the long term. History

shows that under‑investment does not remove

cost; it merely defers and ultimately increases it,

through connection delays leading to lost

economic opportunity and higher system operating

and constraint costs.

#### Our refreshed strategic framework focuses our organisation

Our focus is therefore on getting more from the

networks we have, investing efficiently, making

trade‑offs transparent and maintaining discipline as

we grow.

Achieving this transformation at pace also depends

on effective policy and the right regulatory

frameworks. Strategic planning, efficient permitting

and fair cost allocation are essential. Rate impacts

perceived as unfair, or new loads that compromise

reliability, cannot be the outcome of this growth

cycle. We work closely with our regulators, who

challenge our thinking and help ensure we deliver

for customers. We are working towards a shared

objective: networks that are affordable, resilient

and support economic growth.

Delivering new infrastructure also means earning the

trust of the communities that host it. These are

long‑lived assets that create lasting national and local

benefits, but we are candid that construction and

maintenance can bring disruption and visual impact.

Engagement therefore matters as much as

engineering. We are raising our ambition by being

clearer about the benefits projects bring, innovating

to reduce impacts wherever possible, enhancing the

natural environment and ensuring communities share

in the value created, including through skills

development, apprenticeships and local employment.

Our people sit at the heart of this effort. Each year,

we bring hundreds of new colleagues into National

Grid. For many, this is not just a job, but the start

of a long‑term career. The next generation of

colleagues will operate networks that are more

flexible and intelligent than ever before. Data,

sensors, automation, advanced system design and

digital tools, including artificial intelligence, are

already changing how we plan, operate and deliver

work. These technologies help us unlock capacity

from existing networks, connect customers faster

and improve decision‑making, while maintaining

the safety and reliability on which our

reputation depends.

![Resp_Business_Intro BG v6.jpg]()

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 11 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Chief Executive’s review cont. |  |  |  |  |  |

#### “I am deeply grateful for the opportunity to lead National Grid through a period of profound

change. The networks we plan, build and operate today will serve customers for decades.”

In 2025/26, we increased capital investment by more

than 20% to £11.6 billion, driving asset growth of

10.9%. Higher operating profit, combined with lower

financing costs, increased underlying operating profit

to £5.7 billion, delivering 8% growth in underlying

earnings per share at constant currency, in line with

our guidance. And we grew our dividend by 3.8%, in

line CPIH inflation.

These results give me confidence in the quality of

our assets and the strength of the business. The

professionalism and dedication of my colleagues

make all of this possible, and I thank them for

another year of keeping energy flowing safely

and reliably.

I also want to thank our shareholders. In my first

months as Chief Executive, I have met with many

of you and listened carefully to your perspectives.

I have taken that guidance seriously, and I hope

you will see it reflected in this report and in the way

we are positioning National Grid for the future.

|  |  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |  |
|  |  |  |  |  |  |  |
|  | Five-year financial framework  2026/27 – 2030/31  announced 2 March 2026 | | | | |  |
|  |  |  |  |  |  |  |
|  |  |  |  |  |  |  |
|  | Capital investment |  |  |  |  |  |
|  |  |  | at least  £70bn  to meet decarbonisation and energy security  goals and accelerating demand growth from  data centres and industrial electrification | | | |
|  |  |  |  |  |  |  |
|  |  |  |  |  |  |  |
|  |  |  |  |  |  |  |
|  | Group asset growth |  | Underlying EPS | | |  |
|  | c.10%  CAGR  1 |  | 8-10%  CAGR  2 | | |  |
| – |  | – |  | | | – |
|  | 1. Group asset compound annual growth rate from a 2025/26 baseline. Forward years based on assumed USD FX rate of  $1.35:£1 and long run UK CPIH and US CPI assumptions.  2. EPS compound annual growth rate from a 2025/26 baseline. Forward years based on assumed USD FX rate of  $1.35:£1, long run UK CPIH, US CPI and interest rate assumptions and scrip uptake of 25%. | | | | |  |

![]()

![20340965114934]()

|  |  |  |  |  |
| --- | --- | --- | --- | --- |
|  |  |  |  |  |
|  | UK ET | | | c.£31bn |
|  | UK ED | | | c.£9bn |
|  | New York | | | c.£17bn |
|  | New England | | | c.£12bn |
|  | NGV | | | c.£1bn |

I am deeply grateful for the opportunity to lead

![]()

National Grid through a period of profound change.

![]()

The networks we plan, build and operate today will

serve customers for decades. The choices we

![]()

make now, on sequencing, design, capital

discipline and system architecture, will shape

![]()

investment, resilience and economic growth for

![]()

a generation.

Energy will power the next economy. Networks will

carry it.

Our task is to build those networks safely,

efficiently and at the pace required, so that energy

can unlock the growth, innovation and resilience on

which modern economies depend.

#### Zoë Yujnovich

Chief Executive

13 May 2026

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 12 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Our business model |  |  |  |  |  |

Delivering today,

We operate and invest in regulated infrastructure

that supports economic growth while delivering

resilient returns for shareholders and benefits for

the communities we serve.

#### building for tomorrow

|  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |
| We deploy our resources effectively… | | | | | | | | | | | | | | | | | |  |
|  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |
|  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |
|  | Physical  assets | |  |  |  | Efficient  financial capital | |  |  |  | Strategic and  responsible leadership | | |  |  | Expert  colleagues | |  |
|  | Our network assets are critical infrastructure.  They are large and built to last. We  continuously invest to maintain and upgrade  them to ensure safe and reliable service,  integrate new sources of energy, and meet  new demand. | |  |  |  | We fund our business through a combination  of equity and debt. We maintain an  appropriate mix of the two and manage  financial risks prudently, committing to a  strong overall investment grade credit rating. | |  |  |  | Our strategy positions our business to  support growth, long-term economic  benefits, and a cleaner future in the places  we operate. We have well-established  governance structures and controls in place  to manage risk. | |  |  |  | We are immensely proud of our people.  Together we have spent decades installing  and managing critical networks and systems,  forging relationships, and building a culture of  ambitious, diligent and passionate service. | |  |
|  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |
|  |  | Read more on page [18](#i2193c7e7fbee4753bdbe2d16888565c8_5161) |  |  |  |  | Read more on page [69](#i2193c7e7fbee4753bdbe2d16888565c8_127) |  |  |  |  | Read more on page [8](#i2193c7e7fbee4753bdbe2d16888565c8_17592186051706) |  |  |  |  | Read more on page [47](#i70b5ee7f594547dc9723654471a95a7c_89103) |  |
|  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |

|  |  |  |  |  |  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |  |  |  |  |  |
|  | …and nurture our partner relationships… | | | | | | | | | |
|  | With our customers , including the electricity  generators that own the energy that flows  through our networks. | |  | With our contractors who have complementary  skills, experience and resources to help us get  the job done. |  |  |  | With national and regional governments and  local communities  who support us to deliver  infrastructure that meets their needs. |  | With the regulators and agencies  that agree  the prices we can charge and the amounts we  can invest, as well as the health, safety and  environment standards we must meet. |

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 13 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Our business model cont. |  |  |  |  |  |

…

#### to shape

#### the future of energy systems…

|  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |
|  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |
|  | Generation and storage  In the US, we own and operate fossil  fuel electricity generation facilities on  Long Island. We also operate modern  solar and battery storage projects  with NextEra Energy Resources on  Long Island. |  |  |  | Integrating cleaner energy  Renewables and zero carbon sources  play a critical and fast-growing role in  our energy systems. Facilitating  connections to a wide range of clean  energy sources – including large-scale  generation to local, customer-led  generation and storage – is a  fundamental part of our work. We earn  a regulated return on the assets we  build when extending our network to  connect new energy sources. |  |  |  | Interconnectors  Interconnectors are high-voltage  cables used to connect the electricity  systems of neighbouring countries to  allow the trading of excess energy and  balance supply and demand to  maintain security of supply. We  operate six interconnectors linking the  UK to France, Belgium, Norway, the  Netherlands and Denmark. We sell  capacity on our interconnectors to  facilitate cross-border flow. |  |  |  | Transmission  Our transmission networks transport  energy over long distances, safely and  efficiently from where it is produced to  distribution networks. We facilitate the  connection of energy generation  assets and large loads to our  transmission systems and we charge  generators and distributors for putting  energy through our networks, based  on prices set by regulators. |  |  |  | Distribution and supply  In the UK and US, we deliver  electricity. In the US, we also deliver  gas and act as a supplier. Our  distribution networks take high-voltage  electricity and high-pressure gas from  the transmission networks, and deliver  it at lower voltages and reduced  pressures to homes and businesses.  They also enable two-way flows as  customers generate, store and export  electricity locally. Through our UK  Electricity Distribution System  Operator (DSO) we ensure that supply  and demand are coordinated and that  local generation, storage and flexibility  can be used to support the network. |  |

![]()

#### Sources of energy

![]()

#### Networks and infrastructure

![]()

#### Delivering for customers

#### …to create lasting value and deliver positive outcomes for our stakeholders.

|  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |
| Customers  Delivery of safe and reliable  energy to customers in the  communities we serve and  provision of essential assets that  connect energy generators to our  transmission networks. |  |  | Investors  A low-risk and dependable  investment proposition, focused  on generating shareholder value  through dividends and asset  growth. |  |  | Colleagues  An inclusive and safe environment  where colleagues can develop  their skills and careers to reach  their full potential. |  |  | Supply chain and  delivery partners  Responsible and efficient supply  and delivery chains with aligned  interests. |  |  | Communities  Creation of jobs, skills and  employability pathways, alongside  charitable community work and  the long-term benefits of reliable  supply through infrastructure  investment. |  |  | Political and regulatory  Trusted relationships at national  and regional levels to ensure  alignment and delivery of our  shared energy, growth and  environmental objectives. |
|  |  |  |  |  |  |  |  |  |  |
| 99.9% |  |  | 78.0p |  |  | 33,017 |  |  | c.£8bn |  |  | 52,620 |  |  | £9,834m |
| Network reliability  2024/25: 99.9% |  |  | Underlying EPS  2024/25: 73.3p |  |  | Employees  2024/25:  31,645 |  |  | Electricity Transmission  Partnership launched in UK |  |  | Colleague volunteering hours  292,611 hours since 2021 |  |  | Green capital expenditure1  2024/25: £7,667m |
|  |  |  |  |  |  |  |  |  |  |

1. See definition on page [26](#i2193c7e7fbee4753bdbe2d16888565c8_49).

|  |  |
| --- | --- |
|  |  |
|  | Read more on our Principal Risks on page [31](#i51fd979336404373b4e2f7eb6ab80680_18307) — [36](#i5b716aa667c3427e93e3ed5359a2f216_69378) |

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 14 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Our business environment |  |  |  |  |  |

Our business environment is being shaped by rising electricity demand, an evolving supply mix, and major

reforms which are changing how energy systems are planned, built and operated. Against a backdrop of

geopolitical uncertainty and rapid technological change, we are delivering the adaptive and reliable

infrastructure needed to support economic growth for customers and communities.

![Energy supply.jpg]()

|  |  |  |  |
| --- | --- | --- | --- |
|  |  |  |  |
|  |  |  |  |
|  |  |  |  |
|  | Energy supply  and demand |  |  |
|  |  |  |  |
|  | Shifts in energy supply and  demand are accelerating the need  for larger and smarter electricity  and gas networks. This is driven by  low-carbon generation, storage,  electric vehicles, electrification of  heating and industry, and  increasingly from data centres to  power AI. This is creating new  opportunities and reshaping where  and how capacity is needed. | |  |

#### Impact on our industry

– New generation continues to shift towards low-

carbon sources. In 2025, renewables generated

a record 52.5% of UK electricity and accounted

for nearly 88% of new generation capacity in the

US. The UK’s Contracts for Difference auction in

early 2026 secured 8.4GW of future offshore

wind capacity.

– Natural gas is expected to remain a key part of

the energy mix in the UK and US, playing a

critical role in managing renewable intermittency

and peak demand, as well as home heating.

– Electricity demand continues to rise in the UK

and US, driven by electrification of transport and

heat, and more recently, by the rapid growth in

data centres and advanced manufacturing.

These trends are reshaping long‑term network

planning and connection requirements.

– Battery storage capacity and other flexible

assets are reaching commercial scale, becoming

increasingly important for system balancing and

to avoid excess power going unused.

#### How we are responding

– National Grid is expanding and upgrading its

networks to keep pace with rising demand and

the shift to cleaner generation. In 2025/26, we

connected 1.8GW of new capacity across our

electricity networks.

– We are increasing the capacity of our electricity

and gas networks where demand is growing

fastest. In the UK, we are constructing a new

substation at Uxbridge Moor which is expected

to connect more than a dozen new data centres

to the grid from 2029.

– We are enabling our customers to connect and

operate flexible assets including solar, storage

and other technologies. In New England, we are

piloting new technology to help customer assets

come online faster and adjust output at times of

grid stress.

![Techno pp14.jpg]()

|  |  |  |  |
| --- | --- | --- | --- |
|  |  |  |  |
|  |  |  |  |
|  |  |  |  |
|  | Technology  and innovation |  |  |
|  |  |  |  |
|  | Technology and innovation are  unlocking new ways to plan, build,  operate and maintain our  networks. They are transforming  the customer experience with  smart meters, flexible services and  better billing. AI is reshaping every  aspect of our business,  accelerating our ability to plan,  respond and deliver across our  electricity and gas networks. | |  |

#### Impact on our industry

– AI is creating opportunities to improve

operational efficiency across the value chain,

through enhanced grid intelligence, predictive

and autonomous maintenance, and customer

service. Across our operating areas, AI adoption

continues to accelerate, with increasing agentic

and autonomous applications.

– Grid-enhancing technologies, such as smart

sensors, are unlocking capacity on the existing

network by allowing optimisation of how much

electricity can be safely carried on power lines at

any moment.

– Customer-facing digital platforms are enabling

customers to manage their energy, lower bills

and track real-time outages. Utility companies

are responding with better apps and smart

software.

#### How we are responding

– We are upgrading and operating our

infrastructure with state-of-the-art technology

including dynamic line rating, digital twins and

drones. These technologies are transforming

how we plan and operate the network, easing

constraints and supporting faster connections.

– In the UK, we have installed dynamic line rating

technology on more than 600 km of electricity

transmission infrastructure, which has saved

£21m in constraint costs over the last five years.

– We are leveraging AI technology across our

businesses. Our collaborations with Emerald.AI

and GridCARE are helping to unlock additional

grid capacity and supporting our large load

customers, including data centres, to connect

faster. Our partnership with Rhizome helps us

identify and prevent wildfire risks across our

networks in the US and UK.

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 15 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Our business environment cont. |  |  |  |  |  |

![Global pp15.jpg]()

|  |  |  |  |
| --- | --- | --- | --- |
|  |  |  |  |
|  |  |  |  |
|  |  |  |  |
|  | Global  uncertainty |  |  |
|  |  |  |  |
|  | Economic and political uncertainty  continues to impact energy supply  around the world, making it more  important to focus on resilience  and security. | |  |

#### Impact on our industry

– Global conflicts are increasing uncertainty across

the energy landscape and countries are

refocusing on domestic energy security.

– Oil and gas markets remain volatile, as the UK

and Europe phase out Russian gas imports and

supply from the Middle East becomes

unpredictable.

– Trade disputes are increasingly unpredictable

with new tariffs impacting global trade and

supply chains and creating challenges for major

energy infrastructure projects.

– Transmission and distribution systems are under

pressure from physical and cyber security

threats.

#### How we are responding

– We remain focused on delivering resilient and

secure infrastructure – helping to reduce the risk

of disruption for the communities we serve.

– We participate in key working groups including

the Energy Networks Association in the UK and

the Edison Electric Institute and American Gas

Association in the US, to advocate for policies

that deliver a smooth energy transition.

– We are building resilience in our supply chains.

In the UK, our new supply chain partnership

model is propelling a c.£8 billion programme of

substation upgrades by providing exclusive long-

term contracts to regional suppliers.

– We are supporting the Northeast Supply

Enhancement (NESE) project to expand natural

gas capacity in Downstate New York,

strengthening energy reliability and supporting

economic growth for homes and businesses.

– We build resilience against the increase in

physical and cyber threats into our networks and

operations.

![Affordability NEW pp15.jpg]()

|  |  |  |  |
| --- | --- | --- | --- |
|  |  |  |  |
|  |  |  |  |
|  |  |  |  |
|  | Affordability  and reliability |  |  |
|  |  |  |  |
|  | Affordability and reliability are  shaping customer and regulator  expectations of energy networks.  Households feel pressure from  persistently higher bills, while  business and industry navigate  increasing costs which impact  growth. Meanwhile, regulators are  strengthening their focus on  resilience and reliability of supply  as electricity demand grows,  extreme weather events intensify,  and systems become more  dependent on variable renewables. | |  |

![]()

#### Impact on our industry

– Customers are facing sustained pressure from

higher energy costs and inflation across many

consumer goods. Affordability remains at the

forefront of public expectations and policy debates.

– Grid reliability faces a dual challenge of ageing

infrastructure which requires accelerated

replacement while simultaneously absorbing

rapid growth in intermittent generation, large

demand loads, and flexible assets. The scale of

investment required to maintain and expand the

network is increasing, and customers expect

services that can withstand extreme weather

and rising peak demand.

#### How we are responding

– Since 2023, NGV’s subsea interconnectors have

saved UK customers more than £1.65 billion by

importing electricity from Europe, compared to

generating the same power from gas in the UK.

– In Upstate New York, we are offering $290

million in bill discounts and energy efficiency

improvements for income-eligible electric

customers. In New England, we provide eligible

low-income customers up to 70% off their bills.

– Our UK transmission network had a reliability

rate of 99.99999%. Since 2024, we have

replaced or refurbished over 1,000 assets

including transformers, switchgear and cables.

– On Long Island, New York, we provide reliable,

affordable electricity and critical support to the

tightening electric system. National Grid

Generation (operated by NGV) owns and

operates 3.8GW of power generation – about

65% of the island's total generating capacity.

– We prevented over 19 million minutes of

customer outages in Massachusetts and

13.5 million minutes in Upstate New York by

deploying fault location, isolation and service

restoration technology on our networks.

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 16 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Performance against our strategic priorities |  |  |  |  |  |

![]()

#### We have been guided by five strategicpriorities in 2025/26

|  |  |
| --- | --- |
|  |  |
|  | See our key performance indicators on page [26](#i2193c7e7fbee4753bdbe2d16888565c8_49) — [29](#i524ed5352691497d9607a830fda9ea68_14922) |
|  | See our business units on page [18](#i2193c7e7fbee4753bdbe2d16888565c8_5161) — [22](#i832cdf411ee540298e53c648eaa4e669_1-1-1-2-942406) |

|  |  |  |
| --- | --- | --- |
|  |  |  |
| Business environment links | |  |
|  | Energy supply and demand |  |
|  | Technology and innovation |  |
|  | Global uncertainty |  |
|  | Affordability and reliability |  |

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
|  |  |  |  |  |  |
|  |  |  |  |  |  |
|  | Enable the  energy transition | | | |  |
|  |  |  |  |  |  |
|  | Our networks play an important role in the energy transition.  We work with policymakers, regulators and the wider industry  to shape policy and regulatory frameworks needed to reach  shared energy objectives. | | | |  |
|  |  |  |  |  |  |
|  |  |  |  |  |  |
|  | 1.8GW  of new energised capacity  connected across our power  networks in 2025/26 | | Business environment: | |  |
|  |  |  |  |
|  |  |  |  |
|  | KPIs  – Green capital expenditure  – Climate change  – Scope 1, 2 and 3 emissions | |  |
|  |  |  |  |  |  |
|  |  |  |  |  |  |
|  | 2025/26 achievements  – We connected 1.1GW of energised renewable capacity to  our networks across the UK and US.  – In UK ET, we accepted Ofgem’s RIIO‑T3 Final  Determination, locking in a 2026–31 framework that enables  major expansion of our network and supports plans to  nearly double capacity. The T3 contract incentivises timely  completion of strategic projects and innovation.  – In UK ED, we responded to Ofgem's ED3 Sector Specific  Methodology Consultation, highlighting that transforming the  UK’s energy system will require investment at an  unprecedented scale, supported by a regulatory framework  that enables economic growth, decarbonisation and strong  customer outcomes.  – In New England, we secured Massachusetts Department of  Public Utilities approval for the cost recovery of Electric  Sector Modernization Plan projects, balancing customer  affordability with the state’s clean energy objectives.  – In New York, we gained approval from our regulators for  new rates at Niagara Mohawk and our Long-Term Gas Plan,  supporting greater renewable integration and planning for  the Northeast Supply Enhancement pipeline.  – NGV announced the world’s first 100% hydrogen-fuelled  commercial linear generator at Northport power plant. | | | |  |

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
|  |  |  |  |  |  |
|  |  |  |  |  |  |
|  | Build the networks  of the future now | | | |  |
|  |  |  |  |  |  |
|  | We are scaling a once-in-a-generation increase in network  capacity to connect and transport electricity. We are  modernising our electricity networks to improve capacity,  visibility, security and reliability, and drive economic growth.  We will ensure the safety and reliability of our gas networks. | | | |  |
|  |  |  |  |  |  |
|  |  |  |  |  |  |
|  | at least £70bn  cumulative capital investment  over our five-year financial  framework to 2030/31 | | Business environment: | |  |
|  |  |  |  |
|  |  |  |  |
|  | KPIs  – Group capital investment  – Asset growth | |  |
|  |  |  |  |  |  |
|  |  |  |  |  |  |
|  | 2025/26 achievements  – In UK ET, we advanced major construction activity across  our portfolio, progressing delivery of the transmission  infrastructure required to connect new generation capacity  at pace.  – In UK ED, we added 250MVA of capacity to our distribution  network and are on track to deliver an increase in capital  investment of over £100 million versus prior year.  – In New England, we established strategic contractor  partnerships to accelerate timelines, reduce risk, and lower  costs across more than $3 billion of planned capital work  over the next five years.  – In the US, we have cumulatively installed over 2 million smart  meters – covering 68% of customers in Upstate New York  and 35% of customers in New England.  – NGV is developing projects in the UK and US which will  contribute to future capital investment. In the UK, NGV  recently gained agreement on a regulatory framework for its  LionLink hybrid interconnector project, which is planned to  be delivered in partnership with TenneT. In the US, in  conjunction with partners NY Transco and NY Power  Authority, NGV are engaged with communities to gain  support for NY Propel, a high-voltage enhancement to New  York's electricity grid. | | | |  |

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 17 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Performance against our strategic priorities cont. |  |  |  |  |  |

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
|  |  |  |  |  |  |
|  |  |  |  |  |  |
|  | Deliver for  customers | | | |  |
|  |  |  |  |  |  |
|  | We aspire to provide excellent service to all our customers,  ensuring they can connect to the network in a timely fashion,  that their energy provision is reliable, and that we are easy to  do business with. | | | |  |
|  |  |  |  |  |  |
|  |  |  |  |  |  |
|  | 99.9%  reliability across  our UK and US  electricity networks | | Business environment: | |  |
|  |  |  |  |
|  |  |  |  |
|  | KPIs  – Network reliability  – Customer satisfaction | |  |
|  |  |  |  |  |  |
|  |  |  |  |  |  |
|  | 2025/26 achievements  – Our UK and US networks maintained a high level of service  reliability. Our UK transmission network had just one loss of  supply event, the lowest number in ten years.  – In UK ED, we are connecting new sources of renewable  low-carbon generation to our network, increasing the total  amount across our region to over 14GW. Our Vulnerability  Strategy has supported over 21,000 customers to save  £22m on their bills in 2024/25.  – In UK ET, we drove Connections Reform with NESO,  establishing a new delivery pipeline and prioritisation  framework intended to speed up connections and to enable  more efficient delivery of the transmission capacity required  for Clean Power 2030.  – In the UK, we modernised our contact centre by deploying  Amazon Connect, improving service speed and  management of service restoration after unplanned outages.  – Across New York and New England, we replaced 315 miles  of leak prone gas pipe.  – In the US, we expanded access to emergency bill  assistance, home weatherisation and energy usage  education by partnering with more than 10 local  organisations in New York and Massachusetts. | | | |  |

![]()

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
|  |  |  |  |  |  |
|  |  |  |  |  |  |
|  | Operate safely  and efficiently | | | |  |
|  |  |  |  |  |  |
|  | To deliver our part in a changing energy system, we are  transforming our internal processes, strengthening our  customer focus and sharpening our commercial edge. We are  investing in the capabilities we will need in the future and our  ability to operate safely remains our top priority. | | | |  |
|  |  |  |  |  |  |
|  |  |  |  |  |  |
|  | 0.11  lost time injury  frequency rate  LTIFR) | | Business environment: | |  |
|  |  |  |  |
|  |  |  |  |
|  | KPIs  – Group LTIFR  – Underlying EPS  – Group RoE | |  |
|  |  |  |  |  |  |
|  |  |  |  |  |  |
|  | 2025/26 achievements  – In UK ET, we improved operational efficiency by  modernising how the network is controlled, including  upgrades to our transmission control centre, alongside  innovations including drones, use of AI, and dynamic line  rating, the latter of which has saved £21m in constraint  costs over the last five years.  – During Storm Goretti, our UK ED business dealt with over  1,300 incidents and restored approximately 246,000  customers across the region. We also made over 97,000  proactive calls to the Priority Service Register (PSR).  – Our New York and New England gas systems performed  well during the extended winter storm season, keeping our  customers warm during heavy snow and hurricane-force  winds. Our power restoration efforts were recognised with  Edison Electric Institute (EEI) Emergency Response Awards.  – In NGV, our UK interconnectors delivered 90% availability  across the fleet (up from 86% in 2024/25) and provide a  total import capacity of 7.8GW.  – Our LTIFR stood at 0.11, compared with 0.10 in 2024/25  and against our Group target of 0.10. In response, we have  implemented targeted Group and business unit initiatives to  strengthen risk awareness, leadership engagement and  control effectiveness. | | | |  |

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
|  |  |  |  |  |  |
|  |  |  |  |  |  |
|  | Build tomorrow’s  workforce today | | | |  |
|  |  |  |  |  |  |
|  | Delivering on our ambitions requires one big team. We're  developing and recruiting for the skills and roles we need so  we can build tomorrow's workforce today. From apprentices  to leaders, we're creating the place to develop a career that  positively impacts energy infrastructure and the planet. | | | |  |
|  |  |  |  |  |  |
|  |  |  |  |  |  |
|  | 703  graduates, apprentices  and interns welcomed  in the UK and US | | Business environment: | |  |
|  |  |  |  |
|  |  |  |  |
|  | KPIs  – Employee engagement index | |  |
|  |  |  |  |  |  |
|  |  |  |  |  |  |
|  | 2025/26 achievements  – Across the UK and US, we welcomed 3,790 new employees  during the year.  – All new starters receive training on our mission, values and  standards, supported by role-appropriate technical and  leadership development.  – Over half of vacancies continue to be filled through internal  moves and promotions, reflecting our strong focus on  developing and retaining talent.  – In response to the scale and complexity of our capital  program, we are working with the University of Oxford  and the Saïd Business School to strengthen project  management capability, improve delivery at scale and  reduce risk across our major infrastructure programmes.  – Employee feedback matters and all permanent staff are  invited annually to share their views on working at National  Grid. Our employee engagement score remains strong  at 81%. | | | |  |

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 18 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Our business units |  |  |  |  |  |

![Business_Units_UK_ET_NEW.jpg]()

|  |  |  |  |
| --- | --- | --- | --- |
|  |  |  |  |
|  | UK |  |  |
|  | UK Electricity  Transmission | |  |
|  |  |  |  |
|  | Highlights |  |  |
|  | – Agreed the RIIO T3 price control, securing the regulatory  framework for April 2026–March 2031 and enabling up to  £31bn of capital investment.  – Delivered 2025/26 financial results in line or ahead of  expectations, with underlying operating profit up 18% year  on year and capital investment up 46%.  – Started construction of three new or significantly expanded  substations, including Uxbridge Moor, which is supporting  multiple data centre connections and is expected to be the  largest capacity substation in the UK.  – Launched the Electricity Transmission Partnership (ETP) to  strengthen supply chain relationships, capacity and  productivity, with c.£1.7bn already allocated to partners  under the framework. | |  |
|  |  |  |  |
|  |  |  |  |
|  | Looking ahead |  |  |
|  | – Make submissions to Ofgem across the various stages of  the reopeners process for up to £14bn of additional funding  to deliver new connections and system reinforcements.  – Work closely with customers and industry partners to deliver  Connections Reform.  – Connect up to 35 GW of generation and 19 GVA of demand  through RIIO T3, supporting economic growth and  decarbonisation.  – Deliver the ASTI portfolio, enabling power flows from 50GW  of offshore wind across our network.  – Go live with our next generation Electricity Control Centre  and SCADA system. | |  |

#### Investment

![]()

Over the course of 2025/26, we have delivered £4.37bn of capital

investment. We are working to deliver up to £31bn capital investment

in our RIIO-T3 investment plan, acting as an engine for growth and

powering the country through the shift to a cleaner economy.

The volume of investment planned over RIIO-T3 will stretch our

supply chain, with transmission owners around the world upgrading

their grids. In July, we launched our Electricity Transmission

Partnership (ETP) to help power Britain’s clean energy future. This is

designed to unlock long‑term supply chain capacity and skills across

England and Wales. The ETP remodels how we engage with

suppliers, moving to a longer-term collaborative approach that builds

strong regional partnerships and rewards partners for high-quality

performance over time. It will accelerate the delivery of vital

substation infrastructure across England and Wales and support the

UK’s clean energy transition, with c.£8bn of substation construction

work to be awarded over the RIIO-T3 period across c.130 projects.

Work on our Accelerated Strategic Transmission Investment (ASTI)

projects continues at pace and the primary supply chain is now in

place for all 17 ASTI projects. We have made good progress on the

six ASTI projects where construction commenced in 2024/25. Our

ASTI portfolio is crucial to a lower carbon energy future and we are

working to minimise the carbon emissions from construction while

balancing that with the cost to the customer and delivery at speed.

We now model future emissions so that we can take action to reduce

our impact on the environment without delaying programmes.

#### Innovation

We are building a brand new, state-of-the art control centre to

manage the transmission network of tomorrow. This will reinforce

network resilience, uphold our world-class reliability standards and

power the clean energy transition. The control centre will use our new

SCADA (Supervisory Control and Data Acquisition) system, expected

to go-live in June 2027, providing real-time visibility and control of our

assets and allowing us to respond quickly to changing network

conditions and customer needs.

We are systematically testing new technologies and ways of working.

Over the course of 2025/26, we have worked with Hyperion Robotics

and the University of Sheffield on a UK‑first trial of low‑carbon

3D‑printed concrete substation foundations. If deployed across all

substations, this technology could save over 700 tons of concrete

and over 300 tons of CO₂ over ten years. In addition, we energised

over 300 km of Dynamic Line Rating (DLR) technology in 2025/26

and installed a further 300 km to enable the flow of more renewable

generation. Digital (weather-based) and sensor-based DLR has saved

consumers over £23.4m over the year and £230m over RIIO-T2. We

plan to install a further 260 km of DLR in 2026/27.

#### Customers

We are connecting new energy users as well as new sources of

renewable and flexible power to deliver secure, reliable and

increasingly decarbonised energy. Over the course of 2025/26, we

connected Britain’s largest solar array in Kent and the nation’s

biggest battery energy storage system at Tilbury substation.

We have long advocated for reform as critical to achieving the UK

Government’s Clean Power 2030 ambition. However, there are key

dependencies outside ET’s direct control. This year Ofgem has

approved proposals from the National Energy System Operator

(NESO) to reform Britain’s connection arrangements and prioritise the

energy projects that are most ready and most needed to meet the

country’s clean power targets. In addition, NESO has now published

the new connections pipeline, including details of the strategic

alignment of generation technologies to the UK Government’s Clean

Power 2030 capacity targets. We continue to work closely with

NESO to support the implementation of Connections Reform and are

now taking major steps towards having a better view of the future

needs of the transmission network.

#### Reliability and safety

The reliability of our network remains world-class. Network reliability was

99.99999%, with just one Energy Not Supplied event, the lowest number

in ten years. This is underpinned by delivery of asset health interventions

and maintenance compliance. Our new Enterprise Asset Management

(EAM) platform will support the transformation of our asset management

capabilities and management of an intelligent network with granular asset

data and a shared view of risk and total cost of ownership.

As we grow, maintaining a strong safety culture and ensuring

everyone is competent and confident in their roles is essential. We

narrowly missed our LTIFR target (0.11 vs a 0.10 target) but have

worked with our supply chain to enable growth and delivery while

embedding safety compliance, best practice and innovation.

#### People

Delivery of the energy network of tomorrow will require a significant

expansion of our workforce. We’ve made great progress in attracting

new talent. Our permanent headcount is now 4,718, with 712

experienced hires and 261 graduates and trainees joining over the

year. We’re investing in the future and expanding our training and

authorisation programmes. This year we have created new pathways

for colleagues to build critical skills, gain the right authorisations, and

take on work that matches their experience.

|  |  |
| --- | --- |
|  |  |
|  | Read more about our business units on page [220](#i2193c7e7fbee4753bdbe2d16888565c8_385) |

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 19 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Our business units cont. |  |  |  |  |  |

![ResponsibleBus_UK_ED 7May.jpg]()

|  |  |  |  |
| --- | --- | --- | --- |
|  |  |  |  |
|  | UK |  |  |
|  | UK Electricity  Distribution | |  |
|  |  |  |  |
|  | Highlights |  |  |
|  | – Maintained high Broad Measure Customer Satisfaction  score of 9/10.  – Our Vulnerability Strategy has supported over 21,000  customers to save £22m on their bills in 2025, and our  Winter Campaign drove a 71% increase on Priority  Services Register impact.  – Increased the total amount of generation connected to  our network to over 14GW.  – Enabled 120,000 low-carbon technology (LCT)  connections, including a 30% increase in EV chargers.  – Delivered a material increase in our Distribution System  Operator’s (DSO) flexibility market offerings – registering  309,514 of flexibility assets and securing 3,064MW of  flexibility capacity available to dispatch.  – The EQUINOX trial, one of the UK's largest domestic  heat pump flexibility programme, delivered 8,000+ heat  pumps into business-as-usual flexibility markets  alongside Octopus Energy and Scottish Power. | |  |
|  |  |  |  |
|  |  |  |  |
|  | Looking ahead |  |  |
|  | We remain focused on developing a strong, region-led ED3  business plan for the period out to 2033 that delivers for  customers, supports growth, and enables the region’s net  zero transition in an efficient and affordable way. We will  continue our engagement with customers, communities  and stakeholders as we refine our proposals, ahead of  submitting our final ED3 business plan to Ofgem in  December 2026. | |  |

#### Investment

![]()

Every day, we work to provide safe, reliable electricity, connect

customers to the energy they need, and create the network capacity

required for a cleaner, more flexible energy system in an evolving

climate and market.

In 2025/26, we remained focused on investing at pace to expand

capacity and enable the region’s growth and net zero ambitions. We

delivered record capital investment, up 13% year-on-year. We are

connecting new sources of renewable low-carbon generation to our

network, increasing the total amount across our region to over 14GW

and increased capacity in our secondary network by 250MVA (a 39%

increase on the previous year). We also continued to shape the

evolving regulatory framework, responding to Ofgem’s ED3 Sector

Specific Methodology Consultation and submitting Early Proposals

that emphasised the need for focusing on customers’ needs and the

role of the DSO as we deliver unprecedented investment levels to

support the UK’s clean power transition. We are pleased that seven

of these early proposals have been taken forward by Ofgem.

#### Innovation

Innovation is at the heart of our strategy to deliver greater value to

customers. Through initiatives such as the deployment of monitors

across the low-voltage network, we are enhancing network

management and swiftly locating faults. Our adoption of AI

technologies is specifically targeted at improving customer

experiences, with predictive analytics forecasting scores for customer

service, automated curtailment reporting that will streamline project

lifecycles, and an AI-powered chatbot making data on our public data

portal more accessible and understandable. Our use of AI is also

supporting improvements in our DSO, ensuring the final outputs

better meet customer expectations, which include visibility and

access to our flexibility markets and products that have grown

significantly this year. These advancements collectively demonstrate

our ongoing commitment to utilising innovation to unlock customer

benefit.

#### Customers

UKED plays a vital role in keeping over 8 million homes and

businesses powered and supporting the region’s growth. In 2025/26,

we placed a strong emphasis on enhancing customer service and

engagement. We achieved a Broad Measure Customer Satisfaction

score of 9/10, thanks in part to the modernisation of our contact

centre through the roll-out of Amazon Connect and the complete

digitisation of agent knowledge with a new knowledge management

platform. We also improved customer journeys for unplanned

outages and connections, making it simpler for customers to access

information and support whenever they need it.

During the year, we responded proactively to a number of severe

weather events, mobilising teams to restore supplies safely and

keeping customers informed throughout. Notably, we acted quickly

during Storm Goretti, one of the worst storms on record to

specifically hit the South West. The South West saw winds of over

90mph, the biggest storm in the region for two decades. We

recorded over 1,300 incidents related to Goretti, with approximately

246,000 customers impacted; impressively, 73% had their supply

restored within 24 hours.

Our commitment to customer engagement extended beyond

immediate service improvements. Ahead of ED3, we launched our

BIG Conversation initiative, engaging directly with customers and

stakeholders, and established our Independent Stakeholder Group to

ensure our business plan is customer led and reflects regional

priorities. Furthermore, our largest ever winter campaign achieved

record engagement, driving a 71% increase on Priority Services

Register impact and in 2025, we earned the accolade of Campaign

of the Year at the Energy Awards 2025.

#### Reliability and safety

Maintaining a safe, resilient and reliable network remains central to

our 2025/26 performance. We delivered network reliability of

99.98795%. We strengthened our safety culture and learning,

training operational leaders and safety professionals in incident

investigation and root cause analysis to enhance the quality of

investigations and the actions that follow. We also made progress on

safety performance, with our LTIFR decreasing year-on-year as we

continue to work towards our strong safety target of less than 0.10.

#### People

We continued to invest in our workforce, building the capability and

capacity needed to deliver a safe, reliable and growing regional

network. We strengthened our teams through targeted recruitment

and development, supporting colleagues to build the skills required

for an increasingly complex energy system and the delivery of our

ambitious investment programme.

|  |  |
| --- | --- |
|  |  |
|  | Read more about our business units on page [220](#i2193c7e7fbee4753bdbe2d16888565c8_385) |

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 20 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Our business units cont. |  |  |  |  |  |

![ResponsibleBus_US_NY 7May.jpg]()

|  |  |  |  |
| --- | --- | --- | --- |
|  |  |  |  |
|  | US |  |  |
|  | New York | |  |
|  |  |  |  |
|  | Highlights |  |  |
|  | – New York delivered strong performance across its 26,400  square mile service territory. We met or exceeded key reliability  targets, delivered record gas throughput during extremely cold  temperatures, and continued to invest in a smarter and more  reliable energy system for our customers.  – The Public Service Commission (PSC) unanimously approved  Niagara Mohawk’s joint proposal, establishing a three-year  electric and gas rate plan. The agreement authorises  approximately $5.5 billion in capital investment, delivers more  than $290 million in bill discounts for income eligible customers,  and strengthens Climate Leadership and Community  Protection Act (CLCPA) aligned grid modernisation and storm  resilience.  – In September, the PSC affirmed that the proposed Northeast  Supply Enhancement (NESE) project is necessary to enhance  reliability and resilience of the downstate gas system. We also  helped shape the New York State Energy Plan, which  recommended a diversified approach that expands renewables  and invests in electric and gas infrastructure. | |  |
|  |  |  |  |
|  |  | |  |
|  | Looking ahead |  |  |
|  | Our priorities are clear: delivering safe, reliable, affordable  energy to the millions of customers who depend on us every  day; raising the bar on customer satisfaction; executing our  capital programme efficiently and safely; accelerating the pace  of connecting new customers to our networks; and advancing  regulatory and policy outcomes that serve the long-term  interests of both our customers and business – all the while  maintaining disciplined investment and continuing to  modernise how we operate. | |  |

#### Investment

![]()

We delivered approximately $4.6bn in capital investment, up $440m

year-over-year, and remain on track against our $23bn five-year

capital framework. Under the approved KEDNY and KEDLI rate

plans, we replaced over 220 miles of leak prone pipe to modernise

gas infrastructure. The Upstate Upgrade progressed, with Smart Path

Connect energised, enabling large-scale renewable interconnections

and strengthening transmission resilience. Climate Leadership and

Community Protection Act (CLCPA) Phase 1 and 2 are progressing,

with major construction and material contracts awarded, ready to

support renewable growth and improved reliability for our 1.7 million

upstate customers.

#### Innovation

Innovation centred on modernising operations for our workforce. We

launched Gas Business Enablement in Downstate New York,

streamlining daily work, improving field execution, and elevating

customer interactions by embedding digital innovation across gas

operations. We successfully deployed horizontal directional drilling at

Greenpoint LNG facility using a laser guided boring machine to

complete a fully trenchless installation of foundation heating elements

beneath an active LNG tank. This approach minimised disruption,

maintained operational integrity, and enhanced long-term reliability.

In our electric business, we exceeded deployment targets for fault

location, isolation and service restoration (FLISR), reducing customer

minutes interrupted by more than 13.5 million and supporting over

290,000 customers. We reduced interconnection times for electric

vehicles and distributed energy resources (DERs) by 10% and

advanced remote sensing, including drones for data capture and light

detection and ranging (LiDAR) for vegetation management.

The gas business leveraged advanced technologies to enhance

pipeline inspection. With the use of robotic internal inspection tools,

we can assess pipelines in previously inaccessible locations, reducing

inspection costs while strengthening reliability and system integrity. In

response to recent federal rulemaking, we have also been an early

adopter of non‑destructive technologies that determine pipeline

material properties without physical sampling, conserving resources

and supporting compliance with evolving regulatory requirements.

We have made strong progress in advancing our approach to large

load growth where demand from data centres and advanced

manufacturing continues to increase. We are focused on accelerating

speed to power through a combination of interconnection process

improvements, digitising the customer connection journey, and

flexible connections.

This year we also launched the Kraken programme, a cutting-edge

customer information and relationship management platform. This

innovative step forward will transform the way we interact with and

serve all of our US customers, driving significant advances in

operational efficiency and service quality.

#### Customers

We earned three Edison Electric Institute (EEI) Emergency Response

Awards for restoration efforts following severe storms in Upstate New

York. We responded to twelve major storms, restoring service for

95% of impacted customers within 7.94 hours.

We launched an after-call survey via text message to capture real-time

customer feedback and improve digital experience. We continue to

install Advanced Metering Infrastructure (AMI), with over 1.5 million

meters now completed, reaching 67% of Upstate customers. AMI will

improve outage response, customer insights, and operational efficiency.

Our Grid for Good Initiative delivers community benefits and during

the Annual Day of Service, 1,167 volunteers served at 38 events

across New York.

#### Reliability and safety

We delivered exceptional reliability performance, achieving Customer

Average Interruption Duration Index (CAIDI) and System Average

Interruption Frequency Index (SAIFI) targets for the 18th consecutive

year, the only New York utility in the state to do so. During the

extended historic cold winter in 2026, the downstate network

recorded six of the ten highest gas throughput days in KEDLI’s

history, underscoring resilience during peak demand.

Safety performance remained a core strength. The New York Electric

team achieved zero switching errors across nearly 110,000 switching

steps. We advanced proactive safety practices through Digital Job

Briefs, improving hazard recognition and consistency in field

execution. We deployed telematics across nearly 10,000 vehicles,

giving more than 1,500 daily users improved fleet visibility and safety

performance that outpaces peers. We ended the year with an LTIFR

of 0.11.

#### People

We continued to strengthen our workforce through meaningful labour

engagement and investments in our employees and workforce

pipeline. We reached a four-year collective bargaining agreement with

members of IBEW Local 1049, a labour union, providing stability and

reinforcing our commitment to collaboration and safety. We were

awarded the Bell Seal for Workplace Mental Health, the highest level

of recognition with Platinum status from Mental Health America.

|  |  |
| --- | --- |
|  |  |
|  | Read more about our business units on page [220](#i2193c7e7fbee4753bdbe2d16888565c8_385) |

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 21 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Our business units cont. |  |  |  |  |  |

![Business_Units_US_NewEngland RET.jpg]()

|  |  |  |  |
| --- | --- | --- | --- |
|  |  |  |  |
|  | US |  |  |
|  | New England | |  |
|  |  |  |  |
|  | Highlights |  |  |
|  | – Improved customer satisfaction (CSAT) significantly while  reducing complex connections cycle time by  approximately 10%.  – Announced partnership with Kraken to replace customer  platform.  – Replaced 95 miles of leak prone pipe.  – Completed construction of the VT-NH portion of the  A1B2 project, upgrading a transmission line in service  since 1909. | |  |
|  |  |  |  |
|  |  |  |  |
|  | Looking ahead |  |  |
|  | Moving forward, our priorities remain: significantly  enhancing customer performance, obtaining regulatory and  policy results that benefit our customers, fulfilling our capital  commitments, and continuing to strengthen our safety  plans that support everything we do. | |  |

#### Investment

![]()

We invested $2.7 billion in 2025/26, $500 million more than last year,

to deliver a smarter, stronger, cleaner electric grid and to ensure the

safety and reliability of our gas system. To deliver projects in our

electric business, we stood-up strategic contractor partnerships for

transmission line, substation and distribution work that will allow us to

build long-term strategic relationships with selected suppliers. We

expanded our FLISR capability to 34% of customers, enabling self-

healing networks and avoiding over 19 million minutes of outages.

Construction was completed on the Vermont-New Hampshire portion

of the A1B2 asset condition replacement transmission project that is

upgrading a line which has been in service since 1909.

Natural gas plays an essential role in the Commonwealth’s all-of-the-

above energy strategy, providing a reliable foundation for economic

growth, helping to meet rising demand, and keeping customer bills

affordable. That energy mix requires continued investment to ensure

safety and reliability. We replaced 95 miles of leak prone pipe to

improve network safety and reduce emissions. Additionally, we

awarded the contract for the Tewksbury Vaporizer project, which will

replace ageing LNG vaporisation equipment, and are undertaking a

$283m investment to replace the South Yarmouth LNG storage tank,

both of which are essential to assure peak day reliability on the

natural gas system.

#### Innovation

We are using AI across the business. For example, we implemented

the NICE CX One platform in our contact centres and AI is now

evaluating 100% of calls and directly linking call quality to customer

satisfaction. In our electric business, we partnered with AiDASH to

use satellite imagery and AI to predict and remove vegetation threats,

reducing outages by nearly 30%.

This year we also launched the Kraken programme, a cutting-edge

customer information and relationship management platform. This

innovative step forward will transform the way we interact with and

serve all of our US customers, driving significant advances in

operational efficiency and service quality.

#### Customers

The business made significant gains in customer service and

operations: customer satisfaction (CSAT) increased significantly year

over year to 72% while after-call survey scores increased 22%, and

complex connections cycle time dropped by approximately 10% this

year, following last year’s 10% reduction. We also connected over

160MW of distributed energy resources, enabled the installation of

41MW of EV charging infrastructure, and have now installed nearly

500,000 AMI (smart meters). Our management of storms continues

to be recognised for exemplary performance, including an emergency

response award from the EEI. We continue to make day-to-day

operational improvements as we pursue breakthroughs aligned with

our broader strategy to transform the customer experience.

As part of our most recent electric rate case, we developed a first-of-

its-kind tiered income discount rate to better align bill support with

household need. We proposed a similar tiered income discount rate

rate for gas customers as part of our gas rate case, and are now

working with the Massachusetts Department of Public Utilities,

government, community agencies, and other utilities to develop a

standardised tiered low income discount programme for all

Massachusetts customers.

#### Reliability and safety

On our electric network, performance remains strong; our reliability

puts us in the 1st quartile for System Average Interruption Duration

Index (SAIDI) and the top of 2nd quartile for System Average

Interruption Frequency Index (SAIFI) when using Institute of Electrical

and Electronics Engineers national criteria. In the gas business, we

continued our high leak response performance with over 99% of

odour calls responded to within 60 minutes, compared to a statutory

target of 97%. The gas distribution system demonstrated its

importance to the region once again, performing well during a cold

and snowy winter with our LNG assets supporting over 20% of our

supply portfolio during periods of peak demand.

Safety remains fundamental to our operations. Incident rates remain

low overall, with LTIFR at 0.09 and an Occupational Safety and

Health Administration (OSHA) recordable rate of 1.64, approximately

14% below the three-year average. However, there is opportunity to

improve, and we will continue to mature high-energy awareness and

controls, bolster first-and second-line assurance, strengthen

contractor oversight and readiness, and improve learning quality.

#### People

Our Strategic Workforce Development team leverages partnerships

between community-based training providers, colleges and

universities and vocational technical schools to create and develop

short, medium, and long-term talent pipelines to fill critical roles. This

year we welcomed UMass Lowell, a Research 1 public university with

a deliberate strategy to partner with industry, to the cohort. Since

inception in 2023, approximately 150 graduates have joined our

company in critical roles, with 21 promotions in the current year.

|  |  |
| --- | --- |
|  |  |
|  | Read more about our business units on page [220](#i2193c7e7fbee4753bdbe2d16888565c8_385) |

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 22 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Our business units cont. |  |  |  |  |  |

![Business_Units_NG Ventures new v2.jpg]()

![]()

|  |  |  |  |
| --- | --- | --- | --- |
|  |  |  |  |
|  | International |  |  |
|  | National Grid  Ventures | |  |
|  |  |  |  |
|  | Highlights |  |  |
|  | – National Grid Ventures (NGV) develops, builds, and  operates energy assets and businesses in the US and  through its interconnectors business in the UK. It drives  growth for the organisation through investment in new  projects, with earnings underpinned by stable long-term  regulated frameworks and contracts.  – In 2025/26, NGV sold two of its businesses, National  Grid Renewables in the US for approximately $2.1 billion  and Grain LNG in the UK. | |  |
|  |  |  |  |
|  |  |  |  |
|  | Looking ahead |  |  |
|  | NGV looks to continue to grow its businesses on both  sides of the Atlantic. This year, NGV signed memoranda of  understanding with both TenneT Germany and EirGrid to  explore developing hybrid interconnector projects with  Germany and Ireland respectively. NGV US continues to  progress its competitive transmission strategy with more  bids anticipated to be submitted as part of its new  partnerships in the coming year. | |  |

#### Investment

![]()

In addition to its large fleet of operational assets, NGV is actively

developing projects in the high-voltage transmission markets in both

the UK and the US, which will contribute to future capital investment.

NGV operates six HVDC interconnectors with a total capacity of

7.8GW, connecting the UK to France, Belgium, the Netherlands,

Denmark, and Norway. With LionLink, an upcoming major capital

project in partnership with TenneT Netherlands, NGV is planning for

the construction of a first-of-its-kind hybrid interconnector which

would connect the UK and the Netherlands. The project reached a

major milestone this year, gaining agreement for a regulatory

framework with Ofgem.

NGV US operates 3.8GW of conventional generation assets across

its sites in Long Island, New York. In addition, NGV US owns and

operates the Providence Rhode Island LNG peak-shaving plant which

provides approximately 2 billion cubic feet of LNG storage capacity,

along with vaporisation and liquefaction capabilities. NGV US owns

part of the NYTransco joint venture, which oversees $1bn worth of

transmission assets. NGV has a growing competitive transmission

business in the US and has formed its first partnerships to bid for

transmission projects across multiple transmission markets.

#### Innovation

This year, NGV US announced it will install the world’s first 100%

hydrogen-fuelled commercial linear generator at Northport power

plant to demonstrate the capability of H2 generation with a small-

scale pilot project. NYTransco is currently progressing Propel NY, a

capital project aimed at strengthening the electric connections

between downstate and upstate New York.

In the wake of rapidly growing energy demand across the UK and

Europe, NGV partnered with RenewableUK in chairing the new

Multipurpose Interconnector (MPI) task force, which published its

report and recommendations on how to enable delivery of MPIs in

![]()

January 2026. NGV is now working with industry and regulatory

leaders to progress the recommendations made in the report.

#### Customers

This year showed a strong performance for NGV in terms of

delivering for customers. In the US, the generation business was

required to deliver significant additional capacity as a result of the

seasonal cold weather this winter. From December 2025 through

February 2026, the generation fleet produced 36% higher energy

output than the prior four-year average, including a 260% increase

from 2025 in steam generation during the cold-snap that affected the

US Northeast from 23 January to 9 February 2026.

On 2 March 2026, NGV received a final FERC Order approving the

rate case settlement for the LNG facility in Providence, RI. The rate

case allows the facility to continue to add critical capacity to the

gas system.

February 2026 marked the energisation of the Dover Station

substation in Dutchess County, New York, which was delivered by

NGV’s NYTransco joint venture. This upgrade is allowing for

increased power flows and system improvements, demonstrating the

value of modernised energy systems.

#### Reliability and safety

Availability across the interconnector portfolio was 90%, exceeding

the full-year target with a 4% improvement from 2024/25. To further

improve reliability in the future, NGV is working towards modernising

the IFA interconnector in the coming years along with resilience

initiatives spanning the entire fleet.

In the US, Providence LNG is embarking on a modernisation effort to

improve the efficiency and reliability of the plant.

NGV operates with safety always top of mind for all colleagues,

across all business areas. LTIFR was on target this year at 0.10.

Across the organisation, efforts to centre leading indicators at the

heart of safety discussions have been adopted to foster a proactive

safety culture.

#### People

To support the progress of National Grid’s growth ambitions, NGV

utilises a broad mix of talent, from business originators to skilled

asset operators. NGV continues to build capability in the competitive

transmission space by bring in new talent and ensuring growth

opportunities for existing talent.

|  |  |
| --- | --- |
|  |  |
|  | Read more about our business units on page [220](#i2193c7e7fbee4753bdbe2d16888565c8_385) |
|  |  |

Other activities

Other activities primarily relate to National Grid Partners, the

corporate venture capital and innovation arm of National Grid, as well

as UK property, insurance and corporate activities. In 2025/26,

National Grid Partners invested in three new portfolio companies and

16 follow on rounds. We exited one company, Urbint, during the year.

We now have 41 active companies in the portfolio investments in five

strategic venture funds. We have invested more than $550 million to

date. Some examples of companies and technologies in our portfolio

include: LineVision (dynamic line rating technology), Sensat (capital

project design software) and Emerald.ai (demand flexibility software

for data centres). Looking ahead, we will continue to innovate and

invest in the latest technologies to support the Group.

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 23 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Our stakeholders |  |  |  |  |  |

#### Strong stakeholder engagement

|  |  |
| --- | --- |
|  |  |
|  | Read our Section 172 Statement on page [85](#i2193c7e7fbee4753bdbe2d16888565c8_118) |

![]()

#### drives our success

#### How we engage

Our stakeholder community continues to broaden and evolve, and engaging with them remains fundamental to our daily operations. We focus on timely, effective engagement on the issues and decisions that matter

most to them, with the right colleagues leading each interaction. This spans the full organisation – from our Board of Directors, who maintain regular dialogue with key stakeholders, to the working‑level teams who

support engagement on our day‑to‑day activities. The insights we gain through these interactions directly inform the decisions that shape and deliver our strategy. Structured reporting mechanisms ensure that

information flows seamlessly from stakeholders to the Board and its Committees, helping us understand what we are hearing and enabling us to act on it.

![]()

Customers

Why our customers are important to us

Customers are the heart of our business,

representing a diverse community that includes

residential customers and large and small

businesses. Regular and effective engagement with

them is essential to delivering what they need and

expect from us.

Interests

Our customer base, made up of longstanding

customers and an increasing number of new ones,

have wide ranging interests. However, they all

share an expectation that we will deliver efficient,

reliable and affordable service, with transparency

and fairness in how we work with them. We strive

to understand their needs and challenges, along

with how our activities impact their daily lives and

businesses.

Our engagement

– The Board and Group Executive Committee

actively engage on customer matters to better

understand their needs and perspectives and

leverage that feedback into improving customer

experience.

– Strategic account teams have gained

momentum in 2025/26, positioning themselves

as trusted advisors who bring innovative

strategic solutions that can deliver at speed to

accelerate customers’ expansion opportunities.

– We lead or participate in industry initiatives to

find solutions for: general business planning,

expedited grid connections, and affordability

challenges faced by our customers.

![]()

![]()

Investors

– The Board receives regular updates on customer

matters and undertook two customer deep dives

during the year, including updates on the

implementation of the Kraken programme which will

enhance US customer experience and an

operational visit of the UKED customer call centre.

– Teams  across  the  business  engage  with

customers on a day-to-day basis – in one-to-one

meetings and community forums – regarding

connections, bill-related matters  and social

obligations.

Outcomes

– Our customer engagement helps shape what we

do both operationally and strategically.

Understanding our customers means we can

better meet their needs for new connections and

ongoing account management, and informs

longer-term policy.

– As companies increasingly adopt advanced

technologies, resilient, high-quality power and the

ability to timely connect new loads have become

paramount.

– In the US, our work with consumer advocates

continues to make a difference to many of our

customers’ ability to meet the rising challenge of

cost of living.

– In 2025 we launched our BIG conversation –

engaging with thousands of customers and

stakeholders on the future of their local electricity

network. This engagement will continue

throughout 2026/27 and is key to shaping our

future business plan.

Why our investors are important to us

We engage with equity and debt investors on our

strategy and performance. Their involvement

supports the investment needed for a resilient,

future-ready network and provides important

accountability — ensuring we remain transparent,

disciplined, and aligned with our long‑term

commitments.

Interests

Investors look to our financial and operational

performance as indicators of our capacity to

generate attractive returns and uphold

creditworthiness. They are also interested in our

Responsible Business commitments and reporting

to ensure their investments are sustainable, ethical

and responsible.

Our engagement

– During the year, the Chair, Chief Executive and

CFO met with institutional investors in the UK

and overseas as part of our comprehensive

investor relations programme.

– The Group Treasurer and Deputy Group

Treasurer met with Debt and Fixed Income

investors in the UK and overseas as part of our

debt engagement programme.

– Meetings followed our full and half-year results

and the announcement of our updated five-year

financial framework and acceptance of Ofgem’s

RIIO-T3 price control in March 2026.

– The Board engaged with shareholders at our

2025 AGM, which was held as a hybrid meeting

to enable participation both in person and online.

Shareholders were able to put questions to the

Board in advance of, or during, the meeting.

– The Board receives regular monthly updates on

investor relations matters from the Director of

Investor Relations, including the outcome of an

investor sentiment exercise which affirmed our

investor relations approach.

– Debt investors received an overview of our US

regulated businesses from the Group Treasurer

along with the Presidents and CFOs of our US

businesses.

– Held an investor event in May 2025 that shared

full-year results with a focus on major projects in

UK ET and New York.

Outcomes

– Through our engagement, investors understand

our investment case and have visibility of our

strategy, performance and financial strength. This

engagement helped us to efficiently access new

debt and equity funding during the period,

including £4.2 billion of newly issued senior debt.

– The Remuneration Committee considered

feedback from its engagement with investors in

relation to the Directors’ Remuneration Policy,

with 98.38% of voting investors voting in favour of

the Policy at the AGM.

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 24 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Our stakeholders cont. |  |  |  |  |  |

Colleagues

Why our colleagues are important to us

We listen to and engage extensively with our

colleagues and with the bodies that represent them

through several channels and processes. This

enables us to understand their needs and

requirements and build a culture that not only

drives our performance and shapes our plans, but

also empowers colleagues to take ownership for

delivering results. Through fostering an inclusive,

supportive and collaborative environment, we

create the conditions for a skilled and motivated

workforce where everyone feels valued and able to

contribute to our shared success.

Interests

Colleague interests are wide-ranging. They have an

interest in company performance and what this

means for them individually, but also want to

understand – and play a part in – shaping our role

in the industry, contributing to our social impact,

and supporting the delivery of our strategic

objectives.

Our engagement

We continued our extensive programme of

colleague engagement in 2025/26. This included:

– Twice yearly live webcasts to all employees

hosted by the Chief Executive.

– Regular Chief Executive posts and interaction on

social media platforms.

– Regular all-hands calls hosted by members of

the Group Executive and senior management.

– The Chair visited two training facilities during the

year, one in the UK and one in the US.

– The Chair and members of the Board visited

operational sites in the UK and US, including a

segment of the ASTI transmission facilities under

construction in July and the Long Island Power

plant facilities in March, to observe work

underway and engage in small group

conversations with key team members.

–

![]()

Supply chain and delivery partners

– A series of colleague engagement events were

hosted by the Chair of the People &

Remuneration Committee to discuss reward

structures and talent development. Please see

page [95](#i4535a3551ef14c3b9e820c5fb43500c5_0-0-1-3-948661) for further information.

– Operational site visits by senior management.

– The Chief Executive and Chief People Officer

provided regular updates on employee matters to

the Board, including the results of our twice-

yearly employee engagement survey, Grid:Voice.

Outcomes

– Direct engagement informed Board challenge

and discussion, reinforced the importance of

visible leadership and open dialogue, and fed into

Safety & Operations Committee consideration of

safety reporting, contractor management and on-

site safety behaviours.

– Direct engagement enabled the Board to hear

directly from a broad cross-section of colleagues,

strengthening its understanding of workforce

culture, values and lived experience beyond

formal reporting.

– 82% of colleagues took part in our Grid:Voice

survey in February, with an employee

engagement index score of 81% favourable. The

results and feedback helped to identify areas

where we could do more to support employees.

|  |  |
| --- | --- |
|  |  |
|  | Read more in the Responsible Business  Committee report on page  [106](#i2193c7e7fbee4753bdbe2d16888565c8_172) |
|  |  |
|  | Read more about Board engagement  with colleagues on page [95](#i2193c7e7fbee4753bdbe2d16888565c8_154) |
|  |  |
|  |  |

Why our supply chain and delivery partners

are important to us

Working closely with our supply chain and delivery

partners is essential to delivering our long‑term

ambitions. Through strong partnerships and

consistent engagement, we share insights, drive

innovation, and build the resilience needed to meet

changing expectations. This coordinated,

transparent approach ensures a future‑ready

supply chain that supports effective delivery of our

commitments.

Interests

Effective communication and strong coordination

are essential to how we work with our supply chain

and delivery partners. Clear forward visibility and

longer‑term commitments help us plan and

support partners in building the skills and capacity

they need. Early alignment and consistent dialogue

foster collaboration and innovation, enabling us to

meet evolving needs and deliver successful

outcomes.

Our engagement

– Structured and timely engagement takes place

with strategic suppliers and contractors,

complemented by Executive-sponsored senior-

level engagement to foster collaboration and

discuss strategic issues facing the sector.

– Continued collaboration between UK operators

and suppliers through an industry skills and

workforce planning group, consisting of

representatives from key external partners, to

address the industry skills gap challenge

through a focus on critical specialist workforce

roles.

– The Board receives updates on our supplier

engagement programmes via business unit

updates during the year.

–

– We engage in detailed safety forums with

suppliers to drive industry-wide safety

performance.

– In New England, we established strategic

contractor partnerships to accelerate timelines,

reduce risk, and lower costs across more than

$3bn of planned capital work over the next five

years.

– In the UK we entered into a novel long-term

contracting relationship, the Great Grid

Partnership. Members of the Board visited with

the Great Grid Partnership in July 2025, including

presentations from partners to understand

strategic supply chain management.

– The Board considered and approved the Group’s

Modern Slavery Statement.

Outcomes

– Sharing key priorities with our supply chain and

gaining a better understanding of their needs

allows us to jointly manage continuity of supply

and shape our approach to future challenges,

such as the acceleration of investment required to

connect new sources of energy.

– Working with other energy network operators and

suppliers, we have contributed to the creation of a

comprehensive interim Electricity Networks Sector

Growth Plan published in December 2025 by the

Energy Networks Association (ENA) and BEAMA,

the UK manufacturing trade association for the

electrotechnical sector, setting out a collaborative

roadmap to shape national growth.

– We are signatories to the Prompt Payment Code

and encourage our suppliers to adopt the

principles of this code in their own supply chains.

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 25 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Our stakeholders cont. |  |  |  |  |  |

![]()

Communities

Why our communities are important to us

We engage extensively with the communities

where we work, and with their representatives, to

understand their needs, enhance our contribution

to their wellbeing, and ensure we support them in

the most meaningful and appropriate ways.

Interests

Our communities need us to deliver energy safely

and reliably, while strengthening the positive

contributions our operations bring to their wellbeing

and offering meaningful support to the individuals

and communities who need it most.

Our engagement

– We engage extensively with local communities

as part of our major projects planning

consultations, and we use their feedback to

inform the proposals we submit for development

consent.

– During the year, Board members visited

operational sites and received updates on

community matters, including:

– strategic infrastructure projects and the RIIO-

T3 business plan submission

– a dinner with community, civic and policy

leaders in NYC to discuss policy

considerations, community needs, and how

National Grid could support positive

outcomes.

– On an ongoing basis, we develop and

implement safety programmes, and work with

first responders and communities, so that all

parties have a heightened awareness of how our

system operates and what we do to assure the

highest possible reliability and safety of the

public.

– We lead with listening and lived experience

through structured community feedback,

ensuring our approach is responsive and

informed.

![]()

Political and regulatory

– We build trust-based, inclusive partnerships with

local organisations and under-represented

groups to share ownership and strengthen long-

term outcomes.

– We use data and community insight to target

investments, improve decisions, and measure

social and business value.

Outcomes

– Our outreach programmes continue to support

economic growth and help upskill communities,

particularly in the most disadvantaged areas.

– During National Engineers Week, partners

across the US delivered hands-on Energy

Through Engineering activities, reaching more

than 1,500 students.

– In February 2026 we launched BioBus with the

Long Island Children’s Museum – a mobile lab

that will reach over 45,000 students annually.

– Consultation with communities and residents

near proposed UK infrastructure projects enables

us to shape proposals and progress projects.

– We’ve invested heavily in supporting vulnerable

customers and education programmes:

– 21,000 customers supported to save £22

million via our fuel poverty programmes in UK

ED.

– 5,000 people supported to save £4 million via

our Low Carbon Transition services.

– >100,000 education and STEM outreach

interactions in the UK ED region alone.

Why our regulators and political

stakeholders are important to us

We engage with regulators, governments and

other key political stakeholders to support the

regulatory and policy frameworks required to

deliver current and future energy needs. We work

closely with our regulators on rate cases in the US

and price controls in the UK.

Interests

The interests of our regulators and political

stakeholders are based around a common theme

– whether UK or US, state or federal – to protect

the interests of customers and to deliver a secure

and reliable energy future.

Our engagement

– Our Chief Executive has engaged with key

appointed and elected officials, including

Downing Street, the Federal Energy Regulatory

Commission (FERC), and key US Secretaries to

discuss energy security, infrastructure delivery

and innovation.

– Business unit executives and external affairs

leaders engage with state and local leaders, the

New York Public Service Commission, the MA

Department Public Utilities (MADPU), and

relevant agencies to inform and foster

communication so that rate cases, major

projects, and the regulatory environment are

meeting the needs of customers today and in

the future.

– Our US Federal Government Relations team

engages with Congress, the Trump

Administration, and federal agencies on

affordability, load growth, reliability, tax and

permitting.

– Members of the Board and UK executive and

working-level colleagues engaged with Ofgem

on UK ET’s RIIO-T3 business plan and the ED3

regulatory framework, and with the UK

Government on its policy agenda, including

planning, connections, resilience, supply chain

and skills.

Outcomes

In the US:

– Delivered stakeholder engagement plan in line

with the MADPU new public outreach

requirements for Gas Rate Case filing while

addressing heightened affordability concerns.

– Engaged with the MA Administration and

members of the legislature to inform the

development of energy affordability legislation

consistent with company priorities.

– Collaborated on the new State Energy Plan,

supporting our New York business unit strategy

and reinforcing the role of gas in an affordable,

achievable energy transition.

– Through joint advocacy and coalition building,

achieved the approval and permitting of the

Northeast Supply Enhancement (NESE) pipeline

to increase reliability and affordability in New York.

– Engaged with federal lawmakers on One Big

Beautiful Bill Act (OBBBA) to prevent corporate

tax policy that would negatively impact National

Grid.

In the UK:

– Supported planning reform, with the Planning and

Infrastructure Act becoming law in

December 2025. Specific to UK ED, the

Government has announced its intent to make

legislation changes following the Electricity

Infrastructure Consents, Land Access and Rights

consultation, which should speed up and reduce

costs of delivery for our customers.

– Delivered an interim Electricity Networks Sector

Growth Plan to boost jobs, supply chain

opportunities, and UK network investment.

– Supported the ongoing implementation of a new

regime for grid connections.

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 26 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Our key performance indicators |  |  |  |  |  |

![]()

|  |  |  |  |
| --- | --- | --- | --- |
|  |  |  |  |
|  |  |  |  |
|  | We use a range of  metrics to measure Group  performance. In 2025/26,  these metrics were aligned  to our five strategic priorities. | |  |
|  | Link to remuneration  Remuneration of our Executive Directors, and  our employees, is aligned to the successful  delivery of our strategy. We use a number of  our KPIs and alternative performance  measures as specific measures in  determining the Annual Performance Plan  (APP) and Long-Term Performance Plan  (LTPP) outcomes for employees and  Executive Directors. These measures are  either specifically accounted for in  remuneration targets or considered as part of  a review of wider business performance. | |  |
|  |  | Read more on page [107](#i2193c7e7fbee4753bdbe2d16888565c8_175) |  |
|  |  |  |  |
|  | Responsible Business assured data  We engaged Deloitte LLP in the current and  prior year and PricewaterhouseCoopers LLP  (PwC) in 2023/24 to undertake a limited  assurance engagement, using the  International Standard on Assurance  Engagements (ISAE) 3000 (Revised):  ‘Assurance Engagements Other Than Audits  or Reviews of Historical Financial Information’  and ISAE 3410: ‘Assurance Engagements on  Greenhouse Gas Statements’ over a range of  data points within our Responsible Business  data tables. The metrics identified with the  leaf symbol, featured on page 2, pages 27 –  28, [38](#i2193c7e7fbee4753bdbe2d16888565c8_4644) – [52](#if05dc6fa9b1c45cd9c0112e45388d907_107520)  and page 68 are included in the  scope of their work. Details of National Grid’s  reporting methodology and [Deloitte’s](https://www.nationalgrid.com/responsibility/our-reporting-centre/our-reporting-suite)  [Assurance Opinion](https://www.nationalgrid.com/responsibility/our-reporting-centre/our-reporting-suite) can be found on page [52](#if05dc6fa9b1c45cd9c0112e45388d907_109194). | |  |

|  |  |  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |  |  |
|  |  |  |  |  |  |  |  |
| Underlying EPS (p) |  |  | Group capital investment (£m) |  |  | Green capital expenditure (£m) |  |
| 78.0p |  |  | £11,576m |  |  | £9,834m |  |
| 2025/26 |  |  | 2025/26 |  |  | 2025/26 |  |
| 2024/25 |  |  | 2024/25 |  |  | 2024/25 |  |
| 2023/24 |  |  | 2023/24 |  |  | 2023/24 |  |
|  |  |  |  |  |  |  |  |
| Link to strategy |  |  | Link to strategy |  |  | Link to strategy |  |
|  |  |  |  |  |  |  |  |
|  |  |  |  |  |  |  |  |
|  |  |  |  |  |  |  |  |
| Description  A measure of the Group’s profitability for the year  attributable to equity shareholders of the Group. It  excludes exceptional items, remeasurements, timing,  impact of deferred tax in UK regulated businesses  (NGET and NGED) and US major deferrable storms  (net of in-year allowances and deductibles) if these  exceed $100 million threshold in a year.  We expect underlying earnings per share  CAGR to be 8-10% from the 2025/26 baseline,  aligned with our asset growth. | |  | Description  Measures our annual investment into property,  plant and equipment, including capital  prepayments, intangible assets and equity  contributions to joint ventures and associates.  Investing in our assets helps to increase our future  revenue allowances.  We expect to invest at least £70 billion  between April 2026 and March 2031. | |  | Description  Measures the amount of capital expenditure  invested in decarbonisation of energy systems and  considered to be aligned with the principles of the  EU Taxonomy for climate change mitigation and  adaptation activities. Green capital expenditure  excludes any capital prepayments and equity  investments in joint ventures and associates.  We expect around 85% of our £70 billion  capital investment between April 2026 and  March 2031 to be aligned with the principles of  the EU Taxonomy legislation. | |
|  |  |  |  |  |  |  |  |
|  |  |  |  |  |  |  |  |
| Progress in 2025/26  Underlying EPS increased by 4.7p (6%) year-on-year  driven by strong performance across our regulated  businesses including new rate agreements in the  US, higher revenues from totex allowances driven  by investments in the UK and disciplined cost  efficiency across the Group. These more than offset  the impact of divestments, the increased number of  shares after the Rights Issue and the adverse  impact of the change in FX rates. | |  | Progress in 2025/26  We delivered a record year of capital investment  driven by the ramp up of spend on Wave 1 ASTI  projects in UK ET and increased electricity distribution  and transmission investment in both New York and  New England (including CLCPA and Smart Path  Connect in New York and system capacity, asset  condition and programme spend in New England).  These were partially offset by lower investment in  NGV following the impact of divestments. | |  | Progress in 2025/26  Green capital expenditure increased by £2.2 billion  to £9.8 billion, driven by investment in key  infrastructure projects. Green alignment for capital  expenditure increased to 88.5%, up from 81.1% in  2024/25, demonstrating continued progress in  aligning investment with the clean energy  transition. The share of green capital expenditure  as a proportion of group capital investment, which  includes capital prepayments and equity  contributions, was 85.0%. | |

![]()

Financial measures

![101]()

![1]()

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| delotte-assured.gif |  |  |  |  |  |
| Deloitte assured data 2025/26 | Deloitte assured data 2024/25 | PwC assured data 2023/24 | Enable the energy transition | Build the networks of the future now | Deliver for customers |
|  |  |  |  |  |  |
| Indicates an alternative performance measure | |  | Operate safely and efficiently | Build tomorrow’s workforce today |  |

![13]()

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 27 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Our key performance indicators cont. |  |  |  |  |  |

|  |  |  |  |  |  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |  |  |  |  |  |
|  |  |  |  |  |  |  |  | | |  |
| Group RoE (%) |  |  | Asset growth (%)\* |  |  | Scope 1 and 2 GHG emissions (mtCO2e) |  |  | Scope 3 GHG emissions (mtCO2e) |  |
| 9.8% |  |  | 10.9% |  |  | 7.5 |  |  | 29.5 |  |
| 2025/26 |  |  | 2025/26 |  |  | 2025/26 |  |  | 2025/26 |  |
| 2024/25 |  |  | 2024/25 |  |  | 2024/25 |  |  | 2024/25 |  |
| 2023/24 |  |  | 2023/24 |  |  | 2023/24 |  |  | 2023/24 |  |
|  |  |  |  |  |  |  |  |  |  |  |
| Link to strategy |  |  | Link to strategy |  |  | Link to strategy |  |  | Link to strategy |  |
|  |  |  |  |  |  |  |  |  |  |  |
|  |  |  |  |  |  |  |  |  |  |  |
|  |  |  |  |  |  |  |  |  |  |  |
| Description  Group RoE measures our performance in  generating value for shareholders by dividing our  regulated and non-regulated financial performance,  after interest and tax, by our measure of equity  investment in all our businesses, including our  regulated businesses, NGV and other activities and  joint ventures.  We aim to optimise Group RoE through driving  performance across our operating companies. | |  | Description  Maintaining efficient growth in our regulated and  non-regulated assets ensures we are well  positioned to provide consistently high levels of  service to our customers and increases our future  revenue allowances. This includes critical  investment on network safety and resilience and to  meet increased demand.  We aim to achieve Group asset growth CAGR  of around 10% to March 2031. | |  | Description  We are delivering new infrastructure to enable the digital, electrified economies of the future. Our biggest  contribution to reducing greenhouse gas (GHG) emissions, both across society and in terms of our own  emissions, is what we do to enable the transportation and distribution of clean energy in the regions where  we operate. We understand the importance of partnership and are actively engaging with governments,  regulators, and the energy industry to help ensure the policy and regulatory frameworks required for future  investments in decarbonising the energy sector, and reducing our emissions, are in place.  We will continue to work towards our ambitious climate targets. | | | | |
|  |  |  |  |  |  |  |  |  |  |  |
|  |  |  |  |  |  |  |  |  |  |  |
| Progress in 2025/26  Group RoE has increased by 80bps year-on-year  due to increased regulated performance including  new rate agreements in the US, higher revenues  supported by increased allowances in the UK and  disciplined cost efficiency. This is partially offset by  reduced performance in our non-regulated  business following the divestments and increased  financing costs due to our increased capital spend. | |  | Progress in 2025/26  Asset growth has increased by 190bps year-on-year  driven by growth across our regulated businesses  including ASTI investment and connections work in  UK ET, CLCPA investment in New York and GSEP  investment in New England. | |  | Progress in 2025/26  Scope 1 and 2 emissions for 2025/26 were 7,511 ktCO2e, an increase of 1% from 2024/25. While this is a  decrease of 3% against our 2018/19 baseline it is outside of the range set out in our Climate Transition  Plan. The year-on-year increase is primarily due to increased Scope 1 emissions from our Power Generation  assets in New York, which provide critical system reliability. Scope 2 emissions have decreased year-on-  year, attributable to lower grid carbon intensity. Our Scope 3 emissions (excluding sold electricity) for  2025/26 as per our Science Based Targets initiative (SBTi) target were 26,833 KTCO2e, representing an  11% increase against our 2018/19 baseline. This increase is primarily due to increased capital investment in  constructing new energy infrastructure. You can read more about our GHG emissions and environmental  performance on pages [40](#i2193c7e7fbee4753bdbe2d16888565c8_19791209304966) — [44](#idacfbb1601cb477c9401c46187170fe9_240518). You can read more about the Task Force for Climate-related Financial  Disclosure (TCFD) and our wider sustainability activities on pages [53](#i2193c7e7fbee4753bdbe2d16888565c8_88) — [68](#i5ce9e2b3cd614bcca8423db41cd18ff1_160075). | | | | |

![]()

Financial measures

![17042430231293]()

![39]()

![]()

Non-financial measures

![53]()

![65]()

\* Normalised for the sales of NG Renewables and Grain LNG in the year.

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 28 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Our key performance indicators cont. |  |  |  |  |  |

|  |  |  |  |  |
| --- | --- | --- | --- | --- |
|  |  |  |  |  |
|  |  |  |  |  |
| Group lost time injury frequency rate (LTIFR)  (LTIs per 100,000 hours worked) | |  | Employee engagement index (%) |  |
| 0.11 |  |  | 81% |  |
| 2025/26 |  |  | 2025/26 |  |
| 2024/25 |  |  | 2024/25 |  |
| 2023/24 |  |  | 2023/24 |  |
|  |  |  |  |  |
| Link to strategy |  |  | Link to strategy |  |
|  |  |  |  |  |
|  |  |  |  |  |
|  |  |  |  |  |
| Description  Every day we strive to do the right thing, find a  better way, and make it happen. Safety is our  highest priority for our employees and the public.  One of our main safety indicators is LTIFR. This is  the number of worker LTIs per 100,000 hours  worked in a 12-month period (including fatalities)  and includes our employee and contractor  population.  Our aim is to achieve 0.1 or below lost time  injuries per 100,000 hours worked per year. | |  | Description  Measures how engaged our employees feel, based  on the percentage of favourable responses to  questions repeated annually in our employee  engagement survey.  Our aim is for our employee engagement  metrics to remain at or above the high-  performing norm. | |
|  |  |  |  |  |
|  |  |  |  |  |
| Progress in 2025/26  Safety is an important factor within decision  making, therefore tied to our Executive Directors’  remuneration, reflecting the expectation that safety  is an integral part of how we work at National Grid.  Our LTIFR stood at 0.11, compared with 0.10 in  2024/25 and against our Group target of 0.10. We  are disappointed in this result and in response, we  have implemented targeted Group and business  unit initiatives to strengthen risk awareness,  leadership engagement and control effectiveness.  You can read more about our LTIFR performance in  the Responsible Business section (pages [38](#i2193c7e7fbee4753bdbe2d16888565c8_4644) — [52](#if05dc6fa9b1c45cd9c0112e45388d907_107520)). | |  | Progress in 2025/26  We run an employee engagement survey,  Grid:Voice, twice-yearly, to understand and act on  colleague feedback. This allows us to build a  culture that is purpose-led and results-driven, with a  great colleague experience. As a result, we  experience high engagement and strong advocacy,  above external benchmarks.  This year, 26,000 employees completed the survey,  which resulted in the highest response rate in six  years. Engagement scores remain strong and  leadership will continue to monitor to increase by  1% in line with the high-performing norm. | |

![]()

Non-financial measures

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
|  |  |  |  |  |  |
| Network reliability and interconnector availability | | | | | |
| 99.9% |  |  | 90% | | |
| 2025/26 |  |  | 2025/26 |  |  |
| 2024/25 |  |  | 2024/25 |  |  |
| 2023/24 |  |  | 2023/24 |  |  |
|  | | | | | |
| Network reliability % |  |  | 2025/26 | 2024/25 | 2023/24 |
| UK ET |  |  | 99.99999 | 99.99983 | 99.999998 |
| UK ED |  |  | 99.98795 | 99.98294 | 99.99261 |
| NE ET |  |  | 99.96594 | 99.98544 | 99.97549 |
| NY ET |  |  | 99.92740 | 99.84345 | 99.97168 |
| NE ED |  |  | 99.96434 | 99.97724 | 99.94327 |
| NY ED |  |  | 99.95060 | 99.94077 | 99.92823 |
| Interconnector availability % |  |  |  |  |  |
| IFA interconnector |  |  | 74.81 | 79.42 | 82.01 |
| IFA2 interconnector |  |  | 87.55 | 74.87 | 71.19 |
| BritNed interconnector |  |  | 99.97 | 75.60 | 98.00 |
| Viking interconnector |  |  | 95.96 | 91.75 | N/A |
| NSL interconnector |  |  | 95.22 | 94.96 | 95.87 |
| Nemo Link interconnector |  |  | 98.72 | 98.75 | 96.80 |
| Link to strategy | | | | | |
|  |  |  |  |  |  |
|  |  |  |  |  |  |
| Description  Delivering network reliability is critical to our licence to operate. We achieve this through disciplined  capital investment aligned to demand and supply risks, robust network design and construction, targeted  maintenance and asset replacement, and well‑tested incident response plans. Reliability is measured  separately across each business area. | | | | | |
| Progress in 2025/26  We continued our track record of delivering consistent network reliability for our customers,  demonstrating our continued investment in asset health and resilience. Overall Group network reliability  was 99.9%, consistent with both 2024/25 and 2023/24. Interconnector availability improved by 4% year-  on-year, closing at 90%, the maximum available for the year. This was driven by improved availability for  both IFA2 and BritNed, driven by decreased unplanned outages. | | | | | |

![89]()

![77]()

![46179488368696]()

![4947802327049]()

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 29 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Our key performance indicators cont. |  |  |  |  |  |

|  |  |  |  |  |
| --- | --- | --- | --- | --- |
|  |  |  |  |  |
|  |  |  |  |  |
| Customer satisfaction | | | | |
|  | 2025/26 | 2024/25 | 2023/24 | Target |
| UK ET (/10)1 | 7.0 | 6.5 | 7.2 | 7.7 |
| UK ED (/10)1 | 9.01 | 8.98 | 8.97 | 9.12 |
| NE – (%)2 | 72.2 | 53.9 | 57.5 | 67.33 3 |
| NY – (%)2 | 72.8 | 61.1 | 64.5 | 73.23 3 |
|  |  |  |  |  |
| Link to strategy |  |  |  |  |
|  |  |  |  |  |
|  |  |  |  |  |
|  |  |  |  |  |
| Description  We measure customer and stakeholder satisfaction, while also maintaining engagement with these groups  and improving service levels. | | | | |
| Progress in 2025/26  In UK ET, we follow the Quality of Connections Incentive and our score demonstrates a positive shift  compared to last financial year, marked by significant industry reform and rapid change. We have  strengthened and developed our workforce, invested in digital transformation capabilities and upheld  customer-centric principles in a dynamic and unpredictable environment. NESO initiated reforms to the  existing connections queue that will aim to help UK ET deliver faster, fairer and more strategic grid  connections for existing and future customers.  In UK ED, we continue to deliver year-on-year improvements as we strive to achieve our target with  several connection initiatives driving benefits for customers during the year.  In the US, satisfaction levels improved over the course of the year, reflecting continued progress in how  we serve and support our customers. At the same time, colder weather and increased energy use  contributed to higher bills, creating affordability pressures.  Read more about our customer satisfaction scores in the Responsible Business review on pages [38](#i2193c7e7fbee4753bdbe2d16888565c8_4644) — [52](#if05dc6fa9b1c45cd9c0112e45388d907_107520). | | | | |

![]()

Non-financial measures

1. The UK ET and UK ED scores are included as part of the regulatory framework.

2. Customer trust metrics are based on survey questions that differ year‑on‑year, with the current year reflecting overall experience and the

prior years focusing on trust of advice provided. The current year score is a weighted average from four survey inputs that run

continuously across both residential and commercial customers throughout the year. [Please see our reporting methodology on the](https://www.nationalgrid.com/responsibility/our-reporting-centre/our-reporting-suite)

[Responsibility section of our website for details.](https://www.nationalgrid.com/responsibility/our-reporting-centre/our-reporting-suite)

3. 2025/26 New York and New England targets for the newly introduced Customer Satisfaction metric.

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 30 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Internal control and risk management |  |  |  |  |  |

|  |  |  |
| --- | --- | --- |
|  |  |  |
|  |  |  |
|  | The Board is committed to effective risk management to  deliver our strategy, protect our people, reputation  and assets, and safeguard the interests of our stakeholders. |  |
|  |  |  |
|  | Our Enterprise Risk Management (ERM) Framework  National Grid is exposed to a variety of uncertainties (threats and opportunities) that could have a  material effect on the Group’s financial position, our operations, our reputation and stakeholder  interests; represented by our Group Principal Risks. These uncertainties are managed through our  ERM Framework and system of internal control. We maintain and monitor the application of the  Framework throughout the year and formally assess its effectiveness annually. This ongoing  oversight, alongside continuous improvement, enables us to respond effectively to changes in the  internal and external environment and to inform our Group Principal Risks and related risk  management activities. |  |

|  |  |  |  |
| --- | --- | --- | --- |
|  |  |  |  |
|  |  |  |  |
| Our risk management and internal control activities are delivered via a “Three Lines” model: | | | |

|  |  |  |  |  |
| --- | --- | --- | --- | --- |
|  |  |  |  |  |
|  | Risk, Controls and Assurance Governance: | | |  |
|  |  |  |  |  |
|  | – Identify and monitor the Group Principal Risks and emerging risks across the Group | | |  |
|  | First Line:  Business units |  | Second Line:  Risk and Compliance functions |  |
|  |  |  |  |  |
|  | – Identify and assess risks  – Manage day-to-day operational risks  – Apply risk appetite, delegated authorities,  policies, procedures and codes of conduct  – Design and operate internal controls and  other mitigation measures  – Monitor and report risks through relevant  reporting and escalation processes |  | – Risk and compliance oversight  – Design and/or enable risk management  processes across the Group and  responsible for continuous improvement  – Provide risk expertise, advice and support  – Monitor and assure compliance with  policies, standards and the ERM process  – Report to the Board and Group Executive |  |
|  | Third Line:  Internal Audit | | |  |
|  |  |  |  |  |
|  | – Internal audit (supported by outsourcing or co-sourcing with external assurance providers)  – Review and evaluate risk management activity and provide assurance over the effectiveness of the  control environment  – Report to the Board and the Group Executive | | |  |

#### Governance and oversight

The Board is accountable for the Group’s system of risk management and internal control, including the

amount of risk the Group is prepared to accept in delivering our strategic priorities (our risk appetite).

The Group Principal Risks are monitored throughout the year. Each Group Principal Risk is also subject to

a detailed review annually by the Group Ethics, Risk and Compliance Committee and the relevant Board

committees. A consolidated summary of the Group Principal Risks and how they are being managed is

then reviewed bi-annually by the Audit & Risk Committee. Reporting includes consideration of changes in

the internal and external context, a review of the effectiveness of mitigations and internal controls, and an

assessment of whether risks are being managed within risk appetite, together with any additional

actions required.

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 31 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Our Group Principal Risks |  |  |  |  |  |

Business context

The external context in which we operate has changed significantly in recent years, particularly in relation to the political

and regulatory environment, technological developments, affordability considerations, and how we deliver for customers.

We adapt our business and risk management activities and mitigations accordingly.

Group Principal Risks

![]()

![]()

![]()

![]()

|  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |
|  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |
|  |  | Operational risks arise from our core  business practices, which rely on our  systems, equipment, processes and people.  – Catastrophic security incident  – Significant safety or environmental event  – Loss of supply\*  – Major capital projects |  |  |  |  | Strategic risks, both internal and external,  are associated with the business model,  corporate strategy and long-term planning.  – Satisfactory regulatory outcomes  – Climate change mitigation  – Political and societal expectations  – People capability and capacity |  |  |  |  | Financial risks are risks associated with  National Grid’s ability to raise capital,  maintain access to capital, and deliver  profitable growth.  – Financing our business |  |  |  |  | Compliance risks relate to compliance with  laws and regulations, industry standards,  contract requirements and internal policy.  – Legal and regulatory compliance  frameworks operate at a jurisdictional level  (i.e. UK, US federal, New York and  Massachusetts) and therefore apply  across all relevant National Grid  businesses rather than being  amalgamated at Group. |  |
|  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |

![]()

Strategic Group Principal Risks

![]()

Operational Group Principal Risks

![]()

Financial Group Principal Risks

![]()

Compliance Group Principal Risks

\*Significant disruption of energy was renamed to Loss of supply during 2025/26 to better reflect the nature of the risk. Upstream supply considerations are included as a key cause.

A summary of actions taken by management to manage our Group Principal Risks is provided on pages [32](#i5b716aa667c3427e93e3ed5359a2f216_69379) — [36](#i5b716aa667c3427e93e3ed5359a2f216_69378). The Board reviewed these risks as part of the bi-annual

Group Principal Risk review, which incorporates feedback and recommendations from relevant Board Committees. Further information can be found on pages [100](#if11c3cbaf3d84000b36cff578f5ee47e_358389) — [104](#if11c3cbaf3d84000b36cff578f5ee47e_358390).

![]()

|  |  |  |  |  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |  |  |  |  |
|  | Strategic priorities | | |  |  |  | Risk trend |  |  |
|  |  |  |  |  |  |  |  |  |  |
|  | Enable the energy  transition | Build the networks  of the future now | Deliver for  customers | Operate safely and  efficiently | Build tomorrow’s  workforce today |  | Increasing | Decreasing | No change |
|  |  |  |  |  |  |  |  |  |  |

![]()

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 32 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Our Group Principal Risks cont. |  |  |  |  |  |

Operational Group Principal Risks

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
|  | Catastrophic security incident | | |  |  |
|  |  | Oversight: Board and  Audit & Risk Committee |  | |  |
|  |  |  |  |  |  |
|  |  |  |  |  |  |

Description

There is a risk that we are unable to adequately anticipate and

manage disruptive forces on our critical systems, facilities and

personnel, because of cyber attacks, physical attacks, malicious

internal or external actors, or inadequate recovery capabilities,

resulting in disruption of business operations, tampering or abuse of

assets, safety hazards, or loss of confidentiality, integrity, and/or

availability of systems and data.

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
|  |  |  |  |  |  |
|  |  |  |  |  |  |

Developments during 2025/26

The Board recognises that the risk of a catastrophic security

incident is being driven by an increasingly hostile and complex

threat environment, with potential for severe operational, financial,

and reputational consequences for critical national infrastructure

providers. Against these drivers, the Board’s focus is on whether

the Group has robust, layered defences and recovery capability to

prevent, detect and respond to catastrophic security events.

Actions taken by management

Management actions are focused on preparedness and rapid

recovery, recognising that the threat landscape is constantly

evolving. These actions include:

– Expansion of the risk to incorporate physical security incidents,

recognising the hybrid nature of threat, and reducing visibility

gaps to physical security controls and management.

– Employing technical, administrative, and physical/cyber security

controls for both IT and operational technology aligned to the

National Institute of Standards, and Technology Cybersecurity

Framework (NIST CSF) v2.0, as well as all applicable laws and

regulations.

– We consistently verify and validate our risk management through

internal and external audits and risk assessments, penetration

tests, adversary simulation, incident response exercises,

compromise assessments, continuous control measurements

and other assessment methods.

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
|  | Significant safety or environmental event | | |  |  |
|  |  | Oversight: Safety &  Operations Committee |  | |  |
|  |  |  |  |  |  |
|  |  |  |  |  |  |

Description

There is a risk of a significant safety or environmental event because

of network asset failures or operability issues, extreme weather,

third-party damage or security attacks, resulting in a major public or

employee safety impact, or environmental damage.

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
|  |  |  |  |  |  |
|  |  |  |  |  |  |

Developments during 2025/26

The Board recognises that the risk of a significant safety or

environmental event is influenced by a combination of asset-related

factors, operating environment pressures, and heightened

stakeholder expectations. The Board’s focus is on whether the

Group has robust, consistently applied controls and culture to

prevent serious safety or environmental incidents, and to respond

effectively if they occur. National Grid takes a holistic approach

focusing on proactive preventative measures including inspection

and maintenance of assets as well as appropriate recovery and

response procedures.

Actions taken by management

Management actions are focused on prevention, preparedness,

and continuous improvement, recognising that the consequences

of a significant safety or environmental event could be severe,

including:

– Reduction in risk exposure following the sale of Grain LNG.

– Updates to Group-wide Process Safety Business Management

System to further strengthen prevention of process safety events

through tighter control of safety-critical maintenance.

– Delivering proactive inspection, maintenance and integrity

management programmes to reduce the likelihood of asset

failures that could lead to safety or environmental harm.

– Maintaining and testing emergency response arrangements to

ensure rapid, coordinated action to protect people, communities,

and the environment if an incident occurs.

– Using incident investigations, near miss reporting, assurance

activity, and leadership engagement to embed learning and

reinforce a strong safety and environmental culture across the

organisation.

– Responding to new regulatory requirements in the US which

provide opportunities to strengthen process safety management.

– Although primarily related to the Loss of supply Group Principal

Risk, the proposed New York Northeast Supply Enhancement

(NESE) pipeline project would not only mitigate some gas supply

constraints, it could also reduce the potential risks relating to

major hazard assets that are caused by extensive manual

relighting efforts when service disruptions occur, and will reduce

the number of Compressed Natural Gas (CNG) sites required in

Downstate New York.

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 33 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Our Group Principal Risks cont. |  |  |  |  |  |

Operational Group Principal Risks

![]()

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
|  | Loss of supply | | |  |  |
|  |  | Oversight: Safety &  Operations Committee |  | |  |
|  |  |  |  |  |  |
|  |  |  |  |  |  |

Description

There is a risk of a loss of supply event because of network asset

failures or operability issues, upstream supply issues, extreme

weather, third-party damage or security attacks, resulting in

disruption of energy to our customers.

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
|  |  |  |  |  |  |
|  |  |  |  |  |  |

Developments during 2025/26

Increasing system complexities, system demand and network

stress, coupled with legacy assets, are of key focus to ensure the

Group continues to concentrate on proactive prevention and

efficient recovery from loss of supply events to reduce the risk of

significant disruption of energy to our customers. The UK

Government’s new Energy Resilience Strategy and associated

taskforce will provide enhanced sector‑wide coordination, and new

regulatory requirements in the US have created further opportunities

to strengthen asset management and resilience practices.

In response to the North Hyde substation fire in March 2025, we

have undertaken extensive, multi-stakeholder engagement to

understand the root causes, including comprehensive internal and

independent investigations and close collaboration with regulators,

government bodies and industry partners to ensure all lessons are

identified and issues addressed.

![]()

Actions taken by management

Management actions are focused on reducing the likelihood of

supply interruptions and minimising customer impact when events

occur, including:

– Acceptance of Ofgem’s RIIO-T3 final determinations which

recognise the need for significant investment in the electricity

transmission sector to continue to deliver world-leading reliability

while nearly doubling the amount of power we can transfer

around the country.

– Reduction in risk exposure following the sale of Grain LNG.

– Alleviated supply conditions are expected with the proposed

New York NESE pipeline project.

– Preparing our UK ED3 submission to Ofgem which will seek to

evidence the need for greater investment in climate resilience.

– Updating our risk assessments to incorporate upstream supply

failure scenarios.

– Continued collaboration with energy suppliers, regulators, and

government departments to explore industry wide mitigation

strategies aimed at maximising supply, managing demand and

enhancing storage.

– Gas main replacement programmes and a storm-hardening

programme, along with main outage planning to ensure swift

response and recovery.

– Reviewing and updating Group-wide assessments of climate

vulnerabilities and monitoring progress against multi-decade

climate adaptation plans, complemented by existing resilience

investments to ensure long-term preparedness.

– Further development of emergency response plans covering

wildfire and cyber scenarios, along with asset risk assessment

and integrity management plans.

– We continue to monitor wildfire risk and have engaged a third

party to carry out specialist wildfire risk assessments.

– Ongoing flood contingency plans and robust preparedness for

winter and summer, including scenario planning, and testing

response plans with proactive communication strategies.

– Acceleration of proactive maintenance and asset checks ahead

of winter to maximise network availability, with an emphasis on

system reliability assets, sub-sea cable monitoring and ongoing

year-round maintenance.

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
|  | Major capital projects | | |  |  |
|  |  | Oversight: Safety &  Operations Committee |  | |  |
|  |  |  |  |  |  |
|  |  |  |  |  |  |

Description

There is a risk that we are unable to deliver on our major capital

project programme within the required timeframes because of

misalignment or lack of clarity with regulatory expectations, unclear

financial frameworks to incentivise investment, complex planning

requirements, external impacts on supply chain, or a failure to

demonstrate clear, long-term economic benefits to communities,

leading to increased costs, compromised quality, reputational

damage and detrimentally impacting our ability to deliver our clean

energy transition strategy.

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
|  |  |  |  |  |  |
|  |  |  |  |  |  |

Developments during 2025/26

Delivery of the Group’s major capital projects remains a central

strategic priority, with the scale of our cumulative capital investment

reaching at least £70bn over the next five years to modernise

energy networks, support growing demand, and enable the energy

transition. The focus on execution is being shaped by numerous

external developments such as supply chain constraints, and

regulatory complexities which influence project cost, schedule,

planning, and stakeholder expectations.

Actions taken by management

Management actions are focused on strengthening delivery

discipline and resilience, including:

– implementing more consistent, Group-wide frameworks, to clarify

decision gates, strengthen and schedule controls and improve

transparency over delivery performance;

– enacting earlier engagement strategies with regulators, planning

authorities, and communities to reduce late stage changes or

delays; and

– strengthening procurement strategies, supplier relationships, and

commercial disciplines to mitigate supply chain risk. We are also

actively monitoring the current geopolitical landscape and

considering impact on our risks, including Catastrophic security

incident and Loss of supply in particular.

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 34 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Our Group Principal Risks cont. |  |  |  |  |  |

![]()

Strategic Group Principal Risks

![]()

|  |  |  |  |
| --- | --- | --- | --- |
|  |  |  |  |
| Strategic priorities | | |  |
|  |  |  |  |
| Enable the energy  transition | Build the networks  of the future now | Deliver for  customers |  |
|  |  |  |  |
|  |  |  |  |
| Operate safely and  efficiently | Build tomorrow’s  workforce today |  |  |
|  |  |  |  |
| Risk trend |  |  |  |
|  |  |  |  |
| Increasing | Decreasing | No change |  |

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
|  | Satisfactory regulatory outcomes | | |  |  |
|  |  | Oversight: Responsible  Business Committee |  | |  |
|  |  |  |  |  |  |
|  |  |  |  |  |  |

Description

There is a risk that we fail to influence future energy policies and

secure satisfactory regulatory agreements because of lack of insight

or unsuccessful negotiations given the scale of investment needed

to meet load growth and clean energy requirements, while

balancing affordability and reliable concerns. This will lead to poor

regulatory outcomes, energy policies that negatively impact our

operations, reduced financial performance, fines/penalties,

increased costs to remain compliant and/or reputational damage.

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
|  |  |  |  |  |  |
|  |  |  |  |  |  |

Developments during 2025/26

The scale of change required to enable the energy transition is

unprecedented, driving our focus on whether the Group has the

insight, engagement, and capability to secure satisfactory regulatory

outcomes. Specifically ensuring the Group is proactively shaping

price controls and rate case filings with clear positions and

engagement/advocacy to support economic growth, affordability,

reliability and a cleaner energy system. Affordability remains a

prominent theme, influencing public sentiment and regulatory

scrutiny. Customers are seeking to understand what steps utilities

are taking to manage costs that end up on customer bills. The

impact on customers has always been a concern in utility

infrastructure planning and the costs on the bill beyond delivery

service are growing, leaving less room for necessary grid

investment.

Actions taken by management

Management actions are focused on proactive engagement, robust

regulatory frameworks and disciplined delivery, specifically including

the following:

– Ensuring well-evidenced submissions that clearly articulate

investment need, customer impact, and long-term value, with a

focus on achieving fair and sustainable outcomes.

– Demonstrating cost discipline, delivery efficiency, and value for

customers, including consideration of incentives, reopeners, and

performance mechanisms within regulatory frameworks.

– Continuously monitoring regulatory developments, decisions and

emerging risks across jurisdictions to inform strategy with

escalation where necessary.

– We have accepted the RIIO-T3 price control, achieving a

satisfactory outcome. We are now focused on delivering against

our commitments with continued focus on capital delivery

efficiency and responding to the highly incentivising framework

that aligns outperformance with outcomes customers value (for

example, faster connections and reduced constraint costs).

– We are actively engaging on the ED3 price control (price control

2028-33), focusing on well-evidenced submissions that balance

investment requirements with delivering value for customers and

affordability.

– We are focusing on core regulatory principles in ongoing gas

base rate cases and engaging constructively with regulators to

support balanced and sustainable outcomes, having successfully

agreed our 2025/26 US rate cases.

– We are participating in affordability and rate design dockets in the

US to educate on the regulatory compact.

– Our interconnector structures continue to deliver net benefits to

customers, including supporting system efficiency and enabling

funding for energy assistance programmes.

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 35 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Our Group Principal Risks cont. |  |  |  |  |  |

–

![]()

Strategic Group Principal Risks

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
|  | Climate change mitigation | | |  |  |
|  |  | Oversight: Responsible  Business Committee |  | |  |
|  |  |  |  |  |  |
|  |  |  |  |  |  |

Description

There is a risk that we fail to identify and/or deliver upon the

actions necessary to meet our climate change targets and enable

the wider energy transition because of poor monitoring and

response to external developments associated with mitigating

climate change, leading to legal risks or reputational impacts of

not meeting our climate change targets and, in the longer term,

reaching net zero by 2050.

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
|  |  |  |  |  |  |
|  |  |  |  |  |  |

Developments during 2025/26

Achieving climate change targets remains a central long-term

objective. The strategic focus on delivery is increasingly shaped by

external developments that influence the pace, cost, and feasibility

of the energy transition. These developments continue to evolve

across policy, markets, technology and stakeholder expectations,

and are actively monitored as part of the Group’s risk and strategic

planning processes. Against these drivers, the Board’s focus is on

whether the Group has appropriate governance, controls and

flexibility to manage climate change targets within appetite.

Actions taken by management

Management actions are focused on credible target management,

governance and transparency, recognising the importance of

adapting to a changing external environment. These actions include:

– implementing a revised US operating model with sustainability

teams embedded within business units, and integrating

Environment, Social, Governance and Risk teams to strengthen

oversight and coordination;

– undertaking an internal review of the Group’s climate targets and

maintaining current targets while keeping alternative pathways

under active consideration, reflecting evolving external

dependencies;

– updating greenhouse gas emissions analysis to reflect changes

in policy, regulation and market conditions, and using peer

benchmarking to inform ongoing risk assessment; and

– improving our sustainability narrative to better reflect our wider

societal contribution to emissions reduction.

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
|  | Political and societal expectations | | |  |  |
|  |  | Oversight: Responsible  Business Committee |  | |  |
|  |  |  |  |  |  |
|  |  |  |  |  |  |

Description

There is a risk that we do not position ourselves appropriately to

navigate political and societal expectations because of a failure to

proactively monitor the landscape or anticipate and respond to

changes, leading to political intervention, an inability to meet our

core energy objectives, uncovered costs or pressure on returns or

the inability to gain necessary regulatory approvals.

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
|  |  |  |  |  |  |
|  |  |  |  |  |  |

Developments during 2025/26

The Board recognises that the risk associated with political and

societal expectations arises from a rapidly evolving external

environment, where energy affordability, climate policy and public

trust are increasingly intertwined with political decision making.

Against these drivers, the Board’s focus is on whether the Group is

appropriately positioned to navigate political and societal

expectations, while continuing to deliver its strategic priorities.

Actions taken by management

Management actions are focused on anticipation, engagement and

alignment with policymakers, recognising that many external drivers

are outside the Group’s direct control:

– Implementing a more regionally focused external affairs operating

model to improve engagement with governments, regulators,

communities and other stakeholders in key markets.

– Monitoring political, regulatory, media and societal trends across

jurisdictions to identify emerging issues early and inform decision

making.

– Defining policy priorities aligned to the Group’s strategic

objectives and engaging constructively with policymakers to

support stable, investable regulatory frameworks.

– Conducting scenario analyses to ensure the Group can adapt its

response to changes in the external environment.

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
|  | People capability and capacity | | |  |  |
|  |  | Oversight: People &  Remuneration Committee |  | |  |
|  |  |  |  |  |  |
|  |  |  |  |  |  |

Description

There is a risk that we do not have, across our workforce and within

our leadership, the capability or capacity necessary to deliver on

existing or future commitments because of ineffective planning for

future people needs, insufficient development of people, and failure

to attract and retain people in a competitive market for skills and

talent, leading to failure to deliver on our business goals, strategic

priorities and mission.

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
|  |  |  |  |  |  |
|  |  |  |  |  |  |

Developments during 2025/26

We continue to focus on future workforce needs, recognising that

the ability to deliver the Group’s strategic priorities, including the

energy transition and major capital projects, is fundamentally

dependent on having sufficient workforce capacity, capability and

leadership depth, now and in the future.

Actions taken by management

Management actions are focused on building resilience, flexibility,

and future ready capability, while balancing near-term delivery

needs with longer-term workforce sustainability. These actions

include:

– maintaining a consistent, forward looking, Group-wide approach

to strategic workforce planning to have visibility on future

capacity and capability requirements;

– expanding our early careers programmes to build sustainable

talent pipelines for critical roles and support diversity of talent

pools; and

– monitoring recruitment and retention metrics closely to ensure

capacity is stable and delivery risk is reduced.

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 36 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Our Group Principal Risks cont. |  |  |  |  |  |

![]()

Financial Group Principal Risks

![]()

![]()

|  |  |  |  |
| --- | --- | --- | --- |
|  |  |  |  |
| Strategic priorities | | |  |
|  |  |  |  |
| Enable the energy  transition | Build the networks  of the future now | Deliver for  customers |  |
|  |  |  |  |
|  |  |  |  |
| Operate safely and  efficiently | Build tomorrow’s  workforce today |  |  |
|  |  |  |  |
| Risk trend |  |  |  |
|  |  |  |  |
| Increasing | Decreasing | No change |  |

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
|  | Financing our business | | |  |  |
|  |  | Oversight: Audit & Risk  Committee |  | |  |
|  |  |  |  |  |  |
|  |  |  |  |  |  |

Description

There is a risk that we are unable to fund our business efficiently as

a result of lack of access to a wide pool of equity and debt

investors, market volatility, unsatisfactory regulatory outcomes or

unsatisfactory financial or operational performance of the business,

leading to a lack of access to capital, impacting our ability to

achieve our strategic objectives, including our proposed capital

investment programme.

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
|  |  |  |  |  |  |
|  |  |  |  |  |  |

Developments during 2025/26

The Board recognises that the ability to finance the Group’s

strategy is increasingly influenced by a combination of

macroeconomic conditions, capital market dynamics, and

regulatory outcomes, alongside the scale and duration of the

investment programme. The Group is undertaking a multi-year

investment programme of unprecedented scale to modernise

networks, meet rising demand and enable the energy transition.

The duration and magnitude of this investment mean that continued

access to debt and equity markets on acceptable terms is

essential. The Board considers the long-term nature of these

funding needs to be a key structural driver of financing risk.

Actions taken by management

Management actions are focused on maintaining financial resilience,

flexibility and market access, recognising that many financing

drivers are external and cyclical. Key actions and developments

include:

– We have agreed an updated five-year financial framework to

2030/31, including cumulative capital investment of at least

£70bn over the next five years.

– Delivered positive regulatory outcomes, including approval of

NIMO Niagara Mohawk (National Grid’s electric and gas

distribution business in Upstate New York) rate agreement joint

proposal and acceptance of the RIIO-T3 final determinations.

– Ensured maintenance of appropriate headroom against key

credit metrics, supporting confidence in the Group’s ability to

access debt capital markets.

– Maintained strong engagement with current and potential

investors through both the Group’s equity and debt investor

relations programmes.

– Maintaining strong liquidity, a robust credit rating and access to a

diversified range of funding sources to raise debt efficiency to

fund our investment programme.

– Completion of portfolio actions, including the disposals of

National Grid Renewables and Grain LNG in 2025/26, with

proceeds retained for reinvestment in the regulated business.

– Frequent engagement with credit rating agencies, with no

changes to credit ratings or outlooks expected.

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
|  |  | | |  |  |

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 37 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Cyber security and emerging risks |  |  |  |  |  |

#### Cyber

#### security risk management and strategy

Cyber security risk is overseen and continuously monitored by the

Group Executive and the Board. We apply the NIST cyber security

framework to identify, assess, monitor and respond to cyber security

risks, supported by a risk management process aligned to the

Group’s ERM Framework and covering all IT and operational

technology assets including systems and data, legacy technology risk

and those operated by third parties. Our cyber security risks are

managed via the “Three Lines” model, supplemented by external

specialist support including cyber security firms, providing

independent validation of our approach and specialist expertise for

specific regulatory requirements and technologies. Further assurance

is obtained through risk assessments, penetration testing, adversary

simulation, incident response exercises and compromise

assessments. An independent Supply Chain Risk Management

(SCRM) function identifies and oversees cyber risks arising from

third‑party service providers, with controls implemented by SCRM

that are proportionate to the supplier’s access to Group systems and

the sensitivity of data processed.

There have been no cyber security incidents to date that have

materially impacted the Group’s business strategy, results of

operations or financial condition. Notwithstanding this, we recognise

that the cyber threat environment for critical infrastructure providers

remains highly challenging and dynamic. We recognise that digital

transformation blurs the boundary between physical and cyber

security. Modern hybrid threats can combine common cyber attacks

with physical dimensions such as intrusion or sabotage. We have

emphasised a converged model that strengthens our ability to detect,

prevent and respond to these complex, multi-vector threats,

providing a more robust and resilient security framework.

#### Cyber security governance

The Board is responsible for oversight of cyber security. The Audit &

Risk Committee regularly reviews reporting on our approach to cyber

security risk management and developments throughout the year.

National Grid’s Chief Information and Digital Officer (CIDO) and Chief

Information Security Officer (CISO) regularly attend the Audit & Risk

Committee and hold additional briefings to the Board at least once

per year. The Audit & Risk Committee and Board work collaboratively

to ensure oversight with the proper focus of each respective

Board committee.

Cyber risk reporting includes, among other things, current and

emerging cyber security threats to National Grid and relevant sectors,

the status of key risk indicators and controls, the results of any

relevant internal or external assessments, key incidents escalated to

management during the prior and current reporting period and the

status of cyber security improvement programmes. At the executive

and management level, the CIDO is the owner of the cyber security

risk and the CISO has primary responsibility for the development,

operation and maintenance of National Grid’s cyber security

programme. Under the CISO’s oversight, National Grid’s cyber

security team implements and provides governance and functional

oversight for cyber security services, controls and processes.

In line with our ERM Framework, cyber security processes include the

escalation of material risks and incidents, including those that

originate or occur from third parties, through the organisation to the

Group Executive Committee, Audit & Risk Committee and Board as

appropriate, based on an assessment of likelihood and severity

of impact.

![]()

#### Emerging risks

We consider emerging risks and trends

throughout the year to assess potential future

material impacts on our risk profile. Each risk is

assigned an appropriate owner or subject matter

expert, who monitors developments and is

responsible for implementing relevant mitigations

as necessary. Emerging risk reviews are reported

at least bi-annually to the Group Ethics, Risk &

Compliance Committee, the Audit & Risk

Committee, and the Board, for review and input.

Our top three emerging risks at the date of this report are:

|  |  |  |  |  |
| --- | --- | --- | --- | --- |
|  |  |  |  |  |
| Emerging risk | Impact on strategy | Velocity | | |
| Immediate < 3 years | Short term 3–5 years\* | Medium term 5–10 years |
|  |  |  |  |  |
| Geopolitical tensions  (business or supply chain disruption) |  |  | | |
|  |  |  |  |  |
| Artificial intelligence  (strategic opportunities or disruption) |  |  | | |
|  |  |  |  |  |
| Affordability  (customer affordability issues) |  |  | |  |

![]()

\* We continuously monitor our short-term emerging risks to ensure we respond to changes in our risk assessments appropriately.

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 38 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Responsible Business review |  |  |  |  |  |

#### Delivering our Responsible

#### Business Charter

Our Responsible Business Pillars and UN Sustainable Development Goals where we have the most material impact:

We aim to act as a responsible business and play our part in

delivering an affordable, secure and clean energy system. Our

Responsible Business Charter (RBC) details our approach to being

a responsible business and the commitments we have made. It

focuses on three core pillars: Our environment, Our customers and

communities, and Our people, supported by our Responsible

Business Fundamentals.

Further details on our Responsible Business activities and metrics

can be found on our website. See links below.

|  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |
|  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |
|  |  |  | Our  environment | | | |  |  |  |  | Our customers  and communities | | | |  |  |  |  | Our people | | | |  |
|  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |
|  |  |  | By building out the network of the future, we are  continuing to connect low-carbon generation and  storage and use our networks to support the  electrification of heat and transport. We are also  working hard to manage the impact of energy  infrastructure on the natural environment. | | | |  |  |  |  | As we help to build out the network of the future, we  aim to create social value for our customers and  communities. We work to support economic growth in  the communities we serve, support affordability as a key  part of the energy transition, and engage in volunteering  and community skills development. | | | |  |  |  |  | We are focused on providing development  opportunities to all our colleagues, creating an  inclusive culture, and enhancing the health and  wellbeing of our employees. | | | |  |
|  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |
|  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |
|  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |
|  |  |  | 2025/26 progress | |  | Looking forward |  |  |  |  | 2025/26 progress | |  | Looking forward |  |  |  |  | 2025/26 progress | |  | Looking forward |  |
|  |  |  | – Replaced 315 miles of leak  prone pipe  – Reduced SF6 emissions by  43% through leak repairs and  investing in alternatives | |  | – Continuing to connect low-  carbon generation to our  networks  – Collaborating with suppliers  to reduce their own  emissions |  |  |  |  | – Assisted over 20,000  households through our  UK Grid for Good Energy  Affordability Fund  – Exceeded our Skills  Development | |  | – Continuing to listen to and  address customer feedback  – Expanding new and existing  community partnerships |  |  |  |  | – 81% Group-wide  employee engagement  score  – A Glassdoor 2026 Best  Place to Work | |  | – Expanding recruitment and  development programmes  – Continuing to promote healthy  practices and wellbeing  resources |  |
|  |  |  | | Read more on page [40](#i734e88e4e18e4788ae8e7425d54e0122_19296) |  |  |  |  |  |  | | Read more on page [45](#i37316db5b4374c589ba30a846e6ca2c2_58863) |  |  |  |  |  |  | | Read more on page [47](#i70b5ee7f594547dc9723654471a95a7c_89103) |  |  |  |

|  |  |  |  |  |  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |  |  |  |  |  |
|  |  | Our Responsible Business Fundamentals | | |  |  |  |  |  |  |
|  |  |  |  |  |  |  |  |  |  |  |
|  |  | At National Grid, it is a priority to run our business and  engage with our supply chains in a responsible way.  Our Fundamentals include governance and activities  that are essential to day-to-day business. | 2025/26 progress  – Transitioned supply chain sustainability  risk assessments and data to EcoVadis  to support supplier assessments  – Invested in new innovations, such as AI  demand response in data centres and  enhanced pipeline imaging | Looking forward  – Continuing to improve our safety  programme with insights from our new  reporting system  – Increasing our workforce AI and data  capabilities  – Further embedding sustainability into  supplier sourcing |  | To view our  Responsible  Business data  tables, scan or  click the QR  code |  | To explore our  Responsible  Business  website, scan  or click the QR  code |  | To read more  about our  Responsible  Business  Charter, scan  or click the QR  code |

![RB Data tables pp38.jpg]()

![RB Website pp38.jpg]()

![RB Charter pp38.jpg]()

|  |  |
| --- | --- |
|  |  |
|  | Read more on page [49](#if05dc6fa9b1c45cd9c0112e45388d907_107521) |

All 2025/26 Responsible Business metrics can be found in the Responsible Business data tables on our website.

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 39 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Responsible Business review cont. |  |  |  |  |  |

#### Our progress in 2025/26

Responsible business is important to us and our

stakeholders. Over the past year, we have

navigated a complex landscape characterised by

significant economic and political uncertainty. In

this environment, energy security and affordability

remain priorities. Part of being a responsible

business is taking account of, and responding to,

these expectations to deliver for our customers,

communities, colleagues and other stakeholders.

While clean power retains support from the UK

Government, energy costs remain a significant

challenge and energy resilience has emerged as a

key issue. In the US, both New York and

Massachusetts have acknowledged affordability

concerns related to the energy transition.

We, alongside other network companies, have a

unique role to play in supporting the energy system

transition. While we remain focused on reducing

our own carbon emissions, by building out the

network of the future, we are supporting

the deployment of renewable energy supply to meet

society’s growing electricity needs and bringing

down overall emissions. We are also innovating

through new technologies and approaches to

maximise the pace and scale of system-wide

decarbonisation. We are therefore looking beyond

our own emissions at the emissions reductions we

influence through our delivered and future

business activities.

In 2025/26, we connected 1,125 MW of energised

renewable generation to our transmission and

distribution networks and saw further uptake of

heat pumps and electric vehicles across our

jurisdictions. We expect these new assets to

deliver emissions savings year-on-year and

estimate they will help avoid 5 MtCO2e from

2026/27 to 2030/31 as renewable electricity

generation replaces carbon intensive generation,

heat pumps replace gas and oil boilers, and EVs

replace internal combustion engines1.

Looking forward, a significant uptick in National

Grid activity, underpinned by at least £70 billion of

capital investment in the next five years, will deliver

infrastructure that is expected to support reliable,

cleaner and affordable energy. We expect to

support further avoided emissions through our

continued role in connecting renewable generation

and facilitating the uptake of heat pumps and

electric vehicles in our jurisdictions.

We also have a wider enabling role in the energy

transition. Our infrastructure helps deliver clean

power generated by assets connected to other

networks, to both existing and new sources of

demand served by our network or in other

locations. For example, in the UK we are delivering

transmission projects to increase power flows

between Scotland and England and developing

new links to mainland Europe, better connecting

clean power to demand. In the residential,

commercial and industrial sectors, electrification

can be a key driver of emissions reductions,

including through fuel switching to electricity

supplied through our networks for heating and

transport. In collaboration with others, we therefore

expect our infrastructure to enable significant

emissions reductions across a range of sectors.

A range of activities will contribute, including:

– our [Great Grid Upgrade](https://www.nationalgrid.com/the-great-grid-upgrade), the largest overhaul of

the UK electricity grid in generations;

– [the Upstate Upgrade](https://upstateupgrade.nationalgrid.com/), a collection of complex,

multi-year high-value transmission line projects in

support of New York’s Climate Leadership and

Community Protection Act; and

– innovation through regulatory funded projects,

working with our supply chain partners and

through our venture capital arm National Grid

Partners.

Our Scope 1 and 2 emissions are down 3% vs our

2018/19 baseline. This is outside of the range set

out in our second Climate Transition Plan (CTP),

published in May 2024. We stated in our CTP that

progress is unlikely to be linear. Scope 2 emissions

were lower than last year, but Scope 1 emissions

were higher than expected due to increased

generation from our Long Island facilities that burn

oil and gas. These units are crucial to reliability and

are contracted to the Long Island Power Authority

(LIPA), which controls when and how much they

run to maintain reliable energy supply in the region.

Our Scope 3 emissions increased by 11% in

2025/26, primarily due to an increase in supply

chain emissions, as anticipated in our CTP, as we

build out new infrastructure. We continue to identify

opportunities to reduce supply chain emissions

and aim to decouple spend growth from

emissions growth.

Affordability continues to be a concern for

households and businesses. In the US, we’ve

continued to raise awareness of financial

assistance and support available and, in the UK,

we’ve seen reforms to the connection queue that

will help us to prioritise connection-ready low-

carbon generation projects to expand availability

and maximise capacity.

We also support our local communities through

volunteering and skills development programmes.

We maintain partnerships with charities, non profits

and educators to create skills and employability

pathways for everyone in our communities and to

provide opportunities for colleagues to volunteer.

We are committed to creating a work environment

where people are treated fairly and where everyone

feels respected, valued, and empowered to reach

their full potential. For our colleagues, safety

remains our top priority as project work is scaled

up to meet our commitments, and we have a range

of initiatives underway in our business units to

ensure we meet our safety targets.

The following sections highlight the progress made

in the last year against our RBC and where there is

more to do. Working with our stakeholders, we will

continue to make progress on all of our

commitments.

1.Avoided emissions represent the difference between baseline

(counterfactual) emissions and emissions after the

implementation of the low-carbon alternative. We have estimated

cumulative avoided emissions to 2030/2031 from low-carbon

solutions delivered in 2025/26, specifically 1) Renewable

electricity connections (direct connections to our transmission

and distribution networks) 2) Electric heat pumps replacing fossil-

fuel boilers (in our distribution/customer regions) and 3) Electric

vehicles replacing internal combustion engine vehicles (in our

distribution/customer regions). Renewable electricity connections

are sourced from our Responsible Business data tables. Heat

pump and electric vehicle data is sourced at the NY, MA and UK

level on a calendar year basis, and National Grid’s share is

estimated by using NGED’s share of electricity distribution

network customers in the UK and our delivered electricity load in

our US jurisdictions. Grid carbon intensity and marginal plant

intensity are calculated on a calendar year basis.

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc    Annual Report and Accounts  2025/26 | 40 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Responsible Business review cont.  Our environment |  |  |  |  |  |

![ResponsibleBus-Environment.jpg]()

We have always viewed our targets as ambitious.

Achieving them relies on a combination of actions

we take ourselves, as well as technological

dependencies, policy and regulatory frameworks in

the regions we operate, and actions by others

including businesses and energy consumers. Our

ability to achieve our climate targets is driven by

the policies put in place by the jurisdictions where

we operate that support decarbonising their energy

systems at a rapid pace. Political and economic

headwinds have intensified in the past year.

Governments face multiple pressures, including

budget constraints and customer affordability

concerns, which may impact the pace of

#### Our environment

By building out the network of the future, we enable the

deployment of low-carbon energy supply and support the

electrification of heat and transport. We are also working

hard to manage the impact of energy infrastructure on the

natural environment.

[Our second](https://www.nationalgrid.com/responsibility/our-environment/our-climate-transition-plan) [Climate Transition Plan (CTP)](https://www.nationalgrid.com/responsibility/our-environment/our-climate-transition-plan), published in May 2024, outlines our

roadmap to achieve net zero by 2050. As part of this, we have set near-term science-

based GHG emissions reduction targets at a Group level. These have been approved

by the Science-Based Targets initiative (SBTi) as aligned with limiting global warming

to a 1.5°C pathway and the ambition of the Paris Agreement, and have been developed

using an SBTi sectoral decarbonisation approach where available. SBTi is currently

developing the Corporate Net Zero Standard Version 2, and we have been actively

engaged in their consultation to shape the new standard.

Actions by our stakeholders are crucial to us being able to deliver our emissions

reductions targets. We engage with policymakers and regulators aiming to achieve

the required planning and permitting changes in the UK and US, and in the US where

we are an energy supplier, policies that promote energy efficiency and the use of low-

carbon fuels. We also work with customers to promote efficient solutions, industry

groups to advance new technologies, and our suppliers to help decarbonise the

value chain.

decarbonisation. While the costs of some

technologies continue to fall, the costs of other

renewable technologies have risen, which is also

impacting policy and the pace of the transition.

We’ve made good progress across multiple areas

of our emissions inventory, including where we

have direct control. Where we don’t have direct

control, achieving our near-term targets looks

increasingly challenging as we are reliant on policy

and regulatory dependencies. Below, we provide

an update on progress against some of our

targets, including some of the most material

dependencies that could impact our progress.

Moving forward, we will continue to prioritise

reductions where we have operational control and

influence areas where we do not, refining our

approach based on our results. More detail on our

targets, key dependencies and challenges can be

found in our CTP, available on our website.

![]()

We committed to

#### Achieve net zero by 2050 for Scope 1, 2 and 3 GHG emissions

We continue to work towards our ambitious

targets. However, we are reliant on external

dependencies such as policy and regulatory

support and wider sectoral decarbonisation.

#### Scope 1 and 2 GHG emissions for 2025/26 were7,511ktCO

2e, outside of our range set out in the CTP, and

down

3%

#### from our 2018/19 baseline.

|  |  |  |
| --- | --- | --- |
|  |  |  |
| Progress to target 1,2 % | | Target 2030/31 |
| 3% |  | 60% |

![19791209300355]()

Scope 1 GHG emissions in areas where we have

greater direct control have fallen from the baseline

year. Gas operational emissions from fugitives and

venting comprise about 10% of our Scope 1 and 2

emissions and have decreased 4.2% from the prior

year. These emissions are largely driven by the

volume of gas travelling through our pipes and are

being addressed through investments in cross

compression, pipeline coatings, vacuum purging,

and rehabilitation of leak-prone piping.

In 2025, we replaced 315 miles of leak-prone pipe

in New York and Massachusetts. This long-

standing programme delivers emissions reductions

each year. This programme is progressing within

the projected ranges of our CTP. We are also

evaluating advanced leak detection technologies,

including stationary, satellite, aerial and ground

based solutions to quickly identify and mitigate

emissions sources.

Scope 1 GHG emissions where we have less direct

control are outside of the range that we set out in

our CTP. The most challenging area is emissions

from our Long Island generation facilities, where

emissions increased by 19% from the previous

year. These units burn oil and gas and are

contracted to the Long Island Power Authority

(LIPA), which controls when and how much they

run to maintain reliable energy supply in the region.

1.Includes Scope 2 location-based emissions only.

2.Near-term targets approved by Science-Based Targets initiative

(SBTi) and aligned to the Paris Agreement and a 1.5ºC pathway.

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 41 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Responsible Business review cont.  Our environment |  |  |  |  |  |

Our 2025/26 GHG emissions footprint across direct and indirect sources was 37,015 ktCO2e

Our Long Island generation assets are currently

expected to be materially depreciated by 2040,

![supply chain dia_pp41_NEW v2.jpg]()

|  |  |  |  |  |
| --- | --- | --- | --- | --- |
|  |  |  |  |  |
| Upstream Scope 3 |  | Supply chain and other upstream emissions | |  |
|  | 7,012kt |  |  |
|  | 18.9% of total footprint |  |  |
|  | – Construction and maintenance of energy infrastructure  – Equipment and components  – Well-to-tank emissions for generation  and transportation of electricity | |  |
|  |  |  |  |
|  |  |  |  |  |
| Scope 1 and 2 |  | Power generation | Operation | Administration |
|  | 3,929kt | 3,356kt | 226kt |
|  | 10.8% of total footprint | 9.1% of total footprint | 0.6% of total footprint |
|  | – Electricity generation from  fossil fuels | – Line losses from our electricity  transmission and distribution  networks  – SF  6 leaks from electrical  equipment  – Leaks and venting from  our gas network  – LNG venting and fuel | – Building energy consumption  – Company cars  – Commercial fleet |
|  |  |  |  |
|  |  |  |  |  |
| Downstream Scope 3 |  | Administration | Retail energy:  Sold Gas1 | Retail energy:  Sold Electricity1 |
|  | 86kt | 19,736kt | 2,670kt |
|  | 0.2% of total footprint | 53.4% of total footprint | 7.2% of total footprint |
|  | – Business travel  – Employee commuting  – Waste | – Emissions from the gas that we  sell to our customers | – Emissions from the electricity  that we sell to our customers |

aligning with New York State’s zero-emissions

electricity targets. However, given delays to

offshore wind and anticipated load growth,

achieving a sufficient reduction in operating hours

in the timeframe required to hit our near-term

targets will be challenging, and fossil-fuel

generation assets may continue to operate beyond

2040 to support grid resilience.

Our Scope 2 emissions decreased by 15% during

2025/26. These are almost entirely comprised of

electricity network line losses and are broadly in

line with the trajectory set out in our CTP.

Electricity network line loss emissions are primarily

influenced by the location and carbon intensity of

generation and the location and magnitude of

demand, which are outside of our control. If our

jurisdictions see a slowdown in the pace of

decarbonisation, this will slow the pace of emissions

reductions from line losses. We indirectly reduce the

emissions from electricity line losses by connecting

low-carbon generation to our networks. We calculate

emissions from losses using the average carbon

intensity of electricity in the regions where we

operate, as published by the UK Government and

the US Environmental Protection Agency (EPA).

In the UK, there has been significant progress in

decarbonising the grid. The continued

implementation of various policy reforms, including

connections and planning, is required to support

ongoing progress. For US line loss emissions to

decrease in line with our wider targets, we would

need to see a wider societal increase in the pace of

clean energy development. This would require

addressing wider challenges around permitting,

interconnection, and customer affordability in

addition to current state government activities related

to renewable generation.

Regarding specific sub-targets for Scope 1 and 2,

from a 2018/19 baseline:

– The carbon intensity of our power generation

(Scope 1 GHG emissions) has increased by 3%

per MWh against a target of reducing by 90% by

1. Retail energy emissions are primarily driven by the gas and electricity we sell to our customers. Reducing these emissions depends on a

combination of actions we take, customer choices, wider energy system decarbonisation, and policy and regulatory frameworks.

2030/31 and 92% by 2033/34.

– We’ve reduced absolute Scope 1 and 2 GHG

emissions (excluding generation) by 26% against

a target of 50% by 2030/31.

We report on our power generation emissions

intensity as part of our SBTi targets. Since we

completed the sale of National Grid Renewables in

2025, our generation portfolio is made up solely of

gas and oil generation assets, which are operated

by LIPA. With this change, achieving this target is

very challenging, requiring fuel switching or carbon

capture technologies which are not yet

commercially viable.

|  |  |
| --- | --- |
|  |  |
|  |  |

#### 20%of our light-duty vehicles are electric vehicles.

|  |  |  |
| --- | --- | --- |
|  |  |  |
| Progress to target % | | Target: 2030/31 |
| 20% |  | 100% |

![16492674418246]()

We are making progress against our target to

move to a 100% electric fleet for our light-duty

vehicles, however, we continue to face challenges

with vehicle cost and availability. This year, we

have added 219 electric vehicles to our

commercial fleets, bringing our total to 1,235 EVs,

20% of our total number of light-duty vehicles.

Achieving this target is dependent on the cost,

availability, and performance of vehicles with the

required characteristics to meet operational needs,

which makes achievement of this target

increasingly challenging.

This year, we also introduced our first heavy duty

electric vehicle to our fleet, a box truck with a 230-

mile range based at our Sutton depot in

Massachusetts.

Moving forward, we will consider strategies to reduce

emissions from transport that are informed by vehicle

availability, use cases and conditions in the regions

where we operate, and cost effectiveness. We will

keep this target under review.

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 42 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Responsible Business review cont.  Our environment |  |  |  |  |  |

![Resp Bus_pp40_environ_NEW.jpg]()

SF6

#### emissions from our operations are down43%.

|  |  |  |
| --- | --- | --- |
|  |  |  |
| Progress to target 1 % | | Target: 2030/31 |
| 43% |  | 50% |

![16492674418264]()

We continue to reduce SF6 emissions caused by

emerging leaks, resulting in GHG emissions

reductions of 43% against our 2018/19 baseline.

The majority (around 80%) of the SF6 we use on our

networks is in UK ET. Our focus is on SF6 leak

detection and repairs, as well as increasing our

investment in SF6 alternatives, working with other

UK transmission owners.

![7146825584111]()

#### Absolute energy consumption in our

#### flagship offices

#### is down by48%, exceeding our 20% target.

|  |  |  |
| --- | --- | --- |
|  |  |  |
|  | Target:  2030/31 | Progress to  target % |
|  | 20% | 48% |

![16492674418282]()

We have reduced energy consumption in our flagship

offices by 48% against our 2019/20 baseline,

exceeding our 20% target, by optimising heating,

ventilation, air conditioning, and lighting to promote

efficiency while meeting the needs of our colleagues.

We also indirectly contribute to emissions

reductions through the purchase of renewable

certifications. In 2025/26 we achieved 62%

(2024/25: 36%) of renewable electricity purchased

with renewable certification globally, driven by the

UK, where 99.7% (2024/25: 49%) of electricity

purchased for operational purposes was with

renewable Energy Attribute Certification (EACs)

where we have choice over purchasing sources.

For leased and other sites where we do not have

purchasing decision choice, we do not have

control over whether the electricity purchased is

with renewable credentials. The increase

compared with the prior year mainly reflects the

disposal of Grain LNG; as the asset did not hold

EACs, its exit from the Group has led to a

significant increase in the UK percentage.

#### Our Scope 3 emissions (excluding sold electricity) were up11%from our

#### 2018/19 baseline.

|  |  |  |
| --- | --- | --- |
|  |  |  |
| Progress to target 1 % | | Target: 2033/34 |
| (11%) |  | 37.5% |

#### Our Scope 3 emissions (excluding sold electricity) for 2025/26 were26,833 ktCO

2e.

The majority of our Scope 3 emissions result from

the use of sold gas we deliver to our customers in

the US, with these emissions making up about

75% of our Scope 3 emissions target.

Meeting our Scope 3 sold gas target would require

an additional estimated 1.2-1.8 million gas

customers converting to electric heat by 2033/34.

We continue to seek to enable the connection of

low-carbon electricity generation that is necessary to

support customers in switching to electric heat, and

we offer incentive programmes to encourage

customers to adopt heat pumps. However, to further

motivate heat pump adoption, we would need to

see reductions in the upfront cost of heat pumps, as

well as efficiency gains in heat pump technology.

Achieving the emissions reductions required to meet

our Scope 3 target is therefore challenging.

Emissions within our supply chain represent

approximately 18% of our Scope 3 emissions

target, and we have seen emissions increase by

2% during 2025/26. We projected this in our CTP

due to increased spend on goods and services

associated with the construction of new energy

infrastructure.

Regarding specific sub targets for Scope 3, from a

2018/19 baseline:

– The carbon intensity of power generation and

sold electricity (Scope 1 and Scope 3 GHG

emissions) decreased by 1% against a target of

reducing by 86% by 2033/341.

– We’ve reduced absolute GHG emissions from

gas sold by third parties by 10% against a target

of 37.5% by 2033/341,2.

#### 62%of our UK

#### supply chain emissions

3

#### are from suppliers that have formally committed to setting a science-based target (SBT).32%of our US supply chain

#### emissions

3

#### are from suppliers that have established a roadmap towards science- based targets.

|  |  |  |  |  |
| --- | --- | --- | --- | --- |
|  |  |  |  |  |
| Progress to target 1 % | | | | Target: 2025/26 |
| ResponcE-Bus-UK_Icons.gif | UK | 62% |  | 80% |
| ResponcE-Bus-US_Icons.gif | US | 32% |  | 50% |

![16492674418336]()

![16492674419395]()

We continue to collaborate with key suppliers who

contribute significantly to the emissions associated

with the goods and services we procure. In the UK,

62% of our UK supplier GHG emissions are from

suppliers who are committed to setting an SBT. In

the US, 32% of our supplier GHG emissions are

from suppliers who have established a roadmap

toward SBTs. As our supply chain emissions data

and insights have matured, we have moved from

reporting a percentage of suppliers committed to

SBTs or an SBT roadmap, to the percentage of our

supply chain emissions covered by those suppliers.

Our suppliers have many dependencies that are

outside of their control, including the lack of SBT

pathways for certain sectors. SBTi is currently

consulting on the standards used to set validated

SBTs, with new standards expected to be formally

in place at the start of 2027. Because of this, we are

recommitting to our supply chain engagement,

retaining the target but extending the target date to

2030/31 and reporting a percentage of emissions

rather than a percentage of suppliers. We had

stated that this target was under review in our

2024/25 disclosure.

1.Near-term targets approved by SBTi and aligned to a well below

2°C pathway.

2.Third-party sold gas, a US only emission, are downstream

emissions associated with the combustion of natural gas

delivered through our network but sold by a company other than

National Grid. This differs from Scope 3 Cat. 11 GHG Protocol

guidance, which otherwise advises to consider only the end use

of goods sold by the reporting company itself.

3.Carbon Strategic Supplier Engagement: GHG emissions from

Scope 3 Cat 1 and Cat 2: Purchased Goods and Services and

Capital Goods only.

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 43 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Responsible Business review cont.  Our environment |  |  |  |  |  |

We have developed a new responsible supply chain

We are committed to

strategy to work toward embedding sustainability

criteria into our strategic sourcing process. This

strategy focuses on the changes we need to make to

our contracting approach, tender strategy, and

engagement to drive change. [More detail on this](https://www.nationalgrid.com/responsibility/our-environment/net-zero/supply-chain-targets)

[strategy is available on our website.](https://www.nationalgrid.com/responsibility/our-environment/net-zero/supply-chain-targets)

Key construction materials such as concrete and

steel have significant carbon footprints and more

sustainable alternatives are difficult to source and

come at a higher cost. To see reductions in supply

chain emissions in line with our Scope 3 target, we

would need to see a significant reduction in the

carbon intensity of construction materials. In UK

ET, as part of our RIIO-T3 business plan, we’ve set

targets against some of our key carbon hotspot

areas, enabling us to influence how suppliers

respond and make changes to their operations.

|  |  |
| --- | --- |
|  |  |
|  |  |

#### Air travel emissions are down45%from our 2019/20 baseline.

|  |  |  |
| --- | --- | --- |
|  |  |  |
| Progress to target % |  | Target 2025/26 |
| 45% |  | 50% |

![16492674418354]()

This year, absolute emissions from business air

travel are lower than the previous year at 6.1

![16492674418423]()

ktCO2e, a 45% reduction from our baseline.

Air travel emissions are a very small portion (0.01%) of

our total Scope 3 emissions. While we have not hit our

target, we have made good progress in this area.

We’ve implemented hybrid working, consolidated

meetings to reduce the number of trips necessary and

embedded sustainability considerations into our travel

policy, discouraging travel where it is not necessary.

As a transatlantic business, we try to balance the

business benefits of in-person meetings with creating

efficiencies by reducing air travel. We remain focused

on reducing emissions in our most material areas and

reinforcing our travel policy to drive ongoing

progress, and we will not renew this target.

#### Protecting our natural environment

In the UK we are committed to restoring the land

we manage. We use a natural capital approach to

measure the impact of improvements we make on

the non-operational land at our own sites based on

financial value estimations.

Due to significant differences in the conditions of

habitats and levels of biodiversity present in the

landscape between the UK and US, in the US our

efforts focus on the preservation of the natural

lands that we own. Acreage reported in the US

includes lands we have enrolled in our integrated

vegetation management (IVM) programme, which

aims to preserve biodiversity by optimising

trimming on our rights-of-ways, and other nature-

related projects.

|  |  |
| --- | --- |
|  |  |
|  |  |

#### On the land we manage in the UK, we have restored the natural environment by15%.

![Restoration.jpg]()

|  |  |  |
| --- | --- | --- |
|  |  |  |
| Target | | Progress to target % |
| 10% | | 15% |

A natural capital approach allows us to

demonstrate environmental restoration by

supporting and measuring beneficial changes to

land management and biodiversity. This is only

driven by activities in our UK ET business.

We manage around 1,800 hectares of non-

operational land in the UK, including hedgerows,

ancient woodland, wildflower meadows, wetlands,

grasslands and peat bog. We committed to

improving its environmental value by at least 10%

by 2026. Since 2020/21, we have achieved a 15%

increase. In our final year of the RIIO-T2

Environmental Incentive (2025/26), we delivered a

further uplift by introducing nine new strategic

partnerships and expanding one existing

agreement.

UK ED focuses on improving biodiversity on our

operational sites. We have committed to a six–year

formal partnership with Heart of England Forest to

support woodland management and restoration in

our West Midlands licence area. This past year, we

surveyed 18 sites to establish baseline habitat type

and quality, allowing us to develop habitat

maintenance plans to guide vegetation

management on these sites.

|  |  |
| --- | --- |
|  |  |
|  |  |

#### On the land we manage in the US, we have enrolled

#### 1,162acres in our IVM programme andother nature related projects.

This year, we launched a collaborative BioAudit

biodiversity study with scientists and experts from

ACRT Services to help us assess the habitat quality

of our rights-of-ways. These corridors play an

important role in enhancing plant biodiversity and

ensuring that pollinators and wildlife have a place

to call home.

The data from the on-site assessments help us to

proactively plan and take measures to improve

habitat on these sites.

We also completed a nature-based solutions pilot

with Jacobs Engineering, Biomimicry 3.8, and EMX

Industries on a substation rebuild in Massachusetts.

The initiative aimed to solve common project

challenges using nature-inspired solutions. Eight

nature-based interventions were identified and

scoped into the substation rebuild design,

including moss walls, rain gardens and vegetated

filter strips.

Nature restoration at our Bell Rock

substation expansion project,

Fall River, MA

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 44 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Responsible Business review cont.  Our environment |  |  |  |  |  |

![]()

We are

#### Investing in the decarbonisation

#### of the future of energy

#### We invested £9.8 billion in green infrastructure and projectsin 2025/26

1.

We play a key role in enabling and accelerating the

move to a cleaner energy future. Network

investment is vital for connecting new low-carbon

power generation and storage that will be needed

in the coming decade to accommodate the

expected rises in electricity demand and the

connection of renewable energy resources.

Our proportion of green capital expenditure

increased in 2025/26, aligning with EU Taxonomy

principles for climate change adaptation and

mitigation. In 2025/26, around 88.5% (£9.8 billion)

of our Group’s capital expenditure was aligned,

compared with 81% (£7.7 billion) in the previous

year. Green capital expenditure share of total

capital investment, which includes capital

prepayments and equity contributions, was 85%.

Our first six projects in Wave 1 of our Great Grid

Upgrade in the UK are now in construction, and in

the US, we continue to progress with permitting

requirements for our Upstate Upgrade projects in

New York. The essential upgrades that we’re

delivering in the US and UK will help to create a

modernised, stronger and cleaner energy network

and will generate new jobs.

These infrastructure investments also support

connections of renewable generation to the grid in

our territories. In 2025/26, we connected 1,125

MW of energised renewable capacity to our

networks across the UK and US.

1. Aligned to the principles of EU Taxonomy for sustainable

investment.

We are committed to

#### Using resources responsibly

#### We manage our environmental impact with a focus on pollution, waste and water use.

Various aspects of our work create waste,

including cleaning up former gas plant sites, retiring

old fossil fuel assets and leak-prone equipment,

and building grid infrastructure. We work to ensure

that our waste is correctly disposed of with

appropriate environmental permits and in

compliance with regulatory standards in the

applicable regions.

[The different categories of waste are summarised](https://www.nationalgrid.com/responsibility/our-reporting-centre/our-reporting-suite)

[in our data tables,](https://www.nationalgrid.com/responsibility/our-reporting-centre/our-reporting-suite) [available on our website](https://www.nationalgrid.com/responsibility/our-reporting-centre/our-reporting-suite). Some

waste is classed as hazardous waste. This arises

from the removal of contaminated land during

commercial property activity and the disposal of oil

and polychlorinated biphenyl (PCB) or lead-

contaminated materials.

We recycle, refurbish and reuse materials at asset

refurbishment and investment recovery facilities in

the UK and US, promoting circularity within our

operations. We also work to reduce our waste

through initiatives such as the deployment of

reusable covers to replace plastic bags on units in

our plant centres in the UK. We’re also using

recycled materials in our operations, including the

use of copper with recycled content for

transformers in our Eastern Green Link 2 project.

More on our commitments around resource use

and waste management [can be found in our](https://www.nationalgrid.com/document/152246/download)

[Environmental Operations Polic](https://www.nationalgrid.com/document/152246/download)y.

Our water use relates almost entirely to water used

for generation cooling purposes. Abstracted water

is not altered other than being slightly warmed by

the process. Water discharge temperatures are

closely monitored and follow applicable

regulations. This year, 1,234 million cubic metres

were withdrawn. Of this total, 99.6% relates to the

use of seawater for cooling generation assets in the

US and is returned to the sea in accordance with

permitted temperature limits.

![]()

We are

![]()

#### Adapting to a changing climate

We take action on our climate change

risks and opportunities and invest in

climate change adaptation activities.

Climate hazards are projected to increase in

frequency and severity in the future, with high

temperatures and coastal and river flooding of

particular concern in the areas where we operate.

Our approach to climate resilience, and addressing

risks arising from global warming impacts is

outlined in our TCFD report on pages 61-66. In

addition, our EU Taxonomy report details our

climate change adaptation expenditure.

![RB Environment pp44.jpg]()

|  |  |  |
| --- | --- | --- |
|  |  |  |
|  |  |  |
|  | £9.8bn |  |
|  | 2025/26 Green capital  expenditure |  |
|  | Aligned to EU Taxonomy principles for  climate change adaptation and  mitigation |  |
|  |  |  |
|  |  |  |
|  | 1,125 MW |  |
|  | Energised renewable capacity  connected in 2025/26 |  |

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc    Annual Report and Accounts  2025/26 | 45 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Responsible Business review cont.  Our customer and communities |  |  |  |  |  |

![ResponsibleBus_CustCom_Family.jpg]()

We acknowledge that there is a need for further

support to our customers. In both the UK and US,

support is needed for customers facing high

energy bills. In the UK, customers face long

connection wait times, negatively impacting

consumer sentiment. However, NESO has initiated

reforms to the connections queue that will help us

to deliver faster, more strategic grid connections

for our customers.

We are committed to

#### Supporting an affordable energy transition

#### Our customersand communities

As we help to build out the network of the future, we aim

to create social value for our customers and communities.

We work to create economic growth in the communities

we serve and support affordability as a key part of the

energy transition.

We provide assistance to our customers and communities to help manage the

rising costs of energy and necessary infrastructure upgrades, working to

maintain positive relationships with our stakeholders.

Our skills development programmes provide people from disadvantaged

communities with access to training and employment opportunities, helping to

build our potential workforce of the future.

Our colleagues participate in volunteering events and projects to foster positive

relationships with our customers, communities and local regulators.

#### We have established the Grid for Good

We are committed to

#### Energy Affordability Fund to provide assistance with energy bills.

National Grid remains committed to ongoing

support for those that cannot meet energy costs

and maintains the Grid for Good Energy

Affordability Fund to provide bill assistance. This

fund assists vulnerable households and businesses

struggling with energy costs via our charity

partners including the Fuel Bank Foundation, the

Centre for Sustainable Energy and the National

Energy Foundation.

We worked with key charity partners in the UK and

US to provide assistance with energy efficiency

upgrades, emergency financial support and

provision of energy advice to low-to-moderate-

income customers. In the last year in the UK, we

supported over 20,000 households through our

programmes.

The current Grid for Good Energy Affordability

Fund will run through 2026/27 to continue financial

support for organisations that assist vulnerable

households. Each year, the fund commits

£3.5 million of support in the UK and £3.3 million in

the US.

|  |  |  |
| --- | --- | --- |
|  |  |  |
|  | [More information on how our funding is](https://www.nationalgrid.com/responsibility/our-customers-and-communities/affordability)  [supporting charities and organisations to provide](https://www.nationalgrid.com/responsibility/our-customers-and-communities/affordability)  [relief to vulnerable households can be found on](https://www.nationalgrid.com/responsibility/our-customers-and-communities/affordability)  [our website.](https://www.nationalgrid.com/responsibility/our-customers-and-communities/affordability) | |

In the US, we offer a range of programmes to help

income-eligible families and customers manage

their energy bills. These include tiered discount

rates, bill discounts, energy efficiency programmes,

budget billing structures and payment extensions.

However, we acknowledge that there is more to be

done to support bill assistance to help our

customers manage rising costs.

|  |  |  |
| --- | --- | --- |
|  |  |  |
|  | More details on our contributions to UK bills and  average billing to US households can be found in  our [Responsible Business data tables](https://www.nationalgrid.com/responsibility/our-reporting-centre/our-reporting-suite). | |
|  | More information on our affordability initiatives in  ED, NY and NE can be found on pages [19](#i049406fc5d1e43409e76ecc1cfea6354_378213) — [21](#i049406fc5d1e43409e76ecc1cfea6354_378215) | |

|  |  |
| --- | --- |
|  |  |
|  |  |

#### Accelerating social mobility

We support social mobility in the communities we

serve through partnerships with registered

charities, not-for-profit organisations, social

enterprises, educators, and our supply chain.

With these organisations, we have created skills

and employability pathways that help ensure

everyone has the opportunity to reach their

potential, regardless of background. Our work is

focused on improving awareness of the energy

industry and National Grid as an employer,

providing energy education programmes to

disadvantaged youth and work-ready adults, and

offering coaching for potential future talent.

We’ve exceeded our goal to upskill 45,000 people

in our communities and we remain dedicated to

actively supporting these programmes.

We ranked 8th out of the top 75 employers in the

2025 UK Social Mobility Index (SMI), rising 34

places from the previous year. This achievement

demonstrates our leadership in building an

inclusive, representative, and successful workplace

that supports upward social mobility.

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 46 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Responsible Business review cont.  Our customer and communities |  |  |  |  |  |

We are

#### Engaging directly in our

#### communities through volunteering

Across the UK and US we have delivered

52,620 volunteering hours in 2025/26 to

support our communities.

|  |  |  |
| --- | --- | --- |
|  |  |  |
| Progress to target (hours) | | Target: 2030/31 |
|  |  | 500,000 |

![17042430231100]()

Our volunteering programmes enable our

colleagues across the UK and US to connect with

their communities and have a tangible impact on

the causes that matter. We work with many partner

organisations to provide opportunities for

colleagues to volunteer their time in local

communities. Our volunteer efforts focus on

increasing access to affordable energy, increasing

access to STEM/STEAM education and building

community resilience. Colleagues this year have

logged 52,620 volunteering hours, bringing our

total to 292,611 volunteering hours since 2021.

[Case studies on our volunteering engagement can](https://www.nationalgrid.com/responsibility/our-customers-and-communities/volunteering)

[be found on our website.](https://www.nationalgrid.com/responsibility/our-customers-and-communities/volunteering)

We act

#### Onthe feedback we receive from our customers on the service we provide

Across the UK and US, we serve millions of

households and thousands of businesses. We are

committed to delivering secure and reliable energy

as affordably as possible, maximising the capacity

of our assets and ensuring our customers benefit

from an efficient and reliable network.

We recognise that there has been limited progress

across the business, especially in the US, on

customer satisfaction due to bill increases and

delays in connecting to our network. We are

listening to feedback and taking steps to address

these issues.

#### US customer satisfaction

This year, our US businesses refocused their CSAT

metric to better reflect overall customer experience.

The metric is measured through our monthly Brand

Image Relationship study and through post-

interaction customer surveys, and it is designed to

help us improve customer experience and

strengthen customer-centred thinking across our

business.

In 2025/26, New York saw a CSAT score of 72.8%

and New England saw a score of 72.2%.

Customers in both regions faced high fuel prices

and temperature extremes that increased bills,

which negatively affected customer perceptions.

We recognise that we need to do more to improve

customer satisfaction. We are committed to raising

awareness of financial assistance and other

services that help customers manage their energy

bills. In Massachusetts, we launched a new tiered

discount rate programme that expands eligibility

and assistance for our most vulnerable customers.

In New York, our NIMO rate plan, approved by the

Public Service Commission, includes

enhancements to affordability programmes.

We also held in-person customer assistance events

across our US jurisdictions. These events bring our

customer service specialists into community centres,

senior centres and other public gathering places, to

meet directly with customers. Here, our customers

can ask questions, discuss assistance programmes

and get help with our energy efficiency initiatives.

These events are critical to connect our customers to

the support programmes and tools they need.

We are in the process of implementing Kraken, a

groundbreaking, cost-effective platform that will

support end-to-end ownership of the customer

experience. We will be the first major regulated US

utility to adopt Kraken, which will improve the

customer experience by simplifying and

modernising how customers interact with us.

We continue to deploy Advanced Metering

Infrastructure (AMI) technology across New York

and Massachusetts, giving customers greater

visibility of their energy use. We have cumulatively

deployed over 500,000 smart meters in New

England and over 1.5 million in New York.

#### UK ED customer satisfaction

In UK ED, we have delivered a high level of

customer satisfaction for 2025/26 with a score of 9

![]()

out of 10.

We identify areas of best practice across our

licence areas to expand those solutions across the

business. We continue to undertake customer

service training, have customer engagement group

forums, and learn from the activities of other

distribution network operators to ensure we are

making the right decisions for our customers and

improve the customer experience.

#### UK ET customer satisfaction

In UK ET, Quality of Connections remains a pivotal

initiative, underpinning our commitment to

capturing valuable customer insights at every stage

of the connection lifecycle by measuring customer

satisfaction and gathering feedback. In UK ET, our

customer satisfaction score for 2025/26 was 7 out

of 10, demonstrating a positive shift compared to

last year, marked by significant industry reform and

rapid change.

NESO initiated reforms to the existing connections

queue that will aim to help UK ET deliver faster,

fairer and more strategic grid connections for

existing and future customers. For more on these

reforms, see page [18](#i2193c7e7fbee4753bdbe2d16888565c8_5161).

UK ET also drives broader societal economic

benefits to support customer satisfaction. For

example, we are currently upgrading our Didcot

substation in Oxfordshire to enable the connection

of data centres and battery storage systems to the

electricity transmission network. Located just two

miles from the UK’s first AI Growth Zone at

Culham, Didcot substation will boost grid capacity

for future digital projects. It will also connect 300

MW of battery schemes, helping to meet growing

demand for flexible, zero carbon power in the

region. [Read more about the Didcot substation](https://www.nationalgrid.com/national-grid-kicks-didcot-substation-upgrade-connect-data-centres-and-battery-storage)

[project on our website.](https://www.nationalgrid.com/national-grid-kicks-didcot-substation-upgrade-connect-data-centres-and-battery-storage)

#### NGV customer satisfaction

NGV conducts customer satisfaction surveys

across its business units and achieved good

scores overall in 2025/26.

Our UK subsea electricity interconnectors and US

NGV operations have scored the following:

|  |  |  |
| --- | --- | --- |
|  |  |  |
|  |  |  |
|  | IFA, IFA2 and Viking |  |
|  | 92% |  |
|  | Prior year: 86% |  |
|  |  |  |
|  | BritNed |  |
|  | 90% |  |
|  | Prior year: 87% |  |
|  |  |  |
|  | Nemo |  |
|  | 91% |  |
|  | Prior year: 92% |  |
|  |  |  |
|  | The US Northeast |  |
|  | 8 out of 10  Prior year: 8 out of 10 |  |

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc    Annual Report and Accounts  2025/26 | 47 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Responsible Business review cont.  Our people |  |  |  |  |  |

![ResponsibleBus-People_Intro_NEW v2.jpg]()

We are

I

#### nvesting in our people

#### and building the skills needed to deliver the clean energy future

Our workforce is increasing and new skills will be

needed to deliver the grid of the future. Attracting,

developing and retaining a qualified and competent

workforce requires training programmes that are

robust, comprehensive, in line with local regulations

and focused on safety and competence.

In the UK, 132 graduates participated in our

#### Our people

#### Our33,017colleagues across the UK and US are central to delivering the grid of the future.

To deliver on our commitments, we need to attract, develop and retain

the skilled workforce needed to respond to changes in our external

environment and within the business.

The physical and mental health of our colleagues is central to everything

we do. We continue to focus on ensuring fair pay for all our people and

providing them with development opportunities.

graduate scheme, which aims to enhance

graduates’ capabilities while emphasising

leadership development.

In the US, 98 graduates joined our refreshed

12-month development programme, which

includes a three-week orientation, blended virtual

and in-person skills training, three months of

coaching, and rotational placements for some

roles in months six to twelve.

In the US, we also continue to have a strong

Gridtern internship programme, welcoming

147 interns on summer internships in 2025.

|  |  |  |
| --- | --- | --- |
|  |  |  |
|  | Further details on our development programmes  can be found on our [careers website](www.nationalgrid.com/careers). | |

Alongside early careers programmes, we provide a

wide range of development opportunities to our

colleagues through external learning providers,

including on-demand digital learning, behavioural

science-based development, team effectiveness

sessions and tailored virtual coaching for leaders

and senior colleagues.

We also run targeted leadership programmes to

identify and develop future senior leaders and to

support new and experienced managers in

becoming effective people leaders.

To achieve our commitments and deliver the grid

of the future, we need to attract, hire, and retain

people from a wide array of backgrounds, who

have different experiences and perspectives. We

take a clear stance against discrimination. Our

Global Recruitment and Hiring Policy ensures that

individuals identifying themselves as having a

disability receive fair consideration for all vacancies,

with reasonable accommodations and additional

resources provided whenever feasible. We are

dedicated to equal opportunities in recruitment,

training, promotion, and career development for all

our colleagues, including those with disabilities.

We aim to drive proactive sourcing, create a

best-in-industry candidate experience, and

maintain recruitment practices that help us build a

strong future workforce. We launched a new global

careers website to provide a single, modern

platform for candidates and a more tailored and

intuitive job searching tool.

In 2025/26, 41% of our vacancies were filled by

internal promotions and moves, demonstrating our

commitment to developing talent. We are also

increasing external hiring to secure the specialist

skills required for the future. Our workforce

|  |  |  |  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |  |  |  |
|  |  |  |  |  |  |  |  |  |
|  | 81% |  |  | 73% |  |  | 77% |  |
|  |  |  |  |  |  |  |  |  |
|  | Employee  engagement  index in 2025/26 |  |  | ‘Safe to say’ in  Grid:Voice in  2025/26 |  |  | Employee  wellbeing  index in 2025/26 |  |
|  |  |  |  |  |  |  |  |  |

planning helps us anticipate capability needs and

shape targeted recruitment strategies, including

engaging with relevant talent pools ahead

of demand.

For more information, see our People Capability

and Capacity Group Principal Risk on page [35](#id0b33a93d01e4b18810f48d93747bf68_35).

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 48 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Responsible Business review cont.  Our people |  |  |  |  |  |

We are committed to

#### A workplace where all

#### colleagues can thrive

At National Grid, we believe that diversity of

thought drives innovation, enhances performance,

and strengthens our ability to deliver for our

customers and communities. We are committed to

fostering a workplace that is inclusive, respectful

and empowering, where every individual feels

welcome and supported.

Our focus is on our work environment, ensuring

colleagues are treated fairly, respecting the right to

differing opinions, and maintaining a safe work

environment. We will continue to adapt our

approach to meet the needs of our people, our

industry, and our stakeholders while staying true to

our values of doing the right thing and finding a

better way.

We are committed to

#### Creating an inclusive culture

Fostering a culture in which colleagues

feel safe to speak up and confident their

voices are heard by the Group Executive

Committee and Board remains a priority.

Our leaders play a central role in shaping this

culture, supported by a global learning curriculum

that provides inclusive leadership training for

people managers.

Our Employee Resource Groups (ERGs) play a vital

We are committed to

role at National Grid. Open to all colleagues, 33%

of our workforce are members of at least one ERG.

ERGs help build awareness of inclusion and

belonging by offering support and development

opportunities, enabling colleagues to bring their

true selves to work and reach their full potential.

We carry out two annual employee engagement

surveys to provide the Group Executive Committee

and Board with further insight and understanding

of our culture and engagement. In our 2025/26

survey, our employee engagement index was 81%

and our Safe-to-Say score was 73%,

demonstrating that our employees feel engaged in

their work and empowered to speak up.

Throughout the year we were recognised for

numerous industry awards, including being named

in Times Top 50 Employers for Gender Equality, a

Glassdoor 2026 Best Place to Work, 8th out of the

top 75 employers in the 2025 UK SMI, and The

Equality 100 Award: Leader in LGBTQ+ Workplace

Equality Distinction by the Human Rights

Campaign Foundation.

In 2025, we participated in the Workforce

Disclosure Initiative for the eighth consecutive year,

achieving a disclosure score of 88% compared to

the sector average of 67%.

We are committed to

#### Leading the industry on employee health and wellbeing

#### Our employee wellbeing index i

s 77%.

We aim to empower our colleagues to prioritise

their health and wellbeing by promoting healthy

practices and by offering wellbeing resources

through multiple channels. By focusing on health

and wellbeing, we aim to foster an environment

where everyone can thrive together.

In 2025/26, we continued to deliver our Thriving

Together health and wellness ambition to support

our people in feeling engaged and empowered to

prioritise health, wellbeing, and performance. We

provide our colleagues with educational and

support resources, materials for managers to

promote health and wellbeing on their teams, a full

range of health and wellness benefits, support for

neurodiverse colleagues, and on-site health

professionals. We also provide digital health and

wellbeing apps and access to an Employee

Assistance Programme to our colleagues in the UK

and US.

#### Ensuring all colleagues receive fair and equitable pay

#### We are continuing to focus on our gender pay gap.

In the UK, we remain an accredited Living Wage

Foundation employer, which demonstrates that we

go beyond the Living Wage requirements,

voluntarily paying our trainees the Living Wage. We

undertake a Living Wage review each year to

ensure continued alignment. Our commitment to

the Living Wage for our direct workforce also

extends to our contractors. In the US, colleagues

![]()

are paid above the statutory minimums. We also

|  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |
|  |  | | |  |  |  |  |  |  |  |  |  |  |  |
|  | Gender demographic as at 31 March 20261 | | | | | | | | | | | | |  |
|  | Our Board 2 | | |  |  | Senior management 3 | | |  |  | Whole company 3 | | |  |
|  | 46% | | |  |  | 44% | | |  |  | 25% | | |  |
|  | Male 6 | Female 5 |  |  |  | Male 90 | Female 72 |  |  |  | Male 24,803 | Female 8,214 |  |  |
|  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |
|  | Male |  |  |  |  | Male |  |  |  |  | Male |  |  |  |
|  | Female |  |  |  |  | Female |  |  |  |  | Female |  |  |  |
|  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |
|  | 1. Companies Act 2006 disclosure. We have included information relating to subsidiary directors, in accordance with the Companies Act 2006. Senior management is defined as those managers who are  at the same level as, or one level below, the Group Executive Committee. It also includes those who are Directors of subsidiaries where we have a majority interest, or who have responsibility for  planning, directing or controlling the activities of the Group, or a strategically significant part of the Group, and are employees of the Group.  2. Board refers to Directors of National Grid plc as defined on page [256](#ibba07c05a16c49419b97ca277adc2fa7_42507) of this document.  3. In scope are active, permanent employees. Out of scope are non-employees, temporary staff and interns. | | | | | | | | | | | | |  |

provide a range of competitive benefits to our

colleagues that go beyond statutory minimums.

When making remuneration decisions for our

Executive Directors and other senior leaders, our

People & Remuneration Committee takes account

of the remuneration arrangements and outcomes

for the wider workforce.

We review gender and ethnicity pay gaps annually

![7146825582169]()

![7146825582203]()

![7146825582227]()

and our UK gender pay gap is reported one year in

arrears in accordance with UK legal requirements

on gender pay gap reporting. Our UK base gender

pay gap continues to be minimal.

|  |  |  |
| --- | --- | --- |
|  |  |  |
|  | Our gender pay gap disclosure  can be found on our website | |

|  |  |  |  |  |
| --- | --- | --- | --- | --- |
|  |  |  |  |  |
|  | Further information on Board workforce engagement can be found on page  [95](#i2193c7e7fbee4753bdbe2d16888565c8_154) | |  | [Further details on our culture can be found on our website.](https://www.nationalgrid.com/responsibility/our-people/our-culture) |

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc    Annual Report and Accounts  2025/26 | 49 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Responsible Business review cont.  Our Responsible Business Fundamentals |  |  |  |  |  |

![Resp_Business_Intro BG v6.jpg]()

We are committed to

#### Safely, reliably

#### and efficiently connecting millions of people to the energy they use

#### Health and safety

The health and safety of all our colleagues and

contractors is paramount. We require our people

to demonstrate our company-wide safety

principles of:

– Safe to Say: open and honest conversations

– Safe Choices: make smart decisions

#### Responsible

#### Business

#### Fundamentals

Every day, we safely, securely and reliably

connect millions of people to energy,

prioritise resilience and operate responsibly.

Our Responsible Business Fundamentals are the foundation of the pillars of our

Responsible Business Charter. We aim to continue to deliver on what is expected

of us and to be a compliant and ethical business in everything we do. We seek to

do this by ensuring safe and reliable operations and living our values, while

influencing our partners and supply chain and holding them to the same standards.

We invest in technology and governance, monitor security and risks, and advocate

for responsible business practices.

– Safe to Stop: stop the job whenever there is a

safety concern

– Safe to Learn: learn from every experience

We endeavour to mitigate risks and eradicate

injuries to our workforce, supported by our safety

management processes and Group safety

reporting system. To promote safe practices, we

maintain a full range of internal safety policies and

procedures, including our Employee Safety

Handbook and various process specific

procedures. We are also in the process of

implementing Cority, our enhanced safety reporting

system, to drive continuous improvement and

ongoing learning.

There have been no fatalities in 2025/26.

#### Lost time injuries (LTIs)

We have recorded a Group LTIFR of 0.11 this year,

compared to 0.10 in the prior year against our

Group target of 0.10 or less, per 100,000 hours

worked (this includes contractors working on our

behalf). The majority of the injuries were linked to

common and well-known exposures such as slips,

trips and falls, musculoskeletal injuries, and struck-

by incidents.

Various initiatives have been undertaken to

intervene with rising LTIs, including safety stand-

down days, issuance of safety refocus packs, and

various campaigns and intervention groups. We

aim to prevent serious injuries and fatalities through

a focus on our six fatal risk groups, with processes

in place to thoroughly assess and mitigate safety

risks, select and apply appropriate safety controls,

and intentionally monitor changes in the work

environment.

#### Injuries to members of the public

This year, there have been three incidents resulting

in injuries to members of the public which involved

our assets. These events all related to our UK

ET business.

#### Reliability and resilience

We have maintained reliability at 99.9% across our

networks. Details per business unit can be found on

page [28](#i4d6230b679dc4ca38809d46ec72af5e1_3-0-1-6-861943). We maintain a robust business continuity

programme to ensure we maintain operations in the

event of a disaster or significant disruption.

We are also innovating to use AI and technology to

improve grid resilience. This year, we implemented

solutions to automate crew management during

storm response, piloted x-ray imaging of gas

pipelines, and tested demand response solutions for

data centres.

Further detail on resilience in our strategy can be

found in our TCFD disclosure on page [56](#i2193c7e7fbee4753bdbe2d16888565c8_100).

#### Efficiently connecting customers to the energy they use

We aim to deliver energy to the homes and

businesses of our customers in an efficient way,

and all our business units are undertaking network

projects to improve efficiency and optimise

connections.

In UK ET, we are modernising how the network is

controlled, including making upgrades to our

control centre, and engaging with NESO on

connections reform. In the US, we’ve launched the

Kraken programme to drive efficiency in the

customer experience, and New York’s Smart Path

Connect programme is enabling large-scale

renewable interconnections.

|  |  |  |
| --- | --- | --- |
|  |  |  |
|  | Further information on how we operate safely and  efficiently can be found on page [17](#i6c692041b22b407b8751a59d1a30ae8b_7-1-4-2-899092). | |
|  |  |  |
|  | Further details on our initiatives to improve efficiency  can be found on pages [18](#i2193c7e7fbee4753bdbe2d16888565c8_5161) — [22](#i832cdf411ee540298e53c648eaa4e669_1-1-1-2-942406). | |

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 50 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Responsible Business review cont.  Our Responsible Business Fundamentals |  |  |  |  |  |

We are committed to

#### Influencing our supply chain to operate responsibly

Suppliers must adhere to [our Supplier](https://www.nationalgrid.com/document/145066/download)

[Code of Conduct](https://www.nationalgrid.com/document/145066/download)

#### which includes

We are committed to

commitments to the real Living Wage,

compliance with the Conflict Minerals

Rule and the development of

environmental strategies and targets.

This year we transitioned our supply chain

sustainability risk assessments and data to

EcoVadis, a globally recognised platform widely

used in the UK and US utility sectors. EcoVadis

provides us with enhanced visibility, assurance and

insights into our suppliers’ sustainability practices.

Our key suppliers are determined by our UK and

US supply chain science-based targets and our

strategic supplier lists. To date, over 50% of our

key suppliers hold EcoVadis scorecards and we

will continue to engage with the remainder to

increase impact and accountability across our

supplier base.

We are a partner of the Supply Chain Sustainability

School in both the UK and US, providing free

education and learning pathways to our key

suppliers.

|  |  |
| --- | --- |
|  |  |
|  |  |

We are

#### Fair to our suppliersand committed to paying them promptly

We recognise that timely payment is

crucial for the financial health and

operational stability of our suppliers. We

aim to adhere to the agreed payment

terms set out in contracts or purchase

orders and our finance team works

diligently to ensure that all invoices are

processed efficiently.

In the UK, we are a signatory of the Prompt

Payment Code and we also encourage our

suppliers to adopt the principles of this code. In

2025/26, 91% of our supplier payments in the UK

and 94% in the US were paid to contractual term.

|  |  |
| --- | --- |
|  |  |
|  |  |

#### Our

 [Human Rights](https://www.nationalgrid.com/document/150351/download) [Policy](https://www.nationalgrid.com/document/150351/download)

Human Rights are integral to our Code of

Ethics. We aim to be an ethical company

that stakeholders want to do business

with and colleagues want to work for.

We have a separate [Human Rights Policy](https://www.nationalgrid.com/document/150351/download) to hold

ourselves accountable to respect the rights of our

workforce, our value chain and those impacted by

our operations and to provide a safe, secure and

inclusive work environment. We also publish an

annual Human Rights Report and Modern Slavery

Statement, outlining our approach to mitigating the

risk of modern slavery in our business and supply

chain. In our annual [Modern Slavery Statement](https://www.nationalgrid.com/modern-slavery-statement) we

summarise the progress we have made, our key

policies, including their scope and focus, and the

key measures we use to assess our progress and

programme effectiveness. Further details of our

human rights and modern slavery disclosures can

be found on page [234](#i5f794891492441e7a855126a592fd5a7_62604). Further information and

copies of our policies can be [found in our](https://www.nationalgrid.com/responsibility/our-reporting-centre/approach-and-policies)

[Responsible Business reporting centre on our](https://www.nationalgrid.com/responsibility/our-reporting-centre/approach-and-policies)

[website.](https://www.nationalgrid.com/responsibility/our-reporting-centre/approach-and-policies)

We are committed to

#### Being a compliant and ethical business

We are committed to maintaining high

standards of compliance and ethical

conduct. We have established rigorous

internal incident reporting to drive the

right behaviours, identify and monitor

themes and trends, and facilitate

learning.

A breach of the Code of Ethics can have different

outcomes depending on the severity and impact

on people and our organisation, including

disciplinary actions, up to and including dismissal.

Sexual harassment prevention and response is

included in our Respect at Work policy, Grievance

policy, Code of Ethics, and Supplier Code of

Conduct. Communications across the business

have taken place to highlight our expectations and

how colleagues can speak up and report

concerns.

We have a communication and training programme

for colleagues which aims to promote a strong

ethical culture and includes mandatory e-learning

for colleagues to understand and apply our Code

of Ethics. We take a zero-tolerance approach to

fraud, bribery and corruption of any kind. We have

established policies and governance that set and

monitor our approach to preventing financial

crimes, fraud, bribery and corruption, including our

Code of Ethics. [These are available on our website.](https://www.nationalgrid.com/responsibility/our-reporting-centre/approach-and-policies)

To ensure compliance with relevant anti-fraud and

bribery legislation, including but not limited to the

UK Economic Crime and Corporate Transparency

Act and the US Foreign Corrupt Practices Act, we

conduct a periodic risk assessment and

continuous monitoring of ethical conduct across

our operations and ethics processes. This includes

regular fraud and ethics risk assessments and

dashboard-driven monitoring. These processes

provide systematic verification of ethical behaviour,

detection of potential misconduct, and timely

response to ethics incidents.

Ethics, compliance and business conduct matters

are discussed quarterly at the Group Executive

Audit, Risk & Finance Committee and twice a year

at the Audit & Risk Committee. Serious issues that

meet our escalation criteria are reported in line with

our escalation process to the General Counsel

Litigation and Chief Compliance Officer, Chief Legal

Officer, Chief Executive, Audit & Risk Committee

and the Board, as appropriate. Investigations are

conducted promptly and thoroughly and, where

appropriate, acted upon.

#### Whistleblowing

We operate confidential internal and external

helplines that are always available in all the regions

where we operate for individuals to raise concerns

about breaches of the Code of Ethics. This is

supported by our “Speak-up” policy which sets out

how we protect anonymity and have zero-tolerance

for any form of retaliation.

Whistleblowing is regularly discussed at the Ethics,

Risk & Compliance Committee and the Audit &

Risk Committee.

#### Artificial intelligence

We use AI to solve problems and gain insights for

ourselves, our customers and society. We

recognise the importance of developing and using

AI in a responsible manner. Our use of AI is guided

by the principles of only using AI where

appropriate, using it as a tool to streamline and

accelerate ways of working, and always

maintaining human accountability and intervention.

Our Business Management Data Standard is

reinforced by a dedicated Responsible AI policy

and controls, due diligence assessments of both

ourselves and external partners, and an AI

Governance Council.

We’ve launched a Data and AI Academy with

training programmes for employees at all levels of

AI competence to develop the skills and

knowledge they need to thrive in a data-driven

future. We continually review and update our

approach to AI in line with regulatory, sustainability,

and technological advancements.

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 51 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Responsible Business review cont.  Our Responsible Business Fundamentals |  |  |  |  |  |

We are committed to

We are committed to

#### Investing in developing technologies andinnovations

#### National Grid Partners (NGP) has invested c.$30.8million in Responsible

#### Business aligned companies since its creation in 2018.

This year, investments included:

– [training AI models to reliably identify gas pipeline](https://www.ngpartners.com/stories/how-cogniacs-computer-vision-helps-utilities-improve-pipeline-reliability)

[weaknesses in x-ray imagery, improving](https://www.ngpartners.com/stories/how-cogniacs-computer-vision-helps-utilities-improve-pipeline-reliability)

[reliability;](https://www.ngpartners.com/stories/how-cogniacs-computer-vision-helps-utilities-improve-pipeline-reliability)

– grid simulations to identify areas of underused

capacity, ideal for connecting large-load

customers; and

– [AI technology for data centre demand response,](https://www.ngpartners.com/stories/emerald-ai-whitepaper)

[reducing the need for costly network upgrades.](https://www.ngpartners.com/stories/emerald-ai-whitepaper)

|  |  |  |
| --- | --- | --- |
|  |  |  |
|  | Further details on technological  change can be found on page   [14](#iea74fbbd6f7e441ea7a5c58740bcddaa_1-1-1-1-932292). | |

|  |  |  |
| --- | --- | --- |
|  |  |  |
|  | Find out more about our innovative projects  and investments on our [NGP website](www.ngpartners.com). | |

We are

We are committed to

#### Ensuring we have appropriate governance in place to deliver on our Responsible Business commitments

Through our Board and its five sub-committees,

including the Responsible Business Committee of

the Board, we receive strategic direction and

structure to deliver sustainable shareholder value.

We also maintain an internal Responsible Business

Management Standard that applies to all our

employees and contractors and that sets out how

we will create a positive impact while delivering

excellent customer service.

|  |  |  |
| --- | --- | --- |
|  |  |  |
|  | For further information on the Board and  Committees please refer to pages 88 — 126. | |

|  |  |
| --- | --- |
|  |  |
|  |  |

#### Ensuring security and risks – cyber and physical – are appropriately monitored

We are prioritising physical and cyber security, data

protection, and responsible AI through the

implementation of effective solutions which

manage vulnerabilities, ensure compliance with

regulatory requirements and fulfil reporting

obligations. All our employees undergo mandatory

cyber and physical security training. We enforce

data protection controls to comply with relevant

privacy laws and standards, such as the use of

strong passwords, regular software updates and

colleague training on best practices.

To minimise security incidents, protect customer

data and ensure the ethical use of AI, we keep up

to date with the latest trends and technologies,

collaborate with industry and government, and

share information and best practices.

|  |  |  |
| --- | --- | --- |
|  |  |  |
|  | Please see our Operational Group Principal Risks  on pages  [32](#i87ac3d7691e544cbb978b5553371837c_37) — [33](#ic4942b993dce49acaf8c02272e794521_0-1-1-3-943594) for further information. | |

#### Working with stakeholders

#### and the wider industry to promote

#### Responsible Business topics and advocate for action

|  |  |  |
| --- | --- | --- |
|  |  |  |
|  | Details on stakeholder engagement at National  Grid can be found on pages [23](#i2193c7e7fbee4753bdbe2d16888565c8_4697) — [25](#i887387dceb1f41febe8dc79527952bbf_302642). | |

#### Community engagement

We engage extensively with communities affected

by our infrastructure through planning

consultations on major projects, and we use their

feedback to inform our development proposals.

Throughout the year, Board members visit

operational sites and receive updates on

community matters. This input is a key enabler for

progression of new infrastructure projects, allowing

us to support economic growth in local

communities.

#### International engagement

At COP30 in November 2025, we partnered with

the UK Government, Business Council for

Sustainable Energy, US Council for International

Business and other UK, US and international

organisations to participate in discussions on the

energy transition.

We focused on showcasing how we’re helping to

deliver the energy transition and on sharing best

practice with international peers. We also were able

to bring back key learnings from others to inform

our own strategy and engage our colleagues on

sustainability issues.

As part of our wider international engagement this

year, we’ve provided technical support and

participated in knowledge sharing with

governments and initiatives worldwide. Early in the

year, we welcomed a delegation of officials from

around the world on a tour of the London Power

Tunnels. Throughout the year, we hosted several

international delegations to share insights on

energy regulation, offshore wind infrastructure, and

the UK power system.

We also partnered with the British embassies in

Vietnam and Egypt and worked with global

organisations and alliances on research and

engagement. Finally, we were a major participant in

New York Climate Week and London Climate

Action Week.

#### Responsible political lobbying

National Grid is committed to responsible lobbying

and engagement with our elected leaders across

the jurisdictions in which we operate. We engage

with elected officials in a manner appropriate to the

jurisdiction, with attention to variations in lobbying

definitions across the geographies in which we

work.

All our lobbying and engagement is conducted in

line with the principles and targets set out within

our RBC.

We have global corporate policies on political

contributions, responsible political lobbying,

employment of former public officials and

secondment of employees into public bodies, [all](https://www.nationalgrid.com/about-us/corporate-information/corporate-political-engagement)

[accessible on our website](https://www.nationalgrid.com/about-us/corporate-information/corporate-political-engagement). Our guidelines include

clear principles, an integrated management

approach, and Board accountability and oversight.

|  |  |  |
| --- | --- | --- |
|  |  |  |
|  | Full details of our political donations and  expenditure can be found on page [235](#i5f794891492441e7a855126a592fd5a7_62595). | |

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 52 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Responsible Business review cont.  Our Responsible Business Fundamentals |  |  |  |  |  |

![]()

Transparent reporting

Transparent and public reporting is an integral part

of being a responsible business. We remain

committed to reporting our activities, commitments

and performance in a transparent manner,

including our sustainability data and performance.

#### Our approach

To determine which Responsible Business issues

are important to our business and essential for us

to embed in our strategy, we undertook a double

materiality assessment in 2022. The double

materiality assessment forms the basis of our

reporting. We identified six topics that encompass

the most significant factors for our business and

that align with the priorities of our stakeholders.

We are currently in the process of refreshing our

double materiality assessment to reflect the most

current internal and external environment.

We recognise the need to adapt to changes and

remain proactive in addressing emerging

challenges and opportunities. We are committed to

continuously evolving our approach and striving for

improvement to maintain robust performance on

Responsible Business.

|  |  |  |
| --- | --- | --- |
|  |  |  |
|  | [Further details on our material topics and double](https://www.nationalgrid.com/responsibility/our-reporting-centre/approach-and-policies)  [materiality assessment](https://www.nationalgrid.com/responsibility/our-reporting-centre/approach-and-policies), as well as our work  against the UN SDGs, can be found on our  [website](www.nationalgrid.com/document/150366/download) . | |

#### Our Responsible Business reporting methodology

The Directors are responsible for reporting our

Responsible Business data as of 31 March 2026,

in accordance with the reporting criteria as set out

in Our Reporting Methodology document. Our

reporting methodology document presents metric

definitions, scope and calculations and underpins

our reporting.

|  |  |  |
| --- | --- | --- |
|  |  |  |
|  | For further details, please refer to our Reporting  Methodology document  [on our website](https://www.nationalgrid.com/responsibility/our-reporting-centre/our-reporting-suite). | |

#### Scope of Responsible Business reporting

Our methodology applies the GHG Protocol

operational control approach across all emissions

and environmental metrics unless stated otherwise.

Key changes to the Group’s global operations over

the past three years have been reflected in the

scope of our Responsible Business reporting,

namely:

– Grain LNG and National Grid Renewables were

disposed of in November 2025 and May 2025

respectively and are excluded from 2025/26

Responsible Business reporting, in line with our

disposals policy.

– The Electricity System Operator (ESO) separated

from National Grid on 1 October 2024, with the

NESO established under government ownership;

ESO data is excluded from 2024/25 reporting in

accordance with our disposals policy.

– Viking Link, the UK–Denmark subsea

interconnector, became operational in

December 2023 and is fully included across all

relevant Responsible Business metrics from

2024/25, following inclusion of the

“interconnector capacity” metric for 2023/24, as

it was operational by 31 March 2024.

#### Assurance

We engaged Deloitte LLP to undertake an

independent limited assurance engagement using

the International Standard on Assurance

Engagements (ISAE) 3000 (Revised): “Assurance

Engagements Other than Audits and Review of

Historical Financing Information” and ISAE 3410

“Assurance Engagements on Greenhouse Gas

Statements”.

The Board of Directors of National Grid plc has

reviewed and approved the Responsible Business

data tables for the 12-month reporting period

ended as of 31 March 2026. The Board of

Directors confirms that the information provided is

accurate and in line with the mandatory

requirements, and selected information has been

independently assured by Deloitte.

Deloitte has issued an unqualified opinion on the

![]()

metrics identified by the symbols within the Our

KPIs and TCFD sections on pages [26](#i2193c7e7fbee4753bdbe2d16888565c8_49) – [29](#i524ed5352691497d9607a830fda9ea68_14922) and [53](#i2193c7e7fbee4753bdbe2d16888565c8_88)

– [68](#i5ce9e2b3cd614bcca8423db41cd18ff1_160075) respectively.

|  |  |
| --- | --- |
|  |  |
|  | 2025/26 data externally assured  by Deloitte. |
|  | 2024/25 data externally assured  by Deloitte. |
|  | 2023/24 data externally assured  by PwC. |

[The](https://www.nationalgrid.com/responsibility/our-reporting-centre/our-reporting-suite) [Responsible Business Assurance Opinion](https://www.nationalgrid.com/responsibility/our-reporting-centre/our-reporting-suite)

[Statements from both Deloitte and PwC are](https://www.nationalgrid.com/responsibility/our-reporting-centre/our-reporting-suite)

[available on our website](https://www.nationalgrid.com/responsibility/our-reporting-centre/our-reporting-suite). This Responsible

Business review section of the Annual Report

includes many externally assured metrics, though

they are not separately marked with assurance

symbols for presentational purposes. All

Responsible Business metrics in the data tables

not covered by Deloitte have been assured

independently by our internal second-line Risk and

Controls team. Further details are provided in the

Responsible Business data tables.

Each year we reassess our assurance scope to

ensure that we obtain external assurance for our

most material metrics. We intend to evolve our

assurance approach in line with market

developments and evolving reporting requirements,

and we will actively explore opportunities to

incorporate more rigour into our approach in future

years. Non-financial information, particularly GHG

quantification, is subject to more inherent

limitations than financial information. It is important

to read this report in the context of Deloitte’s full

limited assurance opinion and our reporting

methodology.

|  |  |  |
| --- | --- | --- |
|  |  |  |
|  |  |  |
|  |  |  |
|  | Our reporting centre  Beyond our Responsible Business review  and TCFD statement in this report, we also  produce supplementary reports aligning to  established sustainability reporting  standards:  – Responsible Business data tables  – EU Taxonomy  – Green Financing  – SASB  – GRI  – Our Reporting Methodology  Our [Responsible Business reporting centre](https://www.nationalgrid.com/responsibility/our-reporting-centre/our-reporting-suite)  on our website consolidates our suite of  documents, policies and our commitment to  reporting. |  |
|  |  |  |

![]()

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 53 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Task Force on Climate-related Financial Disclosures (TCFD) |  |  |  |  |  |

#### Understanding the potential impacts of climate change

![]()

|  |  |
| --- | --- |
|  |  |
| CA 2006 requirement | TCFD recommendation |
| Governance |  |
| Section 414CB (2A)(a) | a) Describe the Board’s oversight of climate-related risks and opportunities: pages [54](#i2193c7e7fbee4753bdbe2d16888565c8_94) – [55](#i560897d1211848deb0e960e5c12a4b88_163048) |
|  | b) Describe management’s role in assessing and managing climate-related risks and  opportunities: page  [55](#i560897d1211848deb0e960e5c12a4b88_163048) |
| Risk Management |  |
| Section 414CB (2A)(b) | a) We describe the organisation’s processes for identifying and assessing climate-related  risks: page [61](#i2193c7e7fbee4753bdbe2d16888565c8_106) |
|  | b) We describe the organisation’s processes for managing climate related risks: page [61](#i2193c7e7fbee4753bdbe2d16888565c8_106) |
| Section 414CB (2A)(c) | c) We describe how processes for identifying, assessing and managing climate-related  risks are integrated into the organisation’s overall risk management: page  [61](#i2193c7e7fbee4753bdbe2d16888565c8_106) – [66](#i392e6c38eda84b7a8016482c5b574f46_301668) |
| Strategy |  |
| Section 414CB (2A)(d) | a) We describe the climate-related risks and opportunities the organisation has identified  over the short, medium and long term: pages [62](#i392e6c38eda84b7a8016482c5b574f46_301667) – [66](#i392e6c38eda84b7a8016482c5b574f46_301668) |
| Section 414CB (2A)(e) | b) We describe the impact of climate-related risks and opportunities on the organisation’s  businesses, strategy and financial planning: pages [62](#i392e6c38eda84b7a8016482c5b574f46_301667) – [66](#i392e6c38eda84b7a8016482c5b574f46_301668) |
| Section 414CB (2A)(f) | c) We describe the resilience of the organisation’s strategy, taking into consideration  different climate-related scenarios, including a 2oC or lower scenario: pages: [56](#i2193c7e7fbee4753bdbe2d16888565c8_100) – [60](#i66add40dc32a48a2a2eb6a1314086476_300631) |
| Metrics and Targets | |
| Section 414CB (2A)(h) | a) Our metrics used to assess climate-related risks and opportunities in line with our  strategy and risk management processes: pages [67](#i2193c7e7fbee4753bdbe2d16888565c8_112) – [68](#i5ce9e2b3cd614bcca8423db41cd18ff1_160075) |
| N/A | b) Our Scope 1, Scope 2 and Scope 3 greenhouse gas (GHG) emissions and the related  risks: pages [40](#i2193c7e7fbee4753bdbe2d16888565c8_19791209304966) – [44](#idacfbb1601cb477c9401c46187170fe9_240518) and [67](#i2193c7e7fbee4753bdbe2d16888565c8_112) – [68](#i5ce9e2b3cd614bcca8423db41cd18ff1_160075) |
| Section 414CB (2A)(g) | c) Our targets used to manage climate-related risks and opportunities and performance  against targets: pages [67](#i2193c7e7fbee4753bdbe2d16888565c8_112) – [68](#i5ce9e2b3cd614bcca8423db41cd18ff1_160075) |

At National Grid, we recognise that our

networks and operations are crucial to

transforming the energy system in the

jurisdictions where we operate.

We support the Paris Agreement’s long-

term goal to keep the rise in global average

temperature by 2100 to well below 2ºC

above pre-industrial levels, and to pursue

efforts to limit the increase to 1.5ºC.

Over the past year, we have operated in

a complex environment of economic and

political uncertainty, with energy security

and affordability remaining key priorities.

As a responsible business, we respond

to these expectations across our

stakeholders. While UK policy continues

to support clean power, affordability and

system resilience are pressing challenges;

in the US, New York faces affordability

challenges and Massachusetts is behind

on key climate targets.

We fully comply with Financial Conduct Authority

(FCA) UK Listing Rule 6.6.6R(8) and align our

climate-related financial disclosures with the TCFD's

four pillars – governance, strategy, risk

management, and metrics and targets, with 11

recommended disclosures under these pillars.

Additionally, we meet the climate-related financial

disclosure requirements outlined in sections 414CA

and 414CB of the Companies Act 2006.

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 54 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Task Force on Climate-related Financial Disclosures (TCFD) cont. |  |  |  |  |  |

#### Governance

The Board sets and leads the Group’s climate-related

strategy and goals, maintaining oversight of key risks

and opportunities.

Responding to climate change and supporting the

transition to net zero continue to be important

considerations in shaping our strategy. The Board

is responsible for setting the Group’s climate-

related strategy and goals, although delegates

certain responsibilities to its Committees.

Board members bring a blend of skills and

experience, including expertise in delivering

sustainability and climate change strategies. Their

backgrounds and executive experience, particularly

in the energy sector, help ensure the requisite skills

are available to support the Group’s strategy and

monitor climate-related risks and opportunities.

Several Board members, including Tony Wood,

Martha Wyrsch and Earl Shipp, bring strong

climate and sustainability experience. Martha, Chair

of the People & Remuneration Committee,

contributes extensive climate expertise from her

leadership of a major international gas transmission

business and her role in developing Vestas’ US

renewable energy operations. Earl Shipp, Chair of

the Safety & Operations Committee, adds deep

environmental and sustainability knowledge from

his long career in the chemicals industry and

service on the US Federal Reserves Energy

Advisory Committee.

Tony Wood, Chair of the Responsible Business

Committee, provides further sustainability and

climate experience from senior roles in the

aerospace and defence sector, including as CEO

of Meggitt plc where he was responsible for

leading the Group’s sustainability strategy over a

five‑year period. This included overseeing the

development of science‑based targets for Scope 1,

2 and 3 emissions in line with the Science Based

Targets initiative (SBTi). Other Board members

including Paula Rosput Reynolds, Jacqui Ferguson

and Jonathan Silver also bring relevant climate-

related expertise. See pages [91](#i2193c7e7fbee4753bdbe2d16888565c8_145) – [93](#i4997ac40020447c895a078c99bce5833_0-0-1-1-921425) for

information on the individual experience of Board

members and page 98 for the Board’s skill profile.

As set out on page [89](#ic8148442a0374ce99f3efd5879234dda_74361), the Board Committees

were restructured during the year. As part of the

restructure, the Responsible Business Committee

was established.

The Responsible Business Committee provides

strengthened oversight of sustainability and

climate‑related matters, consolidating

responsibilities that were previously dispersed

across broader Committee remits. It now holds

explicit responsibility for tracking the Group’s

ambition and progress against its sustainability and

climate targets and commitments, meeting three

times during the financial year.

As part of its mandate, the Committee oversees

the Group Principal Risk (GPR) – Climate change

mitigation, reviewing management updates,

assessing risk‑tolerance levels and monitoring the

effectiveness of mitigation strategies.

Climate‑related risks and opportunities remain

integral to the Group’s decision‑making and

oversight. The Committee considers these matters

across strategy, including explicit consideration of

factors such as affordability pressures and fiscal

constraints that may affect the pace of

decarbonisation.

Prior to this change, climate‑related matters were

primarily overseen by the former Safety &

Sustainability Committee, which met for the final

time in May 2025, when the Committee reviewed

progress against Scope 1 and 2 targets, discussed

Scope 3 dependencies, and considered key

external uncertainties, including policy, regulatory,

technological and geopolitical factors.

In September 2025, the Responsible Business

Committee and the Audit & Risk Committee held a

joint meeting to review the Climate Change

Mitigation GPR, including management’s

assessment of the risk against the Board’s risk

appetite and the effectiveness of existing controls

and mitigation actions.

The Committees challenged whether the risk

remained within appetite, noting increasing external

pressures, and considered key risk drivers and

interdependencies, including policy and regulatory

developments, affordability and energy security

considerations. The Committees also reviewed

how climate‑related risks are monitored and

managed, including the use of key risk indicators,

emissions projections and scenario analysis, and

considered emerging risks such as climate‑related

litigation. In addition, the Committees reviewed the

Group’s approach to climate‑related reporting and

disclosures, ensuring that climate risks,

dependencies and uncertainties are appropriately

reflected in external reporting and governance

arrangements.

The Board received three updates from the Chair

of the Responsible Business Committee and one

update from the Chair of the Safety & Sustainability

Committee during the year to provide an overview

of matters discussed at its Committee meetings.

The Board also receives a Chief Executive and

business update report at each meeting which

includes quarterly reporting of climate change

metrics such as GHG emission performance

versus targets.

The Board considered climate‑related themes

across several sessions during the year, including

as part of its strategy‑focused offsite in January

2026, where wider energy transition, system

resilience and long‑term network investment

priorities were discussed alongside affordability and

regulatory considerations. Climate‑related matters

were considered within the context of the Group’s

strategic objectives, recognising the

interdependencies between decarbonisation,

security of supply and customer outcomes.

Prior to the Committee restructure, the People &

Governance Committee reviewed the composition

of the Board and its committees in the year,

applying a Board skills matrix to ensure that the

Board has an appropriate balance of skills and

competencies, including climate change matters.

The Board also considers climate-related issues

when reviewing and guiding annual budgets and

financial decision-making, including major capital

expenditure, acquisitions and divestments.

The remit of the Board and its Committees, as well

as the number of times they met and discussed

climate-related matters during the year, are set out

on pages [89](#i2193c7e7fbee4753bdbe2d16888565c8_142) – [90](#ic8148442a0374ce99f3efd5879234dda_74360).

|  |  |
| --- | --- |
|  |  |
|  | [Terms of Reference for the Board and its](https://www.nationalgrid.com/about-us/corporate-information/corporate-governance)  [Committees are available on our website](https://www.nationalgrid.com/about-us/corporate-information/corporate-governance)  [nationalgrid.com/about-us/corporate-](https://www.nationalgrid.com/about-us/corporate-information/corporate-governance)  [information/corporate-governance](https://www.nationalgrid.com/about-us/corporate-information/corporate-governance) |

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 55 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Task Force on Climate-related Financial Disclosures (TCFD) cont.  Governance |  |  |  |  |  |

![Board committees dia v2.jpg]()

|  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |
|  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |
|  |  |  |  |  |  |  |  |  | Board |  |  |  |  |  |  |  |  |
|  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |
|  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |
|  |  |  | Responsible Business  Committee |  |  | Audit & Risk  Committee |  |  | Safety & Operations  Committee |  |  | People & Remuneration  Committee |  |  | Nomination  Committee |  |  |
|  |  |  | Responsible for Board  oversight of climate‑related  matters, including  sustainability strategy,  climate transition planning,  resilience considerations  and identification of  climate‑related risks and  opportunities, in line with the  TCFD framework. |  |  | Oversees the identification,  assessment and  management of risks,  including internal controls,  assurance and review of  TCFD‑aligned disclosures.  Considers climate‑related  financial impacts, capital  allocation, financing  decisions and metrics, and  alignment of financial  planning with the Group’s  transition plan. |  |  | Monitors operational safety  and resilience, including  management of physical  climate‑related risks and  adaptation measures  impacting assets and  operations. |  |  | Establishes executive  remuneration, incentives,  skills and succession  planning, including LTPP  oversight of controllable  Scope 1 emissions  reductions and energy  transformation measures. |  |  | Ensures the Board  collectively has appropriate  skills and experience,  covering climate, energy  transition and sustainability  expertise. |  |  |
|  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |
|  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |
|  |  |  |  |  |  | Group Executive Committee | | | | | | |  |  |  |  |  |
|  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |
|  |  | Responsible  Business Committee  Oversees Group-wide RBC  matters, including political,  societal, sustainability and  regulatory issues. | |  |  | Audit, Risk &  Finance Committee  Manages and coordinates  development and delivery of  audit, risk and financial  activities across the Group,  including climate-related  principal risks. |  |  | Safety & Operations  Committee  Oversight of safety, heath and  wellbeing, asset management  and capital projects. |  |  | People & Remuneration  Committee  Sets remuneration and  oversees talent, culture, and  people risks to support Group  strategy. |  |  | Group Investment  Committee  Has delegated authority to  approve investment, acquisition  and divestment decisions,  including ASTI and NY Upstate  Upgrade. | |  |
|  |  |  |  |  |  |  |  |  |  |  |
|  |  |  |  |  |  |  |  |  |  |  |
|  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |
|  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |
|  |  |  |  |  |  |  |  |  | Management forums |  |  |  |  |  |  |  |  |
|  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |
|  |  | Sustainability Delivery  Steering Group  Drives RBC integration,  including climate strategy and  targets. Chaired by CSO with  attendance from business unit  and function senior leaders. | |  |  | ESG Strategic  Steering Group  Guides and steers on ESG  strategy. Comprised of senior  leaders from Sustainability,  Finance, Legal and Corporate  Affairs. |  |  | Sustainability  Implementation Group  Implements RBC  commitments and principles.  Monitors climate progress and  shares best practice among  business peer groups. |  |  | Green Financing  Committee  Chaired by the Group  Treasurer, overseeing  governance of the  programme, including project  evaluation for green financing. |  |  | Group Sustainability  and Finance ESG teams  Responsible for the Group’s  sustainability strategy and  reporting deliverables, ensuring  credible and reliable data,  including TCFD disclosures. | |  |
|  |  |  |  |  |  |  |  |  |  |  |
|  |  |  |  |  |  |  |  |  |  |  |
|  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |
|  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |
|  |  |  |  |  |  |  |  |  | Business unit level |  |  |  |  |  |  |  |  |
|  |  |  | Business units are responsible for delivering the Group’s RBC and CTP. Targets are embedded in performance contracts and progress tracked through our Enterprise  Performance Management (EPM) framework. Climate change risks and opportunities are evaluated via the Enterprise Risk Management (ERM) process (see page [30](#i2193c7e7fbee4753bdbe2d16888565c8_61)). | | | | | | | | | | | | |  |  |

#### Management’s role

The Board delegates responsibility to management for

asset management and maintenance planning,

implementation of the net zero strategy and delivering

climate commitments and targets. This is then

considered at the relevant Group Executive Sub-

Committee. These Sub-Committees were revised in

the year to reflect the Board Committees and enable

more streamlined reporting and clearer accountability

of topics, including sustainability and climate change.

Management is also responsible on a day-to-day

basis for managing climate-related risks and

opportunities, and for reporting on progress to the

Board and its Committees.

Sustainability roles are integrated across the Group

to help ensure a top-down, bottom-up response to

climate. Our Chief Sustainability Officer (CSO) heads

a team of subject matter experts who lead the

implementation of the RBC across the Group,

working closely with business units and functions to

align strategy and operations with decarbonisation

and climate resilience targets.

The team drives the Group’s sustainability strategy,

modelling potential climate scenarios and supporting

the business to develop glidepaths aligned to GHG

emission reduction targets. They also oversee

progress on sustainable supply chain initiatives via

the Supply Chain Climate Strategy Steering Group,

collaborating with representatives from Global

Procurement to develop decarbonisation levers

through supplier engagement.

The Chief Engineer leads on climate adaptation and

mitigation activities, assessing asset climate

vulnerability and guiding investment to strengthen

network resilience. Business unit Presidents are

accountable for delivering net zero commitments.

Group Finance further supports sustainability

ambitions through its ESG Centre of Excellence

(CoE), Investor Relations and Treasury teams. The

ESG CoE sets the Group’s sustainability reporting

strategy, overseeing credible and reliable reporting of

mandatory and voluntary disclosures, as well as

coordinating the provision of external assurance and

ESG rating agency submissions. Investor Relations

and Treasury attract green investment, engaging with

debt and equity investors to communicate our

climate strategy.

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 56 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Task Force on Climate-related Financial Disclosures (TCFD) cont. |  |  |  |  |  |

#### Strategy

Our understanding of climate-related risks and opportunities

informs our strategic decision-making, as we drive

unprecedented levels of investment in energy networks.

The energy transition provides significant growth

opportunities, and we are well-positioned to

harness these, through enabling the transportation

and distribution of clean energy to homes and

businesses. Achieving this requires a major

upgrade of our networks, and we are already

delivering these improvements across the regions

and jurisdictions in which we operate.

We proactively prepare and plan for the physical

and transition risks linked to climate change.

Through scenario planning, we assess a range of

possible futures to understand the opportunities

and risks in each, ensuring our strategy remains

resilient and adaptable. Achieving our emissions

reduction goals will be challenging without backing

from policymakers and regulators.

This section summarises how we are responding

to the main climate-related opportunity facing our

business – the expansion of electricity networks to

support the energy transition – and outlines how

we use scenario modelling to evaluate climate-

related risks and opportunities.

#### Investing to enable the energy transition

We expect to invest at least £70 billion across our

regulated energy networks and adjacent

businesses, in the UK and US, over the five-year

period to 2030/31. Of this group capital investment,

around 85% is considered to be aligned with the

principles of the EU Taxonomy legislation as at the

date of reporting (also referred to in this report as

green capital expenditure), directly invested into the

decarbonisation of energy networks.

Under our [Green Financing Framework 2025](https://www.nationalgrid.com/document/558926/download),

National Grid plc and its subsidiaries are able to

issue green financing instruments to fund our

efforts towards a cleaner energy system. Moody’s

provided a second party opinion on our updated

Framework published in May 2025 and assigned

an SQS1 sustainability quality score (excellent). [See](https://www.nationalgrid.com/responsibility/our-reporting-centre/our-reporting-suite)

[our latest Green Financing Report on our website](https://www.nationalgrid.com/responsibility/our-reporting-centre/our-reporting-suite),

which details the issuance of green bonds totalling

£1.2 billion in 2025/26, along with the allocation of

proceeds and their environmental impact.

Having considered the climate-related risks and

opportunities on pages [62](#i392e6c38eda84b7a8016482c5b574f46_301667) – [66](#i392e6c38eda84b7a8016482c5b574f46_301668), we expect our

strategy and investment drivers to deliver strong

growth (see page [11](#i9481148b69324eb8a31d6c1c8e04e605_327341) for further details). We

continue to focus our business on electricity, with

our most recent projections suggesting that over

80% of Group assets are expected to be electric

by 2030/31.

Growth in clean generation and increased demand

for electricity is driving a need for larger, smarter

electricity networks, alongside ensuring existing

energy networks remain resilient and reliable. We

are connecting more new generation and load

faster than ever before, enabling economic growth,

bolstering energy security and supporting cleaner,

affordable energy for our communities and

customers on both sides of the Atlantic. This is a

significant climate-related financial opportunity, and

key activities we are undertaking to support clean

energy supply and electrification are outlined on

page [44](#idacfbb1601cb477c9401c46187170fe9_242435).

As part of our strategy to focus on networks and

streamlining our business, we completed the sale

of National Grid Renewables, our US onshore

renewables business, and Grain LNG, our UK

LNG asset.

In seeking to achieve our net zero target and

support decarbonisation, we will leverage our

strong financial position and investment-grade

credit ratings to finance key investments for net

zero energy transmission and distribution.

Following the successful £7 billion Rights Issue in

2024/25, our balance sheet, backed by valuable

assets and strong credit ratings, is flexible and well

positioned for growth. We secure funding through

borrowing and shareholder investments, adhering

to regulatory rules, and closely monitor the financial

health of our UK and US operations to maintain

appropriate gearing ratios.

As asset growth and earnings become increasingly

aligned, this will support shareholder returns while

preserving balance sheet capacity. Beyond the

next five years, we remain confident in our balance

sheet strength and maintain a broad range of

funding options, including substantial headroom in

hybrid debt capacity, should it be needed.

We, alongside other network companies, have a

unique role to play in supporting system

decarbonisation. By building out the network of the

future, we seek to enable the deployment of low-

carbon energy supply to meet society’s growing

electricity needs while bringing down emissions.

Our Climate Transition Plan, which is aligned with a

1.5°C scenario, identifies the policy and regulatory

support required for future investments aimed at

decarbonising the energy sector and reducing

emissions. For our performance details against the

CTP refer to pages [40](#i2193c7e7fbee4753bdbe2d16888565c8_19791209304966) – [44](#idacfbb1601cb477c9401c46187170fe9_240518).

#### Scenario modelling

We use modelling to test how robust our Group

strategy is to a range of future scenarios out to

2050. Our scenarios are used to inform our

sustainability approach and assess progress

against our climate target commitments.

Transition scenario modelling

Our transition scenarios out to 2050 are tailored to

our UK and US business environments.

Our “Delayed” scenario represents a world with

higher warming levels, where governments,

industry and consumers do not pursue the

transition at pace.

Our “Balanced Pathway” scenario sees

approximately 2°C of warming, with the energy

transition progressing at pace but supply chain,

policy and cost challenges preventing our

jurisdictions from hitting targets.

Our “Electric Net Zero” scenario sees

approximately 1.5°C of warming, with governments

and industry prioritising decarbonisation goals

through supportive policies and regulatory reforms.

Our scenarios reflect possible actions and

conditions within our jurisdictions; the associated

°C ranges within our pathway titles are used as

reference labels for external conditions, rather

than implying corresponding global temperature

outcomes, which depend on cumulative

global emissions.

As part of our ongoing risk management processes,

we continually monitor changes in the external

environment and assess implications for our

scenarios. While our modelling is subject to

limitations, including data availability across other

sectors, we mitigate these through the use of diverse

sources and external scenario benchmarking.

Our scenarios are not intended as predictions, but

as tools to enhance our understanding of potential

climate-related risks and opportunities. Along with

our strategic planning and risk management

approaches, these scenarios guide us in identifying

material climate-related risks and opportunities as

set out on pages [62](#i392e6c38eda84b7a8016482c5b574f46_301667) – [66](#i392e6c38eda84b7a8016482c5b574f46_301668).

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 57 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Task Force on Climate-related Financial Disclosures (TCFD) cont.  Strategy |  |  |  |  |  |

#### Transition scenario descriptions, assumptions and inputs

Scenario: Climate change by 2100 vs. pre-industrial levels (approximate)

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
|  | Scenario | Targets | Macroenvironment and policy | Generation | Demand |
|  | Delayed  2-4°C | – Decarbonisation progresses  but is insufficient to meet net  zero in 2050 | – Geopolitics disrupts  established trade flows, with  supply chain impacts  – Policy delays | – Wind and solar deployment continues slowly with thermal  generation staying online longer to support load growth  – Reduced opportunities for further interconnection growth  beyond what is in the pipeline | – Total energy consumption reduces 18% by 2050  – Electricity demand increases 108% by 2050  – Gas heating dominates, with low uptake of heat pumps due to limited policy support  – EV uptake stagnates due to cost |
|  | Balanced  Pathway  2°C | – Decarbonisation progresses  but falls short of near-term  targets with ~10-year delay to  Clean Power 2030 | – Geopolitical tensions continue,  but with gradual recovery of  supply chains  – Policy incentives maintained  with reforms over time | – Wind and solar deployment continues but misses targets,  while gas for the power sector still has a role to play in the  2030s beyond the maximum 5% of power generation  targeted in Clean Power 2030  – Interconnector projects progress at pace | – Total energy consumption reduces 31% by 2050  – Electricity demand increases 112% by 2050, mainly because of electrification of heat and  transport, green hydrogen production and data centre expansion  – Heat pump growth restricted to new build houses. Current houses converting off gas heating  continues at current rates  – EVs continue to grow at the current rate with the Zero Emissions Vehicles mandate in place |
|  | Electric  Net Zero  1.5°C | – Delayed achievement of Clean  Power 2030, with economy-  wide net zero by 2050 | – Geopolitical tensions ease,  with robust and diversified  supply chains and increased  international collaboration  – Policy progress accelerates  and supports increasing  investment and target delivery | – Strong renewable expansion supported by distributed  flexibility and storage, with some abated gas capacity  providing dispatchable supply  – Increased collaboration and coordination results in faster  adoption of offshore hybrid assets and overall increased  interconnectors | – Total energy consumption reduces 32% by 2050, as more efficient electric technology  replaces combustion technology  – Electricity demand increases 127% by 2050 with near-complete electrification of demand  sectors such as heat and transport  – Heat pumps mandated in existing homes as well as sufficient subsidy to support wide-  spread adoption  – Widespread EV adoption as policies achieve targets |
|  |  |  |  |  |  |
|  |  |  |  |  |  |
|  | Delayed  2-4°C | – Achieves ~50% reduction in  energy-related emission from  1990 levels by 2050 | – Policy prioritises affordability | – New gas infrastructure to address resource adequacy  – No offshore wind added beyond what is fully permitted and  currently under construction  – Some large onshore renewables are added each decade as  states continue to pursue renewable targets but at a  delayed pace | – Total energy consumption reduces 22% by 2 050  – Electricity demand increases 58% by 2050  – State subsidies are scaled back, resulting in low uptake of heat pumps  – EV adoption stagnates in the near term driven by fewer federal incentives, although increases  as costs decline in the 2030s |
|  | Balanced  Pathway  2°C | – Softening in decarbonisation  targets, achieves ~60%  reduction in energy-related  emissions by 2050 | – Softening in decarbonisation  targets due to affordability  concerns | – No new fossil units or major enhancements to existing plant,  with limited gas repowering  – Offshore wind stalls through 2035, then existing lease areas  are gradually built out driven by energy needs, given no  politically viable alternatives  – Onshore renewables deployment increases steadily but  roughly 10 years behind stated policy goals | – Total energy consumption reduces 36% by  2050  – Electricity demand increases 64% by 2050  – Heat pump adoption increases steadily as costs fall, capturing 45% of heat demand by 2050  – Slow adoption of EVs through the 2030s after Federal incentives end in 2025, with full  competitiveness and growth upswing by 2035 |
|  | Electric  Net Zero  1.5°C | – Clean electricity targets lag  through 2035, but energy-  related emissions achieve  ~85% reduction in line with  overall state emissions targets  by 2050 | – Policy prioritises clean power  and decarbonisation | – Existing gas capacity retained for emergency back-up  – New nuclear plays a larger role in decarbonisation  – Offshore wind picks up in the 2030s becoming the leading  source of electricity generation in the region  – Onshore renewables deployment continues to meet the net  zero goals | – Total energy consumption reduces 67% by 2050  – Electricity demand increases 78% by 2050  – Heat pump adoption increases with falling costs, capturing 70% of heat demand by 2050  – Widespread EV adoption in line with policy targets |

![transition scenario_Loz.jpg]()

Delayed 2-4°C

Represents a world where governments, industry and consumers do not pursue

the transition at pace, meaning our jurisdictions miss climate targets.

Balanced Pathway 2°C

Energy transition drives forward at pace, but ongoing supply chain challenges,

policy implementation delays, and short-term financial concerns mean our

jurisdictions narrowly miss targets.

Electric Net Zero 1.5°C

Governments prioritise the achievement of decarbonisation goals through

supportive policies and regulatory reforms, new load is met through clean power

sources.

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 58 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Task Force on Climate-related Financial Disclosures (TCFD) cont.  Strategy |  |  |  |  |  |

#### Transition scenario outputs

|  |  |  |  |  |  |  |  |  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |  |  |  |  |  |  |  |  |
|  |  |  | UK | |  |  | US NY | |  |  | US MA | |  |
| Annual  electricity  demand,  TWh | Delayed  2 –4°C |  |  |  |  |  |  |  |  |  |  |  |  |
| Balanced pathway  2°C |  |  |  |  |  |  |  |  |  |  |  |  |
| Electric Net Zero  1.5°C |  |  |  |  |  |  |  |  |  |  |  |  |

![1]()

![53]()

![113]()

![41]()

![65]()

![89]()

![29]()

![77]()

![101]()

|  |  |  |  |  |  |  |  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |  |  |  |  |  |  |  |
|  |  |  |  |  |  | US NY | |  |  | US MA | |  |
|  |  |  |  |  |  | 2024 | 2035 | 2050 |  | 2024 | 2035 | 2050 |
| Annual  natural gas  demand,  MMBTU | Delayed  2–4°C | | | |  | 815m (2024) | 910m | 994m |  | 270m (2024) | 301m | 339m |
| Balanced Pathway  2°C | | | |  | 815m (2024) | 835m | 699m |  | 270m (2024) | 270m | 220m |
| Electric Net Zero  1.5°C | | | |  | 815m (2024) | 627m | 211m |  | 270m (2024) | 196m | 65m |

Note:  Using 2024 data for natural gas demand in New York and Massachusetts, as 2025 data is not yet available.

|  |  |  |  |  |  |  |  |  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |  |  |  |  |  |  |  |  |
|  |  |  | UK | | |  | US NY | | |  | US MA | | |
| Total  renewable  generation,  TWh | Delayed  2–4°C |  |  |  |  |  |  |  |  |  |  |  |  |
| Balanced Pathway  2°C |  |  |  |  |  |  |  |  |  |  |  |  |
| Electric Net Zero  1.5°C |  |  |  |  |  |  |  |  |  |  |  |  |

![353]()

![389]()

|  |  |  |  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |  |  |  |
|  |  | 2025: 1.1 | 2035: 2.2 | 2050: 2.1 | Total: 5.4 |  |  |  |
|  |  |  |  |  |  |  |  |  |
|  | 3.2 | | |  |  |  |  |  |
|  |  |  |  |  |  |  |  |  |

![425]()

![365]()

![401]()

![413]()

![377]()

![437]()

![449]()

|  |  |  |  |  |  |  |  |  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |  |  |  |  |  |  |  |  |
|  |  |  | UK | | |  | US NY | | |  | US MA | | |
| Number of  passenger  EVs, millions | Delayed  2–4°C |  |  |  |  |  |  |  |  |  |  |  |  |
|  | 93% of car fleet by 2050 | | |  | 70% of car fleet by 2050 | | |  | 70% of car fleet by 2050 | | |
| Balanced Pathway  2°C |  |  |  |  |  |  |  |  |  |  |  |  |
|  | 96% of car fleet by 2050 | | |  | 70% of car fleet by 2050 | | |  | 70% of car fleet by 2050 | | |
| Electric Net Zero  1.5°C |  |  |  |  |  |  |  |  |  |  |  |  |
|  |  | 100% of car fleet by 2050 | | |  | 87% of car fleet by 2050 | | |  | 88% of car fleet by 2050 | | |

![245]()

![281]()

![317]()

![257]()

![293]()

![305]()

![269]()

![329]()

![341]()

|  |  |  |  |  |  |  |  |  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |  |  |  |  |  |  |  |  |
|  |  |  | UK | |  |  | US NY | |  |  | US MA | |  |
| Number of  residential  heat pumps,  millions | Delayed  2–4°C |  |  |  |  |  |  |  |  |  |  |  |  |
| Balanced pathway  2°C |  |  |  |  |  |  |  |  |  |  |  |  |
| Electric Net Zero  1.5°C |  |  |  |  |  |  |  |  |  |  |  |  |

|  |  |  |  |  |
| --- | --- | --- | --- | --- |
|  |  |  |  |  |
|  | 2024: 0.08 | 2035: 0.35 | 2050: 0.49 | Total: 0.92 |
|  |  |  |  |  |

2.3

![16492674420266]()

![16492674420299]()

![16492674420332]()

0.68

![16492674420255]()

![16492674420288]()

![16492674420321]()

![16492674420244]()

![16492674420277]()

![16492674420310]()

|  |  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |  |
|  | 2025 |  | 2035 |  | 2050 | Note: NY refers to New York State, MA to Massachusetts. UK Delayed and Electric Net Zero scenarios based on 2024/25 inputs.  US NY Heat Pump numbers are based on 2024 data as 2025 data is not yet available. |
|  |  |  |

Note: Graphics are not to scale.

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 59 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Task Force on Climate-related Financial Disclosures (TCFD) cont.  Strategy |  |  |  |  |  |

#### Changes since last year

We have retained our scenario framework from last

year, which presents a wide range of energy

transition outcomes. They reflect the tensions or

trade-offs governments may need to manage. We

regularly update our Balanced Pathway scenarios

for the US and UK. Our Electric Net Zero and

Delayed scenarios are long-term outlooks and we

do not update them as frequently. The inputs for

our US Delayed and Electric Net Zero scenarios

have been updated since last year to reflect

market, policy and technology shifts, while the UK

Delayed and Electric Net Zero scenarios remain

consistent with our 2024/25 Annual Report. We will

continue to monitor the evolving market, policy and

technology landscape and consider any revisions

to our UK Delayed and Electric Net Zero scenarios

as appropriate.

#### Transition scenario insights

We assess the resilience of our business strategy

against our transition scenarios, with a particular

focus on the Electric Net Zero scenario, given

the greater level of action required to deliver

decarbonised energy systems. The following

five transition insights are most relevant to a

1.5°C scenario.

1. Achieving energy transition targets

depends on effective reforms to drive clean

power deployment and policies that

incentivise consumer uptake of low-carbon

technologies

Policy interventions will continue to be a key

enabler of the transition. Our ability to meet our

own climate commitments relies on these.

Government support for both supply-side and

demand-side clean technologies is important to

achieve policy targets. This extends to key enabling

policies regarding connections, planning and

permitting, as necessary preconditions for our

jurisdictions to accelerate in line with targets.

Without additional support, despite technology

cost declines, there will be a financing gap for

some clean technologies.

2. Electricity use and share of final demand

will increase driven by consumer

electrification and large demand customer

growth (e.g. data centres)

As more consumers switch to electric vehicles and

heat pumps, electricity demand will increase. Rapid

growth of data centres and the rise of AI, alongside

industrial electrification, is a potentially significant

additional driver of demand. In the UK, we expect

electricity demand to increase 50% by 2035 and

more than double by 2050. In our states in the US,

we expect an increase of around 30% by 2035 and

more than 50% by 2050. These projections could

increase if the pace of electrification accelerates,

with the growth of AI and associated power needs

a key variable. Rising electrification will continue to

drive additional growth and investment in our

electricity network.

3. Energy supply structure will continue

to shift

Renewable capacity will continue to grow globally,

to meet electricity demand growth and replace

fossil fuel generation. Other low-carbon

technologies are also seeing a resurgence in

growth, including nuclear, with growing momentum

for next generation technologies such as small

modular reactors. Battery storage capacity and

other flexible assets continue to advance, with

some technologies already commercially scalable,

and supporting system balancing and curtailment.

4. Pathways will adapt to global and

local realities

Our governments continue to actively shape energy

policy, and we expect to see different energy

transition pathways across our jurisdictions. In the

UK, the Government has continued to drive

progress towards its Clean Power 2030 Action

Plan, breaking further records in recent renewable

auctions. In the US, the Federal Government

remains focused on energy abundance, through

natural gas and expanding energy infrastructure.

Our states continue to pursue climate targets and

policies, while seeking to balance these with other

priorities including affordability.

5. CTP achievement will be challenging in

slower scenarios

Our ability to achieve our climate targets is closely

linked to the decarbonisation of the energy

systems in the jurisdictions in which we operate.

We have always viewed our climate targets as

ambitious, and meeting our targets is contingent

on a range of dependencies. Slower scenarios

present greater challenges to meeting our targets,

and in some we will not be able to meet our

targets. Moving forward, we will continue to evolve

and refine our approach based on progress and

developments in the external landscape.

|  |  |  |
| --- | --- | --- |
|  |  |  |
|  |  |  |
|  | Conclusion  None of the transition scenarios tested  materially threaten the Group's resilience,  and we are well positioned to adapt our  portfolio to maximise the opportunities of  the energy transition, with no significant risk  of a material adjustment to the carrying  amounts of assets and liabilities in the next  annual reporting period. |  |
|  |  |  |

![]()

|  |  |
| --- | --- |
|  |  |
|  | Further detail on the transition risks and  opportunities identified in our scenario analysis,  including estimated qualitative and quantitative  impacts where applicable, can be found on pages  [62](#i392e6c38eda84b7a8016482c5b574f46_301667) – [66](#i392e6c38eda84b7a8016482c5b574f46_301668). |

![TCFD Strategy Image.jpg]()

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 60 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Task Force on Climate-related Financial Disclosures (TCFD) cont.  Strategy |  |  |  |  |  |

#### Physical scenario modelling

We use Group-wide climate scenarios to assess

our vulnerability to climate change. These scenarios

benchmark global progress toward limiting warming

to 1.5°C in line with the Paris Agreement and

evaluate how physical climate impacts – such as

extreme weather and long-term changes in weather

patterns – could affect our business.

#### Descriptions, assumptions and inputs

Climate hazard data is sourced from national

climate assessments in the UK (UKCP18) and US

(CMIP5). Scenario modelling uses the

Intergovernmental Panel on Climate Change

(IPCC’s) Representative Concentration Pathway

(RCP) of RCP8.5 (4°C) and RCP4.5 (2°C) across

future decades (2030s–2070s), compared with

1981–2010 (UK) and 1976–2005 (US) baselines.

While climate projections are inherently uncertain –

due to natural variability, model limits, and imperfect

observations – these uncertainties should not delay

action to mitigate or adapt to climate change.

#### Outputs

Most climate hazards are expected to become

more frequent, with high temperatures and coastal

and river flooding posing the greatest risk across

our operations. Risks are generally higher in a 4°C

scenario than a 2°C scenario.

Wildfire risk remains lower in our territories

compared with areas such as the western US, but

we have strengthened situational awareness and

operating procedures. We recently completed a

third-party wildfire risk assessment for our US

jurisdictions and are in the process of initiating one

in the UK, helping us identify vulnerabilities and

develop mitigations.

We have advanced our physical risk analysis to

guide strategic planning and investment. Our

Climate Change Risk Tool (CCRT) uses geospatial

capability to provide tailored physical risk

assessments for each mapped business area while

still maintaining a Group-level view. We aspire to

further develop the CCRT to account for portfolio

changes and incorporate additional infrastructure

data points in areas like NGED, NGV and SI to

refine our overall risk picture.

#### Climate Vulnerability Assessment (CVA)

Using CCRT insights, we conduct a Group-wide

![critical climate risks.jpg]()

Climate Vulnerability Assessment (CVA) to evaluate

how climate change could affect our assets over

the coming decades. This is typically performed on

a five-year basis, and we anticipate completing the

next Group-wide CVA in 2028.

Understanding changing climate conditions and

asset risk allows us to develop appropriate

mitigations to protect existing assets and build

climate resiliency. The CVA follows a phased risk-

based approach to identify high-risk assets and

develop adaptation plans. Outputs of the CVA

process include business-specific vulnerability

assessment reports, equipment specification

updates, external engineering standards, asset

policy changes, discrete investment projects and

CCRT development.

Each business unit identifies critical assets

vulnerable to climate hazards, accounting for

existing adaptation measures and the latest climate

science. Adaptations are locally developed to inform

standards, capital investment, and broader industry

alignment. Given that many of our assets have

lifespans of 50+ years, future climate hazards must

be considered upfront in planning to avoid

premature asset repair or replacement. For

example, a site not currently at risk of coastal

flooding may become vulnerable within a decade

based on climate projections. Understanding future

climate hazards allows us to make informed design

decisions and resiliency investments to protect our

Group’s assets and improve reliability for customers.

The Climate Resilience Working Group is attended

by representatives from across our business units

who meet monthly to discuss best practice,

particularly related to climate assessments and

response. Additional detail on our actions to

anticipate and respond to climate-related

disruptions is on page [35](#i5b716aa667c3427e93e3ed5359a2f216_69446) and information on

business unit level assessments is on page [66](#i392e6c38eda84b7a8016482c5b574f46_301824).

The climate hazards most significant to us are summarised below.

|  |  |  |  |  |
| --- | --- | --- | --- | --- |
|  |  |  |  |  |
|  |  |  |  |  |
| Group-level critical climate risks | | | Vulnerability |  |
|  |  |  |  |  |
|  | High temperatures  and heatwaves | | Risk of power failure, equipment overheating,  warmer air temperatures contributing toward  accelerated ageing, reduced capacity of  transmission and distribution lines. |  |
|  | Sun_Icon.gif |  |  |
|  |  |  |  |  |
|  | Cold weather | | Ice accretion overloading overhead lines,  structural failure. |  |
|  | Snow_Icon.gif |  |  |
|  |  |  |  |  |
|  | Lightning |  | Risk of power failure, short-circuit faults,  and equipment deterioration. |  |
|  | lightning-bolt.gif |  |  |
|  |  |  |  |  |
|  | Flooding/Erosion | | Risk of power failure, accelerated asset  corrosion, debris damage, equipment  submersion and water infiltration, soil erosion. |  |
|  | Flood_Icon.gif |  |  |
|  |  |  |  |  |
|  | Extreme wind | | Structural failure to overhead lines due to  extreme wind exceeding design standard and  vegetation contact. |  |
|  | Wind_Icon.gif |  |  |
|  | Risk descriptions |  |  |  |
|  |  |  |  |  |
|  | Chronic  physical risk  Gradual, persistent impact over a longer sustained period | | Acute  physical risk  Immediate, high-severity impact concentrated in a short period |  |

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 61 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Task Force on Climate-related Financial Disclosures (TCFD) cont. |  |  |  |  |  |

#### Risk Management

#### Climate change is fully integrated into our enterprise risk management framework.

#### Climate change and ERM

Climate change is a key Group risk factor and is

fully integrated into our enterprise risk management

framework. We consider both physical and

transition risks, and their potential impact on our

business operations, financial performance, and

reputation. For more information on our ERM

framework, which remains consistent with the prior

year, please refer to page [30](#i2193c7e7fbee4753bdbe2d16888565c8_61).

We manage two climate-related Group Principal

Risks (GPR):

1. Climate change (mitigation GPR): This risk

aligns to the strategic objective Enable the

energy transition for all, with a focus on

delivering clean, decarbonised energy to meet

our net zero goals (refer to page [33](#i5b716aa667c3427e93e3ed5359a2f216_69414)).

2. Loss of supply1 (adaptation GPR): Physical

climate risks are incorporated into the Loss of

supply control framework to support system

resilience and the safe, reliable delivery of energy

(refer to page [35](#i5b716aa667c3427e93e3ed5359a2f216_69415)).

This structure provides clear oversight and

accountability – mitigating risk, and maximising

opportunities – in line with Group risk appetite.

1. Significant disruption of energy was renamed to Loss of supply

during 2025/26 to better reflect the nature of the risk, and reflect

that upstream supply considerations are included as a key cause.

Other GPRs affected by climate-related transition

and physical risks include Major capital

programmes which become more significant in a

1.5°C scenario, requiring proactive management

and intervention. Physical risks also contribute to

our Significant safety or environmental event risk,

reinforcing the need for robust safety and

environmental disciplines. Acute physical risks are

already occurring and are expected to increase in

frequency and severity, with greater long-term

impacts under a 4°C scenario.

We routinely horizon scan and track critical energy

transition trends. We monitor key indicators and

metrics against established thresholds and assess

these against our strategy and business plans.

Emerging risks are identified and managed through

our ERM processes with outcomes shared,

reviewed and challenged by senior leadership (refer

to page [30](#i2193c7e7fbee4753bdbe2d16888565c8_61)).

Climate-related risk management is embedded

across all levels of the organisation and follows the

Group’s established “Three Lines” model (see page

[30](#i2193c7e7fbee4753bdbe2d16888565c8_61)).

#### Group Risk Taxonomy

The Group Risk Taxonomy enables the business to

classify any climate change risk under four

categories – strategic, operational, financial, and

compliance – with more detailed sub-categories

and assigned risk appetites. All GPRs are subject

to a detailed annual review and treated as equally

important and not prioritised.

Despite external pressures, our climate-related risk

exposure remains broadly stable, with most risks

within appetite. These risks primarily fall under our

strategic and operational categories.

#### How we manage and monitor our climate-related risks

As part of our risk management process, we have

defined key controls to manage both climate

change mitigation and adaptation risks.

Mitigation controls align with our strategy and

regulatory frameworks and extend across other

relevant risks such as regulatory outcomes, political

and societal expectations, and loss of supply.

These key controls focus on tracking progress

against targets, identifying transition-risk triggers,

and implementing appropriate actions and

solutions. Our material climate change mitigation

controls include the following:

– Business unit action plans: These are

designed to ensure each business unit can

deliver climate change goals to support the

delivery of Group emission reduction targets in

line with our vision and strategy.

– Governance: Our top-down, bottom-up

approach to sustainability governance across all

levels of the organisation (described on page 54)

drives performance and holds business units to

account.

– Responsible Business reporting: We annually

report on our performance, transparently

documenting progress and dependencies

against our commitments.

#### Assessing our climate-related financial risks and opportunities

Our GPRs are rated on a scale of 1 to 5 across

financial, reputational, and likelihood categories.

Financial ratings reflect increasing monetary

impact, while reputational ratings range from

“internal” to “international”.

The overall indicative risk score is calculated by

multiplying likelihood by the greater of financial or

reputational impact, consistent with the stress-

testing methodology used for our Viability

Statement (page [86](#i2193c7e7fbee4753bdbe2d16888565c8_130)).

For TCFD disclosures, we build on this internal

assessment of impact, timeframe and likelihood by

incorporating market data and insights from

subject matter experts across the Group. Short-

term time horizons consider the current effects of

climate-related risks and opportunities while

medium- to long-term consider the

anticipated effects.

We assess material climate-related risks and

opportunities over short, medium, and long-term

horizons, aligned with strategic business planning,

investment and financial forecasting processes.

![]()

#### Conclusion

Our financially material climate-related risks

and opportunities, along with how we

measure and respond to them, are outlined

on the following pages.

Across all pathways, including worst-case

scenarios, none of the identified risks

undermine the Group’s resilience.

We remain well-positioned to adapt our

portfolio and respond to opportunities from

the energy transition.

Reducing uncertainty for uncontrollable

risks through building resilience into

operations and influencing regulatory

outcomes remains essential.

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 62 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Task Force on Climate-related Financial Disclosures (TCFD) cont.  Risk Management |  |  |  |  |  |

![risks background new v2.jpg]()

1. Transition Risk

|  |  |  |
| --- | --- | --- |
|  |  |  |
| Demand for natural gas is  uncertain in long-term scenarios | |  |
|  |  |  |
| Risk/opportunity  Policy and legal  Gas is expected to continue to play an important role across  our US jurisdictions, including the gas assets we own and  operate today. However, achieving net zero will require  progressive decarbonisation of energy networks over the long  term, with the future role of gas shaped by economic,  technological, legal, policy and regulatory developments.  Over the next decade, natural gas demand is expected to  remain robust, reflecting affordability and regional economic  priorities. Over the longer term, net zero pathways assume  increased electrification, including for heating, which would  raise electricity demand and reduce gas consumption, with  implications for the useful economic lives (UELs) and elements  of our gas network assets. | |  |
|  |  |  |
|  | Business units potentially affected:  NY and NE |  |
|  | Asset group(s) potentially affected:  Gas Distribution and Generation |  |
|  | Timeframe |  |
|  |  |  |
|  | Likelihood |  |
|  |  |  |
|  | Measurement indicators:  – Gas UEL sensitivities  – GHG emissions  – CTP |  |

Potential impact

Massachusetts and New York are pursuing accelerated

decarbonisation pathways centred on electrification, which may

reduce long‑term demand for gas heating and shorten the UELs of

certain gas network assets as policy, regulatory and planning

frameworks evolve. Current regulatory frameworks continue to

support capital investment, cost recovery and returns for gas

networks to maintain a safe and reliable service, and while new

customer connections may be constrained, there are no regulatory

mandates requiring the forced conversion of existing gas customers.

State net zero pathways assume a rapid near‑term acceleration in

heat pump adoption, which is a key indicator of electrification and

future gas demand. Achieving material reductions in gas reliance

would also require significant investment in supporting electric

infrastructure. However, recent setbacks to renewable energy

development have increased delivery risk in Massachusetts and New

York. The transition scenario outputs summary on page [30](#i2193c7e7fbee4753bdbe2d16888565c8_61) illustrates

the KPIs relative to the accelerated deployment required under

forecast transition scenarios.

More frequent cold weather events across New York and

Massachusetts underscore the importance of resilient energy

infrastructure. Given the likelihood of recurring extreme cold weather,

many customers are expected to adopt partial electrification

solutions, retaining gas connections for reliability and backup.

Full electrification scenarios appear challenging due to high costs,

customers opting for gas, and existing challenges on the electric

infrastructure to support increasing load in the short term.

We have performed sensitivity analysis to assess the impact on our

Short

Medium

Long

Group financial results of shortening the UELs of our gas business

assets, which for 2050 illustrates an unlikely worst-case scenario.

Please refer to note 13 Property, plant and equipment for more

Very Low

Low

Moderate

High

Very High

details.

Our response

We support the decarbonisation of energy networks while

recognising that gas is expected to continue to play an important,

though evolving, role over the medium to long term, including

through our existing gas assets, with its future role beyond 2050

dependent on economic, technological, legal and regulatory

developments. In assessing the UEL of these assets, we consider

multiple demand pathways reflecting customer behaviour,

electrification pace and affordability, the potential role of low‑carbon

fuels, and jurisdictional net zero ambitions, noting that while New

York and Massachusetts prioritise large‑scale electrification,

challenges remain in meeting near‑term targets.

Notwithstanding long‑term policy objectives, safety and reliability of

the gas network remain key priorities for both National Grid and

regulators. This is evidenced by continued regulatory support for

targeted gas infrastructure investment, including approval of cost

recovery and allowed returns where investment is required to

maintain safe and reliable service. On 7 November 2025, the New

York Department of Environmental Conservation approved permits

for the Northeast Supply Enhancement (NESE) pipeline, which, while

not Company‑owned, will supply gas solely to National Grid and has

been incorporated into our long‑term planning assumptions. The

December 2025 adoption of the New York State Energy Plan further

signals ongoing regulatory recognition of the role of gas infrastructure

in meeting system reliability and policy objectives.

Alternative pathways considered in regulatory proceedings could

also support continued use of gas assets, including as a back‑up

fuel during peak winter demand or through lower‑carbon fuels. Our

US fossil‑fuelled generation assets are currently expected to be

materially depreciated by 2040, aligning with New York State’s

zero‑emissions electricity target. However, due to system reliability

needs, fossil-fuel generation assets may continue to operate beyond

2040. During recent extreme weather events, these assets provided

critical system reliability, including increased steam generation during

a winter cold snap and record daily output at the Northport plant

during a late-June heatwave. As such events become more

frequent, existing assets can continue to support grid resilience and

climate adaptation.

|  |  |  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |  |  |
| Time horizons: |  |  |  | Likelihood: |  |  |  |
| The timeframes we have used to assess the climate-related risks and opportunities are: | | |  | Our likelihood assessment is an indicative estimate of the probability for material financial impacts with  reference to the following categorisation: | | | |
|  |  |  |  |  | | | |
| Up to one year  In line with our annual planning and  shorter-term budget process. | From two to ten years  Reflects our strategic business  planning process period. | Ten years plus  Aligns with our longer-term emerging risk assessment timelines,  up to the date of our net zero commitment. |  | We use our ERM risk assessment scoring scale to categorise the likelihood of our climate change risks and  opportunities. | | | |
| These time horizons largely align with our planning and forecasting process timelines,  with some buffers to reflect the regularity of updating scenarios. | | |  |

Very Low

Low

Moderate

High

Very High

Short

Medium

Long

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 63 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Task Force on Climate-related Financial Disclosures (TCFD) cont.  Risk Management |  |  |  |  |  |

2. Transition Risk

|  |  |  |
| --- | --- | --- |
|  |  |  |
| Uncertainty in the extent  of electricity demand growth | |  |
|  |  |  |
| Risk/opportunity  Market, policy and legal  Electricity demand growth is projected in all scenarios, but  there is uncertainty about the pace and scale of this growth.  A wide range of factors may influence the trajectory, including  political, technological and market trends, and associated rates  of consumer adoption. AI adoption is forecast to drive electricity  load growth, with data centres already a major contributor to  growth in connection demand queues, but there remains  uncertainty including scale of adoption and location. Electricity  demand growth is a key driver of long-term network planning.  This is further complicated by the growth of embedded  generation and flexibility. | |  |
|  |  |  |
|  | Business units potentially affected:  All |  |
|  | Asset group(s) potentially affected:  Electrical Distribution and Transmission |  |
|  | Timeframe |  |
|  |  |  |
|  | Likelihood |  |
|  |  |  |
|  | Measurement indicators:  – Network reliability  – UK and US power networks  – Capital investment |  |
|  |  |  |

Short

Medium

Long

Very Low

Low

Moderate

High

Very High

Potential impact

It is important to accurately forecast demand to right-size the networks

of the future.

If electricity demand is underestimated, there is a risk that the electricity

transmission and distribution networks we operate may not be able to

accommodate the scale of demand growth required to support the

energy transition. This could result in National Grid slowing the pace of

electrification and potentially affect both the reliability of our services

and the delivery of our sustainability objectives, with financial and

reputational risks.

If electricity demand is overestimated, there is a risk of over‑investment

in network assets, increasing energy system costs at a time when

consumer affordability is strained. This would undermine the trust and

confidence of both consumers and regulators, potentially damaging our

reputation and credibility in the market.

Given this two-way risk would likely materialise over the medium to long

term, it is not possible to reliably quantify this risk at this time.

Our response

It is important that governments continue to set clear policy

commitments to provide strategic direction to National Grid

and the wider industry. System planners and regulators play

important roles in providing independent assessments of demand

growth, and we continue to work closely with them to ensure our

plans are flexible and responsive to changing needs. We

undertake our own internal analysis, based on decades of

experience in energy infrastructure development, to model

different futures with varying electric demand growth. This is

supported by close stakeholder relationships across wider

industry and government.

In the UK, NESO has a central role in the strategic planning of

Great Britain’s energy system. Given the scale of electricity

demand growth, we are delivering no-regret anticipatory

investment to future-proof the network. In UK ET, we are making

good progress through the ASTI regime created by Ofgem, and

have integrated anticipatory approaches into our RIIO-T3 plan.

Ofgem’s RIIO-T3 Final Determinations include mechanisms to

respond to projects that may be required by NESO’s Centralised

Strategic Network Plan. We are developing our business plan for

RIIO-ED3, with tools and mechanisms to address uncertainty. Our

DSO governance panel plays an important role in providing

rigorous, independent challenge to our plans.

In the US, investment is prioritised based on system performance,

engineering needs, and execution strategy, and we continue to

deliver efficient solutions to enable electricity demand growth such

as energy efficiency, demand response, and other non‑wires

alternatives. We regularly measure and report our network

reliability across the transmission, distribution and interconnection

network (refer to page [28](#i4d6230b679dc4ca38809d46ec72af5e1_3-0-1-6-861943)).

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 64 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Task Force on Climate-related Financial Disclosures (TCFD) cont.  Risk Management |  |  |  |  |  |

3. Transition Risk

|  |  |  |
| --- | --- | --- |
|  |  |  |
| There are several dependencies  which affect our ability to deliver our  commitments, including supply  chain, talent and finance | |  |
|  |  |  |
| Risk/opportunity  Reputation and market  We are playing our role in delivering an unprecedented  transformation of energy systems, with associated delivery risks  across areas within our strategic influence. These areas  primarily include, but are not limited to, supply chains,  workforce capability and access to capital. Our energy  networks are critical to enable the flows of energy from cleaner  generation to decarbonised demand, and delays to delivery  could jeopardise wider societal decarbonisation goals.  Assuming broader supportive and aligned external conditions  exist, such as political, regulatory and technological, failure to  effectively execute within areas under National Grid’s strategic  influence could result in reputational harm and market  consequences. There may be reputational and market impacts  if we fall short of our own ambitious GHG emissions targets. | |  |
|  |  |  |
|  | Business units potentially affected:  All |  |
|  | Asset group(s) potentially affected:  Electrical Distribution and Transmission, Gas Distribution |  |
|  | Timeframe |  |
|  |  |  |
|  | Likelihood |  |
|  |  |  |
|  | Measurement indicators:  – GHG emissions  – Network reliability  – Proportion of renewables in energy mix  – Customer satisfaction (US)  – Cumulative green bonds on issue  – Capital investment  – Supply chain engagement  – Employee engagement index |  |

Potential impact

The external context in which we operate has evolved significantly,

particularly across political and regulatory frameworks, technological

developments, affordability considerations, and customer expectations.

While these broader factors are captured within our Group Principal

Risks, this transition risk scenario focuses on the potential reputational

and market consequences arising from our execution across areas

under National Grid’s strategic influence. Assuming supportive external

conditions, ineffective delivery could adversely affect stakeholder

confidence, with implications for investors, regulators and other key

stakeholders. Further detail on Group Principal Risks and related

management actions is provided on pages [32](#i2193c7e7fbee4753bdbe2d16888565c8_64) – [37](#i5b716aa667c3427e93e3ed5359a2f216_69413).

Our businesses in the US and UK both depend on, and compete in, a

global market for materials and equipment, talent and green finance. To

deliver at the pace and scale required, we need to purchase

equipment, including assets with long lead times and constrained

global supply in the right timeframes. We also need to compete

effectively for talent, to deliver significant network reinforcement as well

as maintaining a robust and reliable network. Attracting investment

underpins our ability to deliver this reinforcement. It is crucial that we

have investable regulatory frameworks with the right return on and of

capital. These regulatory frameworks include incentives and penalties.

Our supply chain, talent and financing need to operate in conjunction

to successfully deliver investments, and failure could result in

materially lower financial performance, impacting our share price and

EPS projections. It could also damage our relationships with our

trusted stakeholders, including our investors, regulators and

customers, and potentially position National Grid as an obstacle rather

than an enabler in the energy transition. The wider economy is

dependent on the energy sector to enable their decarbonisation plans,

with the ability to connect to our transmission and distribution

networks in a timely manner.

Short

Medium

Long

Given this risk would likely materialise over the medium to long term, it

is not possible to reliably quantify this risk at this time.

Very Low

Low

Moderate

High

Very High

Our response

Climate-related targets are embedded into our internal performance

management and incentives, maintaining our focus on ensuring the

supply chain, talent and financing is in place to deliver on our

commitments. The Responsible Business section (pages [40](#i2193c7e7fbee4753bdbe2d16888565c8_19791209304966) – [44](#idacfbb1601cb477c9401c46187170fe9_240518))

sets out our progress against our Group CTP – our roadmap to a

vision of reaching net zero. We continue to work closely with

stakeholders, including regulators, to ensure policy and regulatory

frameworks enable and facilitate our net zero plans.

We continue to deliver transformative new approaches to strengthen

our supply chains. In the UK, building on pioneering initiatives

including the Great Grid Partnership, in July 2025 we launched our c.

£8bn Electricity Transmission Partnership to unlock long-term supply

chain capacity and skills. In New England, we have established

strategic contractor partnerships to accelerate timelines, reduce risk,

and lower costs across over $3 billion of planned capital work over

the next five years. We also engage with our suppliers to establish

action plans and commitments towards a Science Based Target

(refer to page [42](#idacfbb1601cb477c9401c46187170fe9_242528)).

We have a strategic priority to ‘build tomorrow’s workforce today’ to

develop the skills we need to deliver on our ambitions. We continue to

deliver strong entry level programmes for graduates, interns and

apprentices, as well as proactively investing in leadership

development. In 2026, we expanded our Construction Development

Programme to include a Development Engineer Pathway aimed at

individuals looking to re-skill and transition into the network

development space within our Electricity Transmission business, and

we launched Leading @ Grid, a global development programme to

enhance senior leadership capabilities.

We work closely with regulators to get investable frameworks in place

in all our jurisdictions, with the acceptance of the RIIO-T3 regulatory

framework a significant milestone in March 2026. Our upgraded five-

year financial framework provides a clear investor proposition,

including an upgraded EPS.

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 65 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Task Force on Climate-related Financial Disclosures (TCFD) cont.  Risk Management |  |  |  |  |  |

![]()

4. Transition Opportunity

|  |  |  |
| --- | --- | --- |
|  |  |  |
| Growth of clean generation and  increased demand for electricity, even  in our slowest decarbonising scenarios | |  |
|  |  |  |
| Risk/opportunity  Market  Renewable generation projects are reorienting our system  design, with power flowing from new locations across our  networks. Electrification of heat and transport, alongside  growing business electricity demand, such as data centres,  offers significant growth opportunities in the UK and US.  National Grid is well positioned to capitalise on these  opportunities through our central role in connecting new  sources of energy to end users via our networks.  Products and services  The evolution of the energy system will require innovative  solutions to deliver expanded and decarbonised electricity  networks, with National Grid leading the way to scale these  technologies, benefitting our business and consumers. | |  |
|  |  |  |
|  | Business units potentially affected:  All |  |
|  | Asset group(s) potentially affected:  Electrical Distribution and Transmission, NGV Interconnectors  and NGP investment |  |
|  | Timeframe |  |
|  |  |  |
|  | Likelihood |  |
|  |  |  |
|  | Measurement indicators:  – Network efficiency and reliability  – Renewable capacity additions  – Proportion of renewables in energy mix  – EU Taxonomy green capital expenditure  – Investment in research and development  – National Grid Partners investment |  |

Potential impact

While the pace and scale of electrification growth is uncertain, the

positive trajectory is clear, driving growth in electricity networks.

In the UK, the Government is supporting continued momentum towards

its Clean Power 2030 Plan. Supply-side objectives are intertwined with

ambition for uptake of decarbonised customer technologies including

electric vehicles, heat pumps, embedded generation and storage. In the

US, our states have established targets for clean energy supply and

consumer electrification. The drive to cleaner energy in our jurisdictions

requires the infrastructure to deliver it, underpinning our new five-year

financial framework with cumulative capital investment of at least £70

billion.

Alongside expanding networks in our jurisdictions, we will need greater

interconnectivity to match intermittent renewable generation to

increased electricity demand.

Our response

To maximise these opportunities, we are delivering on our strategy to

focus on networks and streamlining our business. In May 2025, we

completed the sale of National Grid Renewables, our US onshore

renewables business. In November 2025 we completed the sale of

Grain LNG, our UK LNG asset. Our recently upgraded five-year

financial framework projects capital investment of at least £70 billion

across our energy networks from 2027 to 2031. This investment

continues the Group’s shift towards electric, with latest projections

forecasting over 80% of Group assets will be electric by 2030/31.

In the UK, we are leading the largest overhaul of the electricity grid in

a generation, doubling our investment in UK electricity networks

relative to the previous five years. We expect to invest £31 billion in

the next five years to 2030/31 in UK ET. Ofgem's Final Determination

delivers a price control (running from 1 April 2026 to 31 March 2031)

Short

Medium

Long

that enables networks to invest at the pace and scale needed to

meet the ramp up in power demand, with plans to nearly double the

amount of power that can flow across the country. This will help

Very Low

Low

Moderate

High

Very High

avoid constraint costs and ensure a resilient, clean and future-

proofed network that will be critical to underpinning economic

competitiveness and growth in the UK in the years ahead.

For UK ED, we expect to invest £9 billion in the next five years. We

continue to deliver against our RIIO-ED2 business plan (ED2 price

control period runs from 1 April 2023 to 31 March 2028), to ensure

the readiness of the electricity network to unlock the potential for

customers to electrify further and faster. We’ll continue to engage

customers and stakeholders as we refine and get ready to submit

our RIIO-ED3 business plan to Ofgem in December 2026 for the

ED3 price control period, which will run from 1 April 2028 to

31 March 2033. ED3 will be a critical period in transforming

electricity distribution networks to achieve the UK's climate targets.

In the US, our well-developed energy transition scenarios have enabled

us to submit credible rate case filings outlining the investments needed

to deliver the energy transition. As part of our five-year financial

framework to 2031, we expect to invest around £17 billion and £12

billion in our New York and New England regulated businesses

respectively. In New York, we continue to make significant progress

on the $4 billion Upstate Upgrade programme, to deliver a smarter,

stronger and cleaner energy grid. Our NIMO rate settlement for 2025

to 2028 was approved in August 2025, including investments to

integrate renewables and reduce emissions from gas leaks. In New

England, we secured approval for the cost recovery mechanism for

our nearly $600 million Electric Sector Modernization Plan, balancing

customer affordability with the state’s clean energy objectives. Gas

has a foundational role in Massachusetts’ all-of-the-above energy

strategy. In January 2026, we submitted our rate case filing for

Massachusetts Gas. These activities further enhance our role in

delivering the energy transition, while helping to ensure energy

security and sustainable affordability in the regions we operate in.

Our NGV business has planned capital investment of around £1 billion

out to 2031. NGV is a leader in developing electricity interconnector

projects to connect Great Britain with other European countries. By

enabling cross-border electricity trade, interconnectors can displace

fossil fuel generation in favour of renewable energy, reducing the CO2e

intensity of the energy mix, while generating revenue. Our current

portfolio of six interconnectors provide 7.8 GW of capacity, allowing

us to trade excess power –  including renewable energy generated

from the sun, wind and water – between different countries, and we

estimate that by 2030, 90% of the energy imported via our

interconnectors will be from zero‑carbon sources. We are working

towards expanding our portfolio of interconnectors, including LionLink,

a first-of-its-kind interconnector connecting offshore wind to Great Britain

and the Netherlands’ electricity grids, and GriffinLink, a new

multi-purpose interconnector project in partnership with TenneT

Germany. In the US, NGV continues to develop opportunities, including

its announcement in 2025 that it will install the world’s first 100%

hydrogen fuelled commercial linear generator at Northport power plant.

Our corporate venture capital arm, National Grid Partners, continues

to invest in startups at the intersection of energy and emerging

technology, allowing National Grid to benefit operationally and

strategically as we scale them across our business and industry. Since

its founding in 2018, National Grid Partners has invested more than

$550 million in startups advancing the future of energy; and it recently

committed another $100 million to artificial intelligence startups

supporting a smarter, more resilient grid and boosting energy security.

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 66 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Task Force on Climate-related Financial Disclosures (TCFD) cont.  Risk Management |  |  |  |  |  |

![]()

5. Physical Risk

|  |  |  |
| --- | --- | --- |
|  |  |  |
| Increased frequency of extreme  weather events and long-term shifts  in global climate patterns | |  |
|  |  |  |
| Risk/opportunity  Acute  Our assets are at risk of physical impacts from increased  frequency of extreme weather events such as storms and  flooding, leading to asset damage and operational risks.  Chronic  Our assets are at risk of physical impacts from changing  climate trends in the longer term, including increased frequency  and severity of coastal flooding, high temperatures, extreme  wind, wildfires and low temperature, exposing us to asset  damage and operational risks. | |  |
|  |  |  |
|  | Business units potentially affected:  All |  |
|  | Asset group(s) potentially affected:  Electrical Distribution and Transmission, Gas Distribution |  |
|  | Timeframe |  |
|  |  |  |
|  | Likelihood |  |
|  |  |  |
|  | Measurement indicators:  – Network reliability  – Major storm costs  – CCRT outputs  – Research outputs from innovation projects  – EU Taxonomy climate adaptation capital expenditure |  |

Potential impact

Under our US regulatory frameworks, major storm-related costs

become recoverable in future years once deferrable criteria are met. In

2025/26, we incurred deferrable storm costs (net of allowances) which

are eligible for future recovery of £39 million, but this did not exceed our

pre-set $100 million threshold to be excluded from underlying results.

In the prior year, we incurred £87 million of deferrable storm costs (net

of allowances) and consequently these were all excluded from our

reported underlying results. Further details are provided on pages [71](#ib9ca2c5b72fb4936a9d458c7bb253318_286879)

and [73](#ib9ca2c5b72fb4936a9d458c7bb253318_286878). Cost recovery for other US weather-related events is included

within the base rates set at the outset of each rate filing period.

In the UK, storm costs above predefined thresholds can be recovered

through re-opener mechanisms within our price control frameworks,

allowing adjustments to allowed revenues for severe weather-related

expenditure.

At the end of 2023, Niagara Mohawk Power Corporation (NIMO)

submitted its Climate Change Resilience Plan (CCRP) to the New York

Public Service Commission (NYPSC), assessing the vulnerability of its

electric infrastructure to climate-related risks. The study identified a

capital investment of approximately $243 million in resilience

programmes over a five-year period (2026-2030), with cumulative

investments projected to reach about $566 million by the tenth year

(2026-2035) and $1.39 billion by the twentieth year (2026-2045). The

revenue requirements for these resilience investments are expected to

result in total bill increases of 0.02% in 2025/26 to 0.66% in 2029/30

compared to current rates across all service classes.

Subsequent modifications to the CCRP were submitted in December

Short

Medium

Long

2024 with an updated filing in February 2025. The CCRP programme

timelines and budgets were revised following the NMPC FY26-28 rate

case, with several projects deferred to support customer affordability.

Very Low

Low

Moderate

High

Very High

As a result, the FY26-30 CCRP budget was reduced from $243 million

to $110 million.

Weather-related events are likely to become more frequent in line with

the increasing likelihoods illustrated by the IPCC. Costs are expected to

grow accordingly, including potential rises to insurance premiums to

cover such events, unless climate adaptation is appropriately

implemented.

Our response

Our Group-wide CVA leverages CCRT data analysis to identify

long-term climate hazard risks to our energy infrastructure. We are

utilising our findings to develop tailored climate change adaptation

plans across our business.

In Massachusetts, efforts to produce a climate change resilience

plan commenced in 2025 with collaboration among Massachusetts

utilities and the state’s Office of Climate Science. This plan, due to

state regulators in September 2029, will identify specific mitigation

actions across the state. While this plan is developed, we continue

to address substation flood mitigation concerns at substations where

flooding is identified as a risk. These resiliency projects total $98.5

million and form part of the recently approved MECO rate case. We

also continue to accelerate the installation of Fault Location Isolation

and Restoration (FLISR) schemes to improve reliability and resiliency

during storms across both New York and New England.

In the UK, ED responded to Ofgem’s Sector Specific Methodology

Consultation (SSMC) which included dedicated climate resiliency

questions linked to the ED3 price control framework.

In addition, as part of our UK ET T3 business plan, we submitted

a RIIO-T3 Climate Resilience Strategy as an annex to the main

business plan submission.

We continue to invest in climate adaptation across the Group in

the form of storm hardening and flood defences, with a further

£79 million (2024/25: £57 million) invested in the year. Such

investments should increase our ability to withstand disruptive

events, and improve our organisational capability to reduce the

magnitude and impact from such events.

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 67 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Task Force on Climate-related Financial Disclosures (TCFD) cont. |  |  |  |  |  |

#### Metrics and Targets

We disclose our GHG emissions metrics through our

Responsible Business reporting, tracking performance

and material climate change risks and opportunities.

Our approach to setting, reviewing and monitoring

climate‑related targets is embedded in our Climate

change mitigation GPR on page [35](#i5b716aa667c3427e93e3ed5359a2f216_69415), which outlines

how we assess and manage the actual and

potential impacts of climate change. Progress

against each target is monitored using defined

quantitative indicators, with performance reviewed

through established risk management and

governance processes.

Our greenhouse gas (GHG) emission reduction

targets and other climate-related metrics are

summarised on page [68](#i5ce9e2b3cd614bcca8423db41cd18ff1_160075), with performance analysis

(including trends and year‑on‑year movements)

provided in the KPI section on page [27](#i153c4aa816c546d29e1df5f53c4ccfbe_1-6-1-1-945231) and the

Responsible Business review on page [40](#i734e88e4e18e4788ae8e7425d54e0122_19296). The

Responsible Business review also includes

additional metrics and targets used by us to assess

and manage relevant climate-related risks and

opportunities. We also disclose industry‑based

metrics relevant to our business model and

activities, and reflected in our [SASB‑aligned](https://www.nationalgrid.com/responsibility/our-reporting-centre/our-reporting-suite)

[reporting on our website](https://www.nationalgrid.com/responsibility/our-reporting-centre/our-reporting-suite) which helps inform our

Responsible Business commitments.

Our emissions reduction targets have been

informed by the objectives of the Paris Agreement

and the jurisdictional commitments that flow from

it, recognising that failing to play our role in

delivering emissions reductions would risk

undermining the wider decarbonisation goals of the

jurisdictions in which we operate. We are not

subject to entity‑specific legally mandated GHG

reduction targets beyond regulated mechanisms to

incentivise GHG reductions.

In the US, long‑term policy frameworks such as

New York’s Climate Leadership and Community

Protection Act and Massachusetts’ Clean Energy

and Climate Plan set out pathways to fossil‑free

energy systems by 2050, while in the UK the

Government’s Clean Power 2030 Action Plan

signals an accelerated transition to a decarbonised

power system. These commitments have shaped

the ambition and timing of our targets and reinforce

the importance of engagement with policymakers,

trade associations and industry bodies, where

responsible advocacy for enabling policy

frameworks is critical to delivering both

jurisdictional climate objectives and our net zero

commitment (see page [51](#if05dc6fa9b1c45cd9c0112e45388d907_109356)).

We continually monitor our climate-related metrics

and targets to ensure that the data we measure is

meaningful, aligns with our strategy, and provides

the necessary information for effective performance

monitoring and progress demonstration. By

integrating these metrics into our financial

Enterprise Performance Management (EPM)

processes, it allows us to assess GHG reduction

performance in the context of wider enterprise

performance. Our annual Strategic Business

Planning cycle includes mechanisms to track

business units' plans against our SBTi glide paths.

Our monitoring and reporting processes

incorporate internal controls and a team of

technical consultants reviewed our CTP publication

for accuracy, consistency and any material

discrepancies. We have been clear that we do not

expect emissions reductions to follow a linear

trajectory and a significant portion of our emissions

are outside our control.

All of our GHG emissions are reported on a gross

basis, and our primary focus is on decarbonising

the business in line with a 1.5°C pathway. We do

not assume the use carbon offsetting to meet our

near‑term science‑based targets; however, we do

use limited carbon offsets to support our emissions

reduction efforts where emissions cannot be

reduced further, in line with SBTi guidance and our

internal carbon offsetting policy. The Group Carbon

Offsetting Policy, revised in 2025 under the

oversight of the Carbon Offsetting Committee,

helps ensures offsetting is used only as a

high‑integrity complement to direct emissions

reductions and requires a balanced portfolio across

carbon reduction and removal projects, locations,

technologies, storage durations, costs and

co‑benefits. All offsetting is governed by robust

principles including additionality, permanence,

transparency, independent verification and effective

risk management to help ensure environmental

integrity and value for National Grid.

Within our UK Electricity Transmission business, we

collaborated with Housing Associations’ Charitable

Trust to purchase around 1,000 Verified Carbon

Standard credits from achieved carbon reductions

delivered through energy efficiency initiatives in

low‑income households, delivering wider social

benefits to local communities. We also partnered

with Forest Carbon to purchase approximately

14,000 UK‑based Pending Issuance Units (PIUs)

from a bespoke portfolio of woodland projects.

These PIUs represent a promise to deliver a tonne

of carbon dioxide equivalent in the future and

support planning for the compensation of

UK‑based emissions, while delivering

environmental co‑benefits. Under the RIIO‑T3

framework, our UK Electricity Transmission

business has Ofgem‑approved funding of £16.17m

to support further carbon compensation over the

regulatory period. This funding is based on an

assumed unit cost of £74 per tCO₂e, capped at

6% of NGET’s business carbon footprint

GHG emissions.

Details of Directors’ remuneration, including the

incorporation of climate‑related considerations into

executive remuneration and the proportion linked

to such considerations in the current period, are

set out in the Directors’ Remuneration Report on

pages [107](#i2193c7e7fbee4753bdbe2d16888565c8_175) – [126](#i42605b1d6ef943038816b8b341a1e2a7_29881).

In addition to the metrics laid out on the following

page, we have disclosed the proportion of IFRS

revenue, operating expenditure and capital

expenditure that align with the principles of the

EU Taxonomy.

A significant proportion of our Scope 1 GHG

emissions are subject to either a traded carbon

price or a regulatory non‑traded cost of carbon.

These carbon prices are primarily applied through

regulatory frameworks rather than as an internal

shadow price for capital allocation. While carbon

pricing has enhanced our understanding of the

emissions implications of our activities, it has not

materially influenced investment decisions to date,

and we do not operate a single, Group-wide

internal carbon price applied uniformly across our

businesses. Carbon pricing is one of several tools

we use alongside policy drivers, regulatory

commitments, and carbon reduction

methodologies, including the application of carbon

weighting in tendering for construction projects.

On the next page we include our GHG emissions

footprint, a key indicator against our climate-related

risks and opportunities.

![Metrics and Targets pp67.jpg]()

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 68 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Task Force on Climate-related Financial Disclosures (TCFD) cont.  Metrics and targets |  |  |  |  |  |

#### Index of climate-related

#### quantitative measurement indicators

1

In the last year our emissions have risen, due to factors outside of our control and despite our efforts to reduce emissions where we have control.

Refer to pages [40](#i2193c7e7fbee4753bdbe2d16888565c8_19791209304966) – [44](#idacfbb1601cb477c9401c46187170fe9_240518) for further details.

|  |  |  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |  |  |
|  |  | 2025/26 |  | 2024/25 |  |  | 2023/24 |
| SBTi validated GHG emissions reduction targets | | | | | | | |
| Reduce absolute Scope 1 and 2 GHG emissions by 60% by 20302,3 |  | (3.3)% |  | (4.4)% |  |  | (11.8)% |
| Reduce absolute Scope 1 and 2 GHG emissions excluding generation by 50% by 2030 2,3 |  | (26.0)% |  | (14.7)% |  |  | (14.4)% |
| Reduce the carbon intensity of our power generation (Scope 1 GHG emissions) by 90% by 2030, and by 92% by  2033  3 |  | 2.5% |  | (36.7)% |  |  | (34.7)% |
| Reduce the carbon intensity of our power generation and sold electricity (Scope 1 and Scope 3 GHG  emissions) by 86% by 2033  3 |  | (1.2)% |  | (18.3)% |  |  | (15.4)% |
| Reduce absolute GHG emissions for all Scope 3, excluding sold electricity, by 37.5% by 2033 4 |  | 11.1% |  | 5.8% |  |  | 0.8% |
| Reduce absolute GHG emissions from gas sold by third parties by 37.5% by 2033 4,5 |  | (9.6)% |  | (10.5)% |  |  | (17.6)% |
| Key climate-related metrics | | | | | | | |
| Scope 1 GHG emissions (ktCO 2e) |  | 5,001 |  | 4,467 |  |  | 3,988 |
| Scope 2 GHG emissions (ktCO 2e, location based) |  | 2,510 |  | 2,955 |  |  | 2,864 |
| Total Scope 1 and 2 GHG emissions2 (ktCO 2e) |  | 7,511 |  | 7,422 |  |  | 6,852 |
| Scope 3 GHG emissions (ktCO 2e) |  | 29,503 |  | 28,435 |  |  | 27,384 |
| Total Scope 1, 2 and 3 GHG emissions 2 (full value chain) (ktCO 2e) |  | 37,015 |  | 35,857 |  |  | 34,236 |
| Intensity ratio: Scope 1 and 2 GHG emissions per million of revenue 2 (tCO  2e/£m) |  | 425 |  | 427 |  |  | 345 |
| Climate change adaptation capital expenditure (EU Taxonomy aligned activities, £m) |  | 79 |  | 57 |  |  | 30 |
| Climate change mitigation capital expenditure (EU Taxonomy aligned activities, £m) |  | 9,756 |  | 7,610 |  |  | 5,962 |
| Group energy consumption from fossil fuel generation (GWh) |  | 19,317 |  | 17,390 |  |  | 14,375 |
| Group energy consumption from electricity systems line losses (GWh) |  | 15,111 |  | 15,514 |  |  | 14,519 |
| Group energy consumption excluding fossil fuel generation and electricity systems line losses (GWh) |  | 1,386 |  | 1,916 |  |  | 2,547 |
| Total Group energy consumption (GWh) |  | 35,814 |  | 34,820 |  |  | 31,441 |
| UK energy consumption from electricity systems line losses (GWh) |  | 9,702 |  | 10,413 |  |  | 10,046 |
| UK energy consumption excluding electricity systems losses (GWh) |  | 276 |  | 790 |  |  | 1,297 |
| Total UK energy consumption (GWh) |  | 9,978 |  | 11,203 |  |  | 11,343 |
| UK Scope 1 GHG emissions (ktCO 2e) |  | 211 |  | 278 |  |  | 377 |
| UK Scope 2 GHG emissions 2 (ktCO 2e) |  | 1,670 |  | 2,137 |  |  | 2,113 |
| Total UK Scope 1 and 2 GHG emissions 2 (ktCO 2e) |  | 1,881 |  | 2,415 |  |  | 2,490 |

1. Refer to our Responsible Business Reporting Methodology

(methodology) on our website for calculation details. Target year

20Yn indicates that the performance will be reported in the

financial year that aligns with the year 20Yn/Yn+1. Our

methodology applies the GHG Protocol operational control

principle across all emissions and environmental metrics.

Operations that are sold or disposed of are excluded from

reporting from the year of exit. For this reporting year, this

includes National Grid Renewables and Grain LNG. Further

details are provided in the “Changes to global operations”

section within our methodology and in Note 1 (Basis of

preparation and recent accounting developments) to the

consolidated financial statements. We report Scope 3 emissions

across six categories within our current SBTi target boundary, as

defined by the GHG Protocol. Our disclosed Scope 3 GHG

emissions include GHG Protocol Scope 3 Categories 1, 2, 3, 5,

6, 7 and 11. Categories not listed are excluded as not material.

2. Includes Scope 2 location-based emissions only as line losses

make up the vast majority of these emissions and we have

limited renewable electricity certificates and other contractual

instruments in place. 2024/25 excludes National Grid ESO.

3. Near-term target approved by Science Based Targets initiative

(SBTi) and aligned to the Paris Agreement and a 1.5°C pathway.

GHG targets are against a financial year 2018/19 baseline.

4. Near-term target approved by SBTi and aligned to a well below

2°C pathway. GHG targets are against a financial year 2018/19

baseline.

5. Third-Party Sold Gas, a US-only emission, are downstream

emissions associated with the combustion of natural gas

delivered through our network but sold by a company other than

National Grid. This differs from Scope 3 Cat. 11 GHG Protocol

guidance, which otherwise advises to consider only the end use

of goods sold by the reporting company itself.

Note: The above data together with our Climate change – Scope 1,

2 and 3 emissions KPIs on page [27](#i153c4aa816c546d29e1df5f53c4ccfbe_1-6-1-1-945231) and “Absolute energy

consumption in our flagship offices” on page [42](#idacfbb1601cb477c9401c46187170fe9_242527) is responsive to the

UK Government’s Streamlined Energy and Carbon Reporting (SECR)

requirements. We have split out our Group energy consumption into

constituent parts for greater transparency. Fuels consumed for

power generation on behalf of LIPA, the contracting body is shown

separately because energy consumption related to power generation

can vary greatly year-on-year and is determined by LIPA. Amounts

are presented in GWh, with 1 GWh=1,000,000 kWh.

|  |  |
| --- | --- |
|  |  |
|  | 2025/26 data externally assured by Deloitte. |
|  | 2024/25 data externally assured by Deloitte. |
|  | 2023/24 data externally assured by PwC. |

Please refer to the assurance summary on page [52](#if05dc6fa9b1c45cd9c0112e45388d907_109194).

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 69 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Financial review |  |  |  |  |  |

#### A solidfinancial return

#### Making the connection – delivering outputs efficiently and earning a solid financial return.

![]()

|  |  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |  |
| Revenue |  |  | Profit and cash flows |  |  | Investment |
| The vast majority of our revenues are set in accordance with our  regulatory agreements (see pages [220](#i2193c7e7fbee4753bdbe2d16888565c8_385) – [225](#i1db516796de743568156f5fd89cfea10_118416)) and are calculated  based on a number of factors, including investment in network assets,  performance on incentives, allowed returns on equity and cost of  debt, and customer satisfaction. |  |  | Our ability to convert revenue to profit and cash is important. By managing  our operations efficiently, safely and for the long term, we generate substantial  operating cash flows. Coupled with long-term debt financing, as well as  additional capital generated through the Rights Issue and take-up of the  shareholder scrip dividend option during periods of higher investment,  we are able to invest in growing our asset base and fund our dividends. |  |  | We invest efficiently in our networks to achieve strong and sustainable  growth in our regulated asset base over the long term. We also invest  in assets in our non-regulated businesses. We continually assess, monitor  and challenge investment decisions so we can continue to run safe, reliable  and cost-effective networks. |
| Statutory revenue (%) |  |  | Statutory operating profit (%) |  |  | Capital investment (%) |
|  |  |  |  |  |  |  |
| Underlying net revenue1 (%) |  |  | Underlying operating profit 1 (%) |  |  | Total assets (used for asset growth) (%) |
|  |  |  |  |  |  |  |

![16492674416784]()

![16492674416976]()

![7146825581151]()

|  |  |  |
| --- | --- | --- |
|  |  |  |
| ò |  |  |
| UK Electricity Transmission (UK ET) | 16% |
| ò |  |  |
| UK Electricity Distribution (UK ED) | 11% |
| ò |  |  |
| New York | 43% |
| ò |  |  |
| New England | 23% |
| ò |  |  |
| National Grid Ventures (NGV) | 6% |
| ò |  |  |
| Other activities | 1% |

|  |  |  |
| --- | --- | --- |
|  |  |  |
| ò |  |  |
| UK Electricity Transmission (UK ET) | 30% |
| ò |  |  |
| UK Electricity Distribution (UK ED) | 21% |
| ò |  |  |
| New York | 22% |
| ò |  |  |
| New England | 17% |
| ò |  |  |
| National Grid Ventures (NGV) | 13% |
| ò |  |  |
| Other activities | (3)% |

|  |  |  |
| --- | --- | --- |
|  |  |  |
| ò |  |  |
| UK Electricity Transmission (UK ET) | 38% |
| ò |  |  |
| UK Electricity Distribution (UK ED) | 14% |
| ò |  |  |
| New York | 30% |
| ò |  |  |
| New England | 17% |
| ò |  |  |
| National Grid Ventures (NGV) | 1% |
| ò |  |  |
| Other activities | —% |

£17.7bn

£5.4bn

£11.6bn

![]()

![]()

![]()

![16492674416884]()

![7146825581033]()

![7146825581104]()

|  |  |  |
| --- | --- | --- |
|  |  |  |
| ò |  |  |
| UK Electricity Transmission (UK ET) | 20% |
| ò |  |  |
| UK Electricity Distribution (UK ED) | 14% |
| ò |  |  |
| New York | 38% |
| ò |  |  |
| New England | 20% |
| ò |  |  |
| National Grid Ventures (NGV) | 8% |
| ò |  |  |
| Other activities | —% |

|  |  |  |
| --- | --- | --- |
|  |  |  |
| ò |  |  |
| UK Electricity Transmission (UK ET) | 30% |
| ò |  |  |
| UK Electricity Distribution (UK ED) | 22% |
| ò |  |  |
| New York | 30% |
| ò |  |  |
| New England | 15% |
| ò |  |  |
| National Grid Ventures (NGV) | 6% |
| ò |  |  |
| Other activities | (3)% |

|  |  |  |
| --- | --- | --- |
|  |  |  |
| ò |  |  |
| UK Electricity Transmission (UK ET) | 34% |
| ò |  |  |
| UK Electricity Distribution (UK ED) | 18% |
| ò |  |  |
| New York | 27% |
| ò |  |  |
| New England | 14% |
| ò |  |  |
| National Grid Ventures (NGV) | 4% |
| ò |  |  |
| Other activities | 3% |

£13.2bn

£5.7bn

£72.0bn

1. Non-GAAP alternative performance measures (APMs). For further details and reconciliation to equivalent GAAP measures see Other unaudited financial information on pages [236](#i2193c7e7fbee4753bdbe2d16888565c8_400) – [247](#i4d298f0c87f34766961e584275cfa183_101333).

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 70 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Financial review cont. |  |  |  |  |  |

![]()

#### Summary of Group financial performance for the year ended31 March 2026

|  |
| --- |
|  |
| Statutory EPS1 |
| 65.5p |

|  |
| --- |
|  |
| 2024/25 |
| 2023/24 |

![16492674503999]()

|  |
| --- |
|  |
| Underlying EPS1 |
| 78.0p |

|  |
| --- |
|  |
| 2024/25 |
| 2023/24 |

![16492674504003]()

|  |
| --- |
|  |
| Group RoE |
| 9.8% |

|  |
| --- |
|  |
| 2024/25 |
| 2023/24 |

![16492674504008]()

|  |
| --- |
|  |
| Asset growth |
| 10.9% |

|  |
| --- |
|  |
| 2024/25 |
| 2023/24 |

![16492674504012]()

1. From continuing operations.

#### Financial summary for continuing operations

|  |  |  |  |
| --- | --- | --- | --- |
|  |  |  |  |
| £m | 2025/26 | 2024/25 | Change |
| Accounting profit |  |  |  |
| Gross revenue | 17,687 | 18,378 | (4)% |
| Other operating income | 489 | — | n/m |
| Operating costs | (12,745) | (13,444) | 5% |
| Statutory operating profit | 5,431 | 4,934 | 10% |
| Net finance costs | (1,325) | (1,357) | 2% |
| Share of joint ventures and associates | 76 | 73 | 4% |
| Tax | (939) | (821) | (14)% |
| Non-controlling interest | (2) | (3) | 33% |
| Statutory earnings | 3,241 | 2,826 | 15% |
| Exceptional items and remeasurements 1 | (333) | (171) | n/m |
| Tax on exceptional items and remeasurements1 | (16) | (40) | 60% |
| Adjusted earnings 1 | 2,892 | 2,615 | 11% |
| Timing and major storm costs1 | 636 | 592 | n/m |
| Tax on timing and major storm costs1 | (168) | (156) | n/m |
| Deferred tax on underlying profits in NGET and NGED1 | 499 | 401 | 24% |
| Underlying earnings1 | 3,859 | 3,452 | 12% |
|  |  |  |  |
| Statutory EPS | 65.5p | 60.0p | 9% |
| Adjusted EPS 1 | 58.5p | 55.6p | 5% |
| Underlying EPS1 | 78.0p | 73.3p | 6% |
| Dividend per share 1 | 48.49p | 46.72p | 3.8% |
| Dividend cover – underlying1 | 1.6x | 1.6x | 3% |
|  |  |  |  |
| Economic profit |  |  |  |
| Group financial performance after interest and tax (Group RoE numerator)1 | 2,866 | 2,602 | 10% |
| Group RoE1 | 9.8% | 9.0% | 80bps |
|  |  |  |  |
| Capital investment and asset growth |  |  |  |
| Capital investment | 11,576 | 9,847 | 18% |
| Regulated asset growth 1 | 11.7% | 10.5% | 120bps |
| Asset growth1 | 10.9% | 9.0% | 190bps |
|  |  |  |  |
| Balance sheet strength |  |  |  |
| FFO/adjusted net debt1 | 13.0% | 13.7% | -70bps |
| RCF/adjusted net debt1 | 9.3% | 9.8% | -50bps |
| Net debt (note 29 to the financial statements) | 44,160 | 41,371 | 7% |
| Add: held for sale net debt | — | (55) | n/m |
| Net debt (including held for sale)1 | 44,160 | 41,316 | 7% |
| Group regulatory gearing1 | 61% | 61% | 0bps |

1. Non-GAAP alternative performance

measures (APMs) and/or regulatory

performance measures (RPMs).

For further details see Other

unaudited financial information

on pages [236](#i2193c7e7fbee4753bdbe2d16888565c8_400) – [247](#i4d298f0c87f34766961e584275cfa183_101333).

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 71 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Financial review cont. |  |  |  |  |  |

#### Performance management framework

In managing the business, we focus on various non-IFRS alternative performance measures (APMs) and

regulatory performance measures (RPMs) which provide meaningful comparisons of performance between

years, monitor the strength of the Group’s balance sheet and ensure profitability reflects the Group’s

regulatory economic arrangements. Such APMs and RPMs are supplementary to, and should not be

regarded as a substitute for IFRS measures, which we refer to as statutory results.

Our business performance as set out in our regulatory agreements can differ from accounting under

IFRS, principally because our regulators allow for regulatory deferral accounting. Our allowed revenues

are set in accordance with our regulatory price controls or rate plans. Statutory IFRS does not allow us

to recognise regulatory assets or liabilities (for the difference between collected and allowed regulatory

revenues). As a result we use a suite of APMs (defined by us) to help measure and monitor our underlying

regulated business performance. We explain the basis of these measures and, where practicable,

reconcile these to statutory IFRS results (i.e. GAAP) in Other unaudited financial information on pages

[236](#i2193c7e7fbee4753bdbe2d16888565c8_400) – [247](#i4d298f0c87f34766961e584275cfa183_101333). Our RPMs have been calculated for the total Group (or individual entities where relevant)

and these are not based on IFRS measures. Specifically, we measure the financial performance of the

Group from different perspectives:

– Accounting profit: In addition to statutory IFRS measures we report adjusted results (i.e. before

exceptional items and remeasurements), and underlying results, which further take account of:

i) volumetric and other revenue timing differences arising from our regulatory contracts; (ii) major storm

costs (net of in-year allowances and deductibles) which are recoverable in future periods when they

exceed a $100 million threshold; and (iii) deferred tax in our UK regulated businesses (NGET and

NGED). In doing so, we intend to make the impact of such items clear to users of the financial

information in this Annual Report.

– Economic profit: Group Return on Equity (RoE) takes account of the regulated value of our assets

and of our regulatory economic arrangements to show the returns on shareholder equity.

– Capital investment and asset growth: Capital investment comprises our additions to PP&E and

intangible assets (excluding acquisitions), equity investments in joint ventures and associates, along

with net movements in capex prepayments. Asset growth represents the year-on-year increase in

RAV and US rate base in our regulated businesses (referred to as ‘regulated asset growth’), plus

the increase in net assets (excluding certain balances such as pensions, net debt and deferred taxes)

in our non-regulated businesses, but excluding the impact of currency movements.

– Balance sheet strength: Maintaining a strong investment grade credit rating allows us to finance

our growth ambitions at a competitive rate. Hence, we monitor credit metrics used by the major rating

agencies to ensure we are generating sufficient cash flow to service our debts. Group regulatory

gearing measures our Group net debt as a proportion of the Group’s assets that are used to measure

asset growth. This includes balances for businesses classified as held for sale under IFRS.

This balanced range of measures of financial wellbeing informs our dividend policy which aims to grow

annual DPS in line with UK CPIH, thus maintaining the DPS in real terms.

Financial summary for continuing operations

Account ing profit: Statutory IFRS earnings were £3,241 million in 2025/26, £415 million (15%)

higher than the prior year. Statutory earnings benefited from pre-tax net exceptional gains of £376 million

related to the sale of our two non-core businesses (Grain LNG and National Grid Renewables) in 2025/26;

and pre-tax remeasurement losses of £43 million (2025: pre-tax net exceptional credits of £42 million

and pre-tax remeasurement gains of £129 million). For details on exceptional items, refer to note 5

to the financial statements. Timing swings were £131 million adverse year-on-year, with a £636 million

net under-recovery in 2025/26 (2025: £505 million net under-recovery). These factors, the net impact

of tax on these items and an improvement in underlying business performance meant that statutory

EPS for continuing operations of 65.5p was 5.5p higher than the prior year.

Our ‘adjusted’ results exclude the impacts from exceptional items and remeasurements as explained

on page [155](#iea87f48bade440399ea7d415d9b8989a_135724). In 2025/26, adjusted earnings from continuing operations were £2,892 million, up

£277 million (11%) from the prior year. Adjusted earnings in 2025/26 included a timing net under-recovery

after tax of £468 million (2025: £372 million net under-recovery). As a result, adjusted operating profit of

£5,044 million was up £279 million (2025: £4,765 million). Adjusted net finance costs of £1,271 million

were £90 million lower, as a result of higher average net debt and higher interest rates being more than

offset by higher capitalised interest and other interest income. Share of profits from joint ventures and

associates of £76 million were broadly flat year-on-year. Adjusted tax of £955 million was £94 million

higher, driven by the increase in profits, but resulted in a stable effective tax rate of 25.3% (2025: 25.3%).

Our policy is to exclude deferrable storm costs (net of allowances and deductibles) from underlying results if

these exceed a $100 million aggregate pre-tax threshold. In 2024/25, we included $110 million (£87 million)

of storm costs in our adjusted results, but excluded these from underlying results. In 2025/26, our

allowances were higher and deferrable storm costs were below this threshold, so $52 million (£39 million)

of deferrable storm costs that are recoverable in future periods are included in our underlying results.

Underlying operating profit was up 6% driven by improved performance in New York (from updated rates

and the collection of unremunerated costs in prior periods) along with higher allowed revenues in UK

Electricity Transmission (RAV growth and increased ASTI-related ‘fast money’). New England was lower

with updated rates and capital trackers being more than offset by a FERC order on Transmission Owner

RoEs across New England (mostly related to historical years). National Grid Ventures was lower mainly

as a result of the sale of two businesses in the year (Grain LNG and National Grid Renewables). Other

activities and the contribution from joint ventures and associates were broadly flat year-on-year. Regulated

controllable costs were 2% higher (at constant currency), with inflation and workload increases being

partly offset by efficiency savings. Depreciation and amortisation were higher than the prior year due to

our growing asset base. Net debt-related financing costs were higher, driven by our ongoing investment

programme. Other interest was favourable year-on-year driven by higher levels of capitalised interest.

After accounting for non-controlling interests, underlying earnings increased by 12% and resulted in

a 6% increase in underlying EPS to 78.0p.

Economic profit: Our Group RoE for 2025/26 was 9.8%, 80bps higher than the 9.0% achieved in the

prior year, with the numerator increasing by £264 million, (up 10% year-on-year), primarily driven by higher

regulatory business performance, compared with an increase in the denominator of £49 million (up 0.2%

year-on-year), which includes the beneficial impact of asset growth being partly funded by higher gearing.

Capital investment and asset growth: Capital investment of £11,576 million was £1,729 million

(18%) higher than 2024/25, driven by a step up in investment across our regulated businesses, partly

offset by lower investment in National Grid Ventures. Higher capital investment and the impact of RAV

indexation have helped deliver asset growth of 10.9% (2025: 9.0%).

Balance sheet strength: Net debt increased from £41.4 billion at March 2025 to £44.2 billion at

March 2026. Operating cash inflows of £7.8 billion (2025: £6.8 billion) along with disposal proceeds

from the sales of NG Renewables £1.5 billion and Grain LNG £1.3 billion helped to fund £10.6 billion

(2025: £9.7 billion) of investing cash outflows. Regulatory gearing was maintained at 61% (2025: 61%)

and our calculation of RCF/adjusted net debt credit metric was 9.3%, a decrease of -50bps compared

with 2024/25 and remains above the current rating threshold of 7.0%.

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 72 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Financial review cont. |  |  |  |  |  |

#### Dividend

The recommended full-year dividend per ordinary share of 48.49p is in line with our policy of increasing the prior year dividend in line with UK CPIH inflation and is covered 1.6 times by underlying EPS.

#### Profitability and earnings

In calculating adjusted profit measures, where we consider it is in the interests of users of the financial statements to do so, we exclude certain discrete items of income or expense that we consider to be exceptional

in nature. The table below reconciles our statutory profit measures for continuing operations, at actual exchange rates, to adjusted and underlying versions. Further information on exceptional items and remeasurements

is provided in notes 2, 5 and 6 to the financial statements.

Reconciliation of profit and earnings from continuing operations

|  |  |  |  |  |  |  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |  |  |  |  |  |  |
|  | Operating profit | | |  | Profit after tax | | |  | Earnings per share | | |
| £m | 2025/26 | 2024/25 | Change |  | 2025/26 | 2024/25 | Change |  | 2025/26 | 2024/25 | Change |
| Statutory results | 5,431 | 4,934 | 10% |  | 3,243 | 2,829 | 15% |  | 65.5p | 60.0p | 9% |
| Exceptional items | (376) | (42) | n/m |  | (384) | (118) | n/m |  | (7.7p) | (2.4p) | n/m |
| Remeasurements | (11) | (127) | n/m |  | 35 | (93) | n/m |  | 0.7p | (2.0p) | n/m |
| Adjusted results | 5,044 | 4,765 | 6% |  | 2,894 | 2,618 | 11% |  | 58.5p | 55.6p | 5% |
| Timing | 636 | 505 | n/m |  | 468 | 372 | n/m |  | 9.5p | 7.9p | n/m |
| Major storm costs | — | 87 | (100)% |  | — | 64 | (100)% |  | —p | 1.3p | (96)% |
| Deferred tax in NGET and NGED | — | — | —% |  | 499 | 401 | 24% |  | 10.0p | 8.5p | 17% |
| Underlying results | 5,680 | 5,357 | 6% |  | 3,861 | 3,455 | 12% |  | 78.0p | 73.3p | 6% |

Timing over/(under)-recoveries

In calculating underlying profit, we exclude regulatory revenue timing over- and under-recoveries,

major storm costs (defined below) and deferred tax on underlying results of our UK regulated business

(NGET and NGED), also defined below. Under the Group’s regulatory frameworks, most of the revenues

we are allowed to collect each year are governed by regulatory price controls in the UK and rate plans

in the US. If more than this allowed level of revenue is collected, an adjustment will be made to future

prices to reflect this over-recovery; likewise, if less than this level of revenue is collected, an adjustment

will be made to future prices in respect of the under‑recovery. These variances between allowed and

collected revenues and timing of revenue collections for pass-through costs give rise to ‘timing’ over-

and under-recoveries.

The following table summarises management’s estimates of such amounts for the two years ended

31 March 2026 and 31 March 2025 for continuing operations. All amounts are shown on a pre-tax basis

and, where appropriate, opening balances are restated for exchange adjustments and to correspond with

subsequent regulatory filings and calculations, and are translated at the 2025/26 average exchange rate

of $1.343:£1.

|  |  |  |
| --- | --- | --- |
|  |  |  |
| £m | 2025/26 | 2024/25 1 |
| Balance at start of year (restated) | 60 | 1,018 |
| UK Electricity Transmission | (77) | (151) |
| UK Electricity Distribution | (116) | 407 |
| UK Electricity System Operator (sold in 2024/25) | — | (479) |
| New England | 94 | 57 |
| New York | (537) | (323) |
| In-year under-recovery | (636) | (489) |
| Disposal of UK Electricity System Operator | — | (462) |
| Balance at end of year | (576) | 67 |

1. March 2025 balances restated to correspond with 2024/25 regulatory filings and calculations.

In relation to timing under-recoveries, the estimated closing net under-recovered balance at 31 March

2026 (at an average exchange rate of $1.34) was £576 million, comprising: a net £68 million asset

to be recovered in UK Electricity Transmission; a net £2 million liability to be returned in UK Electricity

Distribution; a net £274 million asset to be recovered in New England; and a net £236 million asset to

be recovered in New York (for further details see page [240](#i4d298f0c87f34766961e584275cfa183_103026)). In calculating the post-tax effect of these

in‑year timing recoveries, we impute a tax rate based on the regional marginal tax rates, consistent with

the relative mix of UK and US balances.

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 73 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Financial review cont. |  |  |  |  |  |

Major storm costs (US)

We exclude the impact of major storm costs in the US where the aggregate amount is sufficiently

material in any given year. Such costs (net of in-year allowances and deductibles) are recoverable under

our rate plans but are expensed as incurred under IFRS. Accordingly, where the aggregate total US

major storm costs incurred (net of in-year allowances and deductibles) exceeds $100 million in any given

year, we exclude the net costs from underlying earnings. In 2025/26, we incurred deferrable storm costs

(net of allowances) which are eligible for future recovery of $52 million, but this did not exceed our pre-set

$100 million threshold to be excluded from underlying results. In the prior year, we incurred $110 million

(£87 million) of deferrable storm costs (net of allowances) before tax, or £64 million post-tax and

consequently these were all excluded from our reported underlying results.

Deferred tax in UK regulated businesses

We exclude deferred tax in our UK regulated businesses (NGET and NGED) in our underlying earnings

measure. Tax is generally considered to be a pass-through cost by our UK regulator, with revenue tax

allowances linked to the level of cash tax expected to be paid in the year. In 2025/26, we excluded

£499 million (2025: £401 million) of deferred tax charges from our underlying results.

#### Segmental operating profit

The tables below set out operating profit on statutory, adjusted, and underlying bases.

Statutory operating profit

|  |  |  |  |
| --- | --- | --- | --- |
|  |  |  |  |
| £m | 2025/26 | 2024/25 | Change |
| UK Electricity Transmission | 1,605 | 1,277 | 26% |
| UK Electricity Distribution | 1,122 | 1,598 | (30)% |
| UK Electricity System Operator | — | (213) | 100% |
| New England | 947 | 1,008 | (6)% |
| New York | 1,184 | 1,269 | (7)% |
| National Grid Ventures | 715 | 5 | n/m |
| Other activities | (142) | (10) | n/m |
| Total | 5,431 | 4,934 | 10% |

The notation ‘n/m’ is used throughout this section where the year-on-year percentage change is deemed

to be ‘not meaningful’.

Statutory operating profit increased in the year, primarily as a result of exceptional net gains of

£376 million in 2025/26 compared with net gains of £42 million in the prior year. For details on

exceptional items, refer to note 5 to the financial statements. This was largely offset by £131 million

adverse year-on-year movements in timing, £116 million adverse year‑on-year movements in commodity

derivative remeasurements and the impact of a weaker exchange rate. Statutory operating profit was

also supported by an improved underlying performance in our UK Electricity Transmission, UK Electricity

Distribution and New York businesses, partially offset by the prior year including a contribution from the

UK Electricity System Operator prior to its disposal, along with lower underlying profits in New England,

adversely impacted by the FERC order (mainly related to historical periods) and lower underlying profits

in National Grid Ventures, with the latter being driven by the sales of National Grid Renewables and

Grain LNG in 2025/26.

Adjusted operating profit (a non-GAAP measure)

|  |  |  |  |
| --- | --- | --- | --- |
|  |  |  |  |
| £m | 2025/26 | 2024/25 | Change |
| UK Electricity Transmission | 1,605 | 1,277 | 26% |
| UK Electricity Distribution | 1,122 | 1,610 | (30)% |
| UK Electricity System Operator | — | (364) | 100% |
| New England | 960 | 982 | (2)% |
| New York | 1,172 | 1,023 | 15% |
| National Grid Ventures | 327 | 380 | (14)% |
| Other activities | (142) | (143) | 1% |
| Continuing operations | 5,044 | 4,765 | 6% |

Underlying operating profit (a non-GAAP measure)

|  |  |  |  |
| --- | --- | --- | --- |
|  |  |  |  |
| £m | 2025/26 | 2024/25 | Change |
| UK Electricity Transmission | 1,682 | 1,428 | 18% |
| UK Electricity Distribution | 1,238 | 1,203 | 3% |
| UK Electricity System Operator | — | 115 | (100)% |
| New England | 866 | 924 | (6)% |
| New York | 1,709 | 1,450 | 18% |
| National Grid Ventures | 327 | 380 | (14)% |
| Other activities | (142) | (143) | 1% |
| Continuing operations | 5,680 | 5,357 | 6% |

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 74 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Financial review cont. |  |  |  |  |  |

The following segmental commentaries describe the reasons for the movements in statutory, adjusted

and underlying operating profit compared with the prior year. Unless otherwise stated, the discussion

of performance in the remainder of this Financial review focuses on underlying results.

UK Electricity Transmission

|  |  |  |  |
| --- | --- | --- | --- |
|  |  |  |  |
| £m | 2025/26 | 2024/25 | Change |
| Revenue | 2,898 | 2,619 | 11% |
| Operating costs | (1,293) | (1,342) | 4% |
| Statutory operating profit | 1,605 | 1,277 | 26% |
| Exceptional items | — | — | —% |
| Adjusted operating profit | 1,605 | 1,277 | 26% |
| Timing | 77 | 151 | n/m |
| Underlying operating profit | 1,682 | 1,428 | 18% |
| Analysed as follows: |  |  |  |
| Net revenue | 2,507 | 2,164 | 16% |
| Regulated controllable costs (including pensions) | (290) | (293) | (1)% |
| Other operating costs | (62) | (54) | (15)% |
| Depreciation and amortisation | (550) | (540) | (2)% |
| Adjusted operating profit | 1,605 | 1,277 | 26% |
| Timing | 77 | 151 | n/m |
| Underlying operating profit | 1,682 | 1,428 | 18% |

UK Electricity Transmission statutory operating profit was £328 million higher in the year. Timing under-

recoveries were £77 million in 2025/26 compared with an under-recovery of £151 million in 2024/25.

This year-on-year less adverse under-recovery is mainly the impact of the return in 2024/25 of prior

period balances (primarily tax allowances), a lower inflation true-up and a lower in-year recovery on

volumes and pass-through costs than 2024/25.

UK Electricity Transmission underlying operating profit increased by 18%. Underlying net revenues were

£269 million (12%) higher principally from higher totex allowances (including fast money on ASTI spend)

but also the impact of inflationary increases linked to RAV growth.

Regulated controllable costs including pensions were £3 million lower with the impact of inflationary

and workload increases, due to a larger workforce to support the growing asset base, being more than

offset by efficiency savings, non-recurring benefits related to IT and support service recharges and the

reclassifications of insurance recharges. Other costs were slightly higher than the prior year at £62 million,

including cost reclassifications, but this was partly offset by lower customer-funded diversions and

favourable gains on disposals of assets compared with 2024/25.

The higher depreciation and amortisation principally reflects a higher asset base as a result of continued

investment.

UK Electricity Distribution

|  |  |  |  |
| --- | --- | --- | --- |
|  |  |  |  |
| £m | 2025/26 | 2024/25 | Change |
| Revenue | 1,937 | 2,424 | (20)% |
| Operating costs | (815) | (826) | 1% |
| Statutory operating profit | 1,122 | 1,598 | (30)% |
| Exceptional items | — | 12 | (100)% |
| Adjusted operating profit | 1,122 | 1,610 | (30)% |
| Timing | 116 | (407) | n/m |
| Underlying operating profit | 1,238 | 1,203 | 3% |
| Analysed as follows: |  |  |  |
| Net revenue | 1,753 | 2,239 | (22)% |
| Regulated controllable costs (including pensions) | (311) | (302) | 3% |
| Other operating costs | (49) | (78) | 37% |
| Depreciation and amortisation | (271) | (249) | (9)% |
| Adjusted operating profit | 1,122 | 1,610 | (30)% |
| Timing | 116 | (407) | n/m |
| Underlying operating profit | 1,238 | 1,203 | 3% |

UK Electricity Distribution statutory operating profit was £476 million lower in the year, reflecting the

impact of £523 million adverse year-on-year timing movements. Timing under-recoveries of £116 million

in 2025/26 were mainly due to the return of prior period balances, principally driven by an over-collection

in K‑factor (i.e. volumes/prices) in 2024/25 which was effectively returned in 2025/26, partly offset by true-

ups for pass-through costs and inflation. This compares with a timing over-recovery of £407 million in the

prior year, which was favourably driven by an over-collection of K-factor.

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 75 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Financial review cont. |  |  |  |  |  |

In 2025/26 there were no exceptional costs compared with £12 million of exceptional costs in 2024/25

related to our major transformation programme.

UK Electricity Distribution underlying operating profit increased by £35 million (3%). Underlying net

revenues were £37 million higher than the prior year due to the impact of higher inflation, higher

totex allowances and improved DSO incentives performance partly offset by lower engineering

recharge income.

Regulated controllable costs including pensions were £9 million (3%) higher than the prior year from the

impact of increased inspection and maintenance work, combined with investment in capability build and

inflation impacts, partly offset by efficiencies achieved. Other costs were £29 million lower, reflecting costs

incurred in the prior year associated with Storm Darragh and lower engineering recharges.

Depreciation and amortisation increased by £22 million compared with the prior year due to the increasing

asset base.

UK Electricity System Operator

|  |  |  |  |
| --- | --- | --- | --- |
|  |  |  |  |
| £m | 2025/26 | 2024/25 | Change |
| Revenue | — | 1,029 | (100)% |
| Operating costs | — | (1,242) | 100% |
| Statutory operating loss | — | (213) | 100% |
| Exceptional items | — | (151) | n/m |
| Adjusted operating loss | — | (364) | 100% |
| Timing | — | 479 | n/m |
| Underlying operating profit | — | 115 | (100)% |
| Analysed as follows: |  |  |  |
| Net revenue | — | (188) | 100% |
| Controllable costs | — | (159) | 100% |
| Post-retirement benefits | — | (10) | 100% |
| Other operating costs | — | (7) | 100% |
| Depreciation and amortisation | — | — | —% |
| Adjusted operating loss | — | (364) | 100% |
| Timing | — | 479 | n/m |
| Underlying operating profit | — | 115 | (100)% |

UK Electricity System Operator was purchased by the UK Government on 1 October 2024 and had been

classified as ‘held for sale’ since October 2023. Based on the scale and pass-through nature of the

UK Electricity System Operator, it was not considered to be a separate major line of business and hence,

did not meet the definition of a discontinued operation under IFRS 5.

UK Electricity System Operator had a statutory operating loss of £213 million in 2024/25 as a

result of adverse timing (net of provisions for regulatory liabilities recognised under IFRS). In 2023/24

a £498 million exceptional provision was made for the return of the estimated remaining balance of

over‑collected revenues at the expected date of disposal (at that time, expected to be June 2024).

This provision was partially reversed in 2024/25 generating an exceptional credit of £151 million. Under

IFRS, a regulatory liability is not usually recognised on balance sheet for the return of such over-

recoveries, however due to the intended disposal of this business during 2024/25, a liability was

recognised given these amounts were expected to be settled through the planned sale process as

opposed to reduced future revenues. The remaining £347 million exceptional provision at the disposal

date was reflected in the reported gain on disposal of this business.

During 2024/25, UK Electricity System Operator had a timing under-recovery of £479 million arising from

the return of prior period over-recovered balances. The over-recovery was the result of higher revenues

collected through the BSUoS fixed price charges compared with total system balancing costs incurred.

At the disposal date, the impact of the residual net over-recovered position was assessed when

calculating the overall net disposal proceeds.

UK Electricity System Operator underlying operating profit in 2024/25 was £115 million. No depreciation

and amortisation was charged while the business was classified as ‘held for sale’.

New England

|  |  |  |  |
| --- | --- | --- | --- |
|  |  |  |  |
| £m | 2025/26 | 2024/25 | Change |
| Revenue | 4,174 | 4,306 | (3)% |
| Operating costs | (3,227) | (3,298) | 2% |
| Statutory operating profit | 947 | 1,008 | (6)% |
| Exceptional items | — | 3 | n/m |
| Remeasurements | 13 | (29) | n/m |
| Adjusted operating profit | 960 | 982 | (2)% |
| Timing | (94) | (61) | n/m |
| Major storm costs | — | 3 | (100)% |
| Underlying operating profit | 866 | 924 | (6)% |
| Analysed as follows: |  |  |  |
| Net revenue | 2,723 | 2,648 | 3% |
| Regulated controllable costs | (668) | (706) | 5% |
| Post-retirement benefits | (9) | (21) | 57% |
| Bad debt expense | (84) | (62) | (35)% |
| Other operating costs | (509) | (408) | (25)% |
| Depreciation and amortisation | (493) | (469) | (5)% |
| Adjusted operating profit | 960 | 982 | (2)% |
| Timing | (94) | (61) | n/m |
| Major storm costs | — | 3 | (100)% |
| Underlying operating profit | 866 | 924 | (6)% |

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 76 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Financial review cont. |  |  |  |  |  |

New England’s statutory operating profit was £61 million lower (or £3 million lower on a constant

currency basis). This included commodity derivative remeasurement losses of £13 million (£42 million

adverse year-on-year), partially offset by £33 million favourable year‑on-year timing movements. Timing

over-recoveries of £94 million in 2025/26 are mainly due to the recognition of a receivable for FERC RoE

refunds in Mass Electric from New England Transmission Owners (which will be returned to customers

in future periods). In 2024/25, timing was over-recovered by £61 million mainly due to phasing of energy

efficiency programme spend and commodity costs. In 2024/25, there were £3 million of exceptional

items related to £7 million of charges for our major transformation progress and a £4 million gain related

to environmental provision movements.

New England’s underlying operating profit decreased by £58 million (6%) or £5 million (1%) on a constant

currency basis. Underlying net revenue was £42 million higher (£190 million higher at constant currency)

driven by updated rates, higher revenues from capital trackers and storm recoveries, partly offset by the

adverse impact of the FERC order. New England controllable costs were lower by £38 million (£3 million

higher at constant currency) as a result of additional workload and inflation, which were offset by efficiency

savings. Bad debt expense increased by £22 million (£25 million at constant currency) as a result of higher

accounts receivables and higher reserve rates. Depreciation and amortisation increased by £24 million

(£51 million at constant currency) as a result of higher investment. Other costs (on an underlying basis)

were £101 million higher (£124 million higher at constant currency) due to higher investment-related

expenses and higher property taxes, both driven by the growth in asset base along with higher funded

programme costs.

New York

|  |  |  |  |
| --- | --- | --- | --- |
|  |  |  |  |
| £m | 2025/26 | 2024/25 | Change |
| Revenue | 7,618 | 6,689 | 14% |
| Operating costs | (6,434) | (5,420) | (19)% |
| Statutory operating profit | 1,184 | 1,269 | (7)% |
| Exceptional items | — | (133) | n/m |
| Remeasurements | (12) | (113) | n/m |
| Adjusted operating profit | 1,172 | 1,023 | 15% |
| Timing | 537 | 343 | n/m |
| Major storm costs | — | 84 | (100)% |
| Underlying operating profit | 1,709 | 1,450 | 18% |
| Analysed as follows: |  |  |  |
| Net revenue | 4,505 | 4,202 | 7% |
| Regulated controllable costs | (1,032) | (1,049) | 2% |
| Post-retirement benefits | (19) | (33) | n/m |
| Bad debt expense | (156) | (141) | (11)% |
| Other operating costs | (1,357) | (1,225) | (11)% |
| Depreciation and amortisation | (769) | (731) | (5)% |
| Adjusted operating profit | 1,172 | 1,023 | 15% |
| Timing | 537 | 343 | n/m |
| Major storm costs | — | 84 | (100)% |
| Underlying operating profit | 1,709 | 1,450 | 18% |

New York statutory operating profit was lower by £85 million (or £12 million lower at constant currency).

In the prior year New York incurred £133 million of net exceptional credits (a £142 million credit on

environmental provision movements, partly offset by a £9 million charge on our major transformation

programme). Timing under-recoveries in 2025/26 were £537 million (principally related to revenue

decoupling in KEDNY/KEDLI and the impact of levelisation of new rate increases in NIMO, along

with lower auction sale prices on transmission wheeling). In 2024/25, timing under-recoveries were

£343 million (driven by transmission wheeling and commodity under-recoveries due to colder weather

and KEDNY/KEDLI rate levelisation under-recoveries). This resulted in a £194 million adverse year-on-

year timing swing (£214 million adverse at constant currency).

New York underlying operating profit increased by £259 million (18%), or £342 million (25% at constant

currency). This was driven by higher net underlying revenues which increased by £497 million (11%),

or £757 million at constant currency, principally driven by updated rates including higher storm cost

allowances and the recovery of previously unremunerated costs (e.g. environmental and property taxes).

Regulated controllable costs were £17 million lower (£43 million higher at constant currency) year-on-

year, primarily as a result of increased workload (gas safety and reliability initiatives, CLCPA and increased

IT spend on new digital platforms) plus the impact of inflation, partly offset by efficiency savings. Bad debt

expense increased by £15 million (£23 million at constant currency) driven by increased customer billings.

Depreciation and amortisation increased due to the growth in assets. Other costs (on an underlying basis)

increased due to higher storm costs (partly offset by increased storm cost allowances in revenues), higher

property taxes, inflation-related environmental costs and investment-related costs.

National Grid Ventures

|  |  |  |  |
| --- | --- | --- | --- |
|  |  |  |  |
| £m | 2025/26 | 2024/25 | Change |
| Revenue | 1,098 | 1,397 | (21)% |
| Operating costs | (232) | (1,220) | 81% |
| Depreciation and amortisation | (151) | (173) | 13% |
| Statutory operating profit | 715 | 5 | n/m |
| Exceptional items | (376) | 360 | n/m |
| Remeasurements | (12) | 15 | n/a |
| Adjusted/underlying operating profit | 327 | 380 | (14)% |

National Grid Ventures’ statutory operating profit improved by £710 million, principally as a result of

a £489 million exceptional gain on sale on the disposal of Grain LNG in November 2025, partly offset

by a £96 million exceptional loss on disposal of National Grid Renewables sold in May 2025 (mainly

driven by the recycling of cumulative exchange rate adjustments since 2019/20 when this business was

originally acquired). This compared with exceptional charges in 2024/25 of £303 million (impairment of

our Community Offshore Wind investment), along with £57 million of transaction and separation costs for

the planned disposal of National Grid Renewables. Commodity remeasurements were gains of £12 million

in 2025/26 compared with losses of £15 million in 2024/25.

National Grid Ventures’ underlying operating profit was £53 million lower than 2024/25. On 29 May 2025

the sale of National Grid Renewables was completed, and on 28 November 2025 the sale of Grain LNG

was completed. The sale of Grain LNG in 2025/26 reduced underlying operating profit by £35 million year-

on-year. In the UK, interconnector profits decreased versus the prior year primarily as a result of lower

interconnector revenues as market spreads remained low. In the US, profit was lower, due to a £24 million

Revolution Wind gain on sale recognised in 2024/25, partly offset by lower development expenditure.

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 77 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Financial review cont. |  |  |  |  |  |

Other activities

|  |  |  |  |
| --- | --- | --- | --- |
|  |  |  |  |
| £m | 2025/26 | 2024/25 | Change |
| Statutory operating loss | (142) | (10) | (1,330)% |
| Exceptional items | — | (133) | n/m |
| Adjusted/underlying operating loss | (142) | (143) | 1% |
| Analysed as follows: |  |  |  |
| Property | 46 | 54 | (15)% |
| Corporate and Other activities | (188) | (197) | 5% |
| Adjusted/underlying operating loss | (142) | (143) | 1% |

Other activities incurred a statutory operating loss of £142 million (2025: £10 million loss, which included

a £187 million exceptional gain on disposal of UK Electricity System Operator, £46 million of exceptional

charges related to our major transformation programme and £8 million of exceptional transaction and

separation costs incurred by our corporate function related to the planned disposal of our Grain LNG

business). Following a review of strategic priorities in 2025/26, the major transformation programme

launched in 2024 has been reshaped and the associated programme costs in the current year no longer

meet the quantitative threshold to be treated as exceptional.

Other activities’ underlying operating loss was £142 million (including corporate costs) in 2025/26

compared with £143 million loss in 2024/25. This improvement was driven by favourable year-on-year

fair value movements in our NG Partners investment portfolio and higher insurance captive profits,

mostly offset by increases in central costs to help deliver our overall group efficiency programme and

other corporate centre cost increases along with lower UK property sales in 2025/26 compared with

the prior year.

Exceptional items and remeasurements in operating profit – continuing

In 2025/26, we classified a number of items as exceptional, which has the net impact of increasing

our statutory operating profit by £376 million (2025: £42 million increase) compared with our adjusted

and underlying operating profit measures. These items comprise an exceptional gain of £489 million

on the sale of Grain LNG; an exceptional loss of £96 million on the sale of National Grid Renewables;

transaction, separation and integration costs of £17 million (2025: £65 million). The prior year included

a £146 million credit related to changes in environmental provisions; a £151 million provision release and

a £187 million gain on sale (both linked to UK Electricity System Operator); and a £303 million impairment

of an investment in National Grid Ventures. For further details see note 5 to the financial statements.

In 2024/25, we embarked on a new four-year major transformation programme designed to implement

our ‘pureplay networks business’ strategy, incurring £74 million of exceptional costs. In 2025/26, it was

determined that this programme no longer met the exceptional items criteria and current year costs have

not been treated as exceptional.

We also exclude certain unrealised gains and losses on mark-to-market financial instruments

(‘remeasurements’) from adjusted and underlying profit. In 2025/26, net remeasurement gains

on commodity contract derivatives (i.e. ‘mark-to-market’ movements on derivatives used to hedge

the cost of buying wholesale gas and electricity on behalf of US customers and derivatives in our

UK interconnectors business) were £11 million, compared with net remeasurement gains of

£127 million in 2024/25.

#### Financing costs and taxation – continuing

Net finance costs

Statutory net finance costs of £1,325 million were down from £1,357 million in 2024/25 and included

derivative remeasurement net losses of £54 million (2025: £4 million net gains). Underlying net finance costs

of £1,271 million for 2025/26 were £90 million or 7% lower (£37 million or 3% lower at constant currency)

than 2024/25. Net debt related finance costs were £89 million higher (£146 million higher at constant

currency), driven by higher levels of average net debt (to fund our capex programme) and slightly higher

interest rates, partly offset by gains on favourable debt buy-backs. The effective interest rate for continuing

operations of 4.3% is 20bps higher than the prior year rate. Other interest was favourable year-on-year

reflecting £122 million higher capitalised interest, principally attributable to the step up in ASTI investment

in UK Electricity Transmission, along with favourable pension and OPEB interest income, lower discount

unwind on provisions and higher other interest income.

Joint ventures and associates

The Group’s share of net profits from joint ventures and associates on a statutory basis increased to

£76 million (2025: £73 million). Due to the sale of our Emerald joint venture on 29 May 2025, there are no

derivative remeasurements in the current year (2025: £2 million of losses). On an adjusted basis, the share

of net profits from joint ventures and associates increased by £1 million compared with 2024/25, mostly

reflecting higher BritNed revenues driven by higher auction prices, offset by a shorter ownership period

of our Emerald joint venture, which was sold as part of the National Grid Renewables disposal.

Tax

The statutory tax charge for continuing operations was £939 million (2025: £821 million) including the

impact of tax on exceptional items and remeasurements of £16 million credit (2025: £40 million credit).

The adjusted tax charge for continuing operations was £955 million (2025: £861 million), resulting in an

adjusted effective tax rate for continuing operations (excluding profits from joint ventures and associates)

of 25.3% (2025: 25.3%).

The underlying tax charge for the year (a non-GAAP measure) was £624 million (2025: £616 million).

The underlying effective tax rate (excluding joint ventures and associates) of 14.2% was 120bps lower

than last year (2025: 15.4%). This is mainly due to profit mix within the Group being more weighted

towards NGET and higher levels of capital investment in NGED leading to a lower underlying tax charge.

Our definition of underlying tax excludes deferred tax for NGET and NGED (as these entities do not

receive a regulatory revenue allowance for tax that has not yet been paid i.e. current tax is effectively

a pass-through from a regulatory perspective). The Group’s tax strategy is detailed later in this review.

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 78 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Financial review cont. |  |  |  |  |  |

#### Capital investment and asset growth

Capital investment

Capital investment comprises capital expenditure in critical energy infrastructure, equity investments,

equity funding contributions to joint ventures and associates, and net movements in capital expenditure-

related prepayments to secure delivery of future capital investment projects.

|  |  |  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |  |  |
|  | At actual exchange rates | | |  | At constant currency | | |
| £m | 2025/26 | 2024/25 | Change |  | 2025/26 | 2024/25 | Change |
| UK Electricity Transmission | 4,372 | 2,999 | 46% |  | 4,372 | 2,999 | 46% |
| UK Electricity Distribution | 1,617 | 1,426 | 13% |  | 1,617 | 1,426 | 13% |
| New England | 2,043 | 1,751 | 17% |  | 2,043 | 1,650 | 24% |
| New York | 3,428 | 3,289 | 4% |  | 3,428 | 3,101 | 11% |
| National Grid Ventures | 109 | 378 | (71)% |  | 109 | 362 | (70)% |
| Other activities | 7 | 4 | 75% |  | 7 | 4 | 75% |
| Total Group | 11,576 | 9,847 | 18% |  | 11,576 | 9,542 | 21% |

UK Electricity Transmission investment was £1,373 million higher than 2024/25 with this 46% increase

primarily driven by expenditure on strategic investment (both Wave 1 and Wave 2 projects) including

offshore spend on EGL4 and Sea Link capacity reserve advance payments, and increased onshore spend

including North London Reinforcement, Yorkshire Green, Tilbury-Grain and Norwich-Tilbury along with

other smaller projects. In addition, investment was higher from progress on projects such as Uxbridge

Moor, Wallend and Margam and also increased for IT and cyber including a new state-of-the-art control

room and Supervisory Control and Data Acquisition (SCADA) system. Capitalised interest and interest

on prepayments of £229 million was £86 million higher than the prior year due to higher levels of assets

under construction.

UK Electricity Distribution increased by £191 million primarily due to increased asset replacement

and refurbishment, higher reinforcement works (in line with the scale up under RIIO-ED2), along with

higher non‑load capex driven by higher volumes across overhead lines and diversions and increased

investment in IT and telecoms.

In New England capital investment increased by £292 million (up £393 million at constant currency)

compared with the prior year. This was driven by spend on electric distribution including increases

in asset condition and system capacity, as well as grid modernisation through Advanced Metering

Infrastructure and Fault Location Isolation and Service Restoration (FLISR), higher electric transmission

investment primarily from asset condition and system capacity work, along with an increase in IT

investment. Investment in gas distribution remained relatively stable, with lower Gas System Enhancement

Plan activity being partly offset by increased enhanced safety regulation compliance investment.

Capital investment in New York was £139 million higher (up £327 million at constant currency) compared

with the prior year. The principal driver of this was higher electric investment, driven by system reinforcement

and increasing capacity to fulfil clean energy investment commitments (Upstate Upgrade and Climate

Leadership and Community Protection Act programmes) but also higher from an increase in the level

of IT system development. Investment in our gas networks was lower than in the prior year, with reduced

investment on our mains replacement programme, partly offset by higher spend on city state construction

and other mandated programme spend.

Capital investment in National Grid Ventures was £269 million lower (£253 million lower at constant

currency) with £210 million of this decrease attributable to the disposals of NG Renewables and

Grain LNG, and £53 million reflects the completion of construction of Viking Link interconnector

during 2024/25.

UK Electricity System Operator reported no capital investment since being classified as held for sale

during 2023/24.

Asset growth and regulated asset growth (non‑GAAP measures)

A key part of our investor proposition is growth in our regulated asset base. The regulated asset base is

a regulatory construct, representing the invested capital on which we are authorised to earn a cash return.

By investing efficiently in our networks, we add to our regulatory asset base over the long term and this in

turn contributes to delivering shareholder value. Our regulated asset base comprises our regulatory asset

value (RAV) in the UK, plus our rate base in the US (these are used to measure our ‘regulated asset

growth’). We also invest in related activities that are not subject to network regulation and this further

contributes to ‘asset growth’.

In total, asset growth in 2025/26 was 10.9% (2025: 9.0%). Asset growth tracks the overall increase in

assets (excluding foreign exchange movements and the impact of significant increases or decreases

from business acquisition or disposal transactions) using a combination of UK RAV and US rate base

for our regulated businesses, and IFRS balances for our non-regulated businesses. Asset growth

excludes the impact of the reduction in assets in our National Grid Ventures businesses as a result of

the disposal of our Grain LNG and National Grid Renewables businesses during 2025/26. A detailed

calculation of asset growth is provided on page [247](#i4d298f0c87f34766961e584275cfa183_103027).

In terms of asset growth by business sector, UK RAV growth was 12.8% (2025: 9.8%) driven by

increased ‘slow money’ additions and RAV indexation, along with higher RAV depreciation. US rate base

grew strongly by 10.3% (2025: 11.5%), with continued high levels of capital expenditure (as measured

under US GAAP) and more assets coming into service during the year resulting in increased rate base

at 31 March 2026. On a combined basis, the increase in our UK RAV and US rate base (at constant

currency) produced ‘regulated asset growth’ of 11.7% (2025: 10.5%).

Non-regulated businesses’ growth was 4.3% (2025: (2.1)%) primarily as a result of ongoing investment

in our US Servco on IT, which will support our US regulated businesses, partly offset by lower assets

held in our UK Property business.

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 79 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Financial review cont. |  |  |  |  |  |

#### Cash flow, net debt and funding

Net debt is the aggregate of cash and cash equivalents, borrowings, current financial and other

investments and derivatives (excluding commodity contract derivatives) as disclosed in note 29 to the

financial statements. ‘Adjusted net debt’ used for the RCF/adjusted net debt calculation is principally

adjusted for pension deficits and hybrid debt instruments. For a full reconciliation, see page [242](#i4d298f0c87f34766961e584275cfa183_103204).

The following table summarises the Group’s cash flow for the year, reconciling this to the change

in net debt.

Summary cash flow statement

|  |  |  |  |
| --- | --- | --- | --- |
|  |  |  |  |
| £m | 2025/26 | 2024/25 | Change |
| Cash generated from continuing operations | 7,861 | 6,991 | 12% |
| Purchase of intangibles, PP&E, investments in JVs and  acquisition of financial investments (net of disposals) | (10,601) | (9,713) | (9)% |
| Dividends from JVs and associates | 105 | 126 | (17)% |
| Business net cash outflow from continuing operations | (2,635) | (2,596) | (2)% |
| Net interest paid | (1,701) | (1,588) | (7)% |
| Net tax paid | (32) | (183) | 83% |
| Cash dividends paid | (1,623) | (1,529) | (6)% |
| Other cash movements | 39 | 11 | 255% |
| Net cash outflow (continuing) | (5,952) | (5,885) | (1)% |
| Disposals of subsidiaries and associates 1 | 2,809 | 1,263 | 122% |
| Discontinued operations | — | 22 | (100)% |
| Rights Issue (net of costs) | — | 6,839 | (100)% |
| Other, including net financing raised/(repaid) in year | 2,195 | (1,474) | n/m |
| (Decrease)/increase in cash and cash equivalents | (948) | 765 | n/m |
|  |  |  |  |
| Reconciliation to movement in net debt | | | |
| (Decrease)/increase in cash and cash equivalents | (948) | 765 | n/m |
| Less: other net cash flows from investing and financing  transactions | (2,195) | 1,474 | n/m |
| Net debt reclassified to held for sale | — | (55) | 100% |
| Impact of foreign exchange movements on opening net debt | 624 | 528 | 18% |
| Other non-cash movements | (270) | (476) | 43% |
| (Increase)/decrease in net debt | (2,789) | 2,236 | n/m |
| Net debt at start of year | (41,371) | (43,607) | 5% |
| Net debt at end of year | (44,160) | (41,371) | (7)% |

1. Cash proceeds of £1,499 million for Grain LNG (less £163 million balance of cash and cash equivalents disposed) and £1,531 million

for National Grid Renewables (less £58 million balance of cash and cash equivalents disposed) (2025: cash proceeds of £628 million

for ESO (less £51 million balance of cash and cash equivalents disposed) and £686 million for the disposal of 20% retained interest

in National Gas Transmission).

Cash flow generated from continuing operations was £7.9 billion, £870 million higher than last year,

mainly due to higher net revenues (i.e. after deducting pass-through costs) increasing operating profit

and favourable working capital inflows. Cash expended on investment activities increased as a result of

continued growth in our regulated businesses including a significant step-up of cash capital investment in

UK Electricity Transmission, which was £1.1 billion higher than the prior year, along with higher investment

in New York, New England and UK Electricity Distribution. This includes ongoing cash investment in Grain

LNG and National Grid Renewables, subsequent to these businesses being reclassified as held for sale.

Net interest paid increased mainly as a result of lower interest income following Rights Issue proceeds

being utilised to fund the capital investment programme across the Group, along with the impact of the

timing of cash interest payments (accrued interest movements), partly offset by a higher average level of

net debt. The Group made net tax payments of £32 million (2025: £183 million) during 2025/26. This

decrease mainly related to lower cash tax payable in our US business as a result of offsetting losses and

lower cash tax payable in the UK as a result of our expanding capital programme.

The higher cash dividend reflected a lower weighted average scrip uptake of 28% in the current year

(2025: 31%) along with the annual inflationary increase and a higher share count.

In 2025/26, we completed the sale of our National Grid Renewables business for net cash proceeds of

£1,473 million and also sold our UK Grain LNG business for net cash proceeds of £1,336 million. These

net cash proceeds exclude cash balances sold with these businesses and exclude a provision for estimated

post closing capital expenditure obligations (see note 10 of the financial statements). In 2024/25, we had

cash inflows of £628 million from the sale of our UK Electricity System Operator business to the UK. We

also sold our final 20% interest in National Gas Transmission for proceeds of £686 million.

During the year, we raised £4.2 billion of new long-term senior debt to refinance maturing debt and

to fund a portion of our significant capital programme. In addition, we signed £2.4 billion of new loan

facilities, undrawn as at 31 March 2026, which we expect to draw in the future, including £1.7 billion

across two loan facilities that are guaranteed by European Export Credit Agencies and which are aligned

with our Green Financing Framework. Finally, on 13 April 2026, National Grid North America Inc. signed

a new £0.7 billion equivalent term loan.

Other cash movements principally relate to net financing inflows or outflows to maintain our cash balances

at an appropriate level in accordance with the Group liquidity policy, but do not have an impact on the

Group’s net debt. Other non-cash movements which do impact net debt, primarily reflect changes in the

sterling–dollar exchange rate, accretions on index-linked debt, lease additions and other derivative fair

value movements, offset by the amortisation of fair value adjustments on acquired debt.

As at 13 May 2026, we have £8.0 billion of undrawn committed facilities available for general corporate

purposes, all of which have expiry dates no earlier than May 2027. National Grid’s balance sheet remains

robust, with strong overall investment grade ratings from Moody’s, Standard & Poor’s (S&P) and Fitch.

The Board has considered the Group’s ability to finance normal operations as well as funding a significant

capital programme. This includes stress testing of the Group’s finances under a ‘reasonable worst-case’

scenario, assessing the timing of the sale of businesses held for sale and the further levers at the Board’s

discretion to ensure our businesses are adequately financed. As a result, the Board has concluded that

the Group will have adequate resources to do so.

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 80 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Financial review cont. |  |  |  |  |  |

#### Financial position

The following table sets out a condensed version of the Group’s IFRS balance sheet.

Summary balance sheet

|  |  |  |  |
| --- | --- | --- | --- |
|  |  |  |  |
| £m | 31 March 2026 | 31 March 2025 | Change |
| Goodwill and intangibles | 13,296 | 13,096 | 2% |
| Property, plant and equipment | 81,520 | 74,091 | 10% |
| Assets and liabilities held for sale | — | 2,194 | (100)% |
| Other net liabilities | (1,663) | (805) | (107)% |
| Tax balances | (9,049) | (8,246) | (10)% |
| Net pension assets | 2,147 | 1,916 | 12% |
| Provisions | (2,761) | (3,049) | 9% |
| Net debt | (44,160) | (41,371) | (7)% |
| Net assets | 39,330 | 37,826 | 4% |

Goodwill and intangibles increased mainly as a result of additional investment in IT systems, partly offset

by amortisation and exchange rate movements. Property, plant and equipment increased mainly as a result

of the continuing capital investment programme offset by depreciation and exchange rate movements.

Assets and liabilities held for sale at 31 March 2025 comprised our UK Grain LNG business and our

US National Grid Renewables business, both of which were sold during 2025/26. Tax balances increased

principally from accelerated tax depreciation due to ongoing capital investment and movements in other net

temporary differences, partly offset by exchange rate movements. Net pension assets increased mainly

as a result of returns on investments and actuarial gains on scheme net assets. Provisions were reduced

principally as a result of utilisation of US environmental and UK interconnector revenue provisions, exchange

rate movements, partly offset by the impact of the discount unwind. Other movements are largely explained

by net working capital inflows and changes in the sterling–dollar exchange rate.

Regulatory gearing was maintained at 61% as at 31 March 2026 (2025: 61%). Regulatory gearing is a

non-GAAP measure and is calculated as net debt as a proportion of total regulatory asset value and other

business invested capital. Beneficial inflows from the proceeds for the sales of businesses (National Grid

Renewables and Grain LNG) were offset by financing outflows for net interest and dividend payments.

Taking into account the benefit of our hybrid debt, adjusted gearing as at 31 March 2026 was 61% (2025:

60%), with the current overall Group credit rating of BBB+/Baa1 (S&P/Moody’s).

Retained cash flow as a proportion of adjusted net debt was 9.3%, 50bps lower than 2024/25 but well

above the long-term average level of 7.0% indicated by Moody’s, as consistent with maintaining our

current Group rating.

Off-balance sheet items

There were no significant off-balance sheet items other than the commitments and contingencies detailed

in note 30 to the financial statements. In accordance with IFRS, regulatory assets and regulatory liabilities

are not recognised on the balance sheet. Further information in respect of certain of the Group’s energy

purchase contracts and commodity price risk is disclosed in note 32(f) to the financial statements.

#### Economic returns (non-GAAP measures)

A principal way in which we measure our performance in generating value for shareholders is to divide

regulated financial performance by regulatory equity, to produce RoE.

As explained on page [242](#i4d298f0c87f34766961e584275cfa183_103205), regulated financial performance adjusts reported operating profit to reflect

the impact of the Group’s various regulatory economic arrangements in the UK and US. In order to show

underlying performance, we calculate RoE measures excluding exceptional items of income or expenditure.

Group RoE is used to measure our performance in generating value for our shareholders by dividing

regulated and non-regulated financial performance, after interest and tax, by our measure of equity

investment in all our businesses, including the regulated businesses, NGV and other activities and

joint ventures. For further details, please see page [244](#i4d298f0c87f34766961e584275cfa183_103206).

Regulated businesses’ RoEs are measures of how the businesses are performing compared with

the assumptions and allowances set by our regulators. US jurisdictional and UK entity regulated returns

are calculated using the capital structure assumed within their respective regulatory arrangements

and, in the case of the UK, assuming long-run inflation of 2% CPIH under RIIO-2. As these assumptions

differ between the UK and the US, RoE measures are not directly comparable between the two

geographies. In our performance measures, we compare achieved RoEs to the level assumed when

setting base rate and revenue allowances in each jurisdiction.

Return on Equity ‘RoE’ (non-GAAP measures)

|  |  |  |  |
| --- | --- | --- | --- |
|  |  |  |  |
| % | 2025/26 | 2024/25 | Change |
| UK Electricity Transmission | 8.2% | 8.3% | -10bps |
| UK Electricity Distribution | 8.1% | 7.9% | 20bps |
| New England | 9.2% | 9.1% | 10bps |
| New York | 9.0% | 8.7% | 30bps |
| Group RoE | 9.8% | 9.0% | 90bps |

In 2025/26, UK Electricity Transmission achieved operational returns of 8.2%, delivering 100bps of

outperformance under RIIO-T2, mainly from totex performance related to savings on capital delivery

(2025: 8.3% achieved return, or 100bps above the allowed base return). UK Electricity Distribution

achieved an operational return of 8.1% in 2025/26, including 50bps outperformance, mostly consisting

of non‑totex DSO performance incentives (2025: 7.9% achieved return, or 20bps above the allowed

base return).

New England’s achieved return of 9.2% was 96% of the allowed return in 2025/26 compared with an

achieved return of 9.1% in 2024/25. New York’s achieved return of 9.0% was 96% of the allowed return

in 2025/26 compared with an achieved return of 8.7% in 2024/25. The quoted returns for New England

and New York represent the weighted average return across operating companies within each jurisdiction.

Overall Group RoE, which incorporates NGV, property, corporate and other activities, and financing and

tax performance, was 9.8% in 2025/26 compared with 9.0% achieved in 2024/25.

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 81 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Financial review cont. |  |  |  |  |  |

#### Tax transparency

As a responsible taxpayer, we have voluntarily included additional tax disclosures, which we believe are

of interest to our stakeholders. For information on the Company’s activities, please see page [4](#i2193c7e7fbee4753bdbe2d16888565c8_16), and for

a definition of discontinued operations, please see note 10 to the financial statements.

Tax strategy

National Grid is a responsible taxpayer. Our approach to tax is consistent with the Group’s broader

commitments to doing business responsibly and upholding the highest ethical standards. This includes

managing our tax affairs, as we recognise not only that our tax contribution supports public services but

also that responsible tax practices are part of our social licence and are a key enabler of stakeholder trust,

especially for customers, regulators and tax authorities. We endeavour to manage our tax affairs so that

we pay and collect the right amount of tax, at the right time, in accordance with the tax laws in all the

territories in which we operate. We will claim valid tax reliefs and incentives where these are applicable

to our business operations, but only where they are widely accepted through the relevant tax legislation

such as those established by government to promote investment, employment and economic growth.

We do not have operations in tax havens or low-tax jurisdictions without commercial purpose.

We have a strong governance framework and our internal control and risk management framework helps

us manage risks, including tax risk, appropriately. We take a conservative approach to tax risk. While

there is no prescribed limit to the amount of acceptable tax risk, any material tax judgements are subject

to review and monitoring under our risk management framework with escalation to the Audit & Risk

Committee as appropriate.

Our financial statements have been audited. The figures in the tax transparency disclosures in the

Annual Report and Accounts have been taken from our financial systems, which are subject to our

internal control framework.

We act with openness and honesty when engaging with relevant tax authorities and seek to work with

tax authorities on a real-time basis. We engage proactively in developments of external tax policy and

engage with relevant bodies where appropriate. Ultimate responsibility and oversight of our tax strategy

and governance rests with the Audit & Risk Committee, with executive management delegated to our

Chief Financial Officer who oversees and approves the tax strategy on an annual basis. For more detailed

information, please refer to our published tax strategy on our website.

Country-by-country reporting summary

We have disclosed in the table below data showing the scale of our activities in each of the countries

we operate in. This allows our stakeholders to see the profits earned, taxes paid and the context of those

payments. The Group’s entities are tax resident in their jurisdiction of incorporation other than where

indicated in the footnotes to note 34 to the financial statements.

|  |  |  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |  |  |
| 2025/26 | Revenue | | |  | Profit/  (loss) before  income tax  3  £m | Income tax  accrued –  current year 4  £m | Tangible  assets/(liabilities)  other than cash  and cash  equivalents 5  £m |
| Tax jurisdiction | Unrelated  party1  £m | Related  party  2  £m | Total  £m |  |
| United Kingdom | 5,472 | 197 | 5,669 |  | 3,014 | 9 | 39,155 |
| United States | 12,215 | 51 | 12,266 |  | 1,104 | — | 42,365 |
| Isle of Man | — | 62 | 62 |  | 64 | 9 | — |
| Luxembourg | — | — | — |  | — | — | — |
| Belgium | — | — | — |  | — | — | — |
| Total | 17,687 | 310 | 17,997 |  | 4,182 | 18 | 81,520 |

|  |  |  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |  |  |
| 2024/25 | Revenue | | |  | Profit/  (loss) before  income tax  3  £m | Income tax  accrued –  current year 4  £m | Tangible  assets/(liabilities)  other than cash  and cash  equivalents 5  £m |
| Tax jurisdiction | Unrelated  party1  £m | Related  party  2  £m | Total  £m |  |
| United Kingdom | 6,707 | 241 | 6,948 |  | 2,703 | 67 | 34,680 |
| United States | 11,671 | 58 | 11,729 |  | 947 | 47 | 39,411 |
| Isle of Man | — | 51 | 51 |  | 51 | — | — |
| Luxembourg | — | — | — |  | — | — | — |
| Belgium | — | — | — |  | 1 | — | — |
| Total | 18,378 | 350 | 18,728 |  | 3,702 | 114 | 74,091 |

1. Unrelated party revenue comprises revenue from continuing operations of £17,687 million (2025: £18,378 million) (see note 2 to

the financial statements) and revenue from discontinued operations of £nil (2025: £nil) (see note 10 to the financial statements).

2. Related party revenue only includes cross-border transactions and comprises related party revenue from continuing operations

of £310 million (2025: £350 million) and related party revenue from discontinued operations of £nil (2025: £nil).

3. Profit/(loss) before income tax (PBT) from operations after exceptionals comprises continuing operations PBT of £4,182 million

(2025: £3,650 million) (see consolidated income statement) and discontinued operations PBT of £nil million (2025: £52 million)

(see note 10 to the financial statements).

4. Current year income tax accrued comprises current year income tax from continuing operations of £18 million (2025: £113 million)

(see note 7 to the financial statements) and current year income tax from discontinued operations of £nil million (2025: £1 million).

See the tax charge to tax paid reconciliation below for further information.

5. Tangible assets comprises property, plant and equipment (see consolidated statement of financial position) and excludes tangible fixed

assets for businesses classified as ‘held for sale’ or disposed of during the year of £962 million (Grain LNG £962 million) (2025: £1,359

million UK Electricity System Operator (ESO) £121 million, National Grid Renewables £340 million, Grain LNG £898 million) (see note 10

to the financial statements).

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 82 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Financial review cont. |  |  |  |  |  |

Our Isle of Man company is a captive insurance company and pays taxes in the Isle of Man as applicable.

The company is treated as a controlled foreign company for UK tax purposes and, as such, additional

UK corporation tax is paid on its profits under the UK controlled foreign company rules.

Our presence in Luxembourg is to address a nationalisation risk which arose from a Labour Party

proposal in 2019 to nationalise nearly all of National Grid’s UK assets.

Transfer pricing is not a significant issue for the Group given the nature of our core businesses and the

number of jurisdictions we operate in. Where there are related party transactions, these are taxed on an

arm’s length basis in accordance with the Organisation for Economic Co-operation and Development

(OECD) principles.

Group’s total tax charge to tax paid

The total tax charge for the year disclosed in the financial statements in accordance with accounting

standards and the equivalent total corporate income tax paid during the year will differ.

The principal differences between these two measures are as follows:

Reconciliation of Group’s total tax charge to tax paid

|  |  |  |
| --- | --- | --- |
|  |  |  |
| £m | 2025/26 | 2024/25 |
| Total Group tax charge 1 | 939 | 822 |
| Adjustment for Group non-cash deferred tax | (1,093) | (783) |
| Adjustments for Group current tax (charge)/credit in respect of prior years | 172 | 75 |
| Group current tax charge | 18 | 114 |
| Group tax charge not payable in the current year | (9) | (46) |
| Group tax instalment payments (repayable)/payable in respect of the prior year | — | 25 |
| Tax instalment payments over/(under) paid in the current year | 3 | (27) |
| Tax recoverable offset against current tax payments due | — | — |
| Tax instalment payments over/(under) paid due in the following year | — | — |
| Group tax payment/(refunds) in respect of prior years paid in the current year | 22 | — |
| Tax charge/(credit) included elsewhere in the accounts2 | (2) | 117 |
| Group tax paid | 32 | 183 |
|  |  |  |
| Profit before income tax3 | 4,182 | 3,702 |
|  |  |  |
|  | % | % |
| Effective cash tax rate | 0.8 | 4.9 |
| Effective tax rate 4 | 22.5 | 22.2 |

1. Total Group tax charge from operations after exceptionals is comprised of tax charge of continuing operations of £939 million

(2025: £821 million) and discontinued operations of £nil (2025: £1 million).

2. Relates to amounts charged through OCI (2025: relates to amounts charges in other liabilities in note 10).

3. Profit/(loss) before income tax (PBT) from continuing operations after exceptionals is comprised of continuing operations

PBT of £4,182 million (2025: £3,651 million) and discontinued operations PBT of £nil (2025: £52 million).

4. Effective tax rate for continuing operations after exceptionals is 22.5% (2025: 22.5%) and discontinued operations is nil% (2025: 2.1%).

Effective cash tax rate

The effective cash tax rate for the total Group is 0.8%. The difference between this and the accounting

effective rate of 22.5% is primarily due to the following factors.

National Grid is a capital-intensive business, across both the UK and the US, and invests significant

sums each year in its networks. In 2025/26, the Group’s total capital expenditure was £11,549 million

(excluding JV investment). To promote investment, tax legislation allows a deduction for qualifying capital

expenditure at a faster rate than the associated depreciation in the statutory accounts. The impact of this

is to defer cash tax payments into future years.

Within the UK, tax relief for capital expenditure on property, plant and machinery is given in law via capital

allowances. From 1 April 2023, HM Treasury have increased the rates of capital allowances on in year

capital expenditure spend to 100%/50% (previously 18%/6%). This accelerated tax relief, combined with

the increased capital expenditure in the UK, significantly reduces the Group’s UK cash tax liability and as

a consequence reduces the effective cash tax rate for the year. This trend is expected to continue while

UK capital expenditure remains at current levels and capital allowance rates remain as they are.

The sale of Grain LNG in the year gave rise to a non-taxable gain as it met the conditions of the

UK Substantial Shareholding Exemption. This also reduced the effective cash tax rate for the year.

The Group continued to make payments into the UK defined benefit pension schemes, National Grid

Electricity Group section of the Electricity Supply Pension Scheme and the Western Power Pension

Scheme during the course of the year. These payments have further reduced the overall cash tax paid

in the UK.

Group’s total tax contribution

The total amount of taxes we pay and collect globally year-on-year is significantly more than just the tax

which we pay on our global profits. To provide a full picture, we have disclosed the Group’s global total

tax contribution which includes contributions from both continuing and discontinued businesses.

![]()

Group’s total tax contribution 2025/26

Taxes borneTaxes collected

![53135]()

![53137]()

£1.9bn

£1.3bn

|  |  |  |
| --- | --- | --- |
|  |  |  |
| Key: | | £m |
| ò | People | 305 |
| ò | Product | 224 |
| ò | Profit | 32 |
| ò | Property | 1,306 |
| ò | Miscellaneous | 31 |
|  | Total | 1,898 |

|  |  |  |
| --- | --- | --- |
|  |  |  |
| Key: | | £m |
| ò | People | 911 |
| ò | Product | 359 |
| ò | Miscellaneous | 1 |
|  | Total | 1,271 |
|  |  |  |
|  |  |  |

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 83 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Financial review cont. |  |  |  |  |  |

Taxes borne are a cost to the Group. Taxes collected are taxes generated by the operations of the Group

which we are obliged to administer on behalf of the government (e.g. income tax under PAYE, employees’

national insurance contributions).

|  |  |  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |  |  |
| 2025/26 | Tax contribution | | | | |  |  |
| Tax jurisdiction | Income  tax paid/  (repaid) on  cash basis1  £m | Property  taxes  £m | Other  taxes  borne 2  £m | Taxes  collected  £m | Total tax  contribution  £m |  | Number of  employees 3 as at  31 March 2026 |
| United Kingdom | 36 | 247 | 162 | 428 | 873 |  | 14,554 |
| United States | (4) | 1,060 | 397 | 843 | 2,296 |  | 18,472 |
| Ireland | — | — | — | — | — |  | — |
| Isle of Man | — | — | — | — | — |  | — |
| Luxembourg | — | — | — | — | — |  | — |
| Netherlands | — | — | — | — | — |  | — |
| Total | 32 | 1,307 | 559 | 1,271 | 3,169 |  | 33,026 |

|  |  |  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |  |  |
| 2024/25 | Tax contribution | | | | |  |  |
| Tax jurisdiction | Income  tax paid/  (repaid)  on cash  basis 1  £m | Property  taxes  £m | Other  taxes  borne 2  £m | Taxes  collected  £m | Total tax  contribution  £m |  | Number of  employees 3 as at  31 March 2025 |
| United Kingdom | 156 | 247 | 140 | 858 | 1,401 |  | 13,477 |
| United States | 27 | 990 | 382 | 788 | 2,187 |  | 18,177 |
| Ireland | — | — | — | — | — |  | — |
| Isle of Man | — | — | — | — | — |  | — |
| Luxembourg | — | — | — | — | — |  | — |
| Netherlands | — | — | — | — | — |  | — |
| Total | 183 | 1,237 | 522 | 1,646 | 3,588 |  | 31,654 |

1. See the tax charge to tax paid reconciliation above for further information.

2. Other taxes borne is made up of People, Product and Miscellaneous taxes.

3. Number of employees is calculated as the total National Grid workforce across all parts of the business, including Non-executive Directors

and Executive Directors and employees of the discontinued operations. All are active, permanent employees as well as both full-time and

part-time employees.

For 2025/26, our total tax contribution was £3,169 million (2024/25: £3,588 million), taxes borne were

£1,898 million (2024/25: £1,942 million) and taxes collected were £1,271 million (2024/25: £1,646 million).

The reduction in taxes borne is primarily the result of reduced income taxes paid because of increased

capital spend and an increase in UK capital allowance rates. This reduction is partially offset by an increase

in US property taxes which is paid to over 1,200 cities and towns in Massachusetts, New Hampshire,

New York, Rhode Island and Vermont to help fund local services.

The reduction in taxes collected is primarily the result of a reduction in our net VAT position because

of higher input VAT on our increased capital spend.

In the UK, we participate in the 100 Group’s Total Tax Contribution Survey. The survey ranks the

UK’s biggest listed companies in terms of their contribution to the total UK Government’s tax receipts.

The most recent result of the survey for 2024/25 ranks National Grid as the 20th highest contributor

of UK taxes (2023/24: 15th), the 18th highest in respect of taxes borne (2023/24: 12th) and 2nd

(2022/23: 2nd) in respect of capital expenditure of £3,947 million (2022/23: £3,052 million) on fixed

assets. Our ranking in the survey is proportionate to the size of our business and capitalisation relative

to the other contributors to the survey.

However, National Grid’s contribution to the UK and US economies is broader than just the taxes

it pays over to and collects on behalf of the tax authorities.

Both in the UK and the US, we employ thousands of individuals directly. We also support jobs in the

construction industry through our capital expenditure, which in 2025/26 was £11,549 million (excluding

JV investment), as well as supporting a significant number of jobs in our supply chain. Furthermore,

as a utility we provide a core essential service which allows the infrastructure of the country/states

we operate in to run smoothly. This enables individuals and businesses to flourish and contribute

to the economy and society.

Development of future tax policy

We believe that the continued development of a coherent and transparent tax policy across the

Group is critical to help drive growth in the economy.

We continue to engage on consultations with policymakers where the subject matter impacts taxes

borne or collected by our business, with the aim of openly contributing to the debate and development

of tax legislation for the benefit of all our stakeholders.

To ensure that the needs of our stakeholders are considered in the development of tax policy, we are

a member of a number of industry groups which participate in the development of future tax policy,

such as the Electricity Tax Forum, together with the 100 Group in the UK, which represents the views of

Finance Directors of FTSE 100 companies and several other large UK companies. We undertake similar

activities in the US, where the Group is an active member in the Edison Electric Institute, the American

Gas Association, the Global Business Alliance, the American Clean Power Association, the Business

Council for Sustainable Energy and the Solar Energy Industries Association.

Feedback from these groups, such as the results of the 100 Group Total Tax Contribution survey, helps

to ensure that we consider the needs of our stakeholders and are engaged at the earliest opportunity

on tax issues which affect our business.

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 84 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Financial review cont. |  |  |  |  |  |

#### Pensions

In 2025/26, defined contribution pensions, defined benefit pensions and other post-employment benefit

operating costs were slightly lower than prior year at £279 million (2025: £305 million).

During the year, our pensions and other post-retirement benefit plans increased from a net surplus position

of £1,916 million at 31 March 2025 to a net surplus of £2,147 million at 31 March 2026.

This was principally the result of actuarial gains on plan assets of £72 million (higher investment returns)

and actuarial gains on plan liabilities of £215 million (including changes in US post-retirement demographic

assumptions). Employer contributions during the year were £120 million (2025: £282 million), including

£4 million (2025: £12 million) of deficit contributions. As at 31 March 2026, the total UK and US

assets and liabilities and the overall net IAS 19 (revised) accounting surplus (2025: surplus) is shown

below. Further information can be found in note 25 to the financial statements.

We continue to actively manage our defined benefit pension obligations, including by transferring defined

benefit pensions risk to insurers where appropriate. During the year, £0.9 billion of UK pension liabilities

and £0.5 billion of US pension liabilities were secured with insurers via bulk annuity transactions.

Net defined benefit asset

|  |  |  |  |  |  |  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |  |  |  |  |  |  |
|  | UK pensions | |  | US pensions | |  | US other  post-retirement  benefits | |  | Total | |
|  | 2026 | 2025 |  | 2026 | 2025 |  | 2026 | 2025 |  | 2026 | 2025 |
|  | £m | £m | £m | £m | £m | £m |  | £m | £m |
| Liabilities | (51) | (51) |  | (186) | (196) |  | (123) | (326) |  | (360) | (573) |
| Assets | 1,122 | 1,179 |  | 599 | 672 |  | 786 | 638 |  | 2,507 | 2,489 |
| Net defined  benefit asset | 1,071 | 1,128 |  | 413 | 476 |  | 663 | 312 |  | 2,147 | 1,916 |

#### Dividend

The Board has recommended a final dividend of 32.14p per ordinary share ($2.1738 per American

Depository Share), which will be paid on 23 July 2026 to shareholders on the register of members as at

29 May 2026. If approved, this will bring the full-year dividend to 48.49p per ordinary share, representing

an increase of 3.8% to the dividend per share for 2024/25. This is in line with the increase in average

UK CPIH inflation for the year ended 31 March 2026 as set out in our dividend policy.

The Board aims to grow annual dividend per share (DPS) in line with UK CPIH, thus maintaining the DPS

in real terms. The Board will review this policy regularly, taking into account a range of factors including

expected business performance and regulatory developments.

At 31 March 2026, National Grid plc had £17.0 billion of distributable reserves, which is sufficient to cover

more than five years of forecast Group dividends. If approved, the final dividend will absorb approximately

£1,598 million of shareholders’ funds. The 2025/26 full dividend is covered approximately 1.6x by

underlying earnings.

The Directors consider the Group’s capital structure at least twice a year when proposing an interim and

final dividend and aim to maintain distributable reserves that provide adequate cover for dividend payments.

A scrip dividend alternative will again be offered in respect of the 2025/26 final dividend.

#### New accounting standards

We did not adopt any new accounting standards in 2025/26. Amendments to certain existing accounting

standards were adopted during the year, but these had no material impact on the Group’s results or

financial statement disclosures.

#### Post balance sheet events

For further details, see note 36 to the financial statements.

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 85 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Section 172 Statement and Non-financial and sustainability information statement | | |  |  |  |

#### Section

#### 172(1) Statement

The Board recognises its responsibilities to the Group’s stakeholders and to wider society, and the

importance of effective engagement in delivering the Group’s long‑term strategy. The Directors have

regard to the interests and perspectives of stakeholders when making decisions and are responsible for

setting and overseeing the Group’s culture and values, which underpin those decisions. In balancing the

often competing priorities of stakeholders, the Board seeks to support the long‑term, sustainable success

of the Group and maintain high standards of conduct consistent with its purpose and values.

Throughout the year, the Directors have acted in the way they considered, in good faith, was most likely

to promote the long-term success of the Company for the benefit of its members as a whole, and have

had regard to the matters set out in section 172 of the Companies Act 2006. Further information on how

the Board has had regard to each of these matters is set out below.

|  |  |  |  |
| --- | --- | --- | --- |
|  |  |  |  |
| Section 172 factor | Disclosure | Page | |
| The likely consequence of any decision  in the long term | Our strategic priorities |  | [16](#i2193c7e7fbee4753bdbe2d16888565c8_4819) |
| Our business model |  | [12](#i2193c7e7fbee4753bdbe2d16888565c8_31) |
| The interests of the Company’s  employees | Our stakeholders |  | [23](#i2193c7e7fbee4753bdbe2d16888565c8_4697) |
| Responsible Business review |  | [38](#i2193c7e7fbee4753bdbe2d16888565c8_4644) |
| Board workforce engagement |  | [95](#i2193c7e7fbee4753bdbe2d16888565c8_154) |
| The need to foster the Company’s  business relationships with suppliers,  customers and others | Our stakeholders |  | [23](#i2193c7e7fbee4753bdbe2d16888565c8_4697) |
| Responsible Business review |  | [38](#i2193c7e7fbee4753bdbe2d16888565c8_4644) |
| Board stakeholder engagement |  | [95](#i2193c7e7fbee4753bdbe2d16888565c8_154) |
| The impact of the Company’s operations  on the community and the environment | Our stakeholders |  | [23](#i2193c7e7fbee4753bdbe2d16888565c8_4697) |
| Responsible Business review |  | [38](#i2193c7e7fbee4753bdbe2d16888565c8_4644) |
| TCFD |  | [53](#i2193c7e7fbee4753bdbe2d16888565c8_88) |
| Maintaining a reputation for high  standards of business conduct | Responsible Business review |  | [38](#i2193c7e7fbee4753bdbe2d16888565c8_4644) |
| Corporate Governance overview |  | [89](#i2193c7e7fbee4753bdbe2d16888565c8_142) |
| The need to act fairly as between  members of the Company | Our stakeholders |  | [23](#i2193c7e7fbee4753bdbe2d16888565c8_4697) |
| Responsible Business review |  | [38](#i2193c7e7fbee4753bdbe2d16888565c8_4644) |
| Board stakeholder engagement |  | [95](#i2193c7e7fbee4753bdbe2d16888565c8_154) |

Additional information on the Board’s engagement with key stakeholders can be found on page [95](#i2193c7e7fbee4753bdbe2d16888565c8_154).

|  |  |  |  |  |
| --- | --- | --- | --- | --- |
|  |  |  |  |  |
| Further reading | Environment | Social matters and employees | Anti-corruption  and bribery | Human  rights |
| Our policies and due diligence | [40](#i2193c7e7fbee4753bdbe2d16888565c8_19791209304966) — [44](#idacfbb1601cb477c9401c46187170fe9_240518) | [45](#i2193c7e7fbee4753bdbe2d16888565c8_5022) — [46](#i37316db5b4374c589ba30a846e6ca2c2_59158) and [49](#i2193c7e7fbee4753bdbe2d16888565c8_19791209305109) — [52](#if05dc6fa9b1c45cd9c0112e45388d907_107520) | [50](#if05dc6fa9b1c45cd9c0112e45388d907_109355) | [50](#if05dc6fa9b1c45cd9c0112e45388d907_109355) |
| Outcomes | [40](#i2193c7e7fbee4753bdbe2d16888565c8_19791209304966) — [44](#idacfbb1601cb477c9401c46187170fe9_240518) | [45](#i2193c7e7fbee4753bdbe2d16888565c8_5022) — [46](#i37316db5b4374c589ba30a846e6ca2c2_59158) and [49](#i2193c7e7fbee4753bdbe2d16888565c8_19791209305109) — [52](#if05dc6fa9b1c45cd9c0112e45388d907_107520) | [50](#if05dc6fa9b1c45cd9c0112e45388d907_109355) | 50 |

#### Non-financial and sustainability information statement

This page contains disclosures in compliance with sections 414CA and 414CB of the

Companies Act 2006. The non-financial information listed below is incorporated by cross-

reference.

|  |  |  |
| --- | --- | --- |
|  |  |  |
| Environmental matters |  | [40](#i2193c7e7fbee4753bdbe2d16888565c8_19791209304966) — [44](#idacfbb1601cb477c9401c46187170fe9_240518) and [53](#i2193c7e7fbee4753bdbe2d16888565c8_88) — [68](#i5ce9e2b3cd614bcca8423db41cd18ff1_160075) |
| Our employees |  | [47](#i2193c7e7fbee4753bdbe2d16888565c8_19791209305079) — [48](#i70b5ee7f594547dc9723654471a95a7c_89107) and  [95](#i2193c7e7fbee4753bdbe2d16888565c8_154) |
| Social matters |  | [45](#i2193c7e7fbee4753bdbe2d16888565c8_5022) — [46](#i37316db5b4374c589ba30a846e6ca2c2_59158) and  [49](#i2193c7e7fbee4753bdbe2d16888565c8_19791209305109) —  [52](#if05dc6fa9b1c45cd9c0112e45388d907_107520) |
| Human rights |  | [50](#if05dc6fa9b1c45cd9c0112e45388d907_109355) and  [234](#i5f794891492441e7a855126a592fd5a7_62604) |
| Anti-corruption and anti-bribery |  | [50](#if05dc6fa9b1c45cd9c0112e45388d907_109355) |

In addition, other information describing the business relationships, products and services which are likely

to cause adverse impacts in relation to the matters above can be found as follows:

|  |  |  |
| --- | --- | --- |
|  |  |  |
| Business model |  | [12](#i2193c7e7fbee4753bdbe2d16888565c8_31) — [13](#ia57179db9bea4811911634226a0dbb53_868) |
| KPIs |  | [26](#i2193c7e7fbee4753bdbe2d16888565c8_49) — [29](#i524ed5352691497d9607a830fda9ea68_14922) |
| Our stakeholders |  | [23](#i2193c7e7fbee4753bdbe2d16888565c8_4697) — [25](#i887387dceb1f41febe8dc79527952bbf_302642) |
| Risks |  | [32](#i2193c7e7fbee4753bdbe2d16888565c8_64) — [36](#i5b716aa667c3427e93e3ed5359a2f216_69378) |
| TCFD |  | [53](#i2193c7e7fbee4753bdbe2d16888565c8_88) — [68](#i5ce9e2b3cd614bcca8423db41cd18ff1_160075) |
| Responsible Business Committee report |  | [106](#i2193c7e7fbee4753bdbe2d16888565c8_172) |
| People & Remuneration Committee report |  | [107](#i2193c7e7fbee4753bdbe2d16888565c8_175) — [108](#ie6d45c6a773b48e7bad489eab4795a8c_540432) |

The Company complies with FCA UK Listing Rule 6.6.6R(8) and aligns our climate-related financial

disclosures with the TCFD’s four pillars and 11 recommended disclosures under those pillars.

The Company’s TCFD reporting and index for the 11 recommended disclosures can be found on pages

[53](#i2193c7e7fbee4753bdbe2d16888565c8_88) — [68](#i5ce9e2b3cd614bcca8423db41cd18ff1_160075).

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 86 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Viability Statement |  |  |  |  |  |

The Board’s consideration of the longer-term viability

of the Group is an extension of the business

planning process.

Our business strategy aims to enhance our long-term prospects by

making sure our operations and finances are sustainable. The business

planning process includes financial forecasting, risk assessment and

regular budget reviews, as well as scenario planning of industry trends

including emerging issues and economic conditions.

As required by provision 31 of the 2024 UK Corporate Governance

Code, the Board has formally assessed the prospects of the Group

over the next five financial years, which is in line with the Company’s

Strategic Business Plan.

We also consider how various emerging risks could impact our

Group Principal Risks and we include a cluster scenario to assess

potential impacts if several of our Group Principal Risks were to

crystallise at the same time.

#### Risk cluster

The impact of multiple Group Principal Risks crystallising over the

assessment period was selected by considering the most significant

threat to our viability. Scenarios modelled the financial impact of a

significant cyber attack resulting in a material data breach, a

catastrophic asset failure in the US gas business, a severe loss of

supply, and the potential impact on our New York gas operating

licences, including a period of reduced access to capital markets.

Stress testing concluded that, while the cluster scenarios would lead

to significant impacts, management would have mitigation strategies

available to ensure the Company remains viable over the five-year

assessment period. National Grid operates in largely stable, regulated

markets and the robust financial position of the Group, including the

ability to sell assets, raise capital and suspend or reduce the payment

of dividends, provides a multiple opportunities to secure viability in

addition to ensuring we would have a sound operational response.

#### Viability

The Directors are satisfied that they have sufficient information to

judge the viability of the Company and, based on the assessment

described above and on pages [30](#i2193c7e7fbee4753bdbe2d16888565c8_61) – [37](#i5b716aa667c3427e93e3ed5359a2f216_69413), have a reasonable

expectation that the Company will be able to continue operating and

meet its liabilities as they fall due in the period to May 2031.

The Strategic Report, comprising pages 1 – 86, was approved by the

Board and signed on its behalf. By order of the Board

#### Julian Baddeley

Group Company Secretary

13 May 2026

#### Principal Risk stress testing

Each Group Principal Risk was considered and, where appropriate, a stress testing scenario was identified

to assess impacts on reputation and financial performance over the five-year assessment period as detailed

below. All scenarios are considered low probability events.

|  |  |  |  |  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |  |  |  |  |
|  |  |  |  |  |  |  |  |  |  |
| High |  |  |  |  |  |  |  |  |  |
|  |  |  |  |  |  |  |  |  |  |
| Financial impact |  |  |  |  |  |  |  |  |  |
|  |  |  |  |  |  |  |  |  |  |
| Low |  |  |  |  |  |  |  |  |  |
|  | Internal |  |  | Reputational impact | |  |  | International |  |

![Viability_No1_Stroke.gif]()

![Viability_No9_Stroke.gif]()

![Viability_No5_Stroke.gif]()

![Viability_No3_Stroke.gif]()

![Viability_No2_Stroke.gif]()

![Viability_No7_Stroke.gif]()

![Viability_No8_Stroke.gif]()

![Viability_No6_Stroke.gif]()

![Viability_No4_Stroke.gif]()

|  |  |  |
| --- | --- | --- |
|  |  |  |
| Group Principal Risk | | Stress testing scenarios |
| Viability_No1.gif | Catastrophic  security incident\* | A significant successful cyber attack. |
| Viability_No2.gif | Significant safety or  environmental event  (asset failure)\* | A catastrophic failure of the US gas  system, leading to a major safety breach  or environmental spill. |
| Viability_No3.gif | Loss of supply\* | An extreme weather event leads to the  failure of critical energy assets and  networks, resulting in a widespread loss  of gas and electricity supply across the  US, UK and interconnectors, impacting a  significant number of customers. |
| Viability_No4.gif | Major capital  projects | Inability to either successfully secure  appropriate incentive mechanisms and/  or deliver our major capital projects. |
| Viability_No5.gif | Satisfactory  regulatory  outcomes | Poor outcome of future US rate case  filings, and low performance under RIIO-  T3 in the UK. |

|  |  |  |
| --- | --- | --- |
|  |  |  |
| Group Principal Risk | | Stress testing scenarios |
| Viability_No6.gif | Climate change  mitigation | Inability to meet net zero targets. |
| Viability_No7.gif | Political and societal  expectations | Challenges in NY/MA to meet increasing  demand due to infrastructure constraints  alongside diminishing acceptance of the  energy transition. |
| Viability_No8.gif | People capability  and capacity | n/a |
| Viability_No9.gif | Financing our  business\* | Financing a significant capital investment  programme amid higher interest rates,  inflation, and concerns about cash flow  sufficiency and market risk. |
| \* as part of risk cluster. | | |
|  | Read more about our Group Principal Risks on pages [31](#i51fd979336404373b4e2f7eb6ab80680_18307) – [37](#i5b716aa667c3427e93e3ed5359a2f216_69413). | |

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc    Annual Report and Accounts  2025/26 | 87 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Governance with purpose |  |  |  |  |  |

![Governance intro image v2.jpg]()

### Powering performance today and tomorrow

|  |  |
| --- | --- |
|  |  |
| [88](#i2193c7e7fbee4753bdbe2d16888565c8_136) | Chair’s statement |
| [89](#i2193c7e7fbee4753bdbe2d16888565c8_142) | Governance overview |
| [91](#i2193c7e7fbee4753bdbe2d16888565c8_145) | Our Board |
| [94](#i2193c7e7fbee4753bdbe2d16888565c8_151) | Key Board activities |
| [95](#i2193c7e7fbee4753bdbe2d16888565c8_154) | Culture and workforce engagement |
| [96](#i2193c7e7fbee4753bdbe2d16888565c8_157) | Board evaluation |
| [97](#i2193c7e7fbee4753bdbe2d16888565c8_160) | Directors’ induction, development and training |
| [98](#i2193c7e7fbee4753bdbe2d16888565c8_163) | Nomination Committee report |
| [100](#i2193c7e7fbee4753bdbe2d16888565c8_166) | Audit & Risk Committee report |
| [105](#i2193c7e7fbee4753bdbe2d16888565c8_169) | Safety & Operations Committee report |
| [106](#i2193c7e7fbee4753bdbe2d16888565c8_172) | Responsible Business Committee report |
| [107](#i2193c7e7fbee4753bdbe2d16888565c8_175) | Directors’ Remuneration report |

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 88 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Chair’s statement | |  |  |  |  |

![Chairs intro image flat bottom.jpg]()

|  |  |  |  |
| --- | --- | --- | --- |
|  |  |  |  |
|  |  |  |  |
|  |  | | |
|  | Dear shareholder  I am pleased to introduce our Corporate  Governance Report, which explains how the Board  governs the Company in support of long‑term  value creation and the responsible delivery of our  strategy for shareholders and wider stakeholders.  In a year marked by global uncertainty and a  complex external environment, effective  governance matters more than ever; it helps  ensure we take well‑judged decisions at pace and  manage risk thoughtfully. | | |

![]()

#### Our approach to this year’s Governance Report

In preparing this year’s Governance Report, we have taken a more focused and streamlined approach. Our reporting has been sharpened to

concentrate on matters most material to the Company’s long‑term success, including key strategic and governance considerations, the actions

taken by the Board and its Committees, and the outcomes achieved. We have focused on reducing duplication and narrative without clear

purpose, and reflected how the Board has applied the principles of the 2024 Code in practice. The report is intended to provide a clear,

balanced and meaningful account of the Board’s stewardship on behalf of shareholders and wider stakeholders.

As always, the Board balances its deliberative time on major

strategic, regulatory and business decisions. It was a busy year on

the regulatory front in particular. Our largest business, UK Electricity

Transmission, submitted its RIIO-T3 rate case last year. Investability

and workability of the proposed Ofgem framework were actively

discussed by the Board. We also considered rate filings in our

Upstate New York electric and natural gas distribution business

and Massachusetts gas business with affordability as a major

consideration. With largely supportive regulatory outcomes, we

were able to extend and upgrade the five-year financial framework.

At the same time, active monitoring of performance remains key.

We routinely reviewed the manner in which we are executing our

£70 billion capital plans. Safety and reliability remain paramount, and

the Board has been deeply engaged in understanding asset health,

particularly in the aftermath of the North Hyde substation incident.

#### Chief Executive transition

It is often said that the most consequential decision a Board will

make is the appointment of the Chief Executive. National Grid

flourished under the leadership of John Pettigrew. But succession

planning has been under consideration by the Board as an ongoing

process. That process led us to the announcement on 1 May 2025

that Zoë Yujnovich would join National Grid on 1 September 2025

and succeed John at the half-year. This transition plan provided

continuity of leadership and uninterrupted delivery. The Board worked

closely with Zoë to develop objectives for her first period as Chief

Executive, maintaining focus on safe and reliable operations,

disciplined capital allocation, effective delivery of our strategy, and

continued attention to culture, talent and stakeholder outcomes.

#### 2024 UK Corporate Governance Code

As a company listed in both the UK and the US, we remain focused

on meeting the high standards of governance and disclosure

expected across our markets. This year is our first year reporting

against the 2024 UK Corporate Governance Code (the ‘2024 Code’).

We have also continued our multi-year programme of work to ensure

we are ready to report fully against Provision 29 in 2027.

#### Board effectiveness

During the year, the Board has progressed actions arising from our

last internal evaluation. We adopt goals as a Board that keep us

focused on Board and Committee processes, the quality of

discussion, and robust decision-making. In line with our three-year

evaluation cycle, the Board commissioned an externally facilitated

evaluation this year. The findings and recommendations will be

reported in next year’s Annual Report. Further information can be

found on page [96](#i2193c7e7fbee4753bdbe2d16888565c8_157).

#### Reconsideration of Committee structures

The UK Governance Code has led most companies to structure their

committees in similar fashion, with Audit, Nominations, and

Remuneration as the key functions. In our industry, having a safety

committee is customary. But as part of our effectiveness efforts, we

reviewed our register of Group Principal Risks, looked forward to

emerging trends and issues, and concluded it would be salutary to

refresh our governance architecture with overall oversight remaining

with the Board. The specifics of how we have realigned and

enhanced the coverage of key risks across the committee structure

can be found on page [89](#i2193c7e7fbee4753bdbe2d16888565c8_142) and in the Committee reports.

#### Stakeholders

The Board has remained close to our key stakeholders across the

year. In addition to receiving input from investors, we have engaged

with regulators, public officials, and community representatives as we

hold our meetings at various locations in our franchised service areas.

The Board has had routine engagement with employees, including

site visits to key operational sites and projects across the UK and US,

as set out on page [95](#i2193c7e7fbee4753bdbe2d16888565c8_154).

#### AGM

Over the years, most of our shareholders have opted to participate in

the Annual General Meeting (AGM) remotely. For the few

shareholders who remain interested in attending in person, we will

hold the in-person meeting in July 2026 adjacent to our Warwick, UK

campus. It will be a hybrid meeting, meaning that shareholders may

join online during the live meeting. Further details are set out in the

Notice of AGM, available on our website.

#### Paula Rosput Reynolds

Chair

13 May 2026

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 89 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Governance overview | |  |  |  |  |

We maintain a high-functioning, balanced Board.

Our governance framework supports effective decision-

making and robust oversight of the Group's activities,

underpinned by our core values: do the right thing;

find a better way; and make it happen.

Governance structure

The matters reserved for the Board, together with the Terms of

Reference of each Board Committee, are set out in the Board

Governance document, which is available on the Company’s website.

#### Changes to the Board Committees during the year

During the year, the Board undertook a review of the structure, remit

and effectiveness of its Committees. Informed by feedback from the

Board evaluation and a series of stakeholder engagement exercises,

the Board implemented a revised Committee structure in November

2025, as illustrated in the diagram opposite. The principal changes

were as follows:

– The remit of the Audit & Risk Committee was expanded to incorporate

the responsibilities previously overseen by the Finance Committee.

– The remit of the Remuneration Committee was broadened to

include wider people matters below Board level, including high

potential talent pipeline, culture and workforce engagement.

– The former Safety & Sustainability Committee was separated into

a Safety & Operations Committee and a Responsible Business

Committee, reflecting the distinct nature and scale of these areas.

The restructure aligns the Group Principal Risks to the committees best

placed for specialist oversight, with the Audit & Risk Committee reviewing

the overall effectiveness of the Group’s risk management and internal

control systems.

Committee memberships and Chairs were aligned to ensure the

appropriate balance of skills and experience under the revised structure.

A Board Standing Committee was also established to provide flexible

oversight of ad-hoc and transaction‑specific matters that fall outside

the remit or cadence of the Board’s other Committees, supporting

timely and efficient Board decision-making.

The Disclosure Committee oversees the identification, review and timely

disclosure of market-sensitive and regulatory information, and monitors

the effectiveness of the Company’s disclosure controls. The Disclosure

Committee is chaired by the Chief Financial Officer and members

include the Chief Executive, Group Chief Legal Officer, Group Company

Secretary and the Director of Investor Relations. The Disclosure

Committee meets in advance of key announcements, including the

full and half-year results, and as required throughout the year.

![Gov_framework_image v6.jpg]()

|  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |
|  |  |  |  |  |  |  |  | Our governance framework | | | | | | | | | | |  |  |  |  |  |
|  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |
|  |  |  |  |  |  |  |  | Board of Directors | | | | | | | | | | |  |  |  |  |  |
|  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |
|  |  | The Board has collective responsibility for the long‑term  success of the Group and for providing effective oversight of  its activities. It sets the Group’s strategic direction and  objectives, approves the business plan, dividend policy,  viability assessment and governance framework, and  monitors their implementation to promote sustainable success  and the creation of long‑term shareholder value.  The Board also establishes the Company’s purpose, values  and culture, and ensures that these are aligned with strategy. | | | | | | | | | | |  | In discharging its responsibilities, the Board considers the  interests of key stakeholders and has regard to the matters  set out in section 172 of the Companies Act 2006, thereby  supporting Directors in fulfilling their statutory duties (see page  [85](#i2193c7e7fbee4753bdbe2d16888565c8_118)). To support effective oversight and the efficient discharge  of its responsibilities, the Board has delegated certain matters  to its Committees. Each Committee Chair reports regularly to  the Board on the activities of their Committee, and Committee  papers and minutes are made available to all Directors, save  where an actual or potential conflict of interest exists. | | | | | | | | |  |
|  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |
|  |  |  |  |  |  |  |  | Board Committees | | | | | | | | | | |  |  |  |  |  |
|  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |
|  |  |  | Nomination  Committee | |  |  | Audit & Risk  Committee | |  |  | Safety & Operations  Committee | | | |  |  | Responsible  Business Committee | |  |  | People &  Remuneration  Committee | |  |
|  |  |  |  | Report from page  [98](#i2193c7e7fbee4753bdbe2d16888565c8_163) |  |  |  | Report from page  [100](#i2193c7e7fbee4753bdbe2d16888565c8_166) |  |  |  | Report from page  [105](#i2193c7e7fbee4753bdbe2d16888565c8_169) | | |  |  |  | Report from page  [106](#i2193c7e7fbee4753bdbe2d16888565c8_172) |  |  |  | Report from page  [107](#i2193c7e7fbee4753bdbe2d16888565c8_175) |  |
|  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |
|  |  |  |  |  |  | Group Executive Committee | | | | | | | | | | | | |  |  |  |  |  |
|  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |
|  |  | The Group Executive Committee is responsible for the day-to-day management of the Group and oversees its safety,  operational and financial performance. It takes such operational and management decisions as are necessary to deliver the  strategy, objectives and targets set by the Board and to safeguard the interests of the Company. Biographical details of the  members of the Group Executive Committee are available on the Company’s website. The Group Executive Committee is  supported by a number of management committees, as set out in the table below. | | | | | | | | | | | | | | | | | | | | |  |
|  |  |  | | [Information on the Group Executive Committee can be found on our website.](https://www.nationalgrid.com/about-us/our-leadership-team/the-executive-committee) | | | | | | | | | | | | | | |  |  |  |  |  |
|  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |
|  |  |  | Group Executive Committees1 | | | | | | | | | | | | | | | | | | | |  |
|  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |
|  |  |  | Group Investment  Committee  Responsible for  approving material  capital, operating  and investment  decisions in line with  the Group’s  investment strategy. | |  |  | Audit, Risk &  Finance Committee  Responsible for  overseeing and  coordinating audit,  risk and financial  activities across the  Group. | |  |  | Safety &  Operations  Committee  Responsible for  oversight of safety,  health and wellbeing,  asset management  and capital projects,  including risk and  performance. | | | |  |  | Responsible  Business  Committee  Responsible for  oversight of Group‑  wide responsible  business matters,  including political,  societal, sustainability  and regulatory issues. | |  |  | People &  Remuneration  Committee  Responsible for  setting remuneration  and overseeing talent,  culture, and people  risks to support the  Company’s strategy. | |  |
|  |  |  |  |  |  |  |  |  |  |  |  |
|  |  |  |  |  |  |  |  |  |  |  |  |
|  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |
|  |  |  |  | | | | | | | | | | | | | | | | | | | |  |

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 90 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Governance overview cont. | |  |  |  |  |

![]()

#### Corporate

#### Governance

#### Compliance Statement

The Company is subject to the Principles and Provisions of the 2024

Code, except for Provision 29 which becomes effective for the financial

year beginning 1 April 2026. The Board considers that, for the year

ended 31 March 2026, the Company has complied in full with the

applicable Provisions of the 2024 Code. For the year ended 31 March

2026, the Company has complied with Provision 29 of the 2018 UK

Corporate Governance Code (the ‘2018 Code’). The table below

provides a guide to where the relevant disclosures can be found in this

report. The 2024 Code and the 2018 Code are published by the

Financial Reporting Council and are available at frc.org.uk.

|  |  |  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |  |  |
| 1 | Board leadership and company purpose | | |  |  |  |  |
| A. | The role of the Board and long-term sustainable success | | | | [6](#i2193c7e7fbee4753bdbe2d16888565c8_17592186051697),  [89](#i2193c7e7fbee4753bdbe2d16888565c8_142) - [90](#i370a9b189e464d74b3deab616e8ac041_4034) | |  |
| B. | Purpose, values, strategy and culture | |  | [4](#i2193c7e7fbee4753bdbe2d16888565c8_16)-[5](#i2193c7e7fbee4753bdbe2d16888565c8_19), [12](#i2193c7e7fbee4753bdbe2d16888565c8_31)-[13](#i2193c7e7fbee4753bdbe2d16888565c8_34), [16](#i2193c7e7fbee4753bdbe2d16888565c8_4819)-[17](#i947bc4a754fc4373b34aecf29c0e8234_1-2-1-1-943198),  [47](#i2193c7e7fbee4753bdbe2d16888565c8_19791209305079)-[48](#i70b5ee7f594547dc9723654471a95a7c_89107), [95](#i2193c7e7fbee4753bdbe2d16888565c8_154) | | |  |
| C. | Board decisions and outcomes | | | | [94](#i2193c7e7fbee4753bdbe2d16888565c8_151)-[95](#i2193c7e7fbee4753bdbe2d16888565c8_154) | |  |
| D. | Shareholder and stakeholder engagement | | | [23](#i2193c7e7fbee4753bdbe2d16888565c8_4697)-[25](#i887387dceb1f41febe8dc79527952bbf_302642), [94](#i2193c7e7fbee4753bdbe2d16888565c8_151)-[95](#i2193c7e7fbee4753bdbe2d16888565c8_154) | | |  |
| E. | Workforce policies and practices |  | [24](#i887387dceb1f41febe8dc79527952bbf_305069), [47](#i2193c7e7fbee4753bdbe2d16888565c8_19791209305079)-[48](#i70b5ee7f594547dc9723654471a95a7c_89107), [95](#i2193c7e7fbee4753bdbe2d16888565c8_154) | | | |  |
| 2 | Division of responsibilities |  |  |  |  |  |  |
| F. | Chair’s leadership |  |  | [6](#i2193c7e7fbee4753bdbe2d16888565c8_17592186051697), [88](#i2193c7e7fbee4753bdbe2d16888565c8_136) | | |  |
| G. | Board composition and division of responsibilities | | | | [89](#i2193c7e7fbee4753bdbe2d16888565c8_142)-[90](#i370a9b189e464d74b3deab616e8ac041_4034) | |  |
| H. | Time commitment and role of Non-executive Directors | | | | [90](#i370a9b189e464d74b3deab616e8ac041_4034) , [97](#i2193c7e7fbee4753bdbe2d16888565c8_160) | |  |
| I. | Policies, processes, information and resources | | |  | [88](#i2193c7e7fbee4753bdbe2d16888565c8_136)-[90](#i370a9b189e464d74b3deab616e8ac041_4034), [95](#i2193c7e7fbee4753bdbe2d16888565c8_154),  [233](#i2193c7e7fbee4753bdbe2d16888565c8_394) | |  |
| 3 | Composition, succession and evaluation | | | |  |  |  |
| J. | Board appointments and succession planning | | |  | [88](#i2193c7e7fbee4753bdbe2d16888565c8_136), [98](#i2193c7e7fbee4753bdbe2d16888565c8_163)-[99](#i8c2e0c88a0484d6aa4d679eb2139fafc_1-1-1-6-945058) | |  |
| K. | Board and Committee skills, experience, knowledge  and tenure | | | | [91](#i2193c7e7fbee4753bdbe2d16888565c8_145)-[93](#i4997ac40020447c895a078c99bce5833_0-0-1-1-921425), [98](#i2193c7e7fbee4753bdbe2d16888565c8_163)-[99](#i8c2e0c88a0484d6aa4d679eb2139fafc_1-1-1-6-945058) | |  |
| L. | Board evaluation |  |  |  |  | [96](#i2193c7e7fbee4753bdbe2d16888565c8_157) |  |
| 4 | Audit, risk and internal control |  |  |  |  |  |  |
| M. | Independence and effectiveness of  internal and external audit functions |  |  |  |  | [103](#if11c3cbaf3d84000b36cff578f5ee47e_359016) |  |
| N. | Fair, balanced and understandable assessment | | |  |  | [102](#if11c3cbaf3d84000b36cff578f5ee47e_359002) |  |
| O. | Risk management, internal control and determining the  nature and extent of principal risks | | | | [30](#i2193c7e7fbee4753bdbe2d16888565c8_61)-[37](#i5b716aa667c3427e93e3ed5359a2f216_69413), [102](#if11c3cbaf3d84000b36cff578f5ee47e_359004) | |  |
| 5 | Remuneration |  |  |  |  |  |  |
| P. | Remuneration policies and practices |  |  |  | [107](#i2193c7e7fbee4753bdbe2d16888565c8_175)-[126](#i42605b1d6ef943038816b8b341a1e2a7_29881) | |  |
| Q. | Director and senior management remuneration | | |  | [107](#i2193c7e7fbee4753bdbe2d16888565c8_175)-[126](#i42605b1d6ef943038816b8b341a1e2a7_29881) | |  |
| R. | Independent judgement and discretion in remuneration  outcomes | | | | [107](#i2193c7e7fbee4753bdbe2d16888565c8_175)-[126](#i42605b1d6ef943038816b8b341a1e2a7_29881) | |  |

Details on information required for our US Securities and

Exchange Commission (SEC) filing and the Form 20-F can be

found on page [252](#i01de1c16a17046d497a42f2f76dda2a5_59524).

#### Board composition and roles

As at the date of this report, the Board comprises a Non-executive Chair (independent on appointment), two Executive Directors (Chief

Executive and Chief Financial Officer) and eight independent Non-Executive Directors. There is a clear division of responsibilities between the

Chair, the Chief Executive and the Senior Independent Director. The key responsibilities of each role are set out in our Board Governance

document which can be found on our website.

#### Meeting attendance

The table below sets out Directors’ attendance at scheduled Board and Committee meetings held during the year ended 31 March 2026.

Three ad hoc Board meetings were also held during the year.

|  |  |  |  |  |  |  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |  |  |  |  |  |  |
| Directors | Committee  Chair | Board | People &  Governance  Committee1 | Nomination  Committee2 | Audit & Risk  Committee | Finance  Committee3 | Safety &  Sustainability  Committee 4 | Safety &  Operations  Committee5 | Responsible  Business  Committee6 | Remuneration  Committee7 | People &  Remuneration  Committee8 |
| Paula Rosput  Reynolds |  | 7/7 | 1/1 | 1/1 | – | – | – | – | – | – | – |
| Zoë Yujnovich9 |  | 4/4 | – | – | – | – | – | – | – | – | – |
| Andy Agg |  | 7/7 | – | – | – | 1/1 | – | – | – | – | – |
| Ian Livingston |  | 7/7 | – | 1/1 | 5/5 | 1/1 | – | – | 3/3 | 1/1 | 3/3 |
| Jacqui Ferguson |  | 7/7 | – | 1/1 | 5/5 | – | 2/2 | 2/2 | – | – | – |
| Iain Mackay |  | 7/7 | – | 1/1 | 5/5 | 1/1 | – | – | – | 1/1 | 3/3 |
| Anne Robinson |  | 7/7 | – | 1/1 | – | – | 2/2 | – | 3/3 | 1/1 | 3/3 |
| Earl Shipp |  | 7/7 | 1/1 | 1/1 | – | – | 2/2 | 2/2 | 3/3 | – | – |
| Jonathan Silver |  | 7/7 | 1/1 | 1/1 | – | 1/1 | – | – | 3/3 | – | 3/3 |
| Tony Wood |  | 7/7 | 1/1 | 1/1 | – | – | 2/2 | 2/2 | 3/3 | – | – |
| Martha Wyrsch |  | 7/7 | – | 1/1 | – | – | 2/2 | 2/2 | – | 1/1 | 3/3 |
| John Pettigrew10 |  | 5/5 | – | – | – | 1/1 | – | – | – | – | – |

1. Reflects attendance for the People & Governance Committee prior to the restructure of the Board Committees.

2. Reflects attendance at the Nomination Committee following the restructure of the Board Committees.

3. Reflects attendance at the Finance Committee prior to the restructure of the Board Committees. Following the restructure, matters considered by the Finance Committee were transferred

to the Audit & Risk Committee.

4. Reflects attendance for the Safety & Sustainability Committee prior to the restructure of the Board Committees. Following the restructure, safety matters were transferred to the Safety &

Operations Committee and sustainability matters transferred to the Responsible Business Committee.

5. Reflects attendance at the Safety & Operations Committee following the restructure.

6. Reflects attendance at the Responsible Business Committee following the restructure.

7. Reflects attendance for the Remuneration Committee prior to the restructure.

8. Reflects attendance at the People & Remuneration Committee following the restructure.

9. Zoë Yujnovich was appointed to the Board on 1 September 2025.

10.  John Pettigrew retired from the Board effective 16 November 2025.

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| Committees | | | | | |
|  | Audit & Risk Committee |  | People & Remuneration Committee |  | Safety & Operations Committee |
|  | Nomination Committee |  | Responsible Business Committee |  | Group Executive Committee |

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 91 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Our Board | |  |  |  |  |

|  |  |
| --- | --- |
|  |  |
|  |  |
|  | BoD_Committee_Nominations_Chair.gif |

|  |  |
| --- | --- |
|  |  |
|  |  |
|  | BoD_Committee_Executive_Chair.gif |

|  |  |
| --- | --- |
|  |  |
|  |  |
|  |  |

|  |  |
| --- | --- |
|  |  |
|  |  |
|  |  |

|  |  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |  |
| Paula_Rosput_Reynolds.jpg |  | Zoë_Yujnovich.jpg |  | Andy_Agg.jpg |  | Ian_Livingston.jpg |
|  |  |  |  |  |  |  |
| Paula Rosput  Reynolds |  | Zoë Yujnovich |  | Andy Agg |  | Ian Livingston |
| Chair |  | Chief Executive |  | Chief Financial Officer |  | Senior Independent  Non-executive Director |
| Appointed: |  | Appointed: |  | Appointed: |  | Appointed: |
| Chair on 31 May 2021  Independent Non-executive Director on 1 January 2021 |  | Chief Executive on 17 November 2025  Chief Executive Designate on 1 September 2025 |  | 1 January 2019 |  | 1 August 2021 |
| Age: 69 |  | Age: 51 |  | Age: 56 |  | Age: 61 |
| Skills and competencies: |  | Skills and competencies: |  | Skills and competencies: |  | Skills and competencies: |
| Paula brings a wealth of board-level experience to National  Grid, having led global companies in the energy and  financial sectors. She has over 20 years’ experience as a  Non-executive Director in both the UK and US across  multiple sectors and businesses and has brought a  strategic and regulatory lens on issues to the Board.  During her career, Paula has played a vital role with several  company-wide transformations and mergers. She is  recognised for having transformed AGL Resources from a  local utility into a multi-state energy and  telecommunications company and for materially  enhancing the operating and financial performance of  Safeco Corp, a US insurance company that was ultimately  acquired by Liberty Mutual. |  | Zoë is an international energy executive with extensive  experience in large-scale operations, capital delivery, and  performance transformation across complex, global  markets.  She has held senior leadership roles at Rio Tinto and Shell  plc, working across Australia, the United States, the  United Kingdom, the Netherlands, Brazil, and Canada.  She has a strong track record of leading diverse teams  and improving operational and cultural performance. At  Shell, she led major infrastructure projects and large  integrated businesses, including serving as Director of  Integrated Gas and Upstream and as a member of the  Executive Committee.  Zoë brings deep expertise in capital discipline, operational  excellence, stakeholder engagement, and navigating  complex energy systems. |  | Andy trained and qualified as a chartered accountant with  PricewaterhouseCoopers and is a member of the Institute  of Chartered Accountants in England and Wales. Joining  National Grid in 2008, Andy has significant financial  experience and commercial acumen, having held a  number of senior finance leadership roles across the  Group, including Group Financial Controller, UK Chief  Financial Officer and Group Tax and Treasury Director.  Andy has in-depth knowledge of National Grid, in both  the UK and the US, and has broad experience across  operational and corporate finance roles, including a proven  track record of leading and delivering value-creating  strategies, significant transformation programmes, and  significant transactional experience. Andy is also a member  of the 100 Group Main Committee contributing to  domestic and international finance and regulatory matters. |  | Ian brings a wealth of experience to National Grid, having  been both CEO and CFO of BT Group plc, and CFO of  Dixons Group. In addition to a highly successful executive  career, he has also had extensive non-executive  experience in large UK and US public companies as  board, audit and remuneration committee chair. Ian also  has significant experience of large, regulated companies  operating in both the UK and internationally. He is  a member of the House of Lords and has also previously  served in the UK Government as Minister of State for  Trade and Investment. He is a qualified Chartered  Accountant. |
| External appointments: |  | External appointments: |  | External appointments: |  | External appointments: |
| – Non-executive Director and Chair of the Safety &  Sustainability Committee of GE Vernova  – Non-executive Director of Linde plc |  | – Non-executive Director of Unilever PLC |  | – Non-executive Director of The Weir Group plc |  | – Chair of S&P Global Inc.  – Chair of BGF Group plc  – Member of the House of Lords |

|  |  |  |  |  |  |  |  |  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |  |  |  |  |  |  |  |  |
|  |  |  |  |  |  |  |  |  |  |  |  |  |  |
|  | Audit & Risk Committee |  | Nomination Committee |  | People & Remuneration Committee |  | Responsible Business Committee |  | Safety & Operations Committee |  | Group Executive Committee |  | Committee Chair |

![]()

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 92 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Our Board cont. | |  |  |  |  |

|  |  |
| --- | --- |
|  |  |
|  |  |
|  |  |

|  |  |
| --- | --- |
|  |  |
|  |  |
|  | BoD_Committee_Auditors_Chair.gif |

|  |  |
| --- | --- |
|  |  |
|  |  |
|  |  |

|  |  |
| --- | --- |
|  |  |
|  |  |
|  | BoD_Committee_Safety_Chair.gif |

|  |  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |  |
| Jacqui_Ferguson.jpg |  | Iain_Mackay.jpg |  | Anne_Robinson.jpg |  | Earl_Shipp.jpg |
|  |  |  |  |  |  |  |
| Jacqui Ferguson |  | Iain Mackay |  | Anne Robinson |  | Earl Shipp |
| Independent Non-executive Director |  | Independent Non-executive Director |  | Independent Non-executive Director |  | Independent Non-executive Director |
| Appointed: |  | Appointed: |  | Appointed: |  | Appointed: |
| 1 January 2024 |  | 11 July 2022 |  | 19 January 2022 |  | 1 January 2019 |
| Age: 55 |  | Age: 64 |  | Age: 55 |  | Age: 68 |
| Skills and competencies: |  | Skills and competencies: |  | Skills and competencies: |  | Skills and competencies: |
| Jacqui has significant non-executive experience in  complex science and technology-centric businesses and  in her executive career as a divisional CEO in the  technology industry. She has global broad business  experience, including in mergers and acquisitions, and has  worked across numerous international and emerging  markets. Jacqui has expertise in leading technology-  enabled transformations, digital, cyber security, technology  and business process solutions. Jacqui has formerly held  various senior positions with Hewlett Packard (HP),  including Chief of Staff to the Chairman and CEO, SVP HP  Enterprise Services, Electronic Data Systems (which was  acquired by HP) and KPMG. She was also most recently  the Chair of Tesco Bank. |  | Iain has significant financial experience, gained in a range of  sectors and operating in regulated environments globally.  He was most recently Chief Financial Officer at GSK plc,  where he was responsible for several of its key global  functions, including Finance, Investor Relations and  Technology. Prior to this, Iain was Group Finance Director  at HSBC Holdings plc for eight years, working across Asia,  the US and Europe, and previously worked at General  Electric, Dowell Schlumberger and Price Waterhouse.  Iain’s extensive background knowledge and financial  expertise allow him to effectively chair the Audit & Risk  Committee. Iain is a member of the Institute of Chartered  Accountants of Scotland, holds an MA in Business  Studies and Accounting, and received an Honorary  Doctorate from Aberdeen University in Scotland. |  | Anne has over 20 years’ legal experience in the financial  services industry, where she has counselled senior  executives on a wide range of legal, regulatory and  business issues. She currently serves as IBM's Senior Vice  President and Chief Legal Officer. Anne brings to the  Board extensive legal expertise across the financial  services and consulting sectors. Anne earned a BS from  Hampton University and a JD from Columbia University  Law School and is an advocate for sponsorship and  mentorship of other women in the legal profession. |  | Earl has substantial experience in the global industrial and  energy sectors as an Executive and Non-executive  Director. With a career of over 40 years in the chemical  industry, he has a track record of successfully leading  transformative growth projects and driving pioneering  technology innovation.  Earl is a former chair of the US Federal Reserve Bank of  New Orleans and was a member of the Federal Reserves  Energy Advisory Committee for several years. He has an  enhanced knowledge of cyber risk having graduated from  the Carnegie Mellon University Cyber-Risk Oversight  Program for Corporate Directors. |
| External appointments: |  | External appointments: |  | External appointments: |  | External appointments: |
| – Senior Independent Director and Remuneration  Committee Chair of Croda International plc  – Senior Independent Director at Softcat plc |  | – Non-executive Director of Schroders plc  – Non-executive Director of UK Government Investments Ltd  – Non-executive Director of O-I Glass, Inc. |  | – Senior Vice President and Chief Legal Officer at IBM |  | – Non-executive Director of Olin Corporation  – Non-executive Director of Great Lakes Dredge and  Dock Co. |

|  |  |  |  |  |  |  |  |  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |  |  |  |  |  |  |  |  |
|  |  |  |  |  |  |  |  |  |  |  |  |  |  |
|  | Audit & Risk Committee |  | Nomination Committee |  | People & Remuneration Committee |  | Responsible Business Committee |  | Safety & Operations Committee |  | Group Executive Committee |  | Committee Chair |

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 93 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Our Board cont. | |  |  |  |  |

|  |  |
| --- | --- |
|  |  |
|  |  |
|  |  |

|  |  |
| --- | --- |
|  |  |
|  |  |
|  | BoD_Committee_ResponsibleBusiness_Chair.gif |

|  |  |
| --- | --- |
|  |  |
|  |  |
|  | BoD_Committee_People&Rem_Chair.gif |

|  |  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |  |
| Jonathan_Silver.jpg |  | Tony_Wood.jpg |  | Martha_Wyrsch.jpg |  | Julian_Baddeley.jpg |
|  |  |  |  |  |  |  |
| Jonathan Silver |  | Tony Wood |  | Martha Wyrsch |  | Julian Baddeley |
| Independent Non-executive Director |  | Independent Non-executive Director |  | Independent Non-executive Director |  | Group Company Secretary |
| Appointed: |  | Appointed: |  | Appointed: |  | Appointed: |
| 16 May 2019 |  | 1 September 2021 |  | 1 September 2021 |  | 1 July 2024 |
| Age: 68 |  | Age: 60 |  | Age: 68 |  | Age: 45 |
| Skills and competencies: |  | Skills and competencies: |  | Skills and competencies: |  | Skills and competencies: |
| Jonathan has considerable knowledge of the US-regulated  energy environment, and experience and understanding of  integrating public policy and technology into a utility.  Jonathan’s previous work in the US Department of Energy  included leading the federal government’s $40bn clean  energy investment fund and a $20bn fund focused on  electric vehicles. Jonathan’s strong background in finance  and government policy, along with his long career at the  intersection of policy, technology, finance and energy,  brings innovative insight to the Board’s policy discussions  and to its interaction with management.  Jonathan’s former roles include consultant at McKinsey in  the Financial Institutions practice, COO of Tiger  Management, Senior Advisor to Guggenheim Securities  and Senior Policy Advisor to the US Secretary of  Commerce and the US Secretary of the Interior. |  | Tony has proven business leadership credentials as an  experienced Chief Executive and brings to the Board  significant engineering experience. Tony was Chief  Executive of Meggitt plc and led the operational and  cultural transformation of the company, transitioning from  an industrial holding structure to a focused and customer-  led business, leveraging technology investment.  Tony was formerly President of the Aerospace division of  Rolls Royce plc and developed a strong reputation as an  operator, turning around and growing several challenging  business units and internationalising the company’s  footprint. Tony is a Fellow of the Royal Aeronautical  Society. |  | Martha has held a number of senior positions in the energy  industry and has significant experience of the US market.  She has served as General Counsel of energy and utility  companies and was CEO of the divisions of major energy  companies, including a major international gas  transmission business, as well as leading the growth and  development of the renewables business of Vestas in  the US.  As an accomplished Director for publicly listed companies  in both the UK and the US, Martha brings to the Board  relevant experience across the renewable energy sector,  as well as a strong understanding of the US regulatory  environment, having previously held leadership roles in  large US-regulated utility businesses. |  | Julian is a Chartered Company Secretary and corporate  lawyer. Prior to joining National Grid, Julian served as  Group Company Secretary of abrdn plc, previously known  as Standard Life Aberdeen. He has extensive Board, C-  suite, transactional and regulatory experience in large  FTSE 100 organisations from his former roles at Aviva,  Clifford Chance, Friends Life and Cadbury plc. Julian is  responsible for guiding the Board in governance matters  and leading the Company Secretariat function. |
|  |  |  | External appointments: |
|  |  |  | – Independent Director/Trustee of ShareGift and Chair of  the Audit Committee |
| External appointments: |  | External appointments: |  | External appointments: |  |  |
| – Chair of the Global Sustainability Platform at Apollo Global  Management, Inc.  – Chair of Terram Lab |  | – Non-executive Director of Airbus SE  – Chair of Chemring Group plc |  | – Independent Director of Quanta Services, Inc.  – Advisor to Summit Carbon Solutions |  |  |

![]()

Former Directors who served during the year:

John Pettigrew retired from the Board effective 16

November 2025.

|  |  |  |  |  |  |  |  |  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |  |  |  |  |  |  |  |  |
|  |  |  |  |  |  |  |  |  |  |  |  |  |  |
|  | Audit & Risk Committee |  | Nomination Committee |  | People & Remuneration Committee |  | Responsible Business Committee |  | Safety & Operations Committee |  | Group Executive Committee |  | Committee Chair |

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 94 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Key Board activities | |  |  |  |  |

#### Board meeting agendas are agreed in advance by the Chair, Chief Executive and Group Company

#### Secretary, and are structured to ensure that key standing items are considered across the year, while providin

#### g time for deep-dives and flexibility for any additional matters to beconsidered.

|  |  |  |  |
| --- | --- | --- | --- |
|  |  |  |  |
|  |  |  |  |
|  |  |  |  |
|  |  |  |  |
|  |  | The Board approved Chief Executive succession  arrangements, including the appointment of  Zoë Yujnovich as Chief Executive Designate  (from 1 September 2025) and Chief Executive  (from 17 November 2025), together with related  transition, regulatory and remuneration  arrangements. |  |

April

|  |  |  |  |
| --- | --- | --- | --- |
|  |  |  |  |
|  |  |  |  |
|  |  |  |  |
|  |  |  |  |
|  |  | On 1 May 2025 the appointment of Zoë Yujnovich  was announced. |  |
|  |  | The Board approved the 2024/25 full-year results,  Annual Report and Accounts, Form 20‑F, final  dividend, Notice of AGM and the internal Board  evaluation action plan. |  |
|  |  | The Board reviewed progress on the RIIO‑T3  electricity transmission business plan, focusing on  regulatory engagement with Ofgem ahead of Draft  Determinations, the balance between near‑term  bill impacts and long‑term consumer benefits, and  the need for continued advocacy to support  investment in energy security, affordability and the  UK’s clean power ambitions. |  |

May

|  |  |  |  |
| --- | --- | --- | --- |
|  |  |  |  |
|  |  |  |  |
|  |  |  |  |
|  |  |  |  |
|  |  | The Board held its 2025 AGM at the University of  Warwick. |  |
|  |  | The Board approved changes to the Board  committee structure, approved the Group Modern  Slavery Statement for publication, and authorised  delegated authority (via a transaction committee)  to progress and approve matters relating to the  sale of Grain LNG. An update was received on  NGED covering business performance and  planning for the pathway towards RIIO-ED3. |  |

|  |  |  |  |
| --- | --- | --- | --- |
|  |  |  |  |
|  |  |  |  |
|  |  |  |  |
|  |  |  |  |
|  |  | Zoë Yujnovich joined the Board as Chief Executive  Designate. |  |
|  |  | Board and Committee meetings were held at the  Waltham office in Massachusetts. As part of the  meetings, the Board held a talent engagement  session, enabling employees to engage directly  with the Board and share insights on National  Grid’s talent and people programmes. |  |
|  |  | The Board reviewed Group performance and  outlook, delivery against strategic priorities and the  Strategic Business Plan, performance across the  US businesses, UK and US regulatory and policy  developments, major transformation programmes  and investor perspectives, including insights from  the Investor Perception Study. |  |

![]()

September

October

|  |  |  |  |
| --- | --- | --- | --- |
|  |  |  |  |
|  |  |  |  |
|  |  |  |  |
|  |  |  |  |
|  |  | The Board held an ad hoc meeting where it  considered the RIIO‑T3 electricity transmission  business plan, including the investability and  workability of the framework and management’s  engagement with regulators. The Board also  reviewed an update on major infrastructure  initiatives to support system resilience in the US. |  |

|  |  |  |  |
| --- | --- | --- | --- |
|  |  |  |  |
|  |  |  |  |
|  |  |  |  |
|  |  |  |  |
|  |  | The Board and Committee meetings held were  largely focused on half-year results and included  the approval of the 2025 Strategic Business Plan  and the 2025/26 interim dividend.  The Board considered the RIIO‑T3 electricity  business plan in advance of Ofgem’s final  determinations, including progress with Ofgem  and the investability and workability of the  proposed framework. |  |
|  |  | The Board considered the RIIO‑T3 electricity  business plan in advance of Ofgem’s Final  Determinations, including progress with Ofgem,  the investability and workability of the proposed  framework. |  |
|  |  | John Pettigrew retired from the Board on 16  November. Zoë Yujnovich became Chief  Executive on 17 November 2025. |  |

|  |  |  |  |
| --- | --- | --- | --- |
|  |  |  |  |
|  |  |  |  |
|  |  | |  |
|  |  |  |  |
|  |  | An employee breakfast discussion was held at the  Strand office, London, hosted by Martha Wyrsch.  The session was an opportunity for UK  participants from various talent cohort  programmes to discuss their experience of talent  and development at National Grid. |  |
|  |  | Completion of the Grain LNG sale. |  |

November

|  |  |  |  |
| --- | --- | --- | --- |
|  |  |  |  |
|  |  |  |  |
|  |  |  |  |
|  |  |  |  |
|  |  | Following the completion of a competitive audit  tender process, the Board approved the  appointment of the external auditor for the next  audit term, having considered the Audit & Risk  Committee’s recommendation and the outcome  of its evaluation. |  |
|  |  | The Board held an ad hoc meeting to review the  RIIO‑T3 Final Determinations, with continuing  focus on investability, workability and implications  for delivery against the Strategic Business Plan,  and considered associated risks and next steps. |  |

December

|  |  |  |  |
| --- | --- | --- | --- |
|  |  |  |  |
|  |  |  |  |
|  |  |  |  |
|  |  |  |  |
|  |  | The Board held a strategy offsite led by Zoë  Yujnovich, as described opposite. |  |
|  |  | Deep‑dive sessions focused on capital, assets  and customers, as well as people and  performance culture. The Board reviewed the  RIIO-T3 Final Determinations and any potential  impact on the Strategic Business Plan. |  |

January

November

![]()

July

|  |  |  |  |
| --- | --- | --- | --- |
|  |  |  |  |
|  |  |  |  |
|  |  |  |  |
|  |  |  |  |
|  |  | The Board approved the 2026/27 budget. |  |
|  |  | The Board Sub-Committee reviewed the  RIIO‑T3 Final Determinations and their impact  on the Group’s five‑year financial framework,  including investment priorities and market  guidance, ensuring the outcome supported  long‑term value creation and system resilience. |  |

|  |  |  |  |
| --- | --- | --- | --- |
|  |  |  |  |
|  |  |  |  |
|  |  | |  |
|  |  |  |  |
|  |  | Deep-dives were received on the New York and  New England business units considering  technology, customer experience and regulatory  developments. |  |
|  |  | A site visit was held at the Northport Power  Station in Long Island, one of the Group’s large  steam turbine generating plants within National  Grid Generation. |  |
|  |  | Board evaluation process. |  |
|  | The Board considers key stakeholders in its decision  making and, in doing so, ensures that the Directors  comply with their duty under section 172 of the  Companies Act 2006. Our section 172 statement and  further information on our key stakeholders can be  found on page [85](#i2193c7e7fbee4753bdbe2d16888565c8_118) and pages [23](#i2193c7e7fbee4753bdbe2d16888565c8_4697) to [25](#i887387dceb1f41febe8dc79527952bbf_302642). | |  |

March

![]()

|  |  |  |
| --- | --- | --- |
|  |  |  |
|  |  |  |
|  | Strategy offsite |  |
|  | In January 2026, the Board held its annual Strategy  offsite, the first led by Zoë Yujnovich in role as Chief  Executive, which provided dedicated time for in‑depth  engagement with senior management and Business  Unit Presidents. The Board reviewed performance  against the five‑year framework, assessed progress  made during the year, and discussed investment  priorities and transformation opportunities to support  the Group’s growth agenda. These discussions were  informed by detailed management presentations and  a series of deep‑dive sessions focused on Capital,  Assets and Customers, alongside People and  performance culture. |  |

March

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 95 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Culture and workforce engagement | |  |  |  |  |

|  |  |  |
| --- | --- | --- |
|  |  |  |
| Through a combination of direct engagement, reporting and committee oversight, the Board monitors how the Company’s values are reflected in day-to-day  practice. During the year, the Board continued the ‘Full Board Employee Voice’ approach to workforce engagement, supported by the four key pillars of  engagement outlined below. Following the refreshment of the Board Committees, these pillars were considered in greater depth. In particular, the creation of  the People & Remuneration Committee has consolidated oversight of talent, engagement and wider people matters within a single committee and under one  Non-executive Director, providing a more coherent and consistent forum for discussion and challenge. Similarly, the Safety & Operations Committee enables  site visits and workforce interactions to be aligned more closely to emerging operational and safety themes, where appropriate.  The Board receives regular insight into workforce sentiment, these insights inform the Board’s oversight of workforce culture, engagement and wellbeing and  support ongoing discussion of people strategy and organisational priorities. Health, safety and wellbeing remain fundamental Board considerations. Through the  Safety & Operations Committee, the Board reviews performance trends, serious incidents and management actions, alongside broader wellbeing initiatives. | | |

|  |  |  |
| --- | --- | --- |
|  |  |  |
| Understanding workforce  culture, engagement and  wellbeing is fundamental  to effective oversight and  long-term performance. | | |

|  |  |  |
| --- | --- | --- |
|  |  |  |
|  |  |  |
|  | Talent engagement |  |
|  | Provides engagement with key talent cohorts and  strengthens Board familiarity with succession  candidates. |  |
|  | Review of effectiveness  – The Chair of the People & Remuneration  Committee hosted talent engagement  sessions in the UK and US, enabling  participants from Group talent programmes  to engage directly with Board members on  talent management, strengths and areas for  further development. |  |
|  |  |  |
|  |  |  |
|  | Impact and outcomes  – Board‑led talent engagement enhanced the  Board’s understanding of leadership  capability and succession depth, informing  more effective challenge on talent  development and long‑term succession  planning.  – The sessions provided first‑hand insight into  emerging leaders, leadership behaviours and  talent management across the Group,  highlighting both strengths and areas for  improvement, while also increasing Board  familiarity with the succession pipeline. |  |

![]()

|  |  |  |
| --- | --- | --- |
|  |  |  |
|  |  |  |
|  | Site visits |  |
|  | Provides the Board with direct exposure to  colleagues at key sites and real‑time workforce  insight. |  |
|  | Review of effectiveness  – Board members undertook site visits across  UK and US. Visits included operational and  project locations such as the Network  Design Centre in Bristol, Yorkshire Green  project sites, and the Northport Power  Station on Long Island.  – The visits provided direct engagement with  colleagues on the ground and insight into  culture, safety and workforce experience  across different parts of the business. |  |
|  |  |  |
|  |  |  |
|  | Impact and outcomes  – The site visits enhanced the Board’s  understanding of workforce culture,  engagement and the lived experience of  colleagues across diverse operational  settings. These insights informed Board  challenge and assurance on health and  safety, operational resilience and wellbeing.  – Direct engagement informed Board  challenge and discussion, reinforced the  importance of visible leadership and open  dialogue, and fed into Safety & Operations  Committee consideration of safety reporting,  contractor management and on‑site safety  behaviours. |  |

|  |  |  |
| --- | --- | --- |
|  |  |  |
|  |  |  |
|  | Wider workforce engagement |  |
|  | Ensures the Board hears from a wide cross-  section of the workforce, including those  colleagues not reached through other pillars of  the Board’s engagement programme. |  |
|  | Review of effectiveness  – Board members engaged with the workforce  through the receipt of Company‑wide  webcasts, values‑led events, participation in  the Annual Corporate Audit Conference in  the US, and direct engagement with  business unit Presidents and senior leaders  at the January 2026 strategy offsite, as well  as attendance at engineering dinners, to  gain insight into employee views and  experiences across the Group.  – In February 2026, the Chair visited our  training facility in Eakring. |  |
|  |  |  |
|  |  |  |
|  | Impact and outcomes  – Direct engagement enabled the Board to  hear directly from a broad cross‑section of  colleagues, strengthening its understanding  of workforce culture, values and lived  experience beyond formal reporting.  – Insights from the annual Grid:Voice survey  and interim pulse surveys supported  effective oversight of workforce culture,  engagement and wellbeing, informing Board  discussion on people strategy and  organisational priorities. Employee feedback,  including identified improvement  opportunities, was considered by the Board  and will inform the ongoing development of  workforce engagement arrangements. |  |

|  |  |  |
| --- | --- | --- |
|  |  |  |
|  |  |  |
|  | Board and Committee reporting |  |
|  | Provides the Board and its Committees with the  data to support the other engagement pillars. |  |
|  | Review of effectiveness  – The Board and Committees received regular  reporting throughout the year to support and  refine the key engagement priorities. This  included updates from the annual Grid:Voice  employee survey, a mid‑year snapshot,  succession planning and people strategy  updates, and gender and ethnicity pay gap  reporting.  – The Safety & Operations Committee  oversees health, safety and wellbeing, with  the Board overseeing performance trends,  serious incidents, management actions and  wider wellbeing initiatives. |  |
|  |  |  |
|  |  |  |
|  | Impact and outcomes  – The structured flow of information through  the People & Remuneration Committee and  the Board enabled more targeted workforce  engagement and better-informed discussion  of people and culture matters.  – Ongoing focus through the Safety &  Operations Committee reinforced a strong  safety culture, supported continuous  improvement in health, safety and wellbeing  and ensured timely Board scrutiny of serious  incidents and workforce risks. |  |

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 96 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Board evaluation | |  |  |  |  |

Our annual evaluation process provides the Board and its Committees with an opportunity to consider and reflect

on the quality and effectiveness of decision-making and the contribution and performance of individual members.

The 2025 Board evaluation was internally facilitated and focused on the effectiveness of Board processes,

the operation of the Board and its Committees, and the quality of discussion and decision‑making.

This built on the views and feedback received from the previous year’s evaluation, in particular in relation

to succession and committee structure. Each action has progressed, supported by the arrival of a new

Chief Executive and Chief People Officer in the year who have brought a refreshed lens on talent and

succession and how this feeds into Board discussion. The evaluation actions were approved at the

May 2025 Board meeting and included in last year’s annual report for information. In addition, and mindful

of the Chief Executive Succession process, the evaluation highlighted the importance of maintaining focus

on safe and reliable operations, disciplined capital allocation and effective delivery of our strategy, all of

which were factored into the transition planning.  Progress against the actions is outlined below.

#### External evaluation

In line with the three‑year evaluation cycle, the 2026 evaluation was externally facilitated. Christopher Saul

was appointed as the independent evaluator, and the Chair and Group Company Secretary agreed the

scope and approach for the evaluation, ensuring alignment with the Company’s governance framework

and the 2024 Code. He attended the March Board and Committee meetings as an observer, and met

with Board members and members of the Group Executive Committee for their input. His report, with

recommendations, was presented to the Board at its May 2026 meeting and an update on the actions

will be provided in next year’s annual report. Christopher Saul has no other connection to the Company or

individual Directors.

![]()

|  |  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |  |
| Progress against our 2025 evaluation actions | | | | | | |
|  |  |  |  |  |  |  |
|  |  |  |  |  |  |  |
|  |  |  | Actions |  | Progress |  |
|  |  |  |  |  |  |  |
|  | Talent and  Succession |  | – Focus on senior leadership succession  and the Board’s exposure to senior  management. |  | – With the creation of the People & Remuneration Committee, all non-Board people‑related matters have been consolidated under one  Committee. This provides consistency and wider context around people discussions. This also provides clearer accountability around  Board talent engagement, which is now led by the Chair of the Committee with the support of the Chief People Officer and Group  Company Secretary.  – As part of an induction for Directors into the new Committee, a focused deep‑dive session on people and culture was undertaken to  support the expanded remit of the revised Committee led by senior management from the respective teams.  – Across the year, a series of roundtable engagement sessions were held with participants from the talent leadership programme,  increasing the Board’s exposure to senior management and the wider talent pipeline.  – The appointment of Zoë Yujnovich as Chief Executive and Emma Hardaker-Jones as Chief People Officer in the year has demonstrated  senior leadership succession in action and brought a refreshed approach to how talent exposure to the Board is managed. |  |
|  |  |  |  |  |  |  |
|  |  |  |  |  |  |  |
|  |  |  |  |  |  |  |
|  | Governance  framework |  | – Review the Committee structure  particularly in respect of risk,  sustainability, reputation, operational  and financing matters.  – Assess if the continued ownership of  all the Company’s Group Principal  Risks by the Audit & Risk Committee  remains the most optimal and time  efficient oversight model. |  | – Building on the prior year action around committee structure and external benchmarking, a revised committee framework was  implemented to better reflect the fast moving external environment that the Company operates in, while continuing to give appropriate  focus to key elements of risk, safety and operational performance. This also included the re-allocation of Group Principal Risks.  – Sustainability and reputation oversight: A Responsible Business Committee was established to provide focused oversight of sustainability  and the environment.  – Safety and capital delivery: A Safety & Operations Committee was established with responsibility for safety oversight and the capital  delivery programme.  – Risk management: Each committee now assumes responsibility for Group Principal Risks within its remit, enabling more focused and  specialised risk reviews. The Audit & Risk Committee retains overall ownership of the risk framework, ensuring cohesive oversight across  the organisation. |  |

![]()

![]()

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 97 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Directors’ induction, development and training | |  |  |  |  |

The Board is committed to ensuring that

Directors receive appropriate induction and

ongoing development and training to support

effective decision‑making and oversight.

Ongoing development is tailored to individual

needs and is aligned with the Group’s

strategy, operations and external

environment.

#### Director induction and training

The Group Company Secretary supports the Chair in ensuring that

each Non‑executive Director receives a tailored and comprehensive

induction on appointment. The induction programme is aligned to the

Director’s role, experience and Committee responsibilities and

includes meetings with fellow Board members, briefings from

business unit Presidents and other management, site visits and

discussions with key functions across the Group.

Ongoing Board development is supported through a programme of

enrichment sessions held throughout the year, designed to deepen

the Board’s understanding of the business and to complement, or

provide further insight into, matters considered as part of the Board

agenda. The Board is kept informed of relevant corporate

governance and regulatory developments through regular briefings

from the Group Company Secretary. As the Board has evolved, the

Board’s training and development programme has developed to

place greater emphasis on macroeconomic context and ensure

deep‑dive sessions are aligned to the Group’s strategic priorities and

risk profile.

The Board benefited from different external perspectives during the

year, with a number of external speakers attending Board meetings

and dinners to provide insights on political, regulatory, market and

industry developments, as well as energy sector trends, supporting

informed challenge and strategic oversight by the Board.

#### Time commitment

The Board considers potential conflicts of interest and Directors’ time

commitments when approving appointments to the Board, including

any subsequent external appointments. On appointment, Directors

confirm that they are able to devote sufficient time to discharge their

duties effectively, including attending and preparing for Board and

Committee meetings, and undertaking site and office visits. Directors

are required to obtain prior Board approval before accepting any

additional external appointments.

During the year, the Board approved new external appointments only

where it was satisfied that these would not impair the relevant

Director’s ability to perform their role.

#### Re-election of Directors

The Nomination Committee considers each Director’s skills,

experience, time commitment and tenure when making

recommendations to the Board on the election or re‑election of

Directors. In recommending Directors for re‑election at the 2026

AGM, the Board concluded that each continues to make an effective

and valuable contribution, brings significant knowledge and

experience to the Board, and demonstrates ongoing commitment to

their role. The Board also reviewed the independence of all

Non‑executive Directors and considers each to be independent in

accordance with the UK Corporate Governance Code.

#### Chief Executive appointment and induction

During the year, the Board devoted considerable attention to Chief

Executive succession and the leadership transition, recognising the

importance of ensuring a stable, well‑planned handover. Following a

robust process, as discussed in the People & Governance

Committee report last year, on 1 May 2025 the Board announced the

appointment of Zoë Yujnovich as the next Chief Executive,

succeeding John Pettigrew, who announced his retirement from the

Board after almost ten years in the role.

Consistent with the Board’s commitment to long‑term leadership

planning, the Board conducted a rigorous, multi‑stage succession

process. This ensured that leadership requirements were considered

against the Group’s strategic priorities, operational requirements and

the evolving external environment.

As part of this process, the Board undertook a search to identify the

individual best suited to lead the Company through its next phase of

strategic delivery. In order to support the Chief Executive succession

process the Board appointed Egon Zehnder, who have no other link

to the Company. In assessing candidates, the Board prioritised

identifying a leader with:

– a proven track record in delivering complex, large‑scale capital

programmes;

– extensive operational experience across global energy markets;

– international stakeholder management; and

– the capability to guide the Company through the continuing

complexities of the energy transition.

Following detailed evaluation and robust Board scrutiny, the Board

concluded that Zoë Yujnovich brought the right balance of strategic

insight, operational expertise and industry experience to lead National

Grid into its next phase. She joined the Board as Chief Executive

Designate on 1 September 2025 and succeeded John Pettigrew as

Chief Executive on 17 November 2025, enabling a planned and

orderly transition.

To support an effective transition, a comprehensive and tailored

induction and transition programme was implemented during the

period in which Zoë Yujnovich served as Chief Executive Designate.

This programme was designed to provide comprehensive insight into

the Group’s strategy, governance framework, risk profile and

stakeholder landscape, and to enable effective engagement with the

Board, executive leadership team, investors and key internal and

external stakeholders. The induction was tailored to the Chief

Executive role by covering strategy and external affairs, operational

and safety priorities, regulatory and investor perspectives,

governance and legal responsibilities, and people and culture

matters.

As part of this programme, Zoë Yujnovich undertook direct

engagement with frontline teams and senior operational leaders

across the Group’s operations, including site visits to deepen her

understanding of the Group’s operational footprint, safety culture

and capital delivery activities. These visits included exposure to

operational and training facilities, major assets and operations in both

the UK and the US.

Such site visits form a core component of the Board’s wider

engagement programme and are used to bring to life the Group’s

Principal Risks, safety priorities and workforce capability,

supporting effective oversight and continuity of leadership

during executive transitions.

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 98 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Nomination Committee report | |  |  |  |  |

![Paula_Nom Com Flat bottom.jpg]()

|  |  |  |  |
| --- | --- | --- | --- |
|  |  |  |  |
|  |  |  |  |
|  | Paula Rosput Reynolds | | |
|  | Chair of the Nomination Committee | | |
|  |  |  |  |
|  | Role of the Committee | | |
|  | – Oversees succession planning for Non-executive and  Executive Directors.  – Considers and makes recommendations to the Board  in respect of Board appointments.  – Ensured effective plans are maintained to result in a  diverse pipeline of succession to the Board.  – Assists the Board in discharging its responsibilities  around year-end governance disclosures. | | |
|  | Composition |  | Membership |
|  | The Committee comprises all  independent Non-executive  Directors and the Chair of the  Board who is appointed as Chair  of the Committee. |  | – Paula Rosput Reynolds (C)  – Ian Livingston  – Jacqui Ferguson  – Iain Mackay  – Anne Robinson  – Earl Shipp  – Jonathan Silver  – Tony Wood  – Martha Wyrsch |

|  |  |  |
| --- | --- | --- |
|  |  |  |
|  |  | [The Terms of Reference of the Nomination Committee are](https://www.nationalgrid.com/about-us/corporate-information/corporate-governance)  [available on our website nationalgrid.com/about-us/corporate-](https://www.nationalgrid.com/about-us/corporate-information/corporate-governance)  [information/corporate-governance.](https://www.nationalgrid.com/about-us/corporate-information/corporate-governance) |

– Oversight of Board composition.

– Succession planning for Executive and Non‑executive

Directors.

– Support to the Board in relation to the Chief Executive

transition.

– Prior to the Committee restructure, the People & Governance

Committee considered people strategy and strategic

workforce planning.

Following the Board’s committee restructure, as set out on page [89](#i2193c7e7fbee4753bdbe2d16888565c8_142),

the Nomination Committee was redefined as a dedicated committee

responsible for Board succession planning for both Executive and

Non‑executive Directors (NEDs). Our reasoning was that since we

were transitioning from one Chief Executive to another, we should

recognise that both Board and management composition will

naturally evolve. As such, we decided that all Non-executive Directors

be members of this committee at this juncture. Wider workforce

people‑related matters are overseen by the People & Remuneration

Committee.

The Committee ensures that appointments to the Board are made

following a formal, rigorous and transparent process, in line with the

2024 Code. As such, although nine years is generally viewed as a

maximum, all our Non‑executive Directors have to offer themselves

for annual re-election by shareholders.

![]()

#### Year-end governance and reporting

The Committee supports the Board in overseeing the Company’s

Director related governance disclosures for inclusion in the Annual

Report and Accounts. The Committee reviewed and advised on

Board composition, succession planning, diversity and inclusion,

Board and Committee effectiveness, and related disclosures.

#### Board skills and experience

The composition, balance of skills, experience, independence and

diversity of the Board remain under active evaluation. Our annual survey

of board effectiveness is another helpful tool. The quality of engagement

NEDs bring to board service, the style in which the individual Directors

interact with fellow board members, as well as the Company’s

management, and the attitude of care about the Company’s purpose,

contribute importantly to overall NED effectiveness.

What is also key is that the Board recognises that the issues facing the

Company continue to change and that the leadership of the Company is

dynamic as well. Thus, we are mindful of our responsibility as a Board to

refresh ourselves. The Board skills and experience matrix has to evolve

with the environment in which the Company does business.

An overview of Board skills can be seen in the table to the right and

the expertise of Directors can be found detailed within Board

biographies on page [91](#i2193c7e7fbee4753bdbe2d16888565c8_145). Our skills matrix highlights the broad skills

that are in addition to the domain specific expertise of each director.

The consideration given to this area supports the Board in satisfying

itself that the Board operates in compliance with the 2024 Code and

that the right level of skills and expertise can be found on the Board

to reflect the increasingly complex environment that the Company

operates in.

Key activities during the year

Board skills

|  |  |  |  |  |  |  |  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |  |  |  |  |  |  |  |
|  |  |  |  |  |  |  |  |  |  |  |  |  |
|  | Strategic oversight | | | | | | | | |  | 10 |  |
|  |  | | | | | | | | | |  |  |
|  |  |  |  |  |  |  |  |  |  |  |  |  |
|  | Regulatory engagement oversight | | | | | | | | |  | 9 |  |
|  |  | | | | | | | | | |  |  |
|  |  |  |  |  |  |  |  |  |  |  |  |  |
|  | Mergers, acquisitions, financing and  divestments oversight | | | | | | | | |  | 8 |  |
|  |  | | | | | | | | |  |  |  |
|  |  |  |  |  |  |  |  |  |  |  |  |  |
|  | Government and political engagement oversight | | | | | | | | |  | 7 |  |
|  |  | | | | | | | |  |  |  |  |
|  |  |  |  |  |  |  |  |  |  |  |  |  |
|  | Accounting and financial reporting oversight | | | | | | | | |  | 6 |  |
|  |  | | | | | | |  |  |  |  |  |
|  |  |  |  |  |  |  |  |  |  |  |  |  |

![]()

![]()

![]()

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 99 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Nomination Committee report cont. | |  |  |  |  |

#### Composition, time commitment and independence

![]()

Approach to collating diversity data

As required by UK regulation, we report on diversity data to the extent

that respondents voluntarily self-declare. For Non-executive Directors,

we ask that they submit relevant information at year-end as part of the

declaration process.

Board appointments are based on merit and objective criteria,

including an analysis of the match of a candidate to skills areas where

the Board determines particular expertise or depth is needed. In

accordance with the 2024 Code, we have a Board Composition

policy, which sets out the approach taken to appointments to the

Board and its Committees, including in relation to diversity. The policy

recognises the benefits of diversity in all its forms and seeks to ensure

a good balance of skills, business experience, knowledge,

perspectives and backgrounds is maintained, as per policy objective,

while having regard to the Board’s current and future needs and any

periods of change or refreshment.

In the year, our gender, nationality, ethnicity and tenure of service

percentages changed with the addition of Zoë Yujnovich to the Board

and the departure of John Pettigrew. Our data can be seen in the

adjacent section. As at 31 March 2026, we met the FCA’s targets on

Board diversity set out in UK Listing Rule 6.6.6R(9). We continue to

believe that it is the trends in these factors – and close examination of

the business qualifications of our Directors – that are the meaningful

way to determine how appropriately the Board is composed.

In accordance with UK Listing Rule 6.6.6R(10), as at 31 March 2026,

the numerical data on the gender and ethnic background of our

Board and Group Executive Committee is set out on the tables to

the right.

|  |  |  |  |  |  |  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |  |  |  |  |  |  |
|  |  |  |  |  |  |  |  |  |  |  |  |
|  | Board diversity as at 31 March 2026 | | | | | |  |  |  |  |  |
|  | Chair and Non-executive Directors’ tenure | | | | | |  | Board nationality | | |  |
|  |  |  |  |  |  |  |  |  |  |  |  |
|  |  |  |  |  |  | 0-3 years 1 (11%) |  |  |  | UK 5 (45.5%) |  |
|  |  |  |  |  |  | 3-6 years 6 (67%) |  |  |  | UK/Australian 1 (9%) |  |
|  |  |  |  |  |  | 6-9 years 2 (22%) |  |  |  | US 5 (45.5%) |  |

![20]()

![32]()

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| Gender | Number of Board  members | Percentage  of the Board | Number  of senior positions  on the Board 1 | Number  in executive  management  2 | Percentage  of executive  management 2 |
| Men | 6 | 54.5 | 2 | 6 | 42.9 |
| Women | 5 | 45.5 | 2 | 8 | 57.1 |
| Not specified/prefer not  to say | – | – | – | – | – |

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| Ethnicity | Number of Board  members | Percentage  of the Board | Number  of senior positions  on the Board 1 | Number  in executive  management  2 | Percentage  of executive  management 2 |
| White British or other White (including minority-white  groups) | 9 | 81.8 | 4 | 12 | 85.7 |
| Mixed/Multiple ethnic group | – | – | – | – | – |
| Asian/Asian British | – | – | – | – | – |
| Black/African/Caribbean/Black British | 2 | 18.2 | – | 1 | 7.1 |
| Other ethnic group | – | – | – | – | – |
| Not specified/prefer not to say | – | – | – | 1 | 7.1 |

1.Senior positions on the Board refer to the Chair, Chief Executive, Chief Financial Officer and Senior Independent Director.

2.Executive management comprises the Group Executive Committee, including the Group Company Secretary. The gender balance of senior management and their direct reports can be

found on page [48](#i70b5ee7f594547dc9723654471a95a7c_89107).

#### Paula Rosput Reynolds

Chair of the Nomination Committee

13 May 2026

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 100 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Audit & Risk Committee report | |  |  |  |  |

![Iain_Audit_Risk Comm flat bottom.jpg]()

|  |  |  |  |
| --- | --- | --- | --- |
|  |  |  |  |
|  |  |  |  |
|  | Iain Mackay | | |
|  | Chair of the Audit & Risk Committee | | |
|  |  |  |  |
|  | Role of the Committee | | |
|  | – Monitors the integrity of the Group’s financial reporting.  – Oversees risk management and internal control systems.  – Oversees the independence and effectiveness of the External  Auditor.  – Reviews the effectiveness of Internal Audit.  – Supports the Board’s oversight of financial, operational and  compliance risks. | | |
|  | Composition |  | Membership |
|  | The Committee comprises three  independent Non-executive  Directors. The Committee held  five scheduled meetings and two  ad hoc meetings during the year.  The ad hoc meetings considered  the tender for the External Audit  and the Group’s investment in  Community Offshore Wind. |  | – Iain Mackay (Chair)  – Jacqui Ferguson  – Ian Livingston |

|  |  |  |
| --- | --- | --- |
|  |  |  |
|  |  | [The Terms of Reference of the Audit & Risk Committee are](https://www.nationalgrid.com/about-us/corporate-information/corporate-governance)  [available on our website nationalgrid.com/about-us/corporate-](https://www.nationalgrid.com/about-us/corporate-information/corporate-governance)  [information/corporate-governance.](https://www.nationalgrid.com/about-us/corporate-information/corporate-governance) |

– Oversaw a formal competitive External Audit tender process.

– Undertook focused reviews of several Group Principal Risks,

including Catastrophic security incident and Financing our

business.

– Expanded the Committee’s remit and oversight to include

matters previously overseen by the Finance Committee.

– Reviewed and challenged management’s preparation for

compliance with Provision 29 of the 2024 Code.

I am pleased to present the Committee’s report for the year ended 31

March 2026. The Audit & Risk Committee plays a central role in

supporting the Board’s oversight of the integrity of the Group’s

financial reporting, the effectiveness of risk management and internal

controls, and the quality and independence of the external audit.

During the year, the Committee devoted significant time to reviewing

the Group’s financial reporting and disclosures, overseeing the

year‑end reporting process, and considering matters of accounting

judgement and estimation. We worked closely with management and

the External Auditor, providing robust challenge where appropriate, to

ensure that the Annual Report and Accounts present a clear,

balanced and transparent view of the Group’s performance, position

and prospects.

The Committee also maintained oversight of the Group’s systems

of risk management and internal control, including monitoring

progress against internal control enhancements and receiving

updates on Sarbanes‑Oxley compliance. In light of the 2024 UK

Corporate Governance Code, we paid particular attention to the

work underway to support the Board’s future internal control

declaration under Provision 29. We were satisfied that appropriate

processes and governance are being established to underpin this

enhanced reporting.

As part of the enhanced governance framework following the

restructuring of the Board committees, the Audit & Risk Committee

has expanded its oversight to include matters previously overseen by

the Finance Committee. This includes oversight of activity across

treasury, tax, pensions, insurance and commodity trading, including

management of financial risk within each of thes e areas. In parallel,

oversight of the Group Principal Risks was re-aligned across the

Board committees, with the Audit & Risk Committee continuing to

review and support the Board’s oversight of risk management and

internal control processes.

The Committee undertook focused reviews of selected Group

Principal Risks, as set out on page 103, including a deep-dive into

the Catastrophic security incident Group Principal Risk. This review

considered the effectiveness of controls and mitigations in the

context of an increasingly challenging global threat environment.

To maintain appropriate oversight, it was agreed that cyber security

would also be considered by the Board, ensuring biannual focus

across both the Board and the Committee. The scope of the

Group Principal Risk was also expanded to include physical security

of assets.

Throughout the year, we received regular reports from Internal Audit

and the External Auditor, reviewed the effectiveness of both, and held

private meetings without management present to support open and

constructive dialogue. We also led a formal competitive External Audit

Key activities during the year

tender process which concluded with the Board’s approval of the

Committee’s recommendation to re‑appoint Deloitte as the

Company’s External Auditor. Further information on the External Audit

tender process can be found on pages 103 and 104.

As Chair, I met regularly with the lead External Audit Partner, the

Chief Financial Officer, the Chief Risk Officer, the Group Head of

Internal Audit and other senior leaders, ensuring that emerging issues

were identified early, and addressed through the Group’s governance

and assurance frameworks. The Board was kept informed of the

Committee’s work through regular reports, minutes and discussion.

On behalf of the Committee, I am satisfied that we have discharged

our responsibilities effectively during the year and that the Committee

has made a strong contribution to the Board’s oversight of financial

reporting, risk management and internal controls.

#### Committee financial experience

The Board is satisfied that the Committee comprises members who

are suitably qualified with recent and relevant financial experience and

competence in accounting, auditing or both. Iain Mackay and Ian

Livingston are qualified chartered accountants and are considered

competent in accounting and auditing for the purposes of the 2024

Code and the FCA’s Disclosure Guidance and Transparency Rules.

Collectively, the Committee brings an appropriate balance of

commercial and financial expertise to provide effective challenge and

oversight of the matters within its remit. The Committee as a whole is

deemed to have competence relevant to the sector in which the

Company operates. For the purposes of the US Sarbanes-Oxley Act

of 2002 (SOX), Iain Mackay is designated as the Committee’s

financial expert. Further information on Committee members can be

found in their biographies on pages [91](#i2193c7e7fbee4753bdbe2d16888565c8_145) to [93](#i4997ac40020447c895a078c99bce5833_0-0-1-1-921425).

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 101 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Audit & Risk Committee report cont. | |  |  |  |  |

#### Key activities during the year

The Committee maintains a comprehensive agenda across financial reporting, risk management, internal

controls and assurance, together with treasury, tax, pensions, insurance and commodities, and the

management of related financial risks. The Committee engages regularly with the External Auditor and

senior management from the Finance, Internal Audit, Risk, Treasury and Compliance functions, and

reported to the Board after each meeting, making recommendations where appropriate. The Committee’s

key activities are summarised below.

Financial and non-financial reporting

– Monitored the integrity of the Group’s financial and non‑financial reporting, including the Annual Report

and Accounts and other formal financial communications, and compliance with SOX requirements.

– Reviewed and challenged significant accounting policies, key judgements and principal sources of

estimation uncertainty, and recommended these to the Board for inclusion in the half‑year and full‑year

financial statements and related US regulatory filings.

– Considered management’s assessment of accounting matters such as the sale of NG Renewables and

Grain LNG, including judgements around post-closing capital project obligations, and developments in

the US Offshore wind industry following the full impairment of the Company’s Community Offshore

Wind asset in 2024/25.

– Received updates on developments in accounting standards and practice, including IFRS 18 and IFRS

20, and considered the potential impact on the Group’s external reporting.

– Held a joint meeting with the Responsible Business Committee to review the Climate change mitigation

Group Principal Risk and the Group’s approach to sustainability reporting.

– Reviewed the Responsible Business, TCFD and other environment, social and governance disclosures,

including the findings of Deloitte’s limited assurance, and recommended these disclosures to the Board

for approval.

– Considered the recommendations of the FRC’s Corporate Reporting Review of the Company’s

2024/25 Annual Report and took these into consideration in the preparation of the 2025/26 Annual

Report.

Risk management and internal control

– Oversaw the Group’s risk profile and management actions against the Board‑approved risk appetite,

including the half-year and full-year review of the Group’s principal, emerging and external risks,

including the design and operating effectiveness of related controls.

– Reviewed management attestations and assurance supporting the annual assessment of the

effectiveness of the Group’s risk management processes and internal controls, and advised the Board

that these operated effectively across financial, operational and compliance matters.

– Performed deep-dives on five of the Group’s Principal Risks, as set out on page 103.

– Considered climate‑related transition risks, cyber security, including legacy technology risk, and other

key non‑financial risks within the enterprise risk management framework, and the adequacy of the

associated control environment.

– Reviewed and challenged the going concern and viability assessments, including severe but plausible

downside scenarios, and the robustness of the underlying assumptions, stress testing and controls.

– Monitored progress on the Group’s SOX attestation programme and the broader programme to

strengthen, document and test material controls, including actions to strengthen the maturity of the risk

and controls framework.

– Reviewed management’s approach to identifying material controls, the scope and outcomes of controls

testing, and remediation of any identified deficiencies as part of its preparation for reporting against

Provision 29 of the 2024 Code.

Treasury, tax, pensions, insurance and commodities

– Received regular updates on treasury, tax, pensions and insurance, including oversight of financial risk

appetite, and approved the Finance Policy and related Delegations of Authority.

– Considered the Group’s Tax Strategy and recommended to the Board for approval.

– Reviewed commodities activities, including US energy procurement and interconnector trading,

together with the associated governance framework, risk policies and delegations.

Internal Audit

– Oversaw succession planning and resourcing for the Internal Audit function, including the appointment

of the Group Head of Internal Audit during the year.

– Received regular updates on delivery of the 2025/26 Internal Audit Plan, including significant findings,

thematic insights and progress against agreed management actions, with Internal Audit providing

independent third-line assurance over the design and operating effectiveness of key controls, and

approved the 2026/27 Internal Audit Plan.

– Oversaw the work undertaken by the Internal Audit function on the Quality Assurance and Improvement

Plan, including progress made since the 2024/25 External Quality Assessment (EQA) which concluded

that the Internal Audit function generally conformed with Chartered Institute of Internal Auditors (IIA)

Standards, the highest rating from an EQA.

– Approved the updated Internal Audit Charter, confirming the function’s mandate, independence and

authority under the Global Internal Audit Standards.

– Considered Internal Audit’s work, findings and follow‑up activity alongside the Committee’s assessment

of the effectiveness of the Group’s risk management and internal control framework.

External Auditor

– Received reports from the External Auditor at each meeting on audit progress, scope and key risk

areas, and reviewed the External Auditor’s reports on the half‑year and full‑year results.

– Assessed the External Auditor’s effectiveness, independence and professional scepticism, and

considered non‑audit services.

– Recommended the re-appointment of Deloitte as External Auditor to the Board, for recommendation to

shareholders at the 2026 AGM and led a formal competitive audit tender process for the External Audit

for the year ending 31 March 2028.

Compliance, governance and disclosure

– Reviewed and recommended to the Board the Committee’s Terms of Reference which were updated

to reflect the Committee’s expanded remit.

– Received regular updates on ethics, business conduct and whistleblowing, and reports on legal and

regulatory compliance, including instances of non‑compliance and actions taken to strengthen

compliance and investigation arrangements across the Group.

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 102 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Audit & Risk Committee report cont. | |  |  |  |  |

#### Significant

#### issues and judgements relating to the financial statements

The significant issues and judgements considered by the Committee in relation to the financial statements

for the year ended 31 March 2026 are set out in the table below. During the year, the Committee

discussed these matters in detail with management and the External Auditor as part of its oversight of the

integrity of the Group’s financial reporting.

|  |  |
| --- | --- |
|  |  |
| Matters considered | Factors and reasons considered, including financial outcomes |
| US  environmental  remediation  provisions | During the year, the Committee reviewed the accounting for the £2,012bn of US  environmental remediation provisions. Following correspondence with  environmental regulators on the scope and design of remediation activities  related to Superfund sites, and the revision of management estimates, we  recognised a net movement in the associated provision of £nil. The net  movement in the provision is reported through exceptional items, consistent with  the Group’s policy as disclosed in notes 5 and 26 to the financial statements. |
| Disposal of  Grain LNG | On 28 November 2025, Grain LNG was sold to a consortium of multinational  energy companies, Centrica plc, and an energy transition infrastructure  investment firm, Energy Capital Partners, part of Bridgepoint Group plc. The  Committee reviewed the gain on disposal calculation, including the judgements  around the post closing capital project obligations and related disclosures in note  10 to the financial statements. |
| Disposal of  National Grid  Renewables | On 29 May 2025, National Grid Renewables was sold to Brookfield Asset  Management and its institutional partners including Brookfield Renewable  Partners for $2.1 billion. A pre-tax loss on disposal of £96 million was recognised  within the Group’s results (the loss arose principally from the recycling of  cumulative foreign exchange movements up to the date of disposal). The  Committee reviewed the loss on disposal calculation and related disclosures in  note 10 to the financial statements. |
| Monitoring of  North Hyde  related liability  exposure | The Committee received updates on the investigation into the North Hyde  substation outage. On 18 November 2025, NESO published its final report.  National Grid fully supports the NESO recommendations and remains committed  to working with NESO and others to implement them. The Ofgem investigation is  ongoing. The Committee reviewed management’s assessment of the liability  exposure and the related disclosures in note 30 to the financial statements. |
| Obligations  relating to  FERC Return  on Equity  (ROE) order | On 19 March 2026, the FERC issued an order requiring certain transmission  operators in North East America to establish a base return on equity of 9.57%.  Historical amounts charged in excess of this base ROE are to be refunded. The  Committee has reviewed management’s accounting treatment under IFRS and  the impact on underlying earnings. Further information can be found on page [76](#ib9ca2c5b72fb4936a9d458c7bb253318_286964). |

#### Financial reporting

Going concern and longer-term viability

During the year, the Committee reviewed management’s assessment of the Group’s status as a going

concern and its longer-term viability. This included reviewing the Group’s going concern and longer-term

viability statement (as set out on pages 142 and [86](#ibc992a28e69a47b7a173510e379ebd45_14763) respectively), together with the supporting assessment

reports prepared by management. Based on this review, the Committee concluded that the financial

statements had been appropriately prepared on a going concern basis and that the Company and the

Group have adequate resources to continue in operation for at least 12 months from the date of approval

of the Consolidated Financial Statements for the year ended 31 March 2026 and recommended it to the

Board for approval.

Fair, balanced and understandable

In May 2026, the Committee reviewed this Annual Report and Accounts having provided input and

challenge on earlier drafts. The Committee concluded that the Annual Report and Accounts, taken as a

whole, is fair, balanced and understandable, and provides the information necessary for shareholders and

other stakeholders to assess the Group’s position, performance, business model and strategy.

In reaching this conclusion, the Committee considered both the financial and non-financial disclosures,

including the Group’s disclosures prepared in line with the TCFD recommendations (see pages [53](#i2193c7e7fbee4753bdbe2d16888565c8_88)–[68](#i5ce9e2b3cd614bcca8423db41cd18ff1_160075)).

The Committee also considered the potential impact of these disclosures on the forward-looking

assumptions supporting the Group’s going concern and viability assessments. The Committee’s review

was informed by the following:

– a comprehensive drafting and review framework, including sign-off by Group Executive Committee

members of relevant areas of the Annual Report and Accounts;

– a robust verification process for key financial and non-financial statements;

– a comprehensive review by management, including members of the Group Executive Committee and

the Disclosure Committee, to assess the accuracy and consistency of messaging and overall balance;

and

– feedback from the Company’s advisors, including the External Auditor and Remuneration Advisor.

On this basis, the Committee recommended the Annual Report and Accounts to the Board for approval.

#### Risk management and internal controls

The Board has overall responsibility for the Group’s risk management and internal control framework,

including setting risk appetite, overseeing principal and emerging risks and reviewing the framework’s

effectiveness. The Audit & Risk Committee supports the Board by providing focused oversight and

challenge on the design and operation of the framework, the quality of risk reporting, and the assurance

obtained across financial, operational, reporting and compliance matters.

Risk management

Effective risk management underpins delivery of the Group’s strategic priorities. The Chief Risk Officer is

responsible for establishing and maintaining the Group’s risk management processes and ensuring

principal and emerging risks are identified, assessed and managed within the risk appetite approved by

the Board. During the year, the Board reviewed and approved the Group’s Principal Risks, which are set

out in the Strategic Report on pages [31](#i2193c7e7fbee4753bdbe2d16888565c8_4318)–37. The Committee provided detailed oversight through

scheduled risk updates and deep-dives, testing management’s assessment of risk exposures, ownership,

mitigations, emerging risk indicators and the consistency of disclosures across the Annual Report and

Accounts.

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 103 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Audit & Risk Committee report cont. | |  |  |  |  |

Following the restructure of Board committees, the Group’s Principal Risks are considered by the Board

committee best placed to provide specialist oversight, with the Audit & Risk Committee retaining

responsibility for assessing the overall effectiveness of risk management and internal control and receiving

half‑year and full‑year reporting that summarises how the Group Principal Risks have been managed.

During the year, the Committee undertook focused reviews of selected Group Principal Risks, assessing risk

ownership, key controls and mitigation plans, and the quality of management reporting and assurance. The

reviews included: Satisfactory regulatory outcomes; Major capital projects; Catastrophic security incident;

and Financing our business. The Committee considered the Climate change mitigation Group Principal Risk

in a joint meeting with the Responsible Business Committee.

Internal controls and assurance

The Group’s internal control framework supports the integrity of financial and non‑financial reporting and the

preparation of the Annual Report and Accounts. The Committee oversees the processes in place to support

timely and accurate reporting, the consistent application of accounting standards and significant

judgements, and key disclosures, including going concern and viability. This oversight is informed by regular

management reporting and assurance provided by Internal Audit and the External Auditor.

As a UK and US listed group, the Committee also receives periodic updates on the SOX programme and

management’s assessment of internal control over financial reporting (ICFR), including progress against the

Group‑wide compliance plan and developments in the controls environment. These updates informed the

Committee’s review of full‑year reporting and broader assurance across over the control environment.

Governance developments and forward‑looking oversight

The Committee received updates on relevant regulatory developments, significant litigation and other

emerging matters, supporting forward‑looking oversight of principal risks and the resilience of the control

environment. In line with the 2024 Code, the Committee reviewed management’s programme to strengthen

and evidence the effectiveness of material internal controls across financial, operational, reporting and

compliance activities, supporting the Board’s annual review and related disclosures.

Internal control and risk management effectiveness

The Committee regularly reviewed the effectiveness of the Group’s internal control and risk management

frameworks, with a focus on material controls aligned to the Group’s Principal Risks. Based on the work

undertaken, the Committee confirmed to the Board that the control framework continued to operate

effectively and to provide appropriate assurance. The Committee was also satisfied that the sources of

assurance relied upon were of sufficient authority, independence and expertise to provide objective and

reliable assurance.

The Committee monitored material business conduct and compliance matters, including oversight of the

annual Certificate of Assurance process, through which management confirms the effectiveness of the

Group’s risk management and internal control systems and identifies significant matters not otherwise

captured through existing assurance arrangements. Assurance over internal controls over financial reporting

is provided separately through the Group’s SOX framework. No material weaknesses were identified and the

Committee reported to the Board that management’s processes for monitoring and reviewing risk

management and internal control remained effective.

The Committee also oversaw management’s approach to future compliance with Provision 29 of the 2024

Code, including the identification and review of the material controls that, individually or in aggregate, are

most relevant to the management of risks that could threaten the Group’s business model, future

performance, solvency or liquidity. During the year, the Committee oversaw the development of a structured,

evidence‑based framework to support the Board’s annual effectiveness assessment, which is progressing

as planned in preparation for the year ending 31 March 2027 when this is implemented.

#### Internal Audit

The Internal Audit function supports the Group’s risk management and internal control framework by

providing independent and objective assurance and insight. Its work is delivered in accordance with the

Institute of Internal Auditors’ International Professional Practices Framework (IPPF). Based on the work

performed by the IIA in 2024/25, it was determined that the Internal Audit function generally conforms to all

relevant principles of the IPPF with a high degree of conformance. The Committee is satisfied that Internal

Audit has the appropriate quality, capability and expertise to fulfil its mandate. The appointment of the Group

Head of Internal Audit is a matter reserved for the Committee. During the year, the Committee considered

succession planning and resourcing for the Internal Audit function, including the appointment of the Group

Head of Internal Audit. The Group Head of Internal Audit attends all Committee meetings, has direct access

to the Committee Chair, and meets the Committee in private session without management present.

During the year, the Committee monitored the delivery of the Internal Audit Plan, including key themes arising

from audit work, management’s remediation plans and the timely closure of actions. The Committee also

reviewed the Internal Audit Charter to ensure that it remained aligned to evolving Global Internal Audit

Standards, and received updates on the function’s ongoing transformation to ensure it remains fit for

purpose in light of strategic and technological change and emerging risks.

#### External Audit

The Committee oversees the relationship with the External Auditor, including audit quality, independence and

effectiveness. The Company’s External Auditor, Deloitte LLP, was re-appointed by shareholders at the

Company’s AGM in July 2025 and the Committee was authorised to set Deloitte’s remuneration. The

current Lead Audit Partner is Chris Thomas and 2025/26 was the fourth year of his term. Katie Houldsworth

will succeed Chris Thomas as Lead External Audit Partner following the announcement of the Company’s

half-year results in November 2026. A transition plan is in place to ensure an effective handover.

Audit tender process

In accordance with UK requirements on audit firm rotation and tendering, the Committee keeps the

appointment of the External Auditor under regular review and, during the year, led a formal competitive

tender for the audit for the year ending 31 March 2028. Following the conclusion of the process, the Board

approved the re-appointment of Deloitte as the Company’s External Auditor subject to shareholder approval

at the 2027 AGM. Deloitte was last appointed as the Group’s External Auditor in 2017 and was re-appointed

at the Company’s Annual General Meeting in July 2025.

The tender process undertaken during the year was overseen by the Committee, which was involved

throughout. Seven firms were initially invited to participate, comprising four top‑tier and three mid‑tier firms.

Two top‑tier firms, including the incumbent auditor, accepted the invitation and progressed to the RFP

stage. The Chair of the Committee engaged with firms that declined to tender to understand their reasons

and to reinforce expectations regarding participation in audit tenders. A virtual data room was established for

both firms and structured meetings were held with Committee and Board members, together with senior

finance management to enable a clear assessment of each firm’s capabilities, experience and understanding

of the Company’s audit requirements. Feedback from these meetings was coordinated by the Group

External Reporting team.

Formal submissions were received and final presentations were delivered in December 2025. Proposals

were assessed against weighted criteria, with audit quality as the primary consideration, alongside audit

approach, technical competence and challenge. The Committee also considered the Audit Quality Review

reports published in respect of each firm. Final presentations were attended by the Chair of the

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 104 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Audit & Risk Committee report cont. | |  |  |  |  |

Committee, Chief Executive, Chief Financial Officer, Head of Internal Audit, Group Financial Controller and

other senior finance leaders. Following detailed evaluation and discussion, the Committee recommended

the re‑appointment of Deloitte, which the Board approved in December 2025.

In conducting the tender process, the Committee considered the guidance on tendering set out in the

FRC's Audit Committees and the External Audit: Minimum Standard.

Effectiveness, quality and performance

As part of its responsibilities, the Committee regularly assesses the effectiveness, independence and

performance of the External Auditor to satisfy itself that the quality, rigour and outcomes of the external

audit remain appropriate. During the year, the Committee considered the quality of Deloitte's audit reports

and its responses to accounting, financial control and audit matters as they arose, and reviewed and

challenged the External Audit Plan prior to approval.

In forming its conclusions, the Committee engaged regularly with senior management and members of the

Finance function. The Committee Chair met with the External Auditor privately, both in conjunction with

scheduled Committee meetings and outside the formal meeting cycle, without management present, to

promote open and constructive dialogue. Committee members also met privately with the External Auditor

at least twice during the year. In considering the effectiveness of the External Auditor the Committee:

– reviewed the quality of audit planning, including audit approach, scope, progress and fee levels;

– considered the insights provided by the External Auditor via their reports presented to the Committee at

each meeting which highlight financial reporting and internal control areas which they consider should

be prioritised by management; and

– assessed Deloitte's performance against key aspects of audit delivery, including planning, resourcing,

use of technology, oversight and quality review.

The Committee concluded that the External Audit had been delivered effectively.

Following completion of the 2024/25 External Audit, management conducted a survey of key stakeholders

involved in the audit to gather feedback on the external audit process. The survey covered audit planning

and scope, robustness of the audit process, independence and objectivity, quality of delivery, quality of

people and service, and understanding of the Group. The results were shared with Deloitte and informed

planning for the 2025/26 External Audit.

Survey feedback indicated an improvement in Deloitte's scores compared with the prior year, reflecting

targeted actions taken in response to earlier feedback. The survey confirmed that the audit contributed to

the integrity of the Group's financial reporting, that relationships between Deloitte, the Committee and

management remained effective, and that Deloitte demonstrated appropriate professional scepticism,

supported by the skills and experience of the audit team.

Following its assessment for 2025/26, the Committee recommended to the Board the re-appointment of

Deloitte as External Auditor for the year ending 31 March 2027. A resolution to re-appoint Deloitte, and to

authorise the Committee to determine its remuneration, will be proposed to shareholders at the 2026

AGM. Based on its ongoing assessment, the Committee remains satisfied with Deloitte's independence,

objectivity, effectiveness and performance, and considers its re-appointment for 2026/27 to be in the best

interests of the Company.

The Committee confirmed that, during 2025/26, the Company complied with the mandatory audit

processes and audit committee responsibility provisions of the Competition and Markets Authority

Statutory Audit Services Order 2014. The Committee also confirms its continued compliance with the

FRC's Audit Committees and the External Audit: Minimum Standard. Activities undertaken to support this

assessment are described throughout this report. The Committee promotes transparency and

accountability across the Group's financial reporting and audit processes in support of high-quality

reporting and the long-term sustainability of the Company.

Auditor independence and objectivity

The Committee recognises that auditor independence and objectivity are fundamental to the integrity of

the audit. During the year, it reviewed the safeguards supporting independence, including the annual

assessment by Internal Audit. In May 2026, Deloitte confirmed its compliance with applicable UK

regulatory and professional requirements, US SEC regulations, and Public Company Accounting

Oversight Board (PCAOB) standards, and that its objectivity had not been compromised. Having

considered these confirmations, the level of non‑audit services and the safeguards applied, the

Committee concluded that Deloitte remained independent for the purposes of the External Audit and

confirmed that its recommendation to the Board was free from third‑party influence and restrictive

contractual clauses.

#### Non-audit services

In line with the FRC’s Ethical Standard and to maintain the External Auditor’s objectivity and

independence, the Committee has established a policy governing the provision of non-audit services by

the External Auditor. The total fees payable for non-audit services in any financial year are capped at 70%

of the average audit fees paid in the preceding three financial years. All non-audit services require the prior

approval of the Committee. A limited subset of services which, due to their nature, the Committee has

determined that they do not pose a threat to the auditor’s independence or objectivity and have a value of

less than £250,000 may be pre-approved by the Chief Financial Officer. The Committee receives regular

reports on all non-audit services provided by the External Auditor to ensure ongoing oversight. Non-audit

services approved during the year principally related to ESG assurance and reporting accountant services.

#### External Auditor’s fee

s

The amounts (£m) paid to the External Auditor in the past three years were as follows:

![16492674724242]()

|  |  |  |  |
| --- | --- | --- | --- |
|  |  |  |  |
| ò | Audit fees | ò | Non-audit services |

The total billed non-audit services provided by Deloitte during the year ended 31 March 2026 were £1.6

million, representing 8.1% of total audit and non-audit fees. Further information on the fees paid to Deloitte

for audit, audit-related and other services is provided in note 4 to the financial statements on page [152](#i2193c7e7fbee4753bdbe2d16888565c8_226).

Total audit and audit-related fees include the fees paid to Deloitte for other services that the External

Auditor is required to perform, such as regulatory audits and SOX attestation. Non-audit fees represent all

non-statutory services provided by Deloitte.

#### Iain Mackay

Chair of the Audit & Risk Committee

13 May 2026

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 105 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Safety & Operations Committee report | |  |  |  |  |

![Earle_Safety_Ops Comm flat bottom.jpg]()

|  |  |  |  |
| --- | --- | --- | --- |
|  |  |  |  |
|  |  |  |  |
|  | Earl Shipp | | |
|  | Chair of the Safety & Operations Committee | | |
|  |  |  |  |
|  | Role of the Committee | | |
|  | – The Committee assists the Board in fulfilling its oversight  responsibilities in respect of reviewing and challenging strategies,  policies, initiatives, risk exposure, targets and performance of the  Company in relation to safety and wellbeing.  – The Committee provides oversight of the Company’s major capital  projects and operational activities, particularly in relation to delivery,  governance and risk management, and execution. | | |
|  | Composition |  | Membership |
|  | The Committee comprises four  independent Non-executive  Directors. The Committee held  one orientation meeting and one  further scheduled meeting during  the year. |  | – Earl Shipp (Chair)  – Jacqui Ferguson  – Tony Wood  – Martha Wyrsch |

|  |  |  |
| --- | --- | --- |
|  |  |  |
|  |  | [The Terms of Reference of the Safety & Operations Committee](https://www.nationalgrid.com/about-us/corporate-information/corporate-governance)  [are available on our website nationalgrid.com/about-us/](https://www.nationalgrid.com/about-us/corporate-information/corporate-governance)  [corporate-information/corporate-governance](https://www.nationalgrid.com/about-us/corporate-information/corporate-governance) |

![]()

– Oversaw health, safety and asset governance, operations and

major project delivery, including performance trends, serious

incidents, and the effectiveness of controls across the Group’s

operations.

– Reviewed the management of operational and safety‑related

risks, including relevant Group Principal Risks, asset integrity,

and resilience of critical infrastructure.

– Monitored safety culture, capability and assurance.

As a result of the Committee restructure detailed on page [89](#i2193c7e7fbee4753bdbe2d16888565c8_142), the

Board approved the establishment of the Safety & Operations

Committee, replacing and extending elements of the former Safety &

Sustainability Committee and establishing the Committee’s key areas

of focus as safety and wellbeing, operations, and major project

delivery.

#### Safety and wellbeing

The accelerating pace of work activities has increased reliance on

contractors and placed pressure on internal and external resources.

The refreshed Committee enables enhanced oversight of how we

manage safety performance and wellbeing, including learning from

safety incidents and near misses, regulatory insights and industry

benchmarking as well as how safety-related risk is mitigated. The

safety of our people, contractors, the public, and those affected by

the Group’s activities remain paramount and a central focus for the

Committee.

The former Safety & Sustainability Committee met in May 2025 and

considered the Annual Health and Safety Report for 2024/25 which

provided a strategic review of the Group’s safety, health and

wellbeing performance for the year, including performance against

key safety metrics, sustained areas of improvement, and emerging

operational vulnerabilities. The Safety & Operations Committee has

continued to oversee the Group’s safety, health and wellbeing

performance and receives updates from the Director of Safety, Health

and Wellbeing at each Committee meeting.

The Committee reviewed progress against the Group’s core safety

indicators, including trends in serious incidents and management’s

recovery actions, alongside enhancements to reporting processes

designed to strengthen insight and support more proactive risk

management. Development of a new incident reporting system has

been monitored by the Committee ahead of implementation and the

Committee will continue to monitor progress of this roll-out.

The Committee considered initiatives to reduce the most common

causes of workplace harm and causes of lost time injuries, with a

focus on strengthening system controls, workplace conditions and

leadership engagement. The Committee noted progress in

these areas.

Wellbeing also remained a key focus. The Committee received

updates on initiatives to support mental health, strengthen

organisational resilience and ensure regulatory compliance.

As reported last year in the Safety & Sustainability Committee report,

the Committee continued to track progress against the actions from

an external review of safety governance and culture. This helped to

inform clearer roles and responsibilities and reinforced expectations

across our business units where progress has been positive.

Key activities during the year

#### Operations and major project delivery

As a new area of focus, the Committee spent time understanding the

spread of major projects across the Group. This included those in

construction as well as those planned in the US and under the ASTI

projects in the UK. Operational performance was monitored, noting

the increasing pressure on networks as investment accelerates to

meet future system needs. The Committee reviewed major project

delivery and key operational risks, such as outage planning and

supply chain resilience across both electricity and gas businesses,

and supported the continued development of clearer

milestone‑based reporting to enhance visibility of progress, cost,

schedule and risk exposure.

While overall portfolio performance remained within expected

tolerances, continued attention to supply chain pressures, resource

availability and increasing network operability challenges will be

critical to maintaining project delivery confidence.

The Committee also monitored initiatives to build the Company’s

future delivery capability with an update received from the Group

Chief Engineer providing insight into the Group’s progress around

strengthening engineering competencies.

Following the fire at North Hyde in March 2025, the Board received

several updates on this and asset maintenance. The Committee will

take forward the focus on this area through the next year, including

tracking progress on actions from both internal and external

investigations.

During the year, between the Committee, members participated

in seven site visits to observe field activities, meet and talk

with employees.

#### Earl Shipp

Chair of the Safety & Operations Committee

13 May 2026

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 106 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Responsible Business Committee report |  |  |  |  |  |

![Tony_RB Comm flat bottom.jpg]()

|  |  |  |  |
| --- | --- | --- | --- |
|  |  |  |  |
|  |  |  |  |
|  | Tony Wood | | |
|  | Chair of the Responsible Business Committee | | |
|  |  |  |  |
|  | Role of the Committee | | |
|  | – Assists the Board in fulfilling its oversight responsibilities in respect  of the Company’s role as a responsible business.  – Responsible for monitoring and, where appropriate, challenging  strategies, policies, initiatives and risk exposure relating to political,  societal and regulatory matters, as well as performance against  climate‑ and sustainability‑related targets.  – Provides oversight of reputational risk across the Company’s  stakeholder groups. | | |
|  | Composition |  | Membership |
|  | The Committee comprises five  independent Non-executive  Directors. The Committee held  one orientation meeting and two  further scheduled meetings  during the year. One ad hoc  meeting with the Audit & Risk  Committee was also held. |  | – Tony Wood (Chair)  – Ian Livingston  – Anne Robinson  – Earl Shipp  – Jonathan Silver |

![]()

– Oversaw the Group’s sustainability and climate agenda,

including progress against climate commitments, the Climate

Change Mitigation Group Principal Risk and related disclosures.

– Reviewed Responsible Business reporting, reputation and

stakeholder engagement, ensuring disclosures and external

positioning remained credible, balanced and aligned with

stakeholder expectations.

– Monitored regulatory, political and societal developments,

including related Group Principal Risks, policy engagement

and ESG‑linked performance measures.

|  |  |  |
| --- | --- | --- |
|  |  |  |
|  |  | Our [CTP](https://www.nationalgrid.com/responsibility/our-environment/our-climate-transition-plan)  and  [Responsible Business Charter](https://www.nationalgrid.com/document/150371/download) can be found on our  website nationalgrid.com/responsibility |

|  |  |  |
| --- | --- | --- |
|  |  |  |
|  |  | [The Terms of Reference of the Responsible Business Committee](https://www.nationalgrid.com/about-us/corporate-information/corporate-governance)  [are available on our website nationalgrid.com/about-us/](https://www.nationalgrid.com/about-us/corporate-information/corporate-governance)  [corporate-information/corporate-governance](https://www.nationalgrid.com/about-us/corporate-information/corporate-governance) |

The Responsible Business Committee was established during the

year following a committee restructure as detailed on page [89](#i2193c7e7fbee4753bdbe2d16888565c8_142).

The creation of the Committee reflects the increasingly complex

external environment in which the Group operates, characterised by

heightened political, societal and regulatory scrutiny, evolving

stakeholder expectations, and a rapidly changing climate and

sustainability landscape. The Board determined that these

interrelated matters warranted more focused and integrated oversight

at Board committee level.

The Committee’s remit encompasses three principal areas of focus:

sustainability (including climate change), reputation, and regulatory

and political matters. In this context, the Committee monitors and,

where appropriate, challenges the Company’s strategies, policies,

initiatives and risk exposure relating to customer, political, societal

and regulatory issues, as well as performance against climate‑ and

sustainability‑related targets.

As part of the committee refreshment, the Committee took

responsibility for monitoring and oversight of the following Group

Principal Risks: political and societal expectations; climate change

mitigation; and satisfactory regulatory outcomes. The Committee will

continue to give focus to ensure mitigations are appropriate to the

changing external environment. The Committee also has oversight of

reputational risk across the Company’s key stakeholder groups.

During the initial period of operation, the Committee focused on

establishing a robust governance framework and forward agenda

planner, and on developing a shared understanding of the external

context across our areas of responsibility. It also confirmed its

approach to oversight and reporting. This included consideration of the

Company’s Responsible Business strategy and climate targets, and

the development of enhanced reputation monitoring and reporting.

#### External affairs

The Committee considered the external environment affecting the

Company’s role as a responsible business, including political, societal

and regulatory developments across the Group’s jurisdictions. The

Committee discussed how heightened stakeholder scrutiny,

affordability pressures, geopolitical developments and evolving

regulatory expectations interact with the Company’s sustainability

commitments, reputation and long‑term outcomes.

#### Sustainability

In relation to sustainability and climate change, the Committee

received updates on the Company’s Responsible Business strategy,

including progress against climate targets and plans to refresh the

Responsible Business Charter. The Committee discussed the

challenges presented by the rapidly changing external environment

and the implications for the Company’s climate commitments,

disclosures and external narrative. During the year, the Committee

held a joint meeting with the Audit & Risk Committee to review the

Climate change mitigation Group Principal Risk and the Group’s

approach to sustainability reporting. Prior to the Committee

restructure, climate‑related matters were overseen by the former

Safety & Sustainability Committee, which in May 2025 reviewed

progress against Scope 1 and 2 targets, discussed Scope 3

dependencies and considered key external uncertainties.

#### Reputation

The Committee also focused on reputation and stakeholder

sentiment, recognising reputation as a critical business asset and an

important component of the Company’s licence to operate. During

the year, the Committee oversaw the development of an enhanced

approach to reputation management, including the introduction of a

reputation dashboard designed to provide clearer insight into

stakeholder sentiment, including customers, regulators and

government, employees, suppliers and the general public. Where

Key activities during the year

appropriate, the Committee consolidates inputs from other

committees to avoid duplication while providing a holistic view. The

dashboard also provides insight into emerging issues and

reputational signals across geographies. The Committee discussed

how this insight could be used alongside existing risk frameworks to

support earlier identification of emerging risks and opportunities.

The Committee reviewed the broader regulatory landscape in the

Company’s jurisdictions and considered how the Company positions

itself to support satisfactory regulatory outcomes over the longer term.

#### Tony Wood

Chair of the Responsible Business Committee

13 May 2026

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 107 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| People & Remuneration Committee report |  |  |  |  |  |

![Martha_People_Rem Comm flat bot.jpg]()

|  |  |  |  |  |
| --- | --- | --- | --- | --- |
|  |  |  |  |  |
|  |  |  |  |  |
|  | Martha Wyrsch | | |  |
|  | Chair of the People & Remuneration Committee | | |  |
|  |  |  |  |  |
|  |  |  |  |  |
|  | Role of the Committee | | |  |
|  | – Responsible for determining the Directors’ Remuneration Policy  and setting the remuneration of the Chair, Executive Directors  and members of the Group Executive Committee.  – Oversees remuneration policies and practices across the wider  workforce.  – Oversees the talent and succession planning framework and  approach to diversity, equity and inclusion and organisational  culture.  – Monitors the Group Principal Risk relating to People, capability  and capacity, ensuring that matters are appropriately managed  and aligned with the Company’s strategic objectives. | | |  |
|  | Composition |  | Membership |  |
|  | The Committee comprises five  independent Non-executive  Directors. Since the restructure of  the Committees, three scheduled  meetings were held. Prior to the  restructure, the Remuneration  Committee held one scheduled  meeting and two ad hoc  meetings. |  | – Martha Wyrsch (Chair)  – Ian Livingston  – Iain Mackay  – Anne Robinson  – Jonathan Silver |  |

|  |  |  |
| --- | --- | --- |
|  |  |  |
|  |  | The Terms of Reference of the People & Remuneration Committee  are available on our website nationalgrid.com/about-us/  corporate-information/corporate-governance |

![]()

– Chief Executive succession plan and integration of new Chief

Executive.

– Shareholder approval of the 2025 Directors’ Remuneration

Policy.

– Review of forward-looking APP and LTPP performance

measures.

– Review of strategic workforce planning and early careers

programme.

– Review of employee feedback from workforce engagement

sessions and Group-wide employee engagement survey

First, we would like to thank shareholders for their strong support in

approving the Directors’ Remuneration Policy at the 2025 AGM.

The Group has grown significantly over the past year, driven by

substantial increases in regulated assets and capital investment.

We achieved constructive regulatory outcomes in both the UK and

the USA and made significant progress in securing our supply chain,

leading to confidence in delivery of our capital investment plans. In

March we announced our extended and upgraded five year

Financial Framework, which increased our cumulative capital

investment commitment to at least $70 billion and upgraded

underlying earnings per share growth to 8-10%. It is underpinned by

multiple structural investment drivers, including acceleration demand

from data centres and the continued electrification of industrial

demand.

Against this backdrop, the Group delivered a strong financial and

operational performance in 2025/26, reflecting continued execution

against strategic priorities and disciplined delivery. This performance

provides important context for the Committee’s approach to

remuneration outcomes for the year, as set out in this report, and

demonstrates the alignment between executive incentives, long‑term

value creation and shareholder interests.

#### Alignment of remuneration with our business strategy

We align our performance-linked elements of remuneration to our

strategic priorities, long-term stakeholder and shareholder value and

our vision to bring energy to power possibilities.

We continue to evolve our performance measures to align with our

strategic focus areas and are introducing a new 2026/27 APP

“Performance delivery” measure focusing on capital delivery, asset

management, customer and functional effectiveness. We are also

extending the “Enablement of strategic growth” 2026 LTPP measure

to include demand-side connections and large loads that support the

energy transition and economic growth, in addition to

generation connections.

Safety continues to be an important factor in remuneration decisions

and in previous years the Committee has exercised its discretion

when necessary.

Key activities during the year

As the Company’s strategy evolves, the Committee will ensure that

the remuneration framework evolves in response, reinforcing a clear

and consistent link between strategic delivery and reward. We will

also consider whether an early review of the Remuneration Policy is

needed over the coming year to ensure it remains fit for purpose and

aligned with the Group’s strategic objectives.

#### Chief Executive appointment and leadership transition

During the year, we welcomed our new Chief Executive, marking an

important point in the Company’s leadership and strategic

development. We would like to thank both John Pettigrew and Zoë

Yujnovich for their leadership and for ensuring continuity during the

transition, while positioning the Group strongly for the next phase

of growth.

As announced in May 2025, John retired as Chief Executive on 16

November 2025 and remained available to the Group until 30 April

2026. John’s leaving arrangement can be found on page [118](#ifb753f61964c48f58ba791324ef6fea3_226837).

Zoë joined as Chief Executive Designate on 1 September 2025, to

support a smooth and orderly leadership transition, and was

appointed Chief Executive on 17 November 2025. In determining

Zoë’s appointment terms, the Committee considered her skills and

experience, together with the scope of the role and prevailing market

practice. As Zoë was an external appointment, a share award was

granted for previous entitlements from Shell that were forfeited on her

departure. Further details of Zoë’s joining arrangement can be found

on page [119](#ifb753f61964c48f58ba791324ef6fea3_226844).

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 108 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| People & Remuneration Committee report cont. |  |  |  |  |  |

#### Board and Committee structure

The Committee’s remit was expanded to include responsibility for

people matters and, reflecting this broader oversight, the Committee

was renamed the People & Remuneration Committee. This change

recognises the increasingly important link between pay, culture,

talent, and long‑term performance.

As part of its expanded remit, the Committee placed increased

emphasis during the year on talent and succession planning,

including the strength and composition of the Group Executive

Committee.

People matters prior to the Board Committees restructure were

considered by the People & Governance Committee, including a

deep-dive into strategic workforce planning and early careers.

Following a restructuring of the Board Committees in November,

minor adjustments to the NED fees were made to reflect the scope

and the time commitment of their role. A summary of these changes

can be found on page [89](#ic8148442a0374ce99f3efd5879234dda_74361).

#### Wider workforce and People matters

The Committee engages with the wider workforce at all levels on a

range of topics, including remuneration. Further details of the

Non‑executive Director workforce engagement sessions are set out

on page [95](#i4535a3551ef14c3b9e820c5fb43500c5_0-0-1-3-948661). We held employee engagement sessions in November

2025 and March 2026, during which we heard views from colleagues

on talent, succession and remuneration. The feedback received was

thoughtful and constructive, informing discussions at

Committee level.

The Committee received updates on the results of the Company’s

employee engagement survey, including the mid‑year pulse survey

and the full‑year survey. Further information on the outcomes of these

surveys is set out on page [28](#i3ddb0028d2b0484e9285367dc6785491_1-3-1-1-948652). Insight into employee sentiment and

perceptions of leadership is an important input to the Committee’s

wider consideration of remuneration, reflecting the value of its

expanded remit.

In determining remuneration for Executive Directors, the Committee

takes into account the context of the wider workforce. The

Committee seeks to ensure that reward across the organisation is

fair, competitive and consistent with the culture and values of

National Grid.

#### Incentive outcomes during the year

#### Annual Performance Plan (APP) – 2025/26

The 2025/26 Annual Performance Plan was structured to support

delivery of the Group’s strategic priorities, with performance

assessed against financial measures (70%), operational measures

(15%) and individual objectives (15%). Financial performance

delivered an outcome of 72.58% of maximum, reflecting results for

Group Underlying EPS and Group RoE. Operational performance

reflected progress against key priorities, including capital delivery and

leadership of change, while individual performance outcomes

reflected delivery of executive objectives aligned to strategic and

operational priorities. Having considered performance across all

elements of the plan and overall Group performance during the year,

the Committee determined APP payouts of 74.22%, 69.72% and

71.22% of maximum for Zoë Yujnovich, Andy Agg and John

Pettigrew respectively. Full details are set out on page [112](#ifb753f61964c48f58ba791324ef6fea3_226828).

#### 2023 Long Term Performance Plan (LTPP)

The performance period for the 2023 LTPP ended on 31 March

2026, with outcomes reflecting performance against financial

measures (80%) and energy transformation measures (20%).

Financial performance outturned at 80.80% of maximum, based on

delivery against Group Underlying EPS and Group RoE, while energy

transformation performance outturned at 89.50% of maximum,

reflecting progress against Scope 1 emissions and enablement of

energy transformation objectives. The resulting formulaic vesting

outcome was 82.54% of maximum. Having considered overall

performance, shareholder experience and the external environment,

the Committee concluded that this outcome was appropriate. Full

details are set out on page [116](#ifb753f61964c48f58ba791324ef6fea3_226829).

#### Single total figure of remuneration

The Committee is satisfied that the total single figure outcomes are

appropriate, taking into account the delivery against key performance

measures, wider employee pay, and shareholder and other

stakeholder experience in terms of value created.

#### Policy implementation in 2026/27

#### Salary review

Salary increases, with effect from 1 July 2026, of 4.5% have been

awarded to Zoë Yujnovich and 3.5% to Andy Agg. Overall workforce

pay rates were increased by 4.5%.

The Chief Executive’s starting remuneration reflects that Zoë is new to

the role and was initially positioned towards the lower end of the FTSE

30 peer group, recognising it would rise in the future. Since joining,

Zoë has demonstrated exceptional performance, and the Committee

remains firmly committed to a performance‑led approach to

remuneration. Given both her early impact and the need to ensure

ongoing market competitiveness, the Committee anticipates that

some evolution in pay will be required within the parameters of the

Policy. The Committee will review the Chief Executive’s salary at the

point of her work anniversary. Any adjustment will reflect an

assessment of ongoing performance.

#### Incentive structure

The 2026/27 APP will continue to focus on delivery of the Group’s

strategic priorities, with a maximum opportunity of 200% of salary

and include financial (70%), operational (15%) and individual (15%)

measures. Further details are set out on page [125](#i42605b1d6ef943038816b8b341a1e2a7_29883).

The 2026 LTPP will be awarded at 400% of salary for Zoë Yujnovich

and 350% for Andy Agg, maintaining a focus on long‑term financial

performance and strategic delivery. The financial and energy

transformation measures are set out on page [125](#i42605b1d6ef943038816b8b341a1e2a7_29882).

#### Martha Wyrsch

Chair of the People & Remuneration Committee

13 May 2026

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 109 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Remuneration at a glance |  |  |  |  |  |

#### 2025 Remuneration Policy

– The 2025 Directors’ Remuneration Policy (2025 Policy) was

adopted in July 2025 following approval at the AGM, with

98.38% of shareholders voting in favour of the Policy.

– Our remuneration strategy sets out to ensure strong

![7146825580656]()

alignment with our strategic priorities and creation of value for

shareholders while providing market competitive remuneration

to enable the attraction and retention of top leadership talent.

– The Policy operated as intended during the year, with

outcomes that were aligned to Company performance and

resulted in an appropriate level of remuneration quantum.

![7146825580731]()

– The Policy is available on our website at nationalgrid.com/

about-us/corporate-information/corporate-governance

#### Single total figure of remuneration

Executive Directors

Zoë Yujnovich (Chief Executive) £,000

![7146825580749]()

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
|  |  |  |  |  |  |
|  | 0 | 2,000 | 4,000 | 6,000 | 8,000 |

2025/26 variable pay 74.2% of total maximum opportunity.

Andy Agg (CFO) £,000

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
|  |  |  |  |  |  |
|  | 0 | 2,000 | 4,000 | 6,000 | 8,000 |

2025/26 variable pay 77.4% of total maximum opportunity.

Former Executive Director

John Pettigrew (Former Chief Executive) £,000

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
|  |  |  |  |  |  |
|  | 0 | 2,000 | 4,000 | 6,000 | 8,000 |

2025/26 variable pay 71.2% of total maximum opportunity.

|  |  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |  |
|  |  | Fixed Pay |  | APP |  | Share award (inc. LTPP) |

#### Policy implementation

Executive Directors

|  |  |  |  |  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |  |  |  |  |
|  |  |  |  |  |  |  |  |  |  |
|  | Salary & pension | |  |  |  |  |  |  |  |
| Purpose and link to business strategy: to attract, motivate and retain high-calibre individuals.  Executive Directors receive pension contributions of 12% of salary, which is aligned to the wider  workforce. | | | | | | | | |  |
| 2025/26 | |  |  |  | 2026/27 | |  |  |  |
|  |  | Salary  £,000 | %  increase |  |  |  | Salary  £,000 | %  increase |  |
| Zoë Yujnovich  (Chief Executive) | | £1,300,000 | —% |  | Zoë Yujnovich  (Chief Executive) | | £1,359,000 | 4.5% |  |
| Andy Agg  (CFO) | | £820,575 | 5% |  | Andy Agg  (CFO) | | £849,000 | 3.5% |  |
| John Pettigrew  (Former Chief  Executive) | | £1,246,665 | 5% |  | Wider workforce  principles | |  | 4.5% |  |
| Wider workforce  principles | |  | 5% |  |  |  |  |  |  |
|  |  |  |  |  |  |

|  |  |  |  |
| --- | --- | --- | --- |
|  |  |  |  |
|  | | Read more on page [111](#ifb753f61964c48f58ba791324ef6fea3_226834) |  |

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
|  |  |  |  |  |  |
|  |  | Shareholding requirement | | | |
|  | Requirement  Chief Executive: 500% of salary  Chief Financial Officer: 400% of salary  Former Executive Directors: 200% of salary for two years post-employment | | | | |
|  | Achievement as at 31 March 2026 | | | |  |
|  |  |  |  |  |  |
|  | Zoë Yujnovich (Chief Executive) | | | —% |  |
|  | Andy Agg (CFO) | | | 1,367% |  |
|  | John Pettigrew (Former Chief  Executive) | | | 2,164% |  |
|  |  |  |  |  |  |
| Zoë Yujnovich joined National Grid on 1 September 2025 and is building up towards her  shareholding requirement. | | | | | |

|  |  |  |  |
| --- | --- | --- | --- |
|  |  |  |  |
|  | | Read more on page [119](#ifb753f61964c48f58ba791324ef6fea3_226863) |  |

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 110 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Remuneration at a glance cont. |  |  |  |  |  |

APP

|  |  |  |  |
| --- | --- | --- | --- |
|  |  |  |  |
| Purpose and link to business strategy: to incentivise and reward the achievement of annual  financial measures and strategic non-financial measures. | | | |
| 2025/26  Maximum opportunity:  200% of salary  Total bonus payout (% of maximum): | | |  |
| 74.22%  Zoë Yujnovich (Chief Executive) | | 69.72%  Andy Agg (CFO) | 71.22%  John Pettigrew (Former Chief  Executive) |

|  |  |  |  |  |
| --- | --- | --- | --- | --- |
|  |  |  |  |  |
| Performance  measure | | Weighting | Outturn  bar | Outcome (% of  maximum) |
| Group underlying  EPS (pence) | | 35% |  | 89.52% |
| Group RoE | | 35% |  | 55.64% |
| Group capital  delivery and  effectiveness | | 7.5% |  | 87.12% |
| “Leadership of  change” index | | 7.5% |  | 25% |
| Individual objectives | | |  |  |
| Zoë Yujnovich1 | | 15% |  | 100% |
| Andy Agg | | 15% |  | 70% |
| John Pettigrew | | 15% |  | 80% |

![7146825580575]()

![7146825580758]()

![7146825580776]()

![7146825580794]()

![7146825580812]()

![7146825580830]()

![7146825580848]()

1Reflects seven months performance

|  |  |  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |  |  |
| 2026/27  Maximum opportunity:  200% of salary  Measures: | | | | |  |  |  |
| Financial | |  | Operational | |  | Individual | |
| – Group underlying EPS: 35%  – Group RoE: 35% | |  |  | – Performance delivery: 15% |  |  | – Individual objectives: 15% |

|  |  |  |  |
| --- | --- | --- | --- |
|  |  |  |  |
|  | | Read more on page [112](#ifb753f61964c48f58ba791324ef6fea3_226828) |  |

LTPP

|  |  |  |  |
| --- | --- | --- | --- |
|  |  |  |  |
| Purpose and link to business strategy: to drive long-term business performance, aligning  Executive Director incentives to key shareholder interests over the longer term. | | | |
| 2023 LTPP  Maximum opportunity:  350% (Chief Executive) and 300% (CFO) of salary in line with 2022  Policy  Performance outcome (% of maximum): | | | |
| 82.54%  2023 vesting outcome | |  |  |

|  |  |  |  |  |
| --- | --- | --- | --- | --- |
|  |  |  |  |  |
| Performance  measure | | Weighting | Outturn  bar | Outcome (% of  maximum) |
| Underlying Group  EPS | | 40% |  | 100% |
| Group RoE | | 40% |  | 61.60% |
| Reduction in  Scope 1  emissions | | 10% |  | 100% |
| Enablement of  energy  transformation | | 10% |  | 79.00% |

![7146825580892]()

![7146825580903]()

![16492674417262]()

![16492674417280]()

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| 2026 LTPP  Maximum opportunity: 400% (Chief Executive) and 350% (CFO) of salary in line with 2025 Policy  Measures: | | | | | |
| Measure | |  |  | Threshold | Maximum |
| Cumulative three-year underlying Group EPS (40%) | | | | 291p | 311p |
| Group RoE (40%) | | | | 10.30% | 11.55% |
| Reduction of Scope 1 emissions (10%) | | | | 3% | 9% |
| Enablement of strategic growth initiative (10%) | | | | Demand and generation connections | |

|  |  |  |  |
| --- | --- | --- | --- |
|  |  |  |  |
|  | | Read more on page [116](#ifb753f61964c48f58ba791324ef6fea3_226829) |  |

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 111 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| People & Remuneration Committee report cont.  Statement of implementation of Policy in 2025/26 |  |  |  |  |  |

|  |  |  |
| --- | --- | --- |
|  |  |  |
|  |  |  |
|  | Content contained within a grey box indicates that all the information in the panel is audited |  |
|  |  |  |

![]()

![]()

#### 2025/26 remuneration implementation

Single total figure of remuneration – Executive Directors

T he following table shows a single total figure of remuneration in respect of qualifying service for 2025/26, together with comparative figures for 2024/25. All figures shown to £’000:

|  |  |  |  |  |  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |  |  |  |  |  |
|  | Executive Directors | | | | | | |  | Former Executive Director | |
|  | Zoë Yujnovich | | | |  | Andy Agg | |  | John Pettigrew | |
|  | Chief Executive  Designate – 1  September ’25 to  16 November ’25 | Chief Executive –  17 November ’25  to 31 March '26 | 2025/26 total | 2024/25 |  | 2025/26 | 2024/25 |  | 2025/26 | 2024/25 |
| Salary | 325 | 433 | 758 | – |  | 811 | 773 |  | 768 | 1,175 |
| Benefits | – | 294 | 294 | – |  | 21 | 25 |  | 39 | 40 |
| Pension | 39 | 52 | 91 | – |  | 97 | 93 |  | 92 | 141 |
| Total fixed pay | 364 | 779 | 1,143 | – |  | 929 | 891 |  | 899 | 1,356 |
| APP | – | 1,126 | 1,126 | – |  | 1,131 | 874 |  | 1,094 | 1,349 |
| Share awards (inc. LTPP) | 4,200 | – | 4,200 | – |  | 2,799 | 2,134 |  | – | 3,783 |
| Total variable pay | 4,200 | 1,126 | 5,326 | – |  | 3,930 | 3,008 |  | 1,094 | 5,132 |
| Total remuneration | 4,564 | 1,905 | 6,469 | – |  | 4,859 | 3,899 |  | 1,993 | 6,488 |

|  |  |  |
| --- | --- | --- |
|  |  |  |
|  |  |  |
|  | Notes:  1. Zoë Yujnovich joined the National Grid plc Board as Chief Executive Designate on 1 September 2025 and was appointed Chief Executive on 17 November 2025.  2. John Pettigrew stood down from the Board on 16 November 2025. John’s 2025/26 APP was prorated to reflect his period of service as an Executive Director. The leaving arrangement for John can be found on page [118](#ifb753f61964c48f58ba791324ef6fea3_226837).  Salary: John Pettigrew’s and Andy Agg’s salaries increased by 5.0% to £1,246,665 and £820,575 as of 1 July 2025 respectively, aligned to the principles used for the wider workforce increases. Zoë Yujnovich was hired on a salary of £1,300,000.  Benefits: This includes private medical insurance, life assurance, allowance under the Group’s flexible benefits programme, travel and accommodation expenses, partner travel, a fully expensed car or cash alternative and the use of a car and a driver when required. Zoë Yujnovich  received £165,095 as a relocation allowance, £7,000 for her company car allowance, £6,870 for life assurance, £1,782 for private medical insurance, £48,023 for the use of a car and driver, £57,814 for taxable accommodation and travel expenses including partner travel for  2025/26. A Sharesave option award was granted to Zoë Yujnovich on 30 January 2026 and benefit (approximately £7,500) of this award is included. Andy Agg received £12,000 for his company car allowance, £6,926 for life assurance, £2,852 for private medical insurance and  £185 for taxable accommodation and travel expenses for 2025/26. John Pettigrew received £7,533 for his company car allowance, £1,665 for life assurance, £624 for private medical insurance, £20,000 for legal fees and £9,281 for the use of a car and driver for 2025/26. There  were no Sharesave options granted to either Andy Agg or John Pettigrew during 2025/26.  Pension: Pension contributions for Zoë Yujnovich, Andy Agg and John Pettigrew were 12% of salary for 2025/26.  Share awards (inc. LTPP): The 2023 LTPP is due to vest in July 2026. The average share price over the three months from 1 January 2026 to 31 March 2026 of 1,274.85 pence has been applied and estimated dividend equivalents are included. The value of the 2023 LTPP award  is driven in part by growth in share value over the period, with a share price change of 35.10% and Total Shareholder Return (TSR) growth of 53.61% from the date of grant to 31 March 2026, using one-month average figures. The 2022 LTPP figures (included in the 2024/25  column) have been restated to reflect the actual share price on vesting and all dividend equivalent shares. As the vesting share price of 1,077.92 pence was higher versus the estimate of 962.17 pence (and the reduced dividend equivalent shares added for the dividend with a record  date of 17 July 2025 with a dividend rate of 30.88 pence per share), the actual value at vesting was £391,057 higher than for the estimate published last year for John Pettigrew and £221,029 higher for Andy Agg. The share award value for Zoë Yujnovich relates to her buy-out  award and further information can be found on page [119](#ifb753f61964c48f58ba791324ef6fea3_226844).  Malus and clawback: The Committee operates malus and clawback arrangements to ensure that variable remuneration outcomes are appropriate and fully justified. Malus (to reduce or forfeit unpaid or unvested awards) and clawback (to recover awards already paid or vested)  may be applied in exceptional circumstances, including material misstatement of results, awards determined using inaccurate or misleading information, fraud or gross misconduct, regulatory censure or significant reputational damage attributable to the participant, or a material  failure of risk management and/or corporate failure. Where such circumstances arise, the Committee may reduce, forfeit or recover all or part of an award using methods it considers appropriate. Malus applies to APP cash awards up to payment with clawback for two years from  the end of the performance period; to APP deferred shares until two years after the financial year in which the bonus is earned with clawback for a further two years; and to LTPP awards up to vesting with clawback during the two‑year post‑vesting holding period. During the year,  the Committee considered whether any or all of an award should be forfeited, even if already paid, due to the exceptional circumstances outlined above and in the Directors’ Remuneration Policy, and determined that no action was required. The Committee considers these malus  and clawback periods to be appropriate having regard to the long‑term nature of the Group’s strategy, investment cycle and regulatory environment, and the timeframes over which risks and performance outcomes may crystallise. |  |
|  |  |  |

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 112 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| People & Remuneration Committee report cont.  Statement of implementation of Policy in 2025/26 cont. |  |  |  |  |  |

![]()

#### Total pension benefits

Zoë Yujnovich, Andy Agg and John Pettigrew received a cash allowance in lieu of participation in a pension arrangement. There are no additional benefits on early retirement. The values of pension contributions,

received during this year, are shown in the single total figure of remuneration table.

John Pettigrew has, in addition, accrued defined benefit (DB) entitlements. He opted out of the DB scheme on 31 March 2016 with a deferred pension and lump sum payable at his normal retirement date of 26

October 2031. At 31 March 2026, John Pettigrew’s accrued DB pension was £116,725 per annum and his accrued lump sum was £350,176. No additional DB entitlements have been earned over the financial

year, other than an increase for price inflation due under the pension scheme rules and legislation. Under the terms of the pension scheme, if he satisfies the ill-health requirements or he is made redundant, a

pension may be payable earlier than his normal retirement date. A lump sum death in service benefit is also provided in respect of these DB entitlements.

#### 2025/26 APP

For 2025/26 APP, financial measures represented 70% of the award and operational measures and individual objectives represent 15% each of the award, similar to 2024/25. At least 50% of the award is

delivered in shares (after any sales to pay associated tax) which must be retained until the shareholding requirement is met. Once the shareholding requirement is met, at least 33% of the award is delivered in

shares (after any sales to pay associated tax) must be retained in shares for two years.

For financial measures, threshold, target and stretch performance levels are set by the Committee for the performance period and pay out at 0%, 50% and 100% of the maximum calculated on a straight-line

basis. The capital delivery and effectiveness measure has been assessed primarily on quantitative metrics with a qualitative element to reflect a balanced assessment of progress and performance in our capital

investment ambitions. The ‘Leadership of change’ index measure was a quantitative assessment from our annual Group-wide employee engagement survey of colleagues. Target and stretch performance levels

for the individual objectives are also predetermined by the Committee for the performance period, and an assessment of the performance relative to the target and stretch performance levels is made at the end

of the performance year on each objective. Executive Directors have a maximum opportunity of 200% of salary for 2025/26. In reaching its overall decisions on the APP, the Committee considered the strong

performance and delivery throughout the year across financial, operational, and individual objectives. The Committee concluded that the outcomes are appropriate in the context of performance achieved and

determined that no discretion was required to the resultant APP formulaic outcome.

#### APP – Financial performance

The financial measures (70%) were weighted equally between two measures – Group Underlying EPS and Group RoE. Performance was delivered through clear management actions, including improved

Electricity Distribution and New England incentive outcomes, strong interconnector performance, and proactive financing activities, offsetting headwinds from the FERC regulatory order.

The financial performance outcomes of the 2025/26 APP award are summarised in the table below:

|  |  |  |  |  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |  |  |  |  |
| Measure |  |  |  | Weighting (% of APP) |  | Threshold | Target | Stretch | Outcome (% of max) |
| Group Underlying EPS (pence) |  |  |  | 35% |  | 72.6p | 75.6p | 78.6p | 89.52% |
|  |  |  |  |  |  |  |
| Group RoE (%) |  |  |  | 35% |  | 9.4% | 9.8% | 10.2% | 55.64% |
|  |  |  |  |  |  |  |
| Total financial outturn |  |  |  | 70% |  |  |  |  | 72.58% |

78.0p

![191315023233986]()

9.85%

![191315023234017]()

|  |  |  |
| --- | --- | --- |
|  |  |  |
|  |  |  |
|  | Notes:  Group Underlying EPS: Technical adjustments have been made which reduce the performance range (including threshold, target and stretch) by 2.5 pence. This reflects the net effect of currency adjustments, scrip issuances, US pension assumptions, US/UK pension interest and  storms.  Group RoE: Technical adjustments have been made which decrease the performance range by 0.1% to reflect the impact of the final opening equity being higher than forecast. |  |
|  |  |  |

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 113 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| People & Remuneration Committee report cont.  Statement of implementation of Policy in 2025/26 cont. |  |  |  |  |  |

![]()

#### APP – Operational performance

The operational measures (15%) were weighted equally between two key measures:

– Group capital delivery and effectiveness; and

– Group “Leadership of change” index.

|  |  |  |  |
| --- | --- | --- | --- |
|  |  |  |  |
| Measure | Details | Assessment | Outcome |
| Group capital delivery  and effectiveness  (7.5%) | – Progress in the investment  programme is a top priority for  investors, making this measure  essential for tracking performance.  – The capital delivery and effectiveness  measure is assessed primarily on  quantitative metrics with a qualitative  element to reflect a balanced  assessment of progress and  performance in our capital investment  ambitions. | Actual capital investment for the year was £11.6bn, delivering a small variance to target and representing a significant  increase compared with the prior year. In parallel, an assessment linked to the delivery of major projects was undertaken,  focusing on performance against key milestones, the management of delivery risks, and overall delivery quality.  Performance has been strong, with record levels of capital investment achieved and the majority of projects remaining on  track; this resulted in an overall outturn of 87.12% of maximum. | 87.12% |
|  |  |  |  |
| ‘Leadership of change’  index (7.5%) | – Index in our annual employee  engagement survey (Grid:Voice) that  assesses the ability of leaders to drive  and sustain high performance during  periods of significant change in our  business to achieve our organisational  goals. | Colleague feedback reflected a year of change, with engagement remaining generally positive but highlighting a continued  need for clearer and more consistent communication and practical support during periods of transition, resulting in an  overall outturn of 25% of maximum. | 25.00% |
|  |  |  |  |
| Combined operational  outcome |  |  | 56.06% |

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 114 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| People & Remuneration Committee report cont.  Statement of implementation of Policy in 2025/26 cont. |  |  |  |  |  |

#### APP – Individual objectives

In addition to the financial and operational goals outlined above, the Board approves annual individual performance for the Executive Directors in line with key operational and strategic priorities. As part of the process

for assessing individual performance, the Board is provided with a comprehensive review of company performance and individual contributions relative to the previously adopted goals. The following tables sets out

the 2025/26 individual objectives together with associated performance commentaries and the Committee’s assessment of the performance outcome for each of the Executive Directors:

|  |
| --- |
|  |
| Individual objectives and performance summary – Zoë Yujnovich1  Outcome – 100% |
| Deliver 2025/26 business plan  – Ensured continuity through leadership transition, maintaining strong delivery discipline, safety, and operational performance.  – Conducted extensive investor engagement to sustain confidence and built effective working relationships with the Board.  – Launched a strategic planning process with broad organisational engagement, preserving continuity while enabling forward-looking focus beyond 2025/26.  – Played an active role in final RIIO-T3 negotiations and supporting enhanced investor guidance. |
| Establish a performance‑focused leadership cadence  – Reset performance review cadence and content.  – Enhanced quality of leadership dialogue and demonstrated direct, hands-on leadership engagement.  – Refreshed executive team accountabilities.  – Embedded performance objectives deeper across the organisation, expanding metrics beyond financials to include asset health, capital delivery, and technology. |
| Deliver a high‑quality Board strategy session  – Board strategy session provided strong confidence in delivery, clarified key strategic shifts, and established a foundation for future refresh.  – Increased active management participation in strategy development to strengthen alignment and buy-in to ambitious delivery goals.  – Initiated first assessment of opportunities beyond 2031, identifying areas for further strategic development. |
|  |

1Reflects seven months performance.

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 115 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| People & Remuneration Committee report cont.  Statement of implementation of Policy in 2025/26 cont. |  |  |  |  |  |

|  |
| --- |
|  |
| Individual objectives and performance summary – Andy Agg  Outcome – 70% |
| Delivering the next steps of the financing strategy  – Played a leading role in the RIIO-T3 price control outcome, which supported market confidence in the Group’s financing strategy and outlook.  – Delivered the launch of a new Green Financing Framework and completed the first green issuance under the Framework, strengthening access to sustainable finance.  – Closed the National Grid Renewables and Grain sales. |
| Securing positive regulatory outcomes and supporting the delivery of our capital projects  – Successfully agreed the NiMo rate case and submitted other relevant regulatory cases.  – Drove continuous improvements in capex portfolio management, risk management and governance, with enhanced frameworks now embedded and informing a dedicated capital workstream.  – Total shareholder return (TSR) and share price performance were positive over the period, reflecting investor confidence in National Grid’s strategy and growth plans. |
| Developing our organisational capabilities and tools  – Exceeded efficiency targets for 2025/26, demonstrating continued cost discipline and productivity improvement.  – Progressed implementation of a new financial planning system, with deployment on track and expected to enhance forecasting and decision‑making through AI‑enabled capabilities.  – Continues to strengthen the internal control environment. |
| Driving the identification and development of talent into the right pipelines  – Continued to strengthen succession planning and confidence across key roles.  – Supported leadership continuity and succession pipelines through targeted role moves and development, strengthening breadth of experience and capability.  – Leveraged workstreams to enhance visibility of talent, access to senior leadership and cross‑functional development opportunities. |

|  |
| --- |
|  |
| Individual objectives and performance summary – John Pettigrew  Outcome – 80% |
| Deliver RIIO-T3 and continue to deliver to expectations set at time of rights offering including digital transformation milestones  – Actively contributed to the RIIO-T3 outcome.  – Maintained regulatory and operational momentum to support delivery of the £60bn five‑year commitment.  – Delivered capital investment.  – Strengthened focus on Electricity Distribution, driving safety improvements, capturing synergies, and positioning for the ED3 regulatory cycle.  – Progressed divestment of non‑core assets.  – Scaled technologies including 3D printing, AMI/FLISR, and drone solutions.  – Identified new National Grid Partners opportunities, supporting an additional $100m AI investment. |
| Successful Chief Executive transition  – Succession planning.  – Engaged directly with high‑potential leaders through site visits across the organisation.  – Proactively communicated with investors following the leadership transition announcement.  – Agreed a clear division of responsibilities with the Chair and Chief Executive‑Designate during the transition period.  – Facilitated introductions between the successor and key stakeholders, and transferred key industry leadership responsibilities. |

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 116 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| People & Remuneration Committee report cont.  Statement of implementation of Policy in 2025/26 cont. |  |  |  |  |  |

![]()

#### 2023 LTPP

#### Performance conditions

The 2023 LTPP will vest on 1 July 2026 and was based on two equally weighted financial measures, Group Underlying EPS (40%) and Group RoE (40%). The remaining 20% weighting was split equally between

two non-financial measures: Reduction of Scope 1 emissions (10%) and Enablement of energy transformation (10%). The targets and weightings of the 2023 LTPP below are the same for both Andy Agg and

John Pettigrew.

The outturns of the 2023 LTPP are reflective of the business’ performance over the period. During the performance period we have delivered record levels of capital expenditure, while maintaining a strong focus

on cost efficiencies. In addition, we successfully completed the strategic pivot with the sale of the remaining 40% stake of the UK Gas Transmission business and completed the disposals of both Grain LNG and

National Grid Renewables (NGR). The financial element achieved 80.80% of maximum with EPS achieving stretch driven by strong performance by the regulated businesses, within the interconnector portfolio in

NGV and through management of financing costs. The non-financial measures recognise our role in delivering critical and green investment to enable the decarbonisation of power, transport and heat, and lead a

clean, fair and affordable energy transition across our jurisdictions. Scope 1 emissions reductions outturn is 100% with emissions reductions through SF6 leakage reduction, methane emissions reductions

including leak prone pipe replacement, deploying electric vehicles in our fleet and energy efficiency improvements in our buildings. This measure excludes Scope 1 emissions from our Generation plant in New

York, as these emissions are deemed to be outside management control. This measure therefore makes up a relatively small proportion of our group Scope 1 and 2 target and reflects the elements where

management are deemed to have more control. For further information on our GHG emissions performance, please see the Responsible Business section of this report on page [40](#i734e88e4e18e4788ae8e7425d54e0122_19296). Enablement of energy

transformation outturn was 79% of maximum and was based on progress in energy efficiency and generation, policy and regulatory engagement to support clean energy, and clean energy connections to our UK

transmission networks and UK and US electricity distribution networks.

|  |  |  |  |  |  |  |  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |  |  |  |  |  |  |  |
| Performance measure |  |  |  | Weighting |  | Threshold 20% vesting | Maximum 100% vesting | | | | | Outcome (% of max) |
| Cumulative three-year  Underlying Group EPS |  |  |  | 40% |  | 200p | 218p | | | | | 100% |
|  |  |  | 223.4p | | | | | |  |
| Group RoE |  |  |  | 40% |  | 9.15% |  |  |  |  | 10.4% |  |
|  |  |  |  | 9.8% | | |  |  |  | 61.60% |
| National Grid Scope 1 emissions |  |  |  | 10% |  | ‘34ktCO 2e | 77ktCO 2e | | | | |  |
|  |  |  |  |  | 119ktCO2e | | | | | | 100% |
| Enablement of energy transformation:  Strategic initiatives (Scope 2 and 3) | |  |  | 10% |  | Four strategic initiatives assessed on a four-point scale | | | | | |  |
|  |  |  |  | 79% | | | | |  | 79.00% |
|  |  |  |  |  |  |  |  |  |  |  |  | 82.54% |

Notes:As disclosed on p130 and p292 of the 2024/25 ARA, the financial performance targets were adjusted for the impact of the Rights Issue, exclude the impact of UK regulated Deferred Tax and reflect a change in the calculation methodology (approved by the Audit & Risk

Committee) to reflect amortisation of goodwill and other indefinite life intangible assets (ILIs) over 20 years. Scope 1 emissions targets have been adjusted to account for within-period emissions accounting methodology changes and the sale of our Grain LNG terminal in 2025.

#### Vesting

The performance period for the 2023 LTPP ended on 31 March 2026. Across the period, performance was based on financial measures (80%) and energy transformation measures (20%), as set out in the

2022/23 Annual Report and as detailed above.

The overall outcome of the 2023 LTPP was 82.54% of maximum, with 80.80% of the total award vesting linked to financial measures, driven by achievement of 100% of maximum for Group Underlying EPS and

61.60% of maximum for Group RoE, both weighted equally; 89.50% of the total LTPP award vested in relation to the energy transformation measures, driven by achievement of 100% of maximum for Scope 1

emissions and 79% of maximum for enablement of energy transformation, both weighted equally.

The amounts due to vest under the 2023 LTPP for the performance period that ended on 31 March 2026 are included in the 2025/26 single total figure table on page [111](#ifb753f61964c48f58ba791324ef6fea3_226834) and are shown in the table below.

Because awards are not yet vested, the figures in the table are based on the average share price over the three months from 1 January 2026 to 31 March 2026 of 1,274.85 pence and the proposed 2025/26

final dividend with record date of 29 May 2026, subject to shareholder approval, is included. The total number of shares subject to awards which vest (after any sales to pay associated income tax and social

security), including dividend equivalent shares are subject to a two-year holding period.

The Committee considered wider business factors, such as underlying financial performance, ESG considerations, potential windfall gains and shareholder experience, when determining the final outturn for the

2023 LTPP and were comfortable that no adjustments were required.

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 117 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| People & Remuneration Committee report cont.  Statement of implementation of Policy in 2025/26 cont. |  |  |  |  |  |

![]()

#### Vesting

continued

|  |  |  |  |  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |  |  |  |  |
|  | Shares awarded | Rights Issue  adjustment | Total number of  shares | Performance outcome  (% of maximum) | Vested share based  on performance | Face value of the  award at grant  (£’000) | Share price  appreciation  (£,000) | Dividend  equivalent shares  (£,000) | Total value  (£’000) |
| Andy Agg | 214,445 | 22,945 | 237,390 | 82.54 | 195,941 | 2,050 | 448 | 301 | 2,799 |
| John Pettigrew | 380,130 | 40,673 | 420,803 | 82.54 | 347,330 | 3,634 | 794 | 534 | 4,962 |

#### Assessment of National Grid shareholder returns

National Grid plc’s 10-year annual TSR performance against the FTSE 100 Index since 31 March 2016 is shown below and illustrates the growth in value of a notional £100 holding invested in National Grid plc

on 31 March 2016, compared with the same invested in the FTSE 100 Index. The FTSE 100 Index has been chosen because it is a widely recognised performance benchmark for large companies in the UK and

it is a useful reference to assess relative value creation for National Grid plc shareholders. Over the last 10-year period, National Grid plc’s TSR is 145% versus the FTSE 100 Index at 143%, demonstrating

sustainable long-term value for our shareholders.

#### Total Shareholder Return (£)

![12048]()

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 118 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| People & Remuneration Committee report cont.  Statement of implementation of Policy in 2025/26 cont. |  |  |  |  |  |

#### 2025 LTPP

#### Performance conditions

For the 2025 LTPP, the performance measures comprise two equally weighted financial measures totalling 80% and two equally weighted energy transformation measures totalling 20% over the three-year

performance period, as outlined in the table below.

|  |  |  |  |
| --- | --- | --- | --- |
|  |  |  |  |
| Performance measure | Weighting | Threshold 20% vesting | Maximum 100% vesting |
| Cumulative three-year Underlying Group EPS | 40% | 241p | 259p |
| Group RoE | 40% | 9.35% | 10.60% |
| Reduction of Scope 1 emissions | 10% | 4% | 10% |
| Enablement of strategic growth initiative | 10% | 10.2 GW | 13.3 GW |

Notes: Vesting between threshold and maximum will be on a straight-line basis.

#### 2025 LTPP awards made during the year

The face value of the awards is calculated using the volume weighted average share price at the date of grant. The date of grant for Andy Agg and John Pettigrew was 23 June 2025 and the share price was

1,065.79 pence. For Zoë Yujnovich the date of grant was 1 September 2025 and the share price was 1,027.49 pence. The 2025 LTPP will vest on 30 June 2028. The total number of shares subject to awards

which vest (after any sales to pay associated income tax and social security), including dividend equivalent shares, are subject to a two-year holding period following vesting.

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
|  | Basis of award  (% of salary) | Number of  shares | Face value  (£’000) | Proportion vesting  threshold performance | Performance period  end date |
| Zoë Yujnovich | 400% | 506,086 | 5,200 | 20% | 31 March 2028 |
| Andy Agg | 300% | 230,975 | 2,462 | 20% | 31 March 2028 |
| John Pettigrew | 350% | 409,397 | 4,363 | 20% | 31 March 2028 |

#### Payments to past Directors

The leaving arrangement for John Pettigrew is set out below. There were no payments to past Directors during 2025/26.

#### Leaving arrangement for John Pettigrew

On 1 May 2025 the Company announced that John Pettigrew would retire from the Board effective 16 November 2025. John remained available to the Group until 30 April 2026, being the end of his 12-month

notice period. In line with the approved Policy, he received salary (£464,036), benefits (£10,830) and a pension allowance (£55,684) until 31 March 2026.

In line with the Policy, due to his retirement, John will be treated as a good leaver for the purposes of his outstanding incentive awards. He received a prorated 2025/26 APP to reflect his period of service as an

Executive Director. Details of the outcome of his 2025/26 APP can be found on pages [112](#ifb753f61964c48f58ba791324ef6fea3_226828) to [115](#i393deecd70654983af254c453ce0f814_0-0-1-1-948650). His outstanding LTPP awards will be prorated to his date of leaving, and will vest at the normal dates subject to

the achievement of the relevant performance conditions and continue to be subject to the two-year post-vesting holding period and any relevant malus and clawback provisions. Details of the vesting of his 2023

LTPP can be found on pages [116](#ifb753f61964c48f58ba791324ef6fea3_226829) to [117](#ifb753f61964c48f58ba791324ef6fea3_226858).

A post-employment shareholding requirement is applicable for two years following his departure.

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 119 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| People & Remuneration Committee report cont.  Statement of implementation of Policy in 2025/26 cont. |  |  |  |  |  |

#### Joining arrangement for Zoë Yujnovic

h

Zoë Yujnovich joined the National Grid plc Board as Chief Executive Designate on 1 September 2025

and was appointed Chief Executive on 17 November 2025. Zoë receives a salary of £1,300,000 per

annum. The remaining elements of her remuneration are in line with the Directors' Remuneration

Policy and are set out within this report.

Buy-out award

On appointment, Zoë was granted a share-based award (408,762 shares) to replace remuneration

foregone when leaving her previous employer, as assessed by the Committee under the approved

Policy. The award was structured as a restricted share award, subject to continued employment, and

will vest in three equal tranches (12, 24 and 36 months from commencement of employment). The

face value of the award is £4,200,000 based on the volume weighted average share price at the date

of grant. This aims to broadly mirror the delivery mechanisms, time horizons and levels of

conditionality of the remuneration forfeited upon leaving her previous employment.

|  |  |  |  |  |
| --- | --- | --- | --- | --- |
|  |  |  |  |  |
|  | Type of award | Number of shares | Face value  (£’000) | Vesting dates |
| Zoë Yujnovich | Buy-out award | 408,762 | 4,200 | 1 September 2026 (one-third)  1 September 2027 (one-third)  1 September 2028 (one-third) |

#### Statement of Di

#### rectors’ shareholdings and share interests

The Executive Directors are required to build up and hold a shareholding from vested share plan

awards until their shareholding requirement is met. Until this point, Executive Directors will not be

permitted to sell shares, other than to pay income tax liabilities on shares just vested or in exceptional

circumstances approved by the Committee. The following table shows the position of each of the

Executive Directors in relation to the shareholding requirement, including their connected persons.

The shareholding is as at 31 March 2026 and the salary used to calculate the value of the

shareholding is the gross salary as at 31 March 2026. The table also presents the number of shares

owned by the Non-executive Directors, including their connected persons.

Zoë Yujnovich is building up towards her shareholding requirement and Andy Agg has met his

shareholding requirement.

Further shares have been purchased in April and May 2026 on behalf of Andy Agg as part of the

Share Incentive Plan (SIP) (an HMRC tax-advantaged all-employee share plan), thereby increasing

the beneficial interests by 23 shares (11 in April and 12 in May) for Andy Agg. There have been no

other changes in Directors’ shareholdings between 1 April 2026 and 13 May 2026.

|  |  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |  |
| Directors | Share  ownership  requirements  (multiple of  salary) | Number of  shares owned  outright  (including  connected  persons and  SIP for  Executive  Directors) | Value of shares  held as a  multiple of  current salary  (including  connected  persons) | Number of  options  outstanding  under the  Sharesave Plan | Conditional  share awards  subject to  performance  conditions  (2023, 2024 and  2025 LTPP) | Share awards  subject to  time-based  vesting only  (buy-out  awards) |
| Executive Director | | | | | | |
| Zoë Yujnovich | 500% | - | - | 3,292 | 506,086 | 408,762 |
| Andy Agg | 400% | 883,769 | 1,367% | 4,777 | 715,558 | - |
| Former Executive Director | | | | | | |
| John Pettigrew | 500% | 2,124,589 | 2,164% | 4,219 | 1,268,341 | - |
| Non-executive Directors | | | | | | |
| Paula Rosput  Reynolds | - | 23,393 | - | - | - | - |
| Anne Robinson | - | - | - | - | - | - |
| Earl Shipp | - | 6,046 | - | - | - | - |
| Iain Mackay | - | 4,500 | - | - | - | - |
| Ian Livingston | - | 2,374 | - | - | - | - |
| Jacqui Ferguson | - | - | - | - | - | - |
| Jonathan Silver | - | - | - | - | - | - |
| Martha Wyrsch | - | 25,000 | - | - | - | - |
| Tony Wood | - | 2,583 | - | - | - | - |

Notes:

Zoë Yujnovich: On 31 March 2026, held 3,292 options under the Sharesave Plan with an exercise price of 928 pence per share (20% discounted

option price) which can, subject to their terms, be exercised between 1 April 2031 and 30 September 2031. The number of conditional share awards

subject to performance conditions is as follows: 2025 LTPP: 506,086. The number of shares awards subject to time-based vesting relates to the buy-

out award (408,762).

Andy Agg: On 31 March 2026, held 4,777 options granted under the Sharesave Plan with an exercise price of 628 pence per share (the 20%

discounted option price) and they can, subject to their terms, be exercised between 1 April 2026 and 30 September 2026. The number of conditional

share awards subject to performance conditions is as follows: 2023 LTPP: 237,390; 2024 LTPP: 247,193; and 2025 LTPP: 230,975.

John Pettigrew: On 31 March 2026, held 4,219 options granted under the Sharesave Plan with an exercise price of 743 pence per share (the 20%

discounted option price) which can, subject to their terms, be exercised between 1 April 2030 and 30 September 2030. The number of conditional

share awards subject to performance conditions is as follows: 2023 LTPP: 420,803; 2024 LTPP: 438,141 and 2025 LTPP: 409,397. During the year,

John exercised 4,670 share options granted under the Sharesave Plan at an option price of 642.30 pence per share.

Paula Rosput Reynolds, Earl Shipp and Martha Wyrsch: Hold American Depositary Shares (ADSs) and each ADS represents five ordinary shares,

as presented in the table above.

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 120 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| People & Remuneration Committee report cont.  Statement of implementation of Policy in 2025/26 cont. |  |  |  |  |  |

#### Post-employment shareholding requirements

Past Executive Directors are required to continue to hold their vested shares post-employment for a

period of two years in line with our current Policy.

To enforce this, the Executive Directors have given permission for the Group to periodically check with its

third-party share scheme administrator whether the minimum shareholding requirement is being

maintained. The Executive Directors have acknowledged that if they breach their post-employment

shareholding requirement for any reason, the Group may enforce at its discretion one or more of the

following processes: to request they repay to the Group an amount equivalent in value to the shareholding

requirement that has not been met; the Group may withdraw/vary the vesting of any future shares granted

under the LTPP; the Company may publish a public statement in a form, as the Group may decide, that

the Director has failed to comply with the post-employment shareholding requirement. Executive Directors

are reminded annually and when employed, of the post-employment shareholding requirement. At

termination, the minimum shareholding requirement is confirmed to the Director and checks are made by

the Group at the 12-month and 24-month anniversary of leaving and at the relevant financial year end, 31

March, to ascertain if their post-employment shareholding requirement has been met.

John Pettigrew stood down from the Board on 16 November 2025 and remained subject to an in-

employment shareholding requirement until his final employment date of 30 April 2026, at which time he

was subject to a post-employment shareholding requirement of 200% of salary for a period of two years.

As of 13 May 2026, John Pettigrew continued to meet his shareholding requirement.

#### Shareholder dilution

All Company employees are encouraged to become shareholders through a number of all-employee

share plans and a significant proportion of our employees participate annually. These plans include

Sharesave and the SIP in the UK and the US Employee Stock Purchase Plan (ESPP) and US Incentive

Thrift Plan (commonly referred to as a 401(k) plan) in the US which are summarised on page [255](#i01de1c16a17046d497a42f2f76dda2a5_59459) and in

our Policy.

Where shares may be issued or treasury shares reissued to satisfy incentives, dilution resulting from all

incentives, including all-employee incentives, will not exceed 10% in any 10-year period. The Committee

reviews dilution levels against this limit annually and under this limit the Company, as at 31 March 2026,

had a headroom of 8.18% respectively.

Unvested or unexercised awards under our all-employee and discretionary share plans that were

outstanding on 23 May 2024 have been adjusted to take account of the Rights Issue.

#### Chief Executive pay ratio

We have disclosed our Chief Executive pay ratios comparing the single total figure of remuneration of the

Chief Executive to the equivalent pay for the 25th percentile, median and 75th percentile UK employees

(calculated on a full-time equivalent basis), as well as the median Group-wide pay ratio.

The Chief Executive pay ratio has decreased from 85:1 to 52:1 at the UK median, primarily driven by the

Chief Executive leadership transition and the absence of share awards vesting during tenure. This has also

caused the Group median pay ratio to decrease when compared to last year. The Chief Executive

remuneration used in the pay ratio calculation reflects the combined single figure totals (as disclosed on

page [111](#ifb753f61964c48f58ba791324ef6fea3_226834)) for Zoë Yujnovich and John Pettigrew during the periods in which they served as Chief

Executive.

|  |  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |  |
|  | UK | | | |  | Group-wide |
| Year | Method | 25th percentile  pay ratio | Median pay  ratio | 75th percentile  pay ratio |  | Median pay  ratio |
| 2025/26 | Option A | 69 | 52 | 40 |  | 39 |
| 2024/25 | Option A | 112 | 85 | 65 |  | 61 |
| 2023/24 | Option A | 117 | 90 | 69 |  | 65 |
| 2022/23 | Option A | 144 | 111 | 86 |  | 76 |
| 2021/22 | Option A | 135 | 105 | 81 |  | 76 |
| 2020/21 | Option A | 104 | 81 | 62 |  | 54 |
| 2019/20 | Option A | 111 | 86 | 66 |  | 53 |
| 2018/19 – voluntary | Option A | 96 | 76 | 58 |  | 48 |

Notes: Salaries as at 31 March 2026 and estimated performance-based annual payments for 2025/26 have been annualised for part-time

employees to reflect full-time equivalents. Performance payments have not been further adjusted to compensate where new employees have

not completed a full performance year. The comparison with UK employees is specified by the 2018 amendment of The Large and Medium-

sized Companies and Groups (Accounts and Reports) Regulations 2008. US employees represent approximately 56% of our total

employees. Our median pay ratio on a Group-wide basis is outlined above and calculated on the same basis as the UK pay ratios and at an

exchange rate of $1.34332:£1.

Changes in the Chief Executive pay ratio reflect the fact that a key feature of our executive and senior

leadership remuneration strategy is heavily weighted towards longer-term performance share-based

reward, resulting in larger swings year-on-year than the wider workforce. Across the wider workforce,

employee remuneration is largely focused on in-year annual delivery.

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 121 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| People & Remuneration Committee report cont.  Statement of implementation of Policy in 2025/26 cont. |  |  |  |  |  |

The 2025/26 salary and total pay including benefits for the Chief Executive versus UK employees is shown below.

#### 2025/26 salary and benefits – Chief Executive versus UK wider workforce

|  |  |  |  |  |
| --- | --- | --- | --- | --- |
|  |  |  |  |  |
|  | Chief Executive remuneration | UK employee 25th percentile | UK employee median | UK employee 75th percentile |
| Salary | £1,201,000 | £45,495 | £53,379 | £68,321 |
| Total pay and benefits | £3,897,000 | £56,874 | £74,663 | £98,608 |

We have chosen to use Option A in calculating the ratios, which is a calculation based on the pay of all UK employees on a full-time equivalent basis, as this option is considered to be more statistically robust. The

ratios are based on total pay and benefits inclusive of short-term and long- term incentives applicable for the respective financial year (1 April – 31 March). The reference employees at the 25th, median and 75th

percentile have been determined by reference to pay and taxable benefits as at the last day of the respective financial year, 31 March, with estimates for the respective APP payouts and performance outcomes of the

LTPP and dividend equivalents.

We are satisfied that the median pay ratio reported this year is consistent with our wider pay, reward and progression policies for employees.

#### Relative importance of spend on pay

The chart below shows the relative importance of spend on pay compared with other costs and disbursements (dividends, tax, net interest and capital expenditure). Given the capital-intensive nature of our business

and the scale of our operations, these costs and disbursement were chosen as the most relevant measures for comparison purposes. All amounts exclude exceptional items and remeasurements.

18%

![7146825626854]()

5%

-5%

-7%

11%

Notes:

1. Presented on a continuing basis only.

2.  Percentage increase/decrease of the costs between years is shown.

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 122 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| People & Remuneration Committee report cont.  Statement of implementation of Policy in 2025/26 cont. |  |  |  |  |  |

#### Chief Executive’s pay in the last 10 financial years

Zoë Yujnovich became Chief Executive on 17 November 2025. John Pettigrew was Chief Executive from 1 April 2016 to 16 November 2025.

|  |  |  |  |  |  |  |  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |  |  |  |  |  |  |  |
|  | Zoë  Yujnovich |  | John  Pettigrew | | | | | | | | | |
|  | 2025/26 |  | 2025/26 | 2024/25 | 2023/24 | 2022/23 | 2021/22 | 2020/21 | 2019/20 | 2018/19 | 2017/18 | 2016/17 |
| Single total figure of remuneration (£'000) | 6,469 |  | 1,993 | 6,488 | 6,113 | 7,262 | 6,614 | 5,071 | 5,205 | 4,651 | 3,648 | 4,623 |
| Single total figure of remuneration including only 2014 LTPP (£'000) |  |  |  |  |  |  |  |  |  |  |  | 3,931 |
| APP (proportion of maximum awarded) | 74.22% |  | 71.22% | 91.92% | 75.50% | 82.62% | 85.20% | 80.43% | 70.58% | 84.20% | 82.90% | 73.86% |
| LTPP (proportion of maximum vesting) | – |  | – | 76.31% | 81.87% | 100.00% | 74.22% | 68.00% | 84.90% | 84.20% | 85.20% | 90.41% |

|  |  |  |
| --- | --- | --- |
|  |  |  |
|  |  |  |
|  | Notes:  Zoë Yujnovich: The single total figure of remuneration for 2025/26 is explained in the single total figure of remuneration table.  John Pettigrew: The single total figure of remuneration for 2025/26 is explained in the single total figure of remuneration table and the single total figure for 2024/25 has been restated to reflect actual share price for 2022 LTPP vesting in 2025 and dividend equivalent shares,  consistent with comparative figures shown in this year’s single total figure of remuneration table.  2014 LTPP: The 2016/17 single total figure of remuneration includes both the 2013 LTPP award and the 2014 LTPP award due to a change in the vesting period from four years (2013 LTPP) to three years (2014 LTPP). |  |
|  |  |  |

![]()

#### Single total figure of remuneration – Non-executive Directors

The following table shows a single total figure in respect of qualifying service for 2025/26, together with comparative figures for 2024/25:

|  |  |  |  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |  |  |  |
|  | Fees (£’000) | |  | Other emoluments (£’000) | |  | Total (£’000) | |
|  | 2025/26 | 2024/25 |  | 2025/26 | 2024/25 |  | 2025/26 | 2024/25 |
| Paula Rosput Reynolds | 753 | 724 |  | 50 | 51 |  | 803 | 775 |
| Anne Robinson | 133 | 121 |  | 2 | 1 |  | 135 | 123 |
| Earl Shipp | 139 | 129 |  | 6 | 7 |  | 145 | 136 |
| Iain Mackay | 164 | 158 |  | - | 40 |  | 165 | 198 |
| Ian Livingston | 199 | 189 |  | 1 | 1 |  | 199 | 190 |
| Jacqui Ferguson | 136 | 123 |  | 2 | 3 |  | 138 | 126 |
| Jonathan Silver | 131 | 120 |  | 2 | 4 |  | 133 | 124 |
| Martha Wyrsch | 146 | 134 |  | 11 | 10 |  | 157 | 145 |
| Tony Wood | 133 | 118 |  | 5 | 6 |  | 137 | 124 |
| Total | 1,934 | 1,816 |  | 79 | 123 |  | 2,012 | 1,941 |

|  |  |  |
| --- | --- | --- |
|  |  |  |
|  |  |  |
|  | Notes:  Other emoluments: In accordance with the Group’s expenses policies, Non-executive Directors receive reimbursement for their reasonable expenses for attending Board meetings. In instances where these costs are treated by HMRC as taxable benefits, the Group also meets the  associated tax cost to the Non-executive Directors through a PAYE settlement agreement with HMRC and these costs are included in the table above.  The total emoluments paid to Executive and Non-executive Directors in the year were £15.4 million (2024/25: £12.3 million). |  |
|  |  |  |

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 123 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| People & Remuneration Committee report cont.  Statement of implementation of Policy in 2025/26 cont. |  |  |  |  |  |

#### Percentage change in remuneration

(Executive Directors, Non-executive Directors, employee average)

We have included percentage change in salary/fee, benefits and bonus for each of the Directors compared with prior years. The regulations cover employees of the Parent Company only and not across the Group,

and given most employees, if not all, are employed by subsidiary undertakings, we have voluntarily chosen a comparator group of all employees in the UK and the US to provide a representative comparison. In line

with the regulations, we disclose this information to display a five-year history.

|  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |
|  | 2025/26 | | |  | 2024/25 | | |  | 2023/24 | | |  | 2022/23 | | |  | 2021/22 | | |
| Executive Directors | Salary | Benefits | Bonus |  | Salary | Benefits | Bonus |  | Salary | Benefits | Bonus |  | Salary | Benefits | Bonus |  | Salary | Benefits | Bonus |
| Zoë Yujnovich1 | n/a | n/a | n/a |  | n/a | n/a | n/a |  | n/a | n/a | n/a |  | n/a | n/a | n/a |  | n/a | n/a | n/a |
| Andy Agg | 4.9% | -15.2% | 32.2% |  | 4.4% | -14.3% | 29.6% |  | 4.6% | 0.3% | -7.8% |  | 6.5% | 32.6% | 2.1% |  | 6.5% | -31.6% | 15.9% |
| Former Executive Director |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |
| John Pettigrew2 | -34.6% | -2.5% | -19.0% |  | 4.4% | -54.0% | 27.0% |  | 3.9% | 48.9% | -5.0% |  | 3.4% | -42.0% | 0.3% |  | 1.7% | -8.8% | 7.8% |
| Non-executive Directors |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |
| Paula Rosput Reynolds | 4.1% | -2.1% | n/a |  | 3.4% | -9.2% | n/a |  | -% | 0.4% | n/a |  | 16.9% | 217.1% | n/a |  | 2816.8% | n/a | n/a |
| Anne Robinson | 9.4% | 115.9% | n/a |  | 4.3% | -89.4% | n/a |  | 5.4% | -23.7% | n/a |  | 474.0% | n/a | n/a |  | n/a | n/a | n/a |
| Earl Shipp | 7.9% | -15.0% | n/a |  | 4.4% | -31.1% | n/a |  | 0.7% | -51.6% | n/a |  | 9.0% | 208.6% | n/a |  | 8.6% | n/a | n/a |
| Iain Mackay | 4.3% | -99.6% | n/a |  | 10.2% | 86.5% | n/a |  | 60.7% | 9695.4% | n/a |  | n/a | n/a | n/a |  | n/a | n/a | n/a |
| Ian Livingston | 5.1% | -18.2% | n/a |  | 16.9% | n/a | n/a |  | 14.3% | -100.0% | n/a |  | 113.2% | 3.0% | n/a |  | n/a | n/a | n/a |
| Jacqui Ferguson | 10.9% | -33.3% | n/a |  | 362.3% | 166.7% | n/a |  | n/a | n/a | n/a |  | n/a | n/a | n/a |  | n/a | n/a | n/a |
| Jonathan Silver | 8.8% | -38.6% | n/a |  | -0.9% | -66.2% | n/a |  | -1.7% | -74.2% | n/a |  | 24.5% | 383.6% | n/a |  | -4.2% | n/a | n/a |
| Martha Wyrsch | 9.0% | 0.8% | n/a |  | 9.6% | 27.7% | n/a |  | 4.5% | -30.6% | n/a |  | 111.0% | 280.3% | n/a |  | n/a | n/a | n/a |
| Tony Wood | 12.1% | -21.2% | n/a |  | 4.3% | -60.0% | n/a |  | -3.1% | -19.0% | n/a |  | 144.2% | 857.5% | n/a |  | n/a | n/a | n/a |
| Employee median3 | -0.4% | -5.8% | -1.5% |  | 2.3% | 3.6% | -8.0% |  | 5.0% | 6.6% | -3.8% |  | 12.4% | 36.4% | -23.0% |  | 2.8% | 6.1% | 40.0% |

1. Zoë Yujnovich was appointed to the Board on 1 September 2025, therefore percentage change is not applicable for 2025/26.

2. John Pettigrew retired from the Board effective 16 November 2025, his leaving arrangement is set out on page [118](#ifb753f61964c48f58ba791324ef6fea3_226837).

3. The reduction in employee median values during 2025/26 primarily reflects the impact of exchange rate movements.

4. Benefits/other emoluments: For Executive Directors, benefits include private medical insurance, life assurance, allowance under the Group’s flexible benefits programme, travel and accommodation expenses, a fully expensed car or cash alternative and the use of a car and a driver

when required. For Non-executive Directors, the equivalent of benefits is emoluments. In accordance with the Group’s expenses policies, Non-executive Directors receive reimbursement for their reasonable expenses for attending Board meetings. In instances where these costs are

treated by HMRC as taxable benefits, the Group also meets the associated tax cost to the Non-executive Directors through a PAYE settlement agreement with HMRC and these costs are included in the table above.

#### Service contracts/letters of appointment

In line with our Policy, all Executive Directors have service contracts which are terminable by either party with 12 months’ notice commencing immediately after announcement. Non-executive Directors are subject to

letters of appointment. The Board Chair’s appointment is subject to six months’ notice by either party; for other Non-executive Directors, notice is one month. All Directors are required to be elected at each AGM.

There have been no changes made to Directors’ service contracts and letters of appointment. Copies of service contracts and letters of appointment are available for inspection at the Company’s registered office.

#### External appointments and retention of fees

As per our Policy, Executive Directors may, with the approval of the Board, accept one external appointment as a Non-executive Director of another company and retain any fees received for the appointment.

Experience as a board member of another company is considered to be valuable personal development, which in turn is of benefit to the Company. The table below details the Executive Directors’ appointments as

Non-executive Directors in other companies during the year ended 31 March 2026.

|  |  |
| --- | --- |
|  |  |
|  | Company |
| Zoë Yujnovich | Unilever plc |
| Andy Agg | The Weir Group plc |
| John Pettigrew | Rentokil Initial plc |

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 124 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| People & Remuneration Committee report cont.  Statement of implementation of Policy in 2025/26 cont. |  |  |  |  |  |

#### The Committee’s activities in 2025/26

|  |  |
| --- | --- |
|  |  |
| Meeting/circulations | Main areas of discussion |
| April 2025 | Remuneration arrangements as part of Chief Executive succession plan |
| May 2025 | AGM update  Approval of 2024/25 APP and 2022 LTPP outcomes for the Group Executive  Committee  Approval of the 2025/26 APP financial, operational and individual objectives and  2025 LTPP targets for the Group Executive Committee  Discussion on a number of governance updates, including share dilution limits and  shareholding for the Group Executive Committee |
| November 2025 | External market update and evolving governance  Update on the provisional incentive plan outcomes (2025/26 APP and outstanding  LTPP) for the Group Executive Committee  Discussion on the results of the half-year Group-wide employee engagement  survey |
| January 2026 | Discussion on the 2026/27 APP financial, operational and individual objectives and  2026 LTPP targets for the Group Executive Committee.  Review of broader workforce remuneration and approval of the Gender Pay Gap  calculation. |
| March 2026 | Discussion on the provisional incentive plan outcomes (2025/26 APP and  outstanding LTPP) for the Group Executive Committee  Discussion on the 2026/27 APP financial, operational and individual objectives and  2026 LTPP award for the Group Executive Committee  Market data review, salary increase proposals, in context of wider workforce  increases, for the Group Executive Committee  Review of Chair fees  Discussion on the results of the full-year Group-wide employee engagement  survey |

![7146825580950]()

#### Advisors to the People & Remuneration Committee

PricewaterhouseCoopers LLP (PwC) was selected by the Committee to become its independent advisor

from 3 August 2020 and provided advice and counsel to the Committee throughout 2025/26. PwC is a

member of the Remuneration Consultants Group (RCG) and has signed up to RCG’s code of conduct.

The Committee is satisfied that any potential conflicts were appropriately managed. Work undertaken by

PwC in its role as independent advisor to the Committee has incurred fees of £235,751 during the

2025/26 on the basis of time charged to perform services and deliverables.

The Committee reviews the objectivity and independence of the advice it receives from its advisors each

year. It is satisfied that PwC provided credible and professional advice. PwC has provided general and

technical remuneration services in relation to employees below Board and Group Executive Committee

level that include broad-based employee reward support and data assurance services. In addition, WTW

provided benchmarking support to the Committee in the year and incurred fees of £25,200.

The Committee considers the views of the Chair on the performance and remuneration of the Chief

Executive, and of the Chief Executive on the performance and remuneration of the other members of the

Group Executive Committee. The Committee is also supported by the Group Company Secretary, and

either he or his delegate acts as Secretary to the Committee; the Chief People Officer; the Group Head of

Reward; and, as required, the Chief Financial Officer and the Group Financial Controller.

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| Voting on the Policy and the Directors’ Remuneration Report at the 2025 AGM | | | | | |
| 2025 Policy | | |  | Directors’ Remuneration Report 2024/25 | |
|  |  |  |  |  |  |
| Notes:  1. The Directors’ Remuneration Policy voting figures shown refer to votes cast at the 2025 AGM and represent 76.43% of the issued share  capital. In addition, shareholders holding 3.9 million shares abstained.  2. The Directors’ Remuneration Report voting figures shown refer to votes cast at the 2025 AGM and represent 76.44% of the issued  share capital. In addition, shareholders holding 3.4 million shares abstained. | | | | | |

![7146825580978]()

|  |  |
| --- | --- |
|  |  |
|  | For 98% |
|  | Against 2% |

|  |  |
| --- | --- |
|  |  |
|  | For 99% |
|  | Against 1% |

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 125 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| People & Remuneration Committee report cont.  Implementation of the Policy for 2026/27 |  |  |  |  |  |

The 2025 Policy will be implemented in 2026/27 as detailed below.

#### Salary and pensions

Salary increases for the Executive Directors will be on par with the wider UK and US workforce principles

(4.5%). The wider workforce (non-union) salary budget increase is set at 3.5% plus 1% for compression

and market adjustment. Zoë Yujnovich and Andy Agg will each receive salary increases of 4.5% and 3.5%

respectively, effective from 1 July 2026, with both increases aligned with the principles applied in

determining increases across the wider workforce.

The Committee considers that the Chief Executive’s starting remuneration appropriately reflects that Zoë

is new to the role and deliberately positioned towards the lower end of the market. Since appointment,

Zoë has delivered exceptional performance, reinforcing the Committee’s performance‑first philosophy.

Subject to continued strong company and individual performance, the Committee expects to review salary

at the Chief Executive’s work anniversary, with a view to moving towards a more competitive level over

time. Any increase would be non‑automatic, consistent with the shareholder‑approved Policy, aligned with

relevant peer benchmarks, and reflective of the experience of shareholders.

John Pettigrew was Chief Executive to 16 November 2025 and continued to be available to the Group

through to the end of his 12-month notice period, which expired on 30 April 2026. His departure will be

treated in accordance with the Directors' Remuneration Policy and his service contract. Accordingly, he

continued to receive his current level of salary and benefits up to the cessation of his employment.

|  |  |  |  |
| --- | --- | --- | --- |
|  |  |  |  |
|  | From 1 July 2026 | From 1 July 2025 | % increase |
| Zoë Yujnovich | £1,359,000 | £1,300,000 | 4.5% |
| Andy Agg | £849,000 | £820,575 | 3.5% |

The pension contribution rate for both Executive Directors is in line with that for the UK wider workforce

and new joiners at 12%.

#### 2026/27 APP

The 2026/27 APP measures will be split across financial measures, operational measures and individual

objectives, weighted 70%, 15% and 15% respectively. The maximum APP award for both Executive

Directors for 2026/27 is 200% of salary.

|  |  |  |
| --- | --- | --- |
|  |  |  |
|  | Measure | Weighting |
| Financial measure | Underlying Group EPS | 35% |
|  | Group RoE | 35% |
| Operational measure | Performance delivery | 15% |
| Individual objectives |  | 15% |

#### Financial measures

For 2026/27, the Committee opted to retain Underlying Group EPS and Group RoE as financial measures.

Group RoE continues to be a relevant and important measure of performance as a primarily regulated

asset-based company and targets are set to ensure strong in-year returns and operational results. In

respect of earnings measures, Underlying Group EPS remains the most appropriate measure under the

APP from the perspective of the business, and the targets are set in a manner which considers specific

challenges and opportunities in the year ahead and are flexed accordingly while remaining consistent with

our longer-term performance goals.

Financial APP targets are considered commercially sensitive and consequently will be disclosed

retrospectively in the 2026/27 Directors’ Remuneration Report.

#### Operational measures

The Committee is introducing a “performance delivery” measure focusing on capital, asset, customer and

functional effectiveness. Performance will be assessed on delivering our capital programme on time and

on budget; improving asset reliability, safety and productivity through stronger asset management;

providing consistent, high‑quality customer experiences through clear communication and proactive

engagement; and enabling the business through efficient, responsive corporate functions and IT services.

#### Individual objectives

The Committee has approved individual objectives for the Executive Directors in line with key strategic and

operational priorities for the year ahead. Zoë Yujnovich’s individual objectives for 2026/27 are focused on:

(1) aligning the Board on strategic direction and enhancing strategic optionality; (2) driving big shifts by

developing talent and a high‑performance culture, building external influence and credibility, scaling

technology and innovation; and (3) delivering the brilliant basics. Andy Agg’s individual objectives are

focused on: (1) execute our growth strategy; (2) enhance our investor engagement; (3) embed technology

& innovation; and (4) enhance functional effectiveness.

#### 2026 LTPP

The 2026 LTPP performance measures and weightings for all Executive Directors comprise two equally

weighted financial measures totalling 80% and two equally weighted energy transformation measures

totalling 20% as outlined in the table below. The maximum 2026 LTPP award is 400% and 350% of salary

for Zoë Yujnovich and Andy Agg respectively.

LTPP performance is measured over the entire three-year performance period, which for the 2026 LTPP is

1 April 2026 – 31 March 2029.

|  |  |  |
| --- | --- | --- |
|  |  |  |
|  | Measure | Weighting |
| Financial measure | Cumulative 3-year Underlying Group  EPS | 40% |
|  | Group RoE | 40% |
| Energy transformation measures | Reduction of Scope 1 emissions | 10% |
|  | Enablement of strategic growth  initiative | 10% |

#### Financial measures

Financial measures under the 2026 LTPP are selected to provide alignment with the key drivers of the

Group’s long-term strategy and value creation for shareholders. Earnings growth and sustainable

investment returns remain key measures of long-term value creation in light of the Group’s regulated and

long-term nature.

The Committee is conscious that financial performance measures under our short-term (APP) and long-

term (LTPP) performance plans are similar, however we are of the belief that these measures are the

appropriate and correct measures to deliver both short and long-term business strategy as well as long-

term efficient asset growth and shareholder value.

Consequently, the 2026 LTPP financial measures are designed in a manner which incentivises alternative

elements of performance over the long term as compared with the short term. Specifically in LTPP, Group

RoE is averaged across the three-year performance period to incentivise sustainable returns for

shareholders in the longer term. Similarly, the cumulative three-year Underlying Group EPS measure

assesses Underlying EPS for the three years in the LTPP performance period.

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 126 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| People & Remuneration Committee report cont.  Implementation of the Policy for 2026/27 cont. |  |  |  |  |  |

Below are the performance ranges for the financial measures in the 2026 LTPP.

Performance conditions

|  |  |  |  |
| --- | --- | --- | --- |
|  |  |  |  |
| Performance measures | Weighting | Threshold 20%  vesting | Maximum 100%  vesting |
| Cumulative three-year Underlying Group EPS | 40% | 291p | 311p |
| Group RoE | 40% | 10.30% | 11.55% |

Note: Vesting between threshold and maximum will be on a straight-line basis. Underlying EPS growth reflects the cumulative summation of

the Underlying EPS results for each of the three years in the performance period: 2026/27, 2027/28 and 2028/29.

#### Energy transformation measures

Measures linked to the energy transformation continue to set out key targets and outcomes on the

Group’s journey to achieve: (1) reductions in the Company’s direct Scope 1 emissions and (2) enablement

of strategic growth initiative.

Similar to previous years, the reduction of Scope 1 emissions measure supports meeting our 2030 Group

emission reduction targets. These targets are SBTi validated and aligned to a 1.5ºC pathway.

The second measure of enablement of strategic growth initiative is being expanded to further align with

our strategy and include demand-side connections and large loads that support the energy transition and

business growth, in addition to generation connections. These demand-side connections include

transmission growth to support growth in renewable generation, electric vehicle demand and heat pumps

in distribution networks, electrification of industrial processes and data centre connections.

|  |  |  |  |
| --- | --- | --- | --- |
|  |  |  |  |
| Performance measures | Weighting | Threshold 20% vesting | Maximum 100%  vesting |
| Reduction of Scope 1 emissions | 10% | 3% | 9% |
| Enablement of strategic growth | 10% | Demand and generation connections  measured in MW | |

Notes:

Vesting between threshold and maximum will be on a straight-line basis.

The overall enablement of strategic growth initiative measure comprises of equally weighted demand and generation connection targets

across Electricity Transmission, Electricity Distribution, New England, and New York.

#### Fees for Non-executive Directors

Non-executive Director fees were reviewed in May 2026 and will be effective from 1 July 2026, in line with

the annual salary review cycle for our wider workforce.

|  |  |  |  |
| --- | --- | --- | --- |
|  |  |  |  |
|  | From 1 July 2026  (£’000) | From 1 July 2025  (£’000) | % increase vs  2025 |
| Chair | 795.0 | 760.8 | 4.5% |
| Senior Independent Director | 33.9 | 33.9 | —% |
| Board fee | 100.0 | 90.4 | 10.6% |
| Chair Audit & Risk Committee | 40.0 | 38.1 | 5.0% |
| Chair People & Remuneration Committee | 40.0 | 33.9 | 18.0% |
| Chair Nomination Committee | — | — | —% |
| Chair other Committees (Responsible Business,  Safety & Operations) | 30.0 | 28.3 | 6.0% |
| Audit & Risk Committee member | 26.0 | 26.0 | —% |
| People & Remuneration Committee member | 26.0 | 20.3 | 28.1% |
| Nomination Committee member | 10.0 | — | n/a |
| Other Committee member (Responsible Business,  Safety & Operations) | 17.0 | 17.0 | —% |

The above table incorporates adjustments following the December 2025 restructuring of the Committees to reflect changes in role scope.

These include the expansion of the Remuneration Committee to the People & Remuneration Committee, the establishment of the Nomination

Committee as a standalone committee, and changes to the composition of other Committees. Prior to the restructuring, other Committees

comprised Finance, Safety & Sustainability, and People & Governance.

The Directors’ Remuneration Report has been approved by the Board and signed on its behalf by:

#### Martha Wyrsch

Chair of the People & Remuneration Committee

13 May 2026

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc    Annual Report and Accounts  2025/26 | 127 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Financial Statements | | |  |  |  |

### Ready for the future

|  |  |
| --- | --- |
|  |  |
| [128](#i2193c7e7fbee4753bdbe2d16888565c8_193) | Statement of Directors’ responsibilities |
| [129](#i2193c7e7fbee4753bdbe2d16888565c8_196) | Independent Auditor’s Report |
| [137](#i2193c7e7fbee4753bdbe2d16888565c8_199) | Consolidated income statement |
| [138](#i2193c7e7fbee4753bdbe2d16888565c8_202) | Consolidated statement of comprehensive income |
| [139](#i2193c7e7fbee4753bdbe2d16888565c8_205) | Consolidated statement of changes in equity |
| [140](#i2193c7e7fbee4753bdbe2d16888565c8_208) | Consolidated statement of financial position |
| [141](#i2193c7e7fbee4753bdbe2d16888565c8_211) | Consolidated cash flow statement |
| [142](#i2193c7e7fbee4753bdbe2d16888565c8_217) | Note 1 – Basis of preparation and recent  accounting developments |
| [145](#i2193c7e7fbee4753bdbe2d16888565c8_220) | Note 2 – Segmental analysis |
| [149](#i2193c7e7fbee4753bdbe2d16888565c8_223) | Note 3 – Revenue |
| [152](#i2193c7e7fbee4753bdbe2d16888565c8_226) | Note 4 – Other operating costs |
| [154](#i2193c7e7fbee4753bdbe2d16888565c8_229) | Note 5 – Exceptional items and remeasurements |
| [158](#i2193c7e7fbee4753bdbe2d16888565c8_232) | Note 6 – Finance income and costs |
| [159](#i2193c7e7fbee4753bdbe2d16888565c8_235) | Note 7 – Tax |
| [163](#i2193c7e7fbee4753bdbe2d16888565c8_238) | Note 8 – Earnings per share (EPS) |
| [164](#i2193c7e7fbee4753bdbe2d16888565c8_241) | Note 9 – Dividends |
| [164](#i2193c7e7fbee4753bdbe2d16888565c8_244) | Note 10 – Assets held for sale and discontinued operations |
| [166](#i2193c7e7fbee4753bdbe2d16888565c8_247) | Note 11 – Goodwill |
| [167](#i2193c7e7fbee4753bdbe2d16888565c8_250) | Note 12 – Other intangible assets |
| [168](#i2193c7e7fbee4753bdbe2d16888565c8_253) | Note 13 – Property, plant and equipment |
| [171](#i2193c7e7fbee4753bdbe2d16888565c8_256) | Note 14 – Other non-current assets |

|  |  |
| --- | --- |
|  |  |
| [171](#i2193c7e7fbee4753bdbe2d16888565c8_259) | Note 15 – Financial and other investments |
| [172](#i2193c7e7fbee4753bdbe2d16888565c8_262) | Note 16 – Investments in joint ventures and associates |
| [174](#i2193c7e7fbee4753bdbe2d16888565c8_265) | Note 17 – Derivative financial instruments |
| [176](#i2193c7e7fbee4753bdbe2d16888565c8_268) | Note 18 – Inventories |
| [176](#i2193c7e7fbee4753bdbe2d16888565c8_271) | Note 19 – Trade and other receivables |
| [177](#i2193c7e7fbee4753bdbe2d16888565c8_274) | Note 20 – Cash and cash equivalents |
| [177](#i2193c7e7fbee4753bdbe2d16888565c8_277) | Note 21 – Borrowings |
| [178](#i2193c7e7fbee4753bdbe2d16888565c8_280) | Note 22 – Trade and other payables |
| [179](#i2193c7e7fbee4753bdbe2d16888565c8_283) | Note 23 – Contract liabilities |
| [179](#i2193c7e7fbee4753bdbe2d16888565c8_286) | Note 24 – Other non-current liabilities |
| [179](#i2193c7e7fbee4753bdbe2d16888565c8_289) | Note 25 – Pensions and other post-retirement benefits |
| [187](#i2193c7e7fbee4753bdbe2d16888565c8_292) | Note 26 – Provisions |
| [188](#i2193c7e7fbee4753bdbe2d16888565c8_295) | Note 27 – Share capital |
| [189](#i2193c7e7fbee4753bdbe2d16888565c8_301) | Note 28 – Other equity reserves |
| [190](#i2193c7e7fbee4753bdbe2d16888565c8_304) | Note 29 – Net debt |
| [194](#i2193c7e7fbee4753bdbe2d16888565c8_307) | Note 30 – Commitments and contingencies |
| [194](#i2193c7e7fbee4753bdbe2d16888565c8_310) | Note 31 – Related party transactions |
| [195](#i2193c7e7fbee4753bdbe2d16888565c8_313) | Note 32 – Financial risk management |
| [205](#i2193c7e7fbee4753bdbe2d16888565c8_316) | Note 33 – Borrowing facilities |
| [206](#i2193c7e7fbee4753bdbe2d16888565c8_319) | Note 34 – Subsidiary undertakings, joint arrangements  and associates |

|  |  |
| --- | --- |
|  |  |
| [210](#i2193c7e7fbee4753bdbe2d16888565c8_322) | Note 35 – Sensitivities |
| [211](#i2193c7e7fbee4753bdbe2d16888565c8_325) | Note 36 – Post balance sheet events |
| [212](#i2193c7e7fbee4753bdbe2d16888565c8_334) | Company accounting policies |
| [214](#i2193c7e7fbee4753bdbe2d16888565c8_340) | Company balance sheet |
| [215](#i2193c7e7fbee4753bdbe2d16888565c8_343) | Company statement of changes in equity |
| [216](#i2193c7e7fbee4753bdbe2d16888565c8_349) | Note 1 – Fixed asset investments |
| [216](#i2193c7e7fbee4753bdbe2d16888565c8_352) | Note 2 – Debtors |
| [217](#i2193c7e7fbee4753bdbe2d16888565c8_355) | Note 3 – Creditors |
| [217](#i2193c7e7fbee4753bdbe2d16888565c8_358) | Note 4 – Derivative financial instruments |
| [217](#i2193c7e7fbee4753bdbe2d16888565c8_361) | Note 5 – Investments |
| [218](#i2193c7e7fbee4753bdbe2d16888565c8_364) | Note 6 – Borrowings |
| [218](#i2193c7e7fbee4753bdbe2d16888565c8_367) | Note 7 – Share capital |
| [218](#i2193c7e7fbee4753bdbe2d16888565c8_370) | Note 8 – Shareholders’ equity and reserves |
| [218](#i2193c7e7fbee4753bdbe2d16888565c8_373) | Note 9 – Parent Company guarantees |
| [218](#i2193c7e7fbee4753bdbe2d16888565c8_376) | Note 10 – Audit fees |

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 128 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Statement of Directors’ responsibilities |  |  |  |  |  |

The Directors are responsible for preparing the Annual Report and Accounts,

including the Group financial statements and the Parent Company financial

statements in accordance with applicable law and regulations.

Company law requires the Directors to prepare financial statements for each financial year. Under that

law, the Directors are required to prepare the Group financial statements in accordance with International

Accounting Standards in conformity with the requirements of the Companies Act 2006 and International

Financial Reporting Standards (IFRS) as adopted by the UK. The financial statements also comply with

IFRS as issued by the IASB. In addition, the Directors have elected to prepare the Parent Company

financial statements in accordance with UK Generally Accepted Accounting Practice (UK Accounting

Standards and applicable law), including FRS 101 ‘Reduced Disclosure Framework’. Under company

law, the Directors must not approve the accounts unless they are satisfied that they give a true and fair

view of the state of affairs of the Group and Parent Company and of the profit or loss of the Group and

Parent Company for that period.

In preparing the Group financial statements, International Accounting Standard 1 requires that Directors:

– properly select and apply accounting policies;

– present information, including accounting policies, in a manner that provides relevant, reliable,

comparable and understandable information;

– provide additional disclosures when compliance with the specific requirements in IFRS are insufficient

to enable users to understand the impact of particular transactions, other events and conditions on

the entity’s financial position and financial performance; and

– make an assessment of the Group’s ability to continue as a going concern.

In preparing the Parent Company financial statements, the Directors are required to:

– select suitable accounting policies and then apply them consistently;

– make judgements and accounting estimates that are reasonable and prudent;

– state whether applicable UK Accounting Standards have been followed, subject to any material

departures disclosed and explained in the financial statements; and

– prepare the financial statements on the going concern basis unless it is inappropriate to presume

that the Company will continue in business.

The Directors are responsible for keeping adequate accounting records that are sufficient to show and

explain the Group and Parent Company’s transactions and disclose with reasonable accuracy at any

time the financial position of the Group and Parent Company on a consolidated and individual basis,

and to enable them to ensure that the Group financial statements comply with the Companies Act 2006.

They are also responsible for safeguarding the assets of the Parent Company and its subsidiaries and

hence for taking reasonable steps for the prevention and detection of fraud and other irregularities.

The Directors are responsible for the maintenance and integrity of the corporate and financial information

included on the Company’s website. Legislation in the UK governing the preparation and dissemination of

financial statements may differ from legislation in other jurisdictions.

Having made the requisite enquiries, so far as the Directors in office at the date of the approval of this

Report are aware, there is no relevant audit information of which the auditors are unaware and each

Director has taken all reasonable steps to make themselves aware of any relevant audit information and

to establish that the auditors are aware of that information.

Each of the Directors, whose names and functions are listed on pages [91](#i2193c7e7fbee4753bdbe2d16888565c8_145) – [93](#i4997ac40020447c895a078c99bce5833_0-0-1-1-921425) confirms that:

– to the best of their knowledge, the Group financial statements and the Parent Company financial

statements, which have been prepared in accordance with IFRS as issued by the IASB and IFRS

as adopted by the UK and UK GAAP FRS 101 respectively, give a true and fair view of the assets,

liabilities, financial position and profit of the Company on a consolidated and individual basis;

– to the best of their knowledge, the Strategic Report contained in the Annual Report and Accounts

includes a fair review of the development and performance of the business and the position of the

Company on a consolidated and individual basis, together with a description of the principal risks

and uncertainties that it faces; and

– they consider that the Annual Report and Accounts, taken as a whole, is fair, balanced and

understandable and provides the information necessary for shareholders to assess the Company’s

position and performance, business model and strategy.

This Responsibilities Statement was approved by the Board and signed on its behalf.

#### Directors’ Report

The Directors’ Report, prepared in accordance with the requirements of the Companies Act 2006 and the

UK Listing Authority’s Listing Rules, and Disclosure Guidance and Transparency Rules, comprising pages

[1](#i2193c7e7fbee4753bdbe2d16888565c8_10) – [126](#i42605b1d6ef943038816b8b341a1e2a7_29881) and [219](#i2193c7e7fbee4753bdbe2d16888565c8_382) – [261](#ibba07c05a16c49419b97ca277adc2fa7_45599), was approved by the Board and signed on its behalf.

#### Strategic Report

The Strategic Report, comprising pages  [1](#i2193c7e7fbee4753bdbe2d16888565c8_10) – [86](#i2193c7e7fbee4753bdbe2d16888565c8_130), was approved by the Board and signed on its behalf.

By order of the Board

#### Julian Baddeley

Group Company Secretary

13 May 2026

Company number: 04031152

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 129 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Independent Auditor’s Report to the members of National Grid plc | | |  |  |  |

#### Report on the audit of the financial statements

1. Opinion

![]()

|  |  |  |
| --- | --- | --- |
|  |  |  |
|  |  |  |
|  | In our opinion:  – the financial statements of National Grid Plc (the ‘Parent Company’) and its subsidiaries (the ‘Group’)  give a true and fair view of the state of the Group’s and of the Parent Company’s affairs as at  31 March 2026 and of the Group’s profit for the year then ended;  – the Group financial statements have been properly prepared in accordance with United Kingdom  adopted international accounting standards and IFRS Accounting Standards as issued by the  International Accounting Standards Board (IASB);  – the Parent Company financial statements have been properly prepared in accordance with  United Kingdom Generally Accepted Accounting Practice, including Financial Reporting  Standard 101 ‘Reduced Disclosure Framework’; and  – the financial statements have been prepared in accordance with the requirements of the  Companies Act 2006. |  |
|  |  |  |

We have audited the financial statements which comprise:

Group:

– the consolidated income statement;

– the consolidated statement of comprehensive income;

– the consolidated statement of financial position;

– the consolidated statements of changes in equity;

– the consolidated cash flow statement; and

– the related notes 1 to 36.

Parent Company:

– the Company accounting policies;

– the Company balance sheet;

– the Company statement of changes in equity; and

– the related notes 1 to 10.

The financial reporting framework that has been applied in the preparation of the Group financial

statements is applicable law, United Kingdom adopted international accounting standards and IFRS

Accounting Standards as issued by the IASB. The financial reporting framework that has been applied

in the preparation of the Parent Company financial statements is applicable law and United Kingdom

Accounting Standards, including Financial Reporting Standard 101 ‘Reduced Disclosure Framework’

(United Kingdom Generally Accepted Accounting Practice).

2. Basis for opinion

We conducted our audit in accordance with International Standards on Auditing (UK) (‘ISAs (UK)’)

and applicable law. Our responsibilities under those standards are further described in the auditor’s

responsibilities for the audit of the financial statements section of our report.

We are independent of the Group and the Parent Company in accordance with the ethical requirements

that are relevant to our audit of the financial statements in the UK, including the Financial Reporting

Council’s (the ‘FRC’s’) Ethical Standard as applied to listed public interest entities, and we have fulfilled

our other ethical responsibilities in accordance with these requirements. The non-audit services provided

to the Group and the Parent Company for the year are disclosed in note 4(e) to the consolidated financial

statements and note 10 to the Company financial statements. We confirm that we have not provided any

non-audit services prohibited by the FRC’s Ethical Standard to the Group or the Parent Company.

We believe that the audit evidence we have obtained is sufficient and appropriate to provide a basis

for our opinion.

3. Summary of our audit approach

|  |  |  |
| --- | --- | --- |
|  |  |  |
| Key audit matter | The key audit matter that we identified in the current year relates to US environmental  provisions.  Within this report, key audit matters are identified as follows: | |
|  | 24140_AuditorsIcon_NewlyIdentified.svg | Newly identified |
|  | 24140_AuditorsIcon_IncreasedRisk.svg | Increased level of risk |
|  | 24140_AuditorsIcon_SimilarRisk.svg | Similar level of risk |
|  |  | Decreased level of risk |
| Materiality | The materiality that we used for the Group financial statements was £180 million which  represents 4.3% of profit before tax from continuing operations and 4.7% of adjusted  profit before tax (profit before tax from continuing operations, excluding the impact of  reported exceptional items and remeasurements). | |
| Scoping | The Group is made up of eleven components. Of these, four were subject to audits of the  components’ entire financial information and seven were subject to audit of one or more  account balances of the component by the component audit teams or group audit team. | |
| Significant changes  in our approach | There have been no significant changes in our approach. | |

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 130 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Independent Auditor’s Report to the members of National Grid plc cont. | | |  |  |  |

4. Conclusions relating to going concern

|  |
| --- |
|  |
| In auditing the financial statements, we have concluded that the directors’ use of the going concern basis of accounting  in the preparation of the financial statements is appropriate.  Our evaluation of the directors’ assessment of the Group’s and Parent Company’s ability to continue to adopt the going  concern basis of accounting included:  – assessing available liquidity under management’s base case and a reasonable worst case scenario;  – assessing the financing facilities available including the nature of those facilities, repayment terms and covenants;  – testing the accuracy and appropriateness of the model used to prepare the forecasts;  – assessing the key assumptions used in the forecasts, including the impact of the current macroeconomic  environment;  – assessing potential mitigating actions identified by management and the appropriateness of inclusion of these in the  going concern assessment;  – assessing the historical accuracy of forecasts prepared by management;  – reading analyst reports, and utilising web scanning technology to identify industry data and other external information  to determine if it provided corroborative or contradictory evidence in relation to the assumptions used; and  – evaluating the disclosures made within the financial statements.  Based on the work we have performed, we have not identified any material uncertainties relating to events or conditions  that, individually or collectively, may cast significant doubt on the Group’s and Parent Company’s ability to continue as  a going concern for a period of at least twelve months from when the financial statements are authorised for issue.  In relation to the reporting on how the Group has applied the UK Corporate Governance Code, we have nothing  material to add or draw attention to in relation to the directors’ statement in the financial statements about whether the  directors considered it appropriate to adopt the going concern basis of accounting.  Our responsibilities and the responsibilities of the directors with respect to going concern are described in the relevant  sections of this report. |

5. Key audit matter

|  |  |
| --- | --- |
|  |  |
| The key audit matter communicated below is the matter that, in our professional judgement, was of most significance in  our audit of the financial statements of the current year and includes the most significant assessed risks of material  misstatement (whether or not due to fraud) that we identified. This matter had the greatest effect on: the overall audit  strategy; the allocation of resources in the audit; and directing the efforts of the engagement team.  This matter was addressed in the context of our audit of the financial statements as a whole, and in forming our opinion  thereon, and we do not provide a separate opinion on this matter. | |
| 5.1 US environmental provisions | |
| Key audit  matter  description | Refer to Audit & Risk Committee page [102](#if11c3cbaf3d84000b36cff578f5ee47e_358874) and notes 1D, 26 and 35 to the financial  statements.  At 31 March 2026, the Group has £2,011 million of environmental provisions in the United States  (‘US’) relating to a number of sites owned and managed by the Group, together with certain sites  which are no longer owned.  We have identified the US environmental provisioning at certain sites as a key audit matter due to  the complexities in estimating the future cost of remediation.  The sites with the highest level of estimation uncertainty were identified as those with significant  contamination (‘Superfund’ sites) and certain other legacy Manufactured Gas Plant (‘MGP’) sites  based on factors including the presence of regulatory correspondence in the year and the level of  change in the provision amount.  Environmental provisions are calculated based on management’s best estimate of the cash flows  that will be required to settle the obligation, discounted at a real discount rate, calculated based on  the US government bond yield curve and the weighted average life of the provisions.  The audit procedures required to evaluate the reasonableness of management’s estimates  and assumptions required a high degree of auditor judgement and an increased extent of effort.  Key estimates and assumptions included:  – the impact of changes in regulation or the environmental agencies’ interpretation and  implementation of the regulations;  – the extent of contamination identified and modelled from ongoing exploratory and remediation  works;  – the form, timing, extent, and associated cost of remediation needed; and  – the allocation of responsibility for remediation. |

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 131 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Independent Auditor’s Report to the members of National Grid plc cont. | | |  |  |  |

|  |  |
| --- | --- |
|  |  |
| 5.1 US environmental provisions cont. | |
| How the scope  of our audit  responded to  the key audit  matter | Our audit procedures related to the forecasts of future cash flows of the Superfund and certain  legacy MGP sites for US environmental provisions included the following, among others:  – We tested the effectiveness of controls over management’s compilation of its forecast cash  flows.  – We completed public domain searches on federal databases across all Group subsidiaries’ sites  to determine whether any relevant costs or applicable sites were omitted. We further checked for  the latest regulatory changes at the federal and local level, and precedent from remediation plans  recently agreed with the environmental agencies, to determine any indication of changing  requirements;  – We evaluated the results of ongoing environmental testing for potential non-compliance  or evidence that the existing or planned remediation activities would require revision or  enhancement; and  – We performed additional procedures regarding the uncertainty over the allocation of  responsibilities between the Potentially Responsible Parties (‘PRPs’);  – We made enquiries of the US internal legal counsel and obtained analysis directly from external  legal counsel to understand potential changes to previously determined PRP positions,  including shifts in liability, new legal interpretations, or ongoing negotiations that could impact  the Group's share of responsibility;  – We evaluated settlements reached in the current period with PRPs and analysed compliance  with funding contributions requests, comparing the terms and outcomes to the Group's  assumed shares of responsibility;  – We evaluated publicly available financial statement information and disclosures for a selection  of PRPs to identify contradictory evidence regarding their assumed share percentages and to  assess their financial viability, which could impact their ability to fulfil their allocated  responsibilities; and  – We assessed the extent to which the evidence obtained demonstrated that the allocations will  be substantially followed by all parties.  – We worked with our environmental specialists to assist us in evaluating the associated cost of  remediation. Procedures included:  – Agreeing the proposed remediation activities to technical engineering studies agreed with the  environmental agencies;  – Considering the latest correspondence with the environmental agencies where remediation  plans are yet to be agreed; and  – Agreeing costings to third-party contracts and estimates where available. |
| Key  observations | The relevant controls over the compilation of forecast cash flows were designed and  operating effectively.  We found the provisioning assumptions associated with the tested sites to be reasonable, including  the Superfund and MGP sites. In respect of the Superfund sites, we are satisfied  that management’s estimate of the proportion of costs expected to be allocated to the Group  are reasonable. |

6. Our application of materiality

|  |  |  |  |
| --- | --- | --- | --- |
|  |  |  |  |
| 6.1 Materiality | | | |
| We define materiality as the magnitude of misstatement in the financial statements that makes it probable that the  economic decisions of a reasonably knowledgeable person would be changed or influenced. We use materiality both  in planning the scope of our audit work and in evaluating the results of our work.  Based on our professional judgement, we determined materiality for the financial statements as a whole as follows: | | | |
|  | Group financial  statements |  | Parent Company  financial statements |
| Materiality | £180 million (2025: £160 million) |  | £180 million (2025:  £160 million) |
| Basis for determining  materiality | Our determined materiality represents 4.3% of profit before tax  from continuing operations (2025: 4.4%) and 4.7% (2025:  4.6%) of adjusted profit before tax (profit before tax from  continuing operations, excluding the impact of reported  exceptional items and remeasurements).  Prior year materiality was determined on a similar basis. |  | We determined  materiality for our audit  of the Parent Company  financial statements  using 0.9% of net assets  (2025: 0.8%).  We capped Parent  Company materiality  at the level of Group  materiality.  When performing  procedures on the  parent as a component  of the Group, we used  a lower performance  materiality of 55% of  the Group performance  materiality.  Prior year materiality  was determined on a  similar basis. |

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 132 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Independent Auditor’s Report to the members of National Grid plc cont. | | |  |  |  |

6. Our application of materiality cont.

|  |  |  |  |
| --- | --- | --- | --- |
|  |  |  |  |
| 6.1 Materiality cont. | | | |
|  | Group financial  statements |  | Parent Company  financial statements |
| Rationale for the  benchmark applied | Profit before tax is the benchmark ordinarily considered by  us when auditing listed entities. It provides comparability  against other companies across all sectors, but has  limitations when auditing companies whose earnings are  impacted by items which can be volatile from one period  to the next. It therefore may not be representative of the  volume of transactions and the overall size of the business  in a given year, or where the impact of volatility may result  in the recognition of material income or charges in a  particular year.  We consider adjusted profit before tax to be an important  benchmark of the performance of the Group. We consider  it appropriate to adjust for exceptional items and  remeasurements as these items are volatile and do not fully  reflect the underlying performance of the Group.  We conducted an assessment of which line items are the  most important to investors and analysts by reviewing  analyst reports and National Grid’s communications to  shareholders and lenders, as well as the communications of  peer companies. This assessment resulted in us considering  the benchmarks above in determining materiality.  Whilst not a measure in IFRS Accounting Standards,  adjusted profit is one of the key metrics communicated by  management in National Grid's results announcements. |  | As the Company is  non‑trading, operates  primarily as a holding  company for the Group’s  trading entities and is  not profit orientated,  we believe net assets  is the most appropriate  benchmark to use. |
| NG26_audit_scope_pies_AC.svg | |  |  |

|  |  |  |  |
| --- | --- | --- | --- |
|  |  |  |  |
| 6.2 Performance materiality | | | |
| We set performance materiality at a level lower than materiality to reduce the probability that, in aggregate, uncorrected  and undetected misstatements exceed the materiality for the financial statements as a whole. | | | |
|  | Group financial  statements |  | Parent Company  financial statements |
| Performance materiality | 70% (2025: 70%) of Group materiality. |  | 70% (2025: 70%)  of Parent Company  materiality. |
| Basis and rationale  for determining  performance materiality | In determining performance materiality, we considered the following factors:  – Our cumulative experience from prior year audits;  – The level of corrected and uncorrected misstatements identified;  – Our risk assessment, including our understanding of the entity and its environment; and  – Our assessment of the Group’s overall control environment. | | |
| 6.3 Error reporting threshold | | | |
| We agreed with the Audit & Risk Committee that we would report to them all audit differences in excess of £9 million  (2025: £8 million), as well as differences below that threshold that, in our view, warranted reporting on qualitative grounds.  We also report to the Audit & Risk Committee on disclosure matters that we identify when assessing the overall  presentation of the financial statements. | | | |

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 133 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Independent Auditor’s Report to the members of National Grid plc cont. | | |  |  |  |

7. Audit scope and execution

|  |  |  |
| --- | --- | --- |
|  |  |  |
| 7.1 Identification and scoping of components | | |
| Our audit scope was informed by our understanding of the Group’s internal and external environment, and the risks  of material misstatements at the Group level. We used data analytics tools and involved audit specialists in areas such  as IT, tax, treasury, and pensions to assess complex risks. In assessing audit scope, we considered the control  environment which is tailored to each business unit's specific circumstances. Group management maintains overall  control and requires sign-off on control attestations from all relevant business unit leaders.  We took a risk-based approach to scoping, considering both quantitative size based on revenue and property, plant  & equipment. We assessed these accounts as being indicative of operational significance and therefore appropriate  benchmarks. We also considered qualitative factors including, complexity of operations, commonality of controls,  internal audit findings, and regulatory environment.  Based on this assessment our audit work covered all eleven components, for which we performed audits of the  components’ entire financial information for four components. Audits of one or more account balances were performed  at the remaining seven components to address specific risks. We determined component performance materialities in  a range of £63.0 million – £81.9 million tailored for the size and specific risk factors on each component.  The Group audit team performed extensive procedures at the central and consolidated level. This included auditing the  Parent Company financial statements, performing audit procedures on centrally managed accounts like borrowings and  intercompany balances, testing Group-wide entity-level controls, and performing certain procedures on key areas, such  as the environmental provisions. Furthermore, our work covered testing of the consolidation process, including the  Group’s financial statements and their disclosures.  Finally, we conducted risk assessment procedures on components with balances not subject to further audit  procedures to assess whether the risk of material misstatement in the Group was reduced to an acceptably low level. | | |
| 7.2 Our consideration of the control environment | | |
| Our audit approach was generally to place reliance on the financial reporting and IT controls established by  management to mitigate the risk of misstatement. We tested financial reporting controls through a combination of tests  of inquiry, observation, inspection and re-performance. The Group’s financial reporting process relies on a high number  of UK and US applications. 58 IT systems were identified as relevant to the audit: 18 in the UK for ET, 12 for ED, and  28 in the US, General IT Controls and automated controls supporting the IT infrastructure were tested.  In some circumstances where controls were deficient and there were not sufficient mitigating or alternative controls  we could rely on, we adopted a substantive audit approach. Any control deficiencies considered to be significant were  communicated to the Audit & Risk Committee. Other deficiencies were communicated to management. For each  deficiency identified, we considered the impact on our audit and updated our audit plan accordingly.  The Group continues to invest in its internal controls as part of control improvement activities and in preparation for  the introduction of the Directors' declaration over the effectiveness of material internal controls which was set out in  the 2024 UK Corporate Governance Code and will be applicable for the year ending 31 March 2027. The Audit & Risk  Committee has discussed the transition to the 2024 UK Corporate Governance Code and management’s action plans  on page [100](#i2193c7e7fbee4753bdbe2d16888565c8_166). | | |

|  |  |  |
| --- | --- | --- |
|  |  |  |
| 7.3 Our consideration of climate-related risks | | |
| Climate Change impacts National Grid’s business in several ways as set out in the strategic report on page [53](#i2193c7e7fbee4753bdbe2d16888565c8_88)  of the  annual report and Note 1 of the financial statements on pages  [143](#i61c678bd841d4d03bb848674e52de72f_79097)  and [144](#i61c678bd841d4d03bb848674e52de72f_79098). It represents a key strategic consideration  of management.  We read the other information included in the Annual Report and considered (a) whether there was any material  inconsistency between the other information and the financial statements; or (b) whether there were any material  inconsistencies between the other information and our understanding of the business based on audit evidence  obtained and conclusions reached in the audit.  We reviewed management’s climate change risk assessment and evaluated the completeness of identified risks  and their impact on the financial statements. We also considered the impact of climate change in our broader risk  assessment procedures. Management’s assessment included an overview of legislative changes in the US and an  evaluation of the possible future use of National Grid’s US gas assets in a net zero carbon energy system. Both  management’s and our risk assessment identified the useful economic lives of the gas assets in the US as an area  of estimation uncertainty, as described in note 1 to the financial statements.  With the involvement of our ESG specialist we:  – Tested management’s control of the review of the bottom-up risk identification and assessment;  – Made enquiries of senior management to understand the potential impact of climate change risk including physical  risks to producing assets, the potential changes to the macro-economic environment and the potential for the  transition to a low carbon environment to occur quicker than anticipated;  – Read the climate-related statements made by management (as disclosed in the ‘Our Environment’ section  of the ‘Responsible Business Review’ in the Strategic Report) and considered whether these were in line with  our understanding of management’s approach to climate change, progress against its climate targets and the  narrative reporting was in line with financial statements and the knowledge obtained throughout the audit;  – Read the Task Force on Climate-related Financial Disclosures (‘TCFD’) and considered if any of the information  disclosed was inconsistent with the information we obtained through our audit;  – Performed analysis of risks disclosed within the annual reports of relevant peer companies; and  – Read and considered external publications by recognised authorities on climate change. | | |
| 7.4 Working with other auditors | | |
| For each of the components that maintain separate financial records with in-scope balances, we have engaged  component auditors from the Deloitte member firms in the US or the UK to perform procedures at these components  on our behalf. This approach allows us to engage local auditors who have appropriate knowledge of local regulations  to perform this audit work.  Direction, supervision, and review of the component auditors was performed by the Group audit team to ensure their  work was conducted in accordance with the overall Group audit plan. Global planning sessions were led by the Group  auditor to align component teams on audit strategy and delivery.  A dedicated oversight team maintained regular communication, and the Group team actively participated in  all component planning and closing meetings. This ongoing engagement allowed for the refinement of detailed referral  instructions, which were tailored for each component auditor. The extent of oversight was varied based on the risk  profile of each component and included both virtual and in-person file reviews of key risk areas to facilitate the timely  challenge of outcomes across the Group.  The senior statutory auditor and other Group audit partners conducted visits to meet in person with component teams,  meetings with local management, and reviewing key audit working papers on higher and significant-risk areas to drive  a consistent and high-quality audit.  The level of involvement of the lead engagement partner and the Group audit team in the component audits has been  extensive and we are satisfied that it has enabled us to conclude that sufficient appropriate audit evidence has been  obtained in support of our opinion on the Group financial statements as a whole. | | |

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 134 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Independent Auditor’s Report to the members of National Grid plc cont. | | |  |  |  |

7. Audit scope and execution cont.

|  |  |  |
| --- | --- | --- |
|  |  |  |
| 7.5 Use of audit technology | | |
| The controls and systems in place throughout the Group enable us to deploy and utilise process and data analytics.  We embed technology throughout our audit to improve the quality and effectiveness of our audit, including planning  and scoping, project management, risks and controls assessment, substantive testing and reporting insights to  management and the Audit & Risk Committee.  At the planning stage, our scoping tool profiled testing coverage across all significant accounts and performed  numerical analysis of untested balances. This insight assisted us in our assessment of the risk associated with the  untested portion of each account. To further support our iterative risk assessment, we used web scanning technology  to identify relevant industry and jurisdictional information. This external insight was factored into our audit procedures  for areas such as going concern, subsequent events, and environmental provisions.  In our testing of the IT environment and relevant systems, we utilised our Automated Controls Testing Tool. The tool  enabled the effective collection and evaluation of information, supporting our assessment of the relevant automated  business controls.  We also used process analytics to scrutinise selected large transactional data sets as part of our risk assessment  procedures. For the UK component where S/4HANA has been implemented, we generated a data-driven visualisation  of all transactions within the Procure to Pay process. Analysing the complete flow of transactions allowed us to  corroborate our understanding of the process, identify and investigate anomalies, and provide insight on the internal  control environment. Similarly, we used analytics to identify non-standard transactions in the UK capital expenditure  processes of the UK businesses, which focused our substantive procedures on items with elevated audit risk. | | |

8. Other information

|  |  |  |
| --- | --- | --- |
|  |  |  |
| The other information comprises the information included in the annual report, other  than the financial statements and our auditor’s report thereon. The directors are  responsible for the other information contained within the annual report.  Our opinion on the financial statements does not cover the other information and,  except to the extent otherwise explicitly stated in our report, we do not express any  form of assurance conclusion thereon.  Our responsibility is to read the other information and, in doing so, consider  whether the other information is materially inconsistent with the financial statements  or our knowledge obtained in the course of the audit, or otherwise appears to be  materially misstated.  If we identify such material inconsistencies or apparent material misstatements, we  are required to determine whether this gives rise to a material misstatement in the  financial statements themselves. If, based on the work we have performed, we  conclude that there is a material misstatement of this other information, we are  required to report that fact. |  | We have nothing to report  in this regard. |

9. Responsibilities of directors

|  |
| --- |
|  |
| As explained more fully in the statement of directors’ responsibilities, the directors are responsible for the preparation  of the financial statements and for being satisfied that they give a true and fair view, and for such internal control as  the directors determine is necessary to enable the preparation of financial statements that are free from material  misstatement, whether due to fraud or error. In preparing the financial statements, the directors are responsible for  assessing the Group’s and Parent Company’s ability to continue as a going concern, disclosing, as applicable, matters  related to going concern and using the going concern basis of accounting unless the directors either intend to liquidate  the Group or the Parent Company or to cease operations, or have no realistic alternative but to do so. |

10. Auditor’s responsibilities for the audit of the financial statements

|  |
| --- |
|  |
| Our objectives are to obtain reasonable assurance about whether the financial statements as a whole are free from  material misstatement, whether due to fraud or error, and to issue an auditor’s report that includes our opinion.  Reasonable assurance is a high level of assurance, but is not a guarantee that an audit conducted in accordance with  ISAs (UK) will always detect a material misstatement when it exists. Misstatements can arise from fraud or error and are  considered material if, individually or in the aggregate, they could reasonably be expected to influence the economic  decisions of users taken on the basis of these financial statements.  A further description of our responsibilities for the audit of the financial statements is located on the FRC’s website at:  [www.frc.org.uk/auditorsresponsibilities](https://www.frc.org.uk/auditorsresponsibilities). This description forms part of our auditor’s report. |

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 135 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Independent Auditor’s Report to the members of National Grid plc cont. | | |  |  |  |

11. Extent to which the audit was considered capable of detecting irregularities, including fraud

|  |
| --- |
|  |
| Irregularities, including fraud, are instances of non-compliance with laws and regulations. We design procedures in line  with our responsibilities, outlined above, to detect material misstatements in respect of irregularities, including fraud.  The extent to which our procedures are capable of detecting irregularities, including fraud is detailed below. |
| 11.1 Identifying and assessing potential risks related to irregularities |
| In identifying and assessing risks of material misstatement in respect of irregularities, including fraud and non-  compliance with laws and regulations, we considered the following:  – the nature of the industry and sector, control environment and business performance including the design of the  Group’s remuneration policies, key drivers for directors’ remuneration, bonus levels and performance targets;  – the Group’s own assessment of the risks that irregularities may occur either as a result of fraud or error that was  approved by the Audit & Risk Committee on 17th March 2026;  – results of our enquiries of management, internal audit and the Audit & Risk Committee about their own identification  and assessment of the risks of irregularities, including those that are specific to the Group’s sector;  – any matters we identified having obtained and reviewed the Group’s documentation of their policies and procedures  relating to:  – identifying, evaluating and complying with laws and regulations and whether they were aware of any instances  of non-compliance;  – detecting and responding to the risks of fraud and whether they have knowledge of any actual, suspected  or alleged fraud; and  – the internal controls established to mitigate risks of fraud or non-compliance with laws and regulations;  – the matters discussed among the engagement team, including component audit teams and our specialists regarding  how and where fraud might occur in the financial statements and any potential indicators of fraud. The engagement  team includes partners and staff who have extensive experience working with companies in the same sectors as  National Grid operates, and this experience was relevant to the discussion about where fraud risks may arise.  Fraud specialists also advised the engagement team of fraud schemes that had arisen in similar sectors and  industries, and they participated in the initial fraud risk assessment discussions.  In common with all audits under ISAs (UK), we are required to perform specific procedures to respond to the risk  of management override.  We also obtained an understanding of the legal and regulatory frameworks that the Group operates in, focusing  on provisions of those laws and regulations that had a direct effect on the determination of material amounts and  disclosures in the financial statements. The key laws and regulations we considered in this context included the  UK Companies Act, UK Listing Rules, pensions legislation, tax legislation, UK Corporate Governance Code, the  US Securities Exchange Act 1934 and relevant SEC regulations, as well as laws and regulations prevailing in each  country which we identified material operations.  In addition, we considered provisions of other laws and regulations that do not have a direct effect on the financial  statements but compliance with which may be fundamental to the Group’s ability to operate or to avoid a material  penalty. These included the Group’s operating licences, environmental regulations, General Data Protection  Requirements, US Foreign Corrupt Practices Act, and the UK Bribery Act. |

|  |
| --- |
|  |
| 11.2 Audit response to risks identified |
| As a result of performing the above, we did not identify any key audit matters related to the potential risk of fraud or  non-compliance with laws and regulations.  Our procedures to respond to risks identified included the following:  – reviewing the financial statement disclosures and testing to supporting documentation to assess compliance with  provisions of relevant laws and regulations described as having a direct effect on the financial statements;  – enquiring of management, the Audit & Risk Committee and in-house legal counsel concerning actual and potential  litigation and claims;  – performing analytical procedures to identify any unusual or unexpected relationships that may indicate risks  of material misstatement due to fraud;  – obtaining confirmations from external legal counsel concerning open litigation and claims;  – reading minutes of meetings of those charged with governance, reviewing internal audit reports and reviewing  correspondence with relevant regulatory authorities; and  – reviewing the outcome of any alleged fraud and bribery investigations as well as testing the entity-level controls,  particularly in respect of the compliance and ethics process.  In addressing the risk of fraud through management override of controls our procedures included:  – making enquiries of individuals involved in the financial reporting process about inappropriate or unusual activity  relating to the processing of journal entries and other adjustments;  – using our data analytics tools, we selected and tested journal entries and other adjustments which were either made  at the end of a reporting period or which identified activity that exhibited certain characteristics of audit interest;  – assessing whether the judgements made in making accounting estimates are indicative of a potential bias;  – performing analytical procedures to identify any unusual or unexpected relationships that may indicate risks  of material misstatement due to fraud; and  – considering whether any significant transactions are outside the normal course of business, or that otherwise appear  to be unusual due to their nature, timing or size.  We also communicated relevant identified laws and regulations and potential fraud risks to all engagement team  members including internal specialists and component audit teams and remained alert to any indications of fraud  or non-compliance with laws and regulations throughout the audit. |

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 136 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Independent Auditor’s Report to the members of National Grid plc cont. | | |  |  |  |

Report on other legal and regulatory requirements

12. Opinions on other matters prescribed by the Companies Act 2006

![]()

|  |  |  |
| --- | --- | --- |
|  |  |  |
|  |  |  |
|  | In our opinion the part of the directors’ remuneration report to be audited has been properly prepared in  accordance with the Companies Act 2006.  In our opinion, based on the work undertaken in the course of the audit:  – the information given in the strategic report and the directors’ report for the financial year for which the financial  statements are prepared is consistent with the financial statements; and  – the strategic report and the directors’ report have been prepared in accordance with applicable legal  requirements.  In the light of the knowledge and understanding of the Group and of the Parent Company and their environment  obtained in the course of the audit, we have not identified any material misstatements in the strategic report or the  directors’ report. |  |
|  |  |  |

13. Corporate Governance Statement

The UK Listing Rules require us to review the directors’ statement in relation to going concern, longer-term viability

and that part of the Corporate Governance Statement relating to the Group’s compliance with the provisions of the

UK Corporate Governance Code specified for our review.

![]()

|  |  |  |
| --- | --- | --- |
|  |  |  |
|  |  |  |
|  | Based on the work undertaken as part of our audit, we have concluded that each of the following elements of the  Corporate Governance Statement is materially consistent with the financial statements and our knowledge obtained  during the audit:  – the directors’ statement with regards to the appropriateness of adopting the going concern basis of accounting  and any material uncertainties identified set out on page [102](#if11c3cbaf3d84000b36cff578f5ee47e_358875);  – the directors’ explanation as to its assessment of the Group’s prospects, the period this assessment covers and  why the period is appropriate set out on page [86](#i2193c7e7fbee4753bdbe2d16888565c8_130);  – the directors’ statement on fair, balanced and understandable set out on page [102](#if11c3cbaf3d84000b36cff578f5ee47e_359009);  – the board’s confirmation that it has carried out a robust assessment of the emerging and principal risks set out  on pages [31](#i2193c7e7fbee4753bdbe2d16888565c8_4318) – [37](#i5b716aa667c3427e93e3ed5359a2f216_69412);  – the section of the annual report that describes the review of effectiveness of risk management and internal  control systems set out on page [30](#i2193c7e7fbee4753bdbe2d16888565c8_61); and  – the section describing the work of the Audit & Risk Committee set out on pages [100](#i2193c7e7fbee4753bdbe2d16888565c8_166) – [104](#if11c3cbaf3d84000b36cff578f5ee47e_358390). |  |
|  |  |  |

14. Matters on which we are required to report by exception

|  |  |
| --- | --- |
|  |  |
| 14.1 Adequacy of explanations received and accounting records | |
| Under the Companies Act 2006 we are required to report to you if, in our opinion:  – we have not received all the information and explanations we require for our audit; or  – adequate accounting records have not been kept by the Parent Company, or returns  adequate for our audit have not been received from branches not visited by us; or  – the Parent Company financial statements are not in agreement with the accounting  records and returns. | We have nothing to  report in respect of  these matters. |
| 14.2 Directors’ remuneration | |
| Under the Companies Act 2006 we are also required to report if in our opinion certain  disclosures of directors’ remuneration have not been made or the part of the directors’  remuneration report to be audited is not in agreement with the accounting records  and returns. | We have nothing to  report in respect of  these matters. |

15. Other matters which we are required to address

|  |  |
| --- | --- |
|  |  |
| 15.1 Auditor tenure | |
| Following the recommendation of the Audit & Risk Committee, we were appointed by the Shareholders at the Annual  General meeting held on 31 July 2017 to audit the financial statements for the year ending 31 March 2018 and  subsequent financial periods.  The period of total uninterrupted engagement including previous renewals and reappointments of the firm is ten years,  covering the years ending 31 March 2018 to 31 March 2026. | |
| 15.2 Consistency of the audit report with the additional report to the Audit & Risk Committee | |
| Our audit opinion is consistent with the additional report to the Audit & Risk Committee we are required to provide in  accordance with ISAs (UK). | |

16. Use of our report

This report is made solely to the company’s members, as a body, in accordance with Chapter 3 of Part 16 of the

Companies Act 2006. Our audit work has been undertaken so that we might state to the company’s members those

matters we are required to state to them in an auditor’s report and for no other purpose. To the fullest extent permitted

by law, we do not accept or assume responsibility to anyone other than the company and the company’s members as

a body, for our audit work, for this report, or for the opinions we have formed.

As required by the Financial Conduct Authority (FCA) Disclosure Guidance and Transparency Rule (DTR) 4.1.15R –

DTR 4.1.18R, these financial statements will form part of the Electronic Format Annual Financial Report filed on the

National Storage Mechanism of the FCA in accordance with DTR 4.1.15R – DTR 4.1.18R. This auditor’s report provides

no assurance over whether the Electronic Format Annual Financial Report has been prepared in compliance with

DTR 4.1.15R – DTR 4.1.18R.

#### Christopher Thomas FCA (Senior statutory auditor)

For and on behalf of Deloitte LLP

Statutory Auditor

London, United Kingdom

13 May 2026

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 137 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Consolidated income statement  for the years ended 31 March | | |  |  |  |

|  |  |  |  |  |  |  |  |  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |  |  |  |  |  |  |  |  |
|  |  |  | 2026 | | |  | 2025 | | |  | 2024 | | |
|  | Notes |  | Before  exceptional  items and  remeasurements  £m | Exceptional  items and  remeasurements  (note 5)  £m | Total  £m |  | Before  exceptional items  and  remeasurements  £m | Exceptional  items and  remeasurements  (note 5)  £m | Total  £m |  | Before  exceptional items  and  remeasurements  £m | Exceptional  items and  remeasurements  (note 5)  £m | Total  £m |
| Continuing operations |  |  |  |  |  |  |  |  |  |  |  |  |  |
| Revenue | 2(a), 3 |  | 17,687 | — | 17,687 |  | 18,378 | — | 18,378 |  | 19,850 | — | 19,850 |
| Impairment losses on financial assets | 4 |  | (243) | — | (243) |  | (200) | — | (200) |  | (179) | — | (179) |
| Other operating costs | 4, 5 |  | (12,400) | (102) | (12,502) |  | (13,413) | 169 | (13,244) |  | (14,221) | (987) | (15,208) |
| Other operating income | 5 |  | — | 489 | 489 |  | — | — | — |  | 12 | — | 12 |
| Operating profit | 2(b) |  | 5,044 | 387 | 5,431 |  | 4,765 | 169 | 4,934 |  | 5,462 | (987) | 4,475 |
| Finance income | 5, 6 |  | 378 | 2 | 380 |  | 449 | 1 | 450 |  | 244 | 4 | 248 |
| Finance costs | 5, 6 |  | (1,649) | (56) | (1,705) |  | (1,810) | 3 | (1,807) |  | (1,723) | 11 | (1,712) |
| Share of post-tax results of joint ventures and associates | 5, 16 |  | 76 | — | 76 |  | 75 | (2) | 73 |  | 101 | (64) | 37 |
| Profit before tax | 2(b), 5 |  | 3,849 | 333 | 4,182 |  | 3,479 | 171 | 3,650 |  | 4,084 | (1,036) | 3,048 |
| Tax | 5, 7 |  | (955) | 16 | (939) |  | (861) | 40 | (821) |  | (983) | 152 | (831) |
| Profit after tax from continuing operations |  |  | 2,894 | 349 | 3,243 |  | 2,618 | 211 | 2,829 |  | 3,101 | (884) | 2,217 |
| Profit after tax from discontinued operations | 10 |  | — | — | — |  | 4 | 72 | 76 |  | 13 | 61 | 74 |
| Total profit for the year |  |  | 2,894 | 349 | 3,243 |  | 2,622 | 283 | 2,905 |  | 3,114 | (823) | 2,291 |
| Attributable to: |  |  |  |  |  |  |  |  |  |  |  |  |  |
| Equity shareholders of the parent |  |  | 2,892 | 349 | 3,241 |  | 2,619 | 283 | 2,902 |  | 3,113 | (823) | 2,290 |
| Non-controlling interests |  |  | 2 | — | 2 |  | 3 | — | 3 |  | 1 | — | 1 |
| Earnings per share (pence) |  |  |  |  |  |  |  |  |  |  |  |  |  |
| Basic earnings per share (continuing) | 8 |  |  |  | 65.5 |  |  |  | 60.0 |  |  |  | 55.5 |
| Diluted earnings per share (continuing) | 8 |  |  |  | 65.2 |  |  |  | 59.8 |  |  |  | 55.3 |
| Basic earnings per share (continuing and discontinued) | 8 |  |  |  | 65.5 |  |  |  | 61.6 |  |  |  | 57.4 |
| Diluted earnings per share (continuing and discontinued) | 8 |  |  |  | 65.2 |  |  |  | 61.4 |  |  |  | 57.1 |

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 138 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Consolidated statement of comprehensive income  for the years ended 31 March | | |  |  |  |

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
|  |  |  | 2026 | 2025 | 2024 |
|  | Notes |  | £m | £m | £m |
| Profit after tax from continuing operations |  |  | 3,243 | 2,829 | 2,217 |
| Profit after tax from discontinued operations |  |  | — | 76 | 74 |
| Total profit for the year |  |  | 3,243 | 2,905 | 2,291 |
| Other comprehensive income from continuing operations |  |  |  |  |  |
| Items from continuing operations that will never be reclassified to profit or loss: |  |  |  |  |  |
| Remeasurement gains/(losses) on pension assets and post-retirement benefit obligations | 25 |  | 132 | (106) | (218) |
| Net gains/(losses) in respect of cash flow hedging of capital expenditure |  |  | 22 | (16) | (37) |
| Tax on items that will never be reclassified to profit or loss | 7 |  | (44) | 27 | 59 |
| Total items from continuing operations that will never be reclassified to profit or loss |  |  | 110 | (95) | (196) |
| Items from continuing operations that may be reclassified subsequently to profit or loss: |  |  |  |  |  |
| Retranslation of net assets offset by net investment hedge |  |  | (348) | (352) | (335) |
| Exchange differences reclassified to the consolidated income statement on disposal | 10 |  | 76 | — | — |
| Net (losses)/gains in respect of cash flow hedges |  |  | (120) | 218 | 240 |
| Net gains/(losses) in respect of cost of hedging |  |  | 36 | (52) | 26 |
| Net gains on investment in debt instruments measured at fair value through other comprehensive income |  |  | 8 | 1 | 21 |
| Tax on items that may be reclassified subsequently to profit or loss | 7 |  | 21 | (40) | (66) |
| Total items from continuing operations that may be reclassified subsequently to profit or loss |  |  | (327) | (225) | (114) |
| Other comprehensive loss |  |  | (217) | (320) | (310) |
| Other comprehensive (loss)/income for the year from discontinued operations, net of tax | 10 |  | — | (10) | 10 |
| Other comprehensive loss |  |  | (217) | (330) | (300) |
| Total comprehensive income for the year from continuing operations |  |  | 3,026 | 2,509 | 1,907 |
| Total comprehensive income for the year from discontinued operations | 10 |  | — | 66 | 84 |
| Total comprehensive income for the year |  |  | 3,026 | 2,575 | 1,991 |
| Attributable to: |  |  |  |  |  |
| Equity shareholders of the parent |  |  |  |  |  |
| From continuing operations |  |  | 3,022 | 2,508 | 1,906 |
| From discontinued operations |  |  | — | 66 | 84 |
|  |  |  | 3,022 | 2,574 | 1,990 |
| Non-controlling interests |  |  |  |  |  |
| From continuing operations |  |  | 4 | 1 | 1 |

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 139 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Consolidated statement of changes in equity  for the years ended 31 March | | |  |  |  |

|  |  |  |  |  |  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |  |  |  |  |  |
|  | Notes | Share  capital  £m | Share  premium account  £m | Retained  earnings  £m | Other equity  reserves  1  £m |  | Total shareholders’  equity  £m | Non-  controlling interests  £m |  | Total  equity  £m |
| At 31 March 2023 |  | 488 | 1,302 | 31,608 | (3,860) |  | 29,538 | 24 |  | 29,562 |
| Profit for the year |  | — | — | 2,290 | — |  | 2,290 | 1 |  | 2,291 |
| Other comprehensive loss for the year |  | — | — | (168) | (132) |  | (300) | — |  | (300) |
| Total comprehensive income/(loss) for the year |  | — | — | 2,122 | (132) |  | 1,990 | 1 |  | 1,991 |
| Equity dividends |  | — | — | (1,718) | — |  | (1,718) | — |  | (1,718) |
| Scrip dividend-related share issue 2 |  | 5 | (6) | — | — |  | (1) | — |  | (1) |
| Issue of treasury shares |  | — | — | 21 | — |  | 21 | — |  | 21 |
| Transactions in own shares |  | — | 2 | (6) | — |  | (4) | — |  | (4) |
| Share-based payments |  | — | — | 37 | — |  | 37 | — |  | 37 |
| Tax on share-based payments |  | — | — | 2 | — |  | 2 | — |  | 2 |
| Cash flow hedges transferred to the statement of financial position, net of tax |  | — | — | — | 2 |  | 2 | — |  | 2 |
| At 1 April 2024 |  | 493 | 1,298 | 32,066 | (3,990) |  | 29,867 | 25 |  | 29,892 |
| Profit for the year |  | — | — | 2,902 | — |  | 2,902 | 3 |  | 2,905 |
| Other comprehensive loss for the year |  | — | — | (80) | (248) |  | (328) | (2) |  | (330) |
| Total comprehensive income/(loss) for the year |  | — | — | 2,822 | (248) |  | 2,574 | 1 |  | 2,575 |
| Rights Issue | 27 | 135 | — | — | 6,704 |  | 6,839 | — |  | 6,839 |
| Transfer between reserves | 27 | — | — | 6,704 | (6,704) |  | — | — |  | — |
| Equity dividends |  | — | — | (1,529) | — |  | (1,529) | — |  | (1,529) |
| Scrip dividend-related share issue 2 |  | 10 | (10) | — | — |  | — | — |  | — |
| Issue of treasury shares |  | — | — | 18 | — |  | 18 | — |  | 18 |
| Transactions in own shares |  | — | 4 | (11) | — |  | (7) | — |  | (7) |
| Other movements in non-controlling interests |  | — | — | — | — |  | — | (3) |  | (3) |
| Share-based payments |  | — | — | 37 | — |  | 37 | — |  | 37 |
| Tax on share-based payments |  | — | — | (1) | — |  | (1) | — |  | (1) |
| Cash flow hedges transferred to the statement of financial position, net of tax |  | — | — | — | 5 |  | 5 | — |  | 5 |
| At 1 April 2025 |  | 638 | 1,292 | 40,106 | (4,233) |  | 37,803 | 23 |  | 37,826 |
| Profit for the year |  | — | — | 3,241 | — |  | 3,241 | 2 |  | 3,243 |
| Other comprehensive income/(loss) for the year |  | — | — | 93 | (312) |  | (219) | 2 |  | (217) |
| Total comprehensive income/(loss) for the year |  | — | — | 3,334 | (312) |  | 3,022 | 4 |  | 3,026 |
| Equity dividends |  | — | — | (1,623) | — |  | (1,623) | — |  | (1,623) |
| Scrip dividend-related share issue 2 |  | 9 | (9) | — | — |  | — | — |  | — |
| Issue of treasury shares |  | — | — | 40 | — |  | 40 | — |  | 40 |
| Transactions in own shares |  | — | 2 | (3) | — |  | (1) | — |  | (1) |
| Other movements in non-controlling interests |  | — | — | — | — |  | — | 4 |  | 4 |
| Share-based payments |  | — | — | 45 | — |  | 45 | — |  | 45 |
| Tax on share-based payments |  | — | — | 10 | — |  | 10 | — |  | 10 |
| Cash flow hedges transferred to the statement of financial position, net of tax |  | — | — | — | 3 |  | 3 | — |  | 3 |
| At 31 March 2026 |  | 647 | 1,285 | 41,909 | (4,542) |  | 39,299 | 31 |  | 39,330 |

1. For further details of other equity reserves, see note 28.

2. Included within the share premium account are costs associated with scrip dividends.

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 140 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Consolidated statement of financial position  as at 31 March | | |  |  |  |

|  |  |  |  |  |
| --- | --- | --- | --- | --- |
|  |  |  |  |  |
|  |  |  | 2026 | 2025 |
|  | Notes |  | £m | £m |
| Non-current assets |  |  |  |  |
| Goodwill | 11 |  | 9,417 | 9,532 |
| Other intangible assets | 12 |  | 3,879 | 3,564 |
| Property, plant and equipment | 13 |  | 81,520 | 74,091 |
| Other non-current assets | 14 |  | 1,384 | 959 |
| Pensions and other post-retirement benefit assets | 25 |  | 2,507 | 2,489 |
| Financial and other investments | 15 |  | 842 | 798 |
| Investments in joint ventures and associates | 16 |  | 624 | 608 |
| Derivative financial assets | 17 |  | 623 | 369 |
| Total non-current assets |  |  | 100,796 | 92,410 |
| Current assets |  |  |  |  |
| Inventories | 18 |  | 559 | 557 |
| Trade and other receivables | 19 |  | 3,867 | 4,092 |
| Current tax assets |  |  | 16 | 11 |
| Financial and other investments | 15 |  | 2,453 | 5,753 |
| Derivative financial assets | 17 |  | 215 | 113 |
| Cash and cash equivalents | 20 |  | 375 | 1,178 |
| Assets held for sale | 10 |  | — | 2,628 |
| Total current assets |  |  | 7,485 | 14,332 |
| Total assets |  |  | 108,281 | 106,742 |

|  |  |  |  |  |
| --- | --- | --- | --- | --- |
|  |  |  |  |  |
|  |  |  | 2026 | 2025 |
|  | Notes |  | £m | £m |
| Current liabilities |  |  |  |  |
| Borrowings | 21 |  | (3,900) | (4,662) |
| Derivative financial liabilities | 17 |  | (268) | (381) |
| Trade and other payables | 22 |  | (5,049) | (4,472) |
| Contract liabilities | 23 |  | (110) | (96) |
| Current tax liabilities |  |  | (45) | (219) |
| Provisions | 26 |  | (425) | (357) |
| Liabilities held for sale | 10 |  | — | (434) |
| Total current liabilities |  |  | (9,797) | (10,621) |
| Non-current liabilities |  |  |  |  |
| Borrowings | 21 |  | (42,855) | (42,877) |
| Derivative financial liabilities | 17 |  | (750) | (821) |
| Other non-current liabilities | 24 |  | (1,114) | (876) |
| Contract liabilities | 23 |  | (2,699) | (2,418) |
| Deferred tax liabilities | 7 |  | (9,040) | (8,038) |
| Pensions and other post-retirement benefit obligations | 25 |  | (360) | (573) |
| Provisions | 26 |  | (2,336) | (2,692) |
| Total non-current liabilities |  |  | (59,154) | (58,295) |
| Total liabilities |  |  | (68,951) | (68,916) |
| Net assets |  |  | 39,330 | 37,826 |
| Equity |  |  |  |  |
| Share capital | 27 |  | 647 | 638 |
| Share premium account |  |  | 1,285 | 1,292 |
| Retained earnings |  |  | 41,909 | 40,106 |
| Other equity reserves | 28 |  | (4,542) | (4,233) |
| Total shareholders’ equity |  |  | 39,299 | 37,803 |
| Non-controlling interests |  |  | 31 | 23 |
| Total equity |  |  | 39,330 | 37,826 |

The consolidated financial statements set out on pages 137 – 211 were approved by the Board of

Directors on 13 May 2026  and were signed on its behalf by:

#### Zoë Yujnovich

Chief Executive

#### Andy Agg

Chief Financial Officer

National Grid plc

Registered number: 4031152

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 141 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Consolidated cash flow statement  for the years ended 31 March | | |  |  |  |

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
|  |  |  | 2026 | 2025 | 2024 |
|  | Notes |  | £m | £m | £m |
| Cash flows from operating activities |  |  |  |  |  |
| Total operating profit from continuing operations | 2(b) |  | 5,431 | 4,934 | 4,475 |
| Adjustments for: |  |  |  |  |  |
| Exceptional items and remeasurements | 5 |  | (387) | (169) | 987 |
| Other fair value movements |  |  | (31) | 66 | (16) |
| Depreciation, amortisation and impairment |  |  | 2,247 | 2,175 | 2,061 |
| Share-based payments |  |  | 45 | 37 | 37 |
| Changes in working capital |  |  | 759 | 104 | (49) |
| Changes in provisions |  |  | (127) | 10 | (154) |
| Changes in pensions and other post-retirement  benefit obligations |  |  | (31) | (90) | 31 |
| Cash flows relating to exceptional items |  |  | (45) | (76) | (91) |
| Cash generated from operations – continuing operations |  |  | 7,861 | 6,991 | 7,281 |
| Tax paid |  |  | (32) | (183) | (342) |
| Net cash inflow from operating activities –  continuing operations |  |  | 7,829 | 6,808 | 6,939 |
| Cash flows from investing activities |  |  |  |  |  |
| Purchases of intangible assets |  |  | (586) | (526) | (549) |
| Purchases of property, plant and equipment |  |  | (9,989) | (8,780) | (6,904) |
| Disposals of property, plant and equipment |  |  | 68 | 26 | 52 |
| Investments in joint ventures and associates |  |  | (94) | (396) | (332) |
| Dividends received from joint ventures, associates  and other investments |  |  | 105 | 126 | 176 |
| Disposal of interest in National Grid Renewables 1 | 10 |  | 1,473 | — | — |
| Disposal of interest in Grain LNG 1 | 10 |  | 1,336 | — | — |
| Disposal of interest in the UK Electricity System Operator 1 |  |  | — | 577 | — |
| Disposal of interest in the UK Gas Transmission business1 | 10 |  | — | 686 | 681 |
| Disposal of financial and other investments |  |  | 67 | 85 | 102 |
| Acquisition of financial investments |  |  | (67) | (122) | (81) |
| Contributions to National Grid Renewables and Emerald  Energy Venture LLC |  |  | — | — | (19) |
| Net movements in short-term financial investments |  |  | 3,285 | (2,606) | (1,141) |
| Interest received | 29(b) |  | 231 | 332 | 148 |
| Cash inflows on derivatives | 29(b) |  | 20 | 11 | 123 |
| Cash outflows on derivatives | 29(b) |  | (6) | (6) | — |
| Cash flows relating to exceptional items |  |  | — | — | 143 |
| Net cash flow used in investing activities –  continuing operations |  |  | (4,157) | (10,593) | (7,601) |
| Net cash inflow from investing activities –  discontinued operations |  |  | — | 22 | 102 |

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
|  |  |  | 2026 | 2025 | 2024 |
|  | Notes |  | £m | £m | £m |
| Cash flows from financing activities |  |  |  |  |  |
| Proceeds of Rights Issue | 27 |  | — | 7,001 | — |
| Transaction fees related to Rights Issue | 27 |  | — | (162) | — |
| Proceeds from issue of treasury shares |  |  | 40 | 18 | 20 |
| Transactions in own shares |  |  | (1) | (7) | (4) |
| Proceeds received from loans | 29(b) |  | 4,172 | 3,237 | 5,563 |
| Repayment of loans | 29(b) |  | (2,961) | (2,861) | (1,701) |
| Payments of lease liabilities | 29(b) |  | (145) | (130) | (118) |
| Net movements in short-term borrowings | 29(b) |  | (2,225) | 925 | 544 |
| Cash inflows on derivatives | 29(b) |  | 93 | 62 | 86 |
| Cash outflows on derivatives | 29(b) |  | (38) | (106) | (58) |
| Interest paid | 29(b) |  | (1,932) | (1,920) | (1,627) |
| Dividends paid to shareholders | 9 |  | (1,623) | (1,529) | (1,718) |
| Net cash flow (used in)/from financing activities –  continuing operations |  |  | (4,620) | 4,528 | 987 |
| Net cash flow used in financing activities –  discontinued operations |  |  | — | — | — |
| Net (decrease)/increase in cash and cash  equivalents | 29(b) |  | (948) | 765 | 427 |
| Reclassification to held for sale | 10, 29(b) |  | 153 | (123) | (30) |
| Exchange movements | 29(b) |  | (8) | (23) | (1) |
| Cash and cash equivalents at start of year |  |  | 1,178 | 559 | 163 |
| Cash and cash equivalents at end of year | 20 |  | 375 | 1,178 | 559 |

1. Balances consist of cash proceeds received, net of cash disposed.

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 142 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Notes to the consolidated financial statements | | |  |  |  |

1. Basis of preparation and recent accounting developments

|  |  |  |
| --- | --- | --- |
|  |  |  |
|  |  |  |
|  | Accounting policies describe our approach to recognising and measuring transactions  and balances in the year. The accounting policies applicable across the financial statements  are shown below, whereas accounting policies that are specific to a component of the  financial statements have been incorporated into the relevant note.  This section also shows areas of judgement and key sources of estimation uncertainty in  these financial statements. In addition, we have summarised new International Accounting  Standards Board (IASB) and UK endorsed accounting standards, amendments and  interpretations and whether these are effective for this year end or in later years, explaining  how significant changes are expected to affect our reported results. |  |
|  |  |  |

![]()

National Grid’s principal activities involve the transmission and distribution of electricity in Great Britain and

of electricity and gas in northeastern US.  The Company is a  public limited liability company  incorporated

and domiciled in England and Wales , with its registered office at 1–3 Strand, London, WC2N 5EH.

The Company, National Grid plc , which is the ultimate parent of the Group, has its primary listing on

the London Stock Exchange and is also quoted on the New York Stock Exchange.

These consolidated financial statements were approved for issue by the Board on 13 May 2026.

These consolidated financial statements have been prepared in accordance with IFRS® Accounting

Standards (IFRSs) as issued by the IASB and as adopted by the UK. They are prepared on the basis

of all IFRSs that are mandatory for the period ended 31 March 2026 and in accordance with the

Companies Act 2006. The comparative financial information has also been prepared on this basis.

The consolidated financial statements have been prepared on a historical cost basis, except for the

recording of pension assets and liabilities, the revaluation of derivative financial instruments and certain

commodity contracts and certain financial assets and liabilities measured at fair value.

These consolidated financial statements are presented in pounds sterling, which is also the functional

currency of the Company.

The notes to the financial statements have been prepared on a continuing basis unless otherwise stated.

Our income statement and segmental analysis separately identify financial results before and after

exceptional items and remeasurements. We continue to use a columnar presentation as we consider it

improves the clarity of the presentation, is consistent with the way that financial performance is measured

by management and reported to the Board and the Group Executive Committee, and assists users of the

financial statements to understand the results. The inclusion of total profit for the period from continuing

operations before exceptional items and remeasurements is used to derive part of the incentive target set

annually for remunerating certain Executive Directors and accordingly, we believe it is important for users

of the financial statements to understand how this compares with our results on a statutory basis

and period on period.

A. Going concern

As part of the Directors’ consideration of the appropriateness of adopting the going concern basis

of accounting in preparing these financial statements, the Directors have assessed the Principal Risks

discussed on pages [30](#i2193c7e7fbee4753bdbe2d16888565c8_61) – [36](#i5b716aa667c3427e93e3ed5359a2f216_69378) alongside potential downside business cash flow scenarios impacting the

Group’s operations. The Directors specifically considered both a base case and reasonable worst-case

scenario for business cash flows.

The main cash flow impacts identified in the reasonable worst-case scenario are:

– adverse impacts of higher spend on our capital expenditure programme;

– adverse impact from timing across the Group (i.e. a net under-recovery of allowed revenues

or reductions in over-collections) and slower collections of outstanding receivables;

– higher operating and financing costs than expected, including non‑delivery of planned efficiencies

across the Group; and

– the potential impact of further significant storms in the US.

As part of its analysis, the Board also considered the following potential levers at their discretion

to improve the position identified by the analysis if the debt capital markets are not accessible:

– the payment of dividends to shareholders;

– significant changes in the phasing of the Group’s capital expenditure programme, with elements

of non‑essential works and programmes delayed; and

– a number of further reductions in operating expenditure across the Group.

Having considered the reasonable worst-case scenario and the further levers at the Board’s discretion,

the Group continues to have headroom against the Group’s committed facilities identified in note 33 to

the financial statements.

In addition to the above, the ability to raise new and extend existing financing was separately included

in the analysis, and the Directors noted £4.2 billion of new long-term senior debt had been raised in the

year from 1 April 2025 to 31 March 2026 as evidence of the Group’s ability to continue to have access

to the debt capital markets if needed.

We have considered the impact of recent geopolitical developments, including the escalation of conflict in

the Middle East, which has contributed to increased market volatility and higher energy prices. While these

conditions could increase the cost of new debt and introduce short term execution volatility, we have

continued to observe access to funding and availability of committed liquidity during this period, consistent

with our recent issuance activity and funding plan; including a $0.7 billion bond issued in March 2026

and a $0.9 billion loan executed in April 2026. Consequently, we believe that, despite a more uncertain

external environment, the Group retains the ability to access debt capital markets as required to support

its financing needs over the going concern period.

Based on the above, the Directors have concluded the Group is well placed to manage its financing and

other business risks satisfactorily and have a reasonable expectation that the Group will have adequate

resources to continue in operation for at least 12 months from the signing date of these consolidated

financial statements. They therefore consider it appropriate to adopt the going concern basis of

accounting in preparing the financial statements.

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 143 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Notes to the consolidated financial statements cont. | | |  |  |  |

1. Basis of preparation and recent accounting developmentscont.

B. Basis of consolidation

The consolidated financial statements incorporate the results, assets and liabilities of the Company

and its subsidiaries, together with a share of the results, assets and liabilities of joint operations.

A subsidiary is defined as an entity controlled by the Group. Control is achieved where the Group is

exposed to, or has the rights to, variable returns from its involvement with the entity and has the ability

to affect those returns through its power over the entity.

The Group accounts for joint ventures and associates using the equity method of accounting, where the

investment is carried at cost plus post‑acquisition changes in the share of net assets of the joint venture

or associate, less any provision for impairment. Losses in excess of the consolidated interest in joint

ventures and associates are not recognised, except where the Company or its subsidiaries have made

a commitment to make good those losses.

Where necessary, adjustments are made to bring the accounting policies used in the individual financial

statements of the Company, subsidiaries, joint operations, joint ventures and associates in line with

those used by the Group in its consolidated financial statements under IFRS. Intercompany transactions

are eliminated.

The results of subsidiaries, joint operations, joint ventures and associates acquired or disposed of during

the year are included in the consolidated income statement from the effective date of acquisition or up

to the effective date of disposal, as appropriate.

Acquisitions are accounted for using the acquisition method, where the purchase price is allocated to

the identifiable assets acquired and liabilities assumed on a fair value basis and the remainder recognised

as goodwill.

C. Foreign currencies

Transactions in currencies other than the functional currency of the Company or subsidiary concerned

are recorded at the rates of exchange prevailing on the date of the transactions. At each reporting date,

monetary assets and liabilities that are denominated in foreign currencies are retranslated at closing

exchange rates. Non-monetary assets are not retranslated unless they are carried at fair value.

Gains and losses arising on the retranslation of monetary assets and liabilities are included in the income

statement, except where the application of hedge accounting requires inclusion in other comprehensive

income (see note 32(e)).

On consolidation, the assets and liabilities of operations that have a functional currency different from the

Company’s functional currency of pounds sterling, principally our US operations that have a functional

currency of US dollars, are translated at exchange rates prevailing at the reporting date. Income and expense

items are translated at the average exchange rates for the period where these do not differ materially from

rates at the date of the transaction. Exchange differences arising are recognised in other comprehensive

income and transferred to the consolidated translation reserve within other equity reserves (see note 28).

D. Areas of judgement and key sources of estimation uncertainty

The preparation of financial statements requires management to make estimates and assumptions that

affect the reported amounts of assets and liabilities, disclosures of contingent assets and liabilities, and

the reported amounts of revenue and expenses during the reporting period. Actual results could differ

from these estimates. Information about such judgements and estimations is in the notes to the financial

statements, and the key areas are summarised below.

Areas of judgement that have the most significant effect on the amounts recognised in the financial

statements are:

– categorisation of certain items as exceptional items or remeasurements and the definition of adjusted

earnings (see notes 5 and 8). In applying the Group’s exceptional items framework, we have considered

a number of key matters, as detailed in note 5; and

– the judgement that, notwithstanding legislation enacted and targets committing the states of New York

and Massachusetts to achieving net zero greenhouse gas emissions by 2050, these do not shorten the

remaining useful economic lives (UELs) of our US gas network assets, which we consider will have an

expected use and utility beyond 2050 (see other areas of estimation uncertainty below and note 13).

Key sources of estimation uncertainty that have a significant risk of causing a material adjustment to the

carrying amounts of assets and liabilities within the next financial year are:

– the future cash flows and real discount rates applied in determining the US environmental provisions,

in particular relating to two Superfund sites and certain other legacy Manufacturing Gas Plant (MGP)

sites (see note 26); and

– the valuation of liabilities for pensions and other post-retirement benefits (see note 25).

In order to illustrate the impact that changes in assumptions for the valuation of pension liabilities and

cash flows for environmental provisions could have on our results and financial position, we have included

sensitivity analysis in note 35.

Other areas of estimation uncertainty

A further area of estimation uncertainty pertains to the estimates made regarding the UELs of our

gas network assets due to uncertainty over the pace of delivery of the energy transition and the multiple

pathways by which it could be delivered. Our estimates consider anticipated changes in customer

behaviour and developments in new technology, the potential to decarbonise fuel through the use of

renewable natural gas and green hydrogen, and the feasibility and affordability of increased electrification

(see note 13 for details and sensitivity analysis).

E. Impact of climate change and the transition to net zero

In preparing these financial statements for the year ended 31 March 2026, management has taken into

account the Group’s commitments regarding its transition to net zero and the impact of climate change.

The Group has a published climate transition plan which sets out its targets to achieve this commitment

by 2050, in line with the Paris Agreement. Management has also identified a number of significant climate-

related risks and opportunities, as set out within the Task Force on Climate-related Financial Disclosures

(TCFD) on pages [53](#i2193c7e7fbee4753bdbe2d16888565c8_88) – [68](#i5ce9e2b3cd614bcca8423db41cd18ff1_160075). Changes to the Group’s commitments and the impact of climate change may

have a material impact on the currently reported amounts of the Group’s assets and liabilities and on

similar assets and liabilities that may be recognised in future reporting periods, as set out above with

respect to the judgement and other areas of estimation uncertainty regarding the UELs of our US gas

network assets. Other climate and transition impacts are further detailed below.

Repairs to property, plant and equipment and climate adaptation activities

The Group’s network assets recorded within property, plant and equipment (PP&E) are at risk of physical

impacts from extreme weather events such as major storms which may be accentuated by increased

frequency of weather incidents and changing long-term climate trends, thereby leading to asset damage.

As set out in the Financial review on pages [69](#i2193c7e7fbee4753bdbe2d16888565c8_127) – [84](#ib9ca2c5b72fb4936a9d458c7bb253318_286544), major storm costs in the US, net of deductibles and

disallowances, incurred by the Group are recoverable as revenue in future periods under our rate plans

but the associated repair costs are expensed as incurred as other operating costs under IFRS.

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 144 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Notes to the consolidated financial statements cont. | | |  |  |  |

1. Basis of preparation and recent accounting developmentscont.

E. Impact of climate change and the transition to net zero cont.

Impairment of property, plant and equipment and goodwill

Included within the Group’s plant and machinery (see note 13) are £267 million of oil- and gas-fired

electricity generation units with approximately 3,800 MW of electric generation capacity located in

Long Island, New York. While the Group retains ownership of these assets, it sells all of the capacity,

energy in response to dispatch requests, and any related ancillary services provided by the generating

facilities to the Long Island Power Authority (LIPA) via a Power Supply Agreement running until 2028.

The maximum UEL for these units ends in 2040, which aligns to the target set by the state of New York

to achieve decarbonised power generation by 2040. However, there is a risk that the UEL of certain,

or all, of the units may be shortened, depending on the progress of decarbonisation activities in Long

Island. The Group believes there are no material accounting judgements in respect of the generation

assets and the UELs have not been accelerated in the year.

The UELs of our assets related to our commercial operations in LNG at Providence, Rhode Island are

informed by the recovery periods used for ratemaking purposes and the majority of the UELs are covered

by fixed price service contracts. The net book value of these assets will be immaterial by 2050. Accordingly,

the Group believes there are no material accounting judgements in respect of the UELs of the LNG assets

as of 31 March 2026.

The net zero pathway may also impact our US gas networks which in turn may affect the recoverable

amount of our New York and New England cash-generating units (CGUs). In assessing the recoverability

of our CGUs (see note 11), we calculate the value-in-use based on projections that incorporate our best

estimates of future cash flows and assumptions pertaining to the net zero plans of the jurisdictions that

we operate in. In respect of our New York and New England CGUs, our forecast cash flow duration used

in our impairment testing is five years. We apply a terminal growth rate informed by expected long-term

economic inflation and the discount rate used takes into consideration the potential impact of net zero

plans on our gas business. Accordingly, the impact of certain variables that will play out in the medium

to long term as a result of the anticipated transition to decarbonised power generation are not anticipated

to have an impact on the recoverable amount of our New York and New England CGUs.

Decommissioning provisions

Provisions to decommission significant portions of our regulated transmission and distribution assets

are not recognised where no legal obligations exist, and a realistic alternative exists to incurring costs

to decommission assets at the end of their life. Included within the Group’s decommissioning provisions

as at 31 March 2026 (see note 26) is £38 million relating to legal requirements to remove asbestos upon

major renovation or demolition of our oil- and gas-fired electricity generation structures and facilities

located in Long Island, New York. As noted above, the progress of decarbonisation activities in Long

Island may bring forward the decommissioning of these assets, thereby increasing the present value of

associated decommissioning provisions. In the current year, there have been no material changes to the

expected timing of decommissioning expenditures. Currently, the expected timing of decommissioning

expenditures has not materially been brought forward but management will continue to review the

facts and circumstances.

Sensitivity to commodity contract derivatives

The Group has contracts associated with the forward purchase of gas and enters into derivative financial

instruments linked to commodity prices, including gas options and swaps which are used to manage

market price volatility (see note 17(b)). As at 31 March 2026, the Group’s gas commodity contract

derivatives are primarily short-term and, accordingly, we do not anticipate a risk as a result of the

transition to net zero.

F. Accounting policy choices

IFRS provides certain options available within accounting standards. Choices we have made, and

continue to make, include the following:

– Presentational formats: we use the nature of expense method for our income statement and aggregate

our statement of financial position to net assets and total equity. In the income statement, we present

subtotals of total operating profit, profit before tax and profit after tax from continuing operations,

together with additional subtotals excluding exceptional items and remeasurements as a result of the

three-columnar presentation described earlier. Exceptional items and remeasurements are presented

in a separate column on the face of the income statement.

– Financial instruments: we normally opt to apply hedge accounting in most circumstances where this is

permitted (see note 32(e)).

G. New IFRS accounting standards and interpretations effective for the year ended 31 March 2026

The Group adopted the following amendments to standards which have had no material impact on the

Group’s results or financial statement disclosures:

– amendments to IAS 21 ‘Lack of exchangeability’.

H. New IFRS accounting standards and interpretations not yet adopted

The following new accounting standards and amendments to existing standards have been issued but

are not yet effective or have not yet been endorsed by the UK:

– IFRS 18 ‘Presentation and Disclosure in Financial Statements’;

– IFRS 9 and IFRS 7 ‘Amendments to the Classification and Measurement of Financial Instruments’;

– Amendments to IFRS 9 and IFRS 7 ‘Contracts Referencing Nature-dependent Electricity’;

– Annual Improvements to IFRS Accounting Standards – Volume 11; and

– IFRS 19 ‘Subsidiaries without Public Accountability: Disclosures’.

Effective dates will be subject to the UK endorsement process.

The Group is currently assessing the impact of the above standards, but they are not expected to have

a material impact other than in respect of IFRS 18.

IFRS 18 replaces IAS 1 and the Group will apply the new standard from 1 April 2027, with retrospective

application. The Group is in the process of assessing the impact of IFRS 18 and anticipates changes to

certain presentational and disclosure-related matters in its consolidated financial statements. The adoption

of IFRS 18 will not affect the Group’s profit after tax; however, it will result in changes to the presentation

of the primary financial statements and to certain disclosures. In particular, income and expenses will be

grouped into five categories in the Consolidated income statement, namely the operating, investing,

financing, discontinued operations and income tax categories. There will also be an additional mandatory

subtotal for ‘Profit before financing and income taxes’ and the ‘useful structured summary’ concept will

necessitate certain changes to line items presented in the Consolidated income statement, although the

overall impact is not expected to be significant. Management-defined performance measures will also

require disclosure in a single note. Preparatory work is currently underway to support adoption, including

updates to reporting systems and the chart of accounts.

The Group has not adopted any other standard, amendment or interpretation that has been issued but

is not yet effective.

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 145 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Notes to the consolidated financial statements cont. | | |  |  |  |

2. Segmental analysis

|  |  |  |
| --- | --- | --- |
|  |  |  |
|  |  |  |
|  | This note sets out the financial performance for the year split into the different parts of the business (operating segments). The performance of these operating segments is monitored  and managed on a day-to-day basis. Revenue and the results of the business are analysed by operating segment, based on the information the Board of Directors uses internally for  the purposes of evaluating the performance of each operating segment and determining resource allocation between them. The Board is National Grid’s chief operating decision maker  (as defined by IFRS 8 ‘Operating Segments’) and as a matter of course, the Board considers multiple profitability measures by segment, being ‘adjusted profit’ and ‘underlying profit’.  Adjusted profit excludes exceptional items and remeasurements (as defined in note 5) and is used by management and the Board to monitor financial performance as it is considered that  it aids the comparability of our reported financial performance from year to year. Underlying profit, as presented in the Annual Report and Accounts, represents adjusted profit and also  excludes the effects of timing, major storm costs and deferred tax expenses in our UK Electricity Transmission and UK Electricity Distribution businesses. The measure of profit disclosed  in this note and the primary profitability benchmark considered by the chief operating decision maker is operating profit before exceptional items and remeasurements, adjusted profit,  as this is the measure that is most consistent with the IFRS results reported within these financial statements. |  |
|  |  |  |

![]()

The results of our  five principal businesses are reported to the Board of Directors and are accordingly treated as reportable operating segments. All other operating segments are reported to the Board of Directors

on an aggregated basis. The following table describes the main activities for each reportable operating segment :

|  |  |
| --- | --- |
|  |  |
| UK Electricity Transmission | The high-voltage electricity transmission networks in England and Wales. This includes our Accelerated Strategic Transmission Investment projects to connect more clean,  low-carbon power to the transmission network in England and Wales. |
| UK Electricity Distribution | The electricity distribution networks of NGED in the East Midlands, West Midlands and South West of England and South Wales. |
| New England | Electricity distribution networks, high-voltage electricity transmission networks and gas distribution networks in New England. |
| New York | Electricity distribution networks, high-voltage electricity transmission networks and gas distribution networks in New York. |
| National Grid Ventures | Comprises our electricity interconnectors in the UK, our electricity generation business in the US, all commercial operations in LNG at Providence, Rhode Island in the US and  the Isle of Grain in the UK, and our investment in NG Renewables, our renewables business in the US. While NGV operates outside our regulated core business, the electricity  interconnectors in the UK are subject to indirect regulation by Ofgem regarding the level of returns they can earn. The Group sold its interest in NG Renewables on 29 May 2025  and in Grain LNG on 28 November 2025 (see note 10). |

Included within the comparative years are the results of the UK Electricity System Operator which also represented a separate operating segment. The Group completed the disposal of the ESO to the UK

Government in the prior year.

Other activities that do not form part of any of the segments in the above table primarily relate to our UK property business together with insurance and corporate activities in the UK and US and the Group’s

investments in technology and innovation companies through National Grid Partners.

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 146 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Notes to the consolidated financial statements cont. | | |  |  |  |

2. Segmental analysiscont.

(a) Revenue

Revenue primarily represents the sales value derived from the generation, transmission and distribution of energy, together with the sales value derived from the provision of other services to customers. Refer to note  3

for further details.

Sales between operating segments are priced considering the regulatory and legal requirements to which the businesses are subject. The analysis of revenue by geographical area is on the basis of destination. There

are no material sales between the UK and US geographical areas.

|  |  |  |  |  |  |  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |  |  |  |  |  |  |
|  | 2026 | | |  | 2025 | | |  | 2024 | | |
|  | Total  sales  £m | Sales  between  segments  £m | Sales  to third  parties  £m |  | Total  sales  £m | Sales  between  segments  £m | Sales  to third  parties  £m |  | Total  sales  £m | Sales  between  segments  £m | Sales  to third  parties  £m |
| Operating segments – continuing operations: |  |  |  |  |  |  |  |  |  |  |  |
| UK Electricity Transmission | 2,898 | (87) | 2,811 |  | 2,619 | (135) | 2,484 |  | 2,735 | (40) | 2,695 |
| UK Electricity Distribution | 1,937 | — | 1,937 |  | 2,424 | (3) | 2,421 |  | 1,795 | (5) | 1,790 |
| UK Electricity System Operator | — | — | — |  | 1,029 | (17) | 1,012 |  | 3,788 | (35) | 3,753 |
| New England | 4,174 | — | 4,174 |  | 4,306 | — | 4,306 |  | 3,948 | — | 3,948 |
| New York | 7,618 | — | 7,618 |  | 6,689 | — | 6,689 |  | 6,094 | — | 6,094 |
| National Grid Ventures | 1,098 | (41) | 1,057 |  | 1,397 | (47) | 1,350 |  | 1,389 | (57) | 1,332 |
| Other | 97 | (7) | 90 |  | 122 | (6) | 116 |  | 244 | (6) | 238 |
| Total revenue from continuing operations | 17,822 | (135) | 17,687 |  | 18,586 | (208) | 18,378 |  | 19,993 | (143) | 19,850 |
|  |  |  |  |  |  |  |  |  |  |  |  |
| Split by geographical areas – continuing operations: |  |  |  |  |  |  |  |  |  |  |  |
| UK |  |  | 5,472 |  |  |  | 6,707 |  |  |  | 9,063 |
| US |  |  | 12,215 |  |  |  | 11,671 |  |  |  | 10,787 |
| Total revenue from continuing operations |  |  | 17,687 |  |  |  | 18,378 |  |  |  | 19,850 |

The principal revenues of the UK Electricity Transmission segment arise from the provision of electricity transmission services and are invoiced to, and collected from, National Energy System Operator (NESO).

Amounts are invoiced and settled in equal monthly instalments throughout the financial year. No other single customer contributed 10% or more of the Group’s revenue in any of the years presented.

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 147 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Notes to the consolidated financial statements cont. | | |  |  |  |

2. Segmental analysiscont.

(b) Operating profit

A reconciliation of the operating segments’ measure of profit to profit before tax from continuing operations

is provided below. Further details of the exceptional items and remeasurements are provided in note 5.

|  |  |  |  |  |  |  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |  |  |  |  |  |  |
|  | Total operating profit/(loss)  before exceptional items  and remeasurements | | |  | Exceptional items  and remeasurements | | |  | Total operating profit/(loss)  after exceptional items  and remeasurements | | |
|  | 2026 | 2025 | 2024 |  | 2026 | 2025 | 2024 |  | 2026 | 2025 | 2024 |
|  | £m | £m | £m |  | £m | £m | £m |  | £m | £m | £m |
| Operating segments –  continuing operations: |  |  |  |  |  |  |  |  |  |  |  |
| UK Electricity  Transmission | 1,605 | 1,277 | 1,677 |  | — | — | (3) |  | 1,605 | 1,277 | 1,674 |
| UK Electricity  Distribution | 1,122 | 1,610 | 993 |  | — | (12) | (18) |  | 1,122 | 1,598 | 975 |
| UK Electricity  System Operator | — | (364) | 880 |  | — | 151 | (498) |  | — | (213) | 382 |
| New England | 960 | 982 | 643 |  | (13) | 26 | (2) |  | 947 | 1,008 | 641 |
| New York | 1,172 | 1,023 | 860 |  | 12 | 246 | (498) |  | 1,184 | 1,269 | 362 |
| National Grid  Ventures | 327 | 380 | 469 |  | 388 | (375) | 89 |  | 715 | 5 | 558 |
| Other | (142) | (143) | (60) |  | — | 133 | (57) |  | (142) | (10) | (117) |
| Total Group | 5,044 | 4,765 | 5,462 |  | 387 | 169 | (987) |  | 5,431 | 4,934 | 4,475 |
|  |  |  |  |  |  |  |  |  |  |  |  |
| Split by geographical  area – continuing  operations: |  |  |  |  |  |  |  |  |  |  |  |
| UK | 2,948 | 2,775 | 3,923 |  | 484 | 257 | (487) |  | 3,432 | 3,032 | 3,436 |
| US | 2,096 | 1,990 | 1,539 |  | (97) | (88) | (500) |  | 1,999 | 1,902 | 1,039 |
| Total Group | 5,044 | 4,765 | 5,462 |  | 387 | 169 | (987) |  | 5,431 | 4,934 | 4,475 |

|  |  |  |  |  |  |  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |  |  |  |  |  |  |
|  | Profit/(loss) before tax  before exceptional items  and remeasurements | | |  | Exceptional items  and remeasurements | | |  | Profit/(loss) before tax after  exceptional items  and remeasurements | | |
|  | 2026 | 2025 | 2024 |  | 2026 | 2025 | 2024 |  | 2026 | 2025 | 2024 |
|  | £m | £m | £m |  | £m | £m | £m |  | £m | £m | £m |
| Reconciliation to profit  before tax: |  |  |  |  |  |  |  |  |  |  |  |
| Operating profit  from continuing  operations | 5,044 | 4,765 | 5,462 |  | 387 | 169 | (987) |  | 5,431 | 4,934 | 4,475 |
| Share of post-tax  results of joint  ventures  and associates | 76 | 75 | 101 |  | — | (2) | (64) |  | 76 | 73 | 37 |
| Finance income | 378 | 449 | 244 |  | 2 | 1 | 4 |  | 380 | 450 | 248 |
| Finance costs | (1,649) | (1,810) | (1,723) |  | (56) | 3 | 11 |  | (1,705) | (1,807) | (1,712) |
| Total Group | 3,849 | 3,479 | 4,084 |  | 333 | 171 | (1,036) |  | 4,182 | 3,650 | 3,048 |

The following items are included in the total operating profit by segment:

|  |  |  |  |
| --- | --- | --- | --- |
|  |  |  |  |
| Depreciation, amortisation and impairment 1 | 2026 | 2025 | 2024 |
| £m | £m | £m |
| Operating segments: |  |  |  |
| UK Electricity Transmission | (550) | (540) | (521) |
| UK Electricity Distribution | (271) | (249) | (223) |
| UK Electricity System Operator | — | — | (61) |
| New England | (493) | (469) | (420) |
| New York | (769) | (731) | (658) |
| National Grid Ventures | (151) | (173) | (166) |
| Other | (13) | (13) | (12) |
| Total | (2,247) | (2,175) | (2,061) |
|  |  |  |  |
| Asset type: |  |  |  |
| Property, plant and equipment | (1,929) | (1,878) | (1,769) |
| Non-current intangible assets | (318) | (297) | (292) |
| Total | (2,247) | (2,175) | (2,061) |

1. Depreciation, amortisation and impairment relates to property, plant and equipment and other intangible assets. The charge is stated net

of depreciation and amortisation capitalised.

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 148 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Notes to the consolidated financial statements cont. | | |  |  |  |

2. Segmental analysiscont.

(c) Capital investment

Capital investment represents additions to property, plant and equipment, prepayments to suppliers to

secure production capacity in relation to our capital projects, non-current intangibles and additional equity

investments in joint ventures and associates. Capital investments exclude additions for assets or

businesses from the point they are classified as held for sale.

|  |  |  |  |
| --- | --- | --- | --- |
|  |  |  |  |
|  | 2026 | 2025 | 2024 |
|  | £m | £m | £m |
| Operating segments: |  |  |  |
| UK Electricity Transmission | 4,372 | 2,999 | 1,912 |
| UK Electricity Distribution | 1,617 | 1,426 | 1,247 |
| UK Electricity System Operator | — | — | 85 |
| New England | 2,043 | 1,751 | 1,673 |
| New York | 3,428 | 3,289 | 2,654 |
| National Grid Ventures | 109 | 378 | 662 |
| Other | 7 | 4 | 2 |
| Total | 11,576 | 9,847 | 8,235 |
|  |  |  |  |
| Asset type: |  |  |  |
| Property, plant and equipment | 9,924 | 8,894 | 7,124 |
| Non-current intangible assets | 693 | 478 | 481 |
| Equity investments in joint ventures and associates | 27 | 116 | 332 |
| Capital expenditure prepayments | 932 | 359 | 298 |
| Total | 11,576 | 9,847 | 8,235 |

(d) Geographical analysis of non-current assets

Non-current assets by geography comprise goodwill, other intangible assets, property, plant and

equipment, investments in joint ventures and associates and other non-current assets.

|  |  |  |  |
| --- | --- | --- | --- |
|  |  |  |  |
|  | 2026 | 2025 | 2024 |
|  | £m | £m | £m |
| Split by geographical area: |  |  |  |
| UK | 47,551 | 42,623 | 40,065 |
| US | 49,273 | 46,131 | 44,270 |
|  | 96,824 | 88,754 | 84,335 |
|  |  |  |  |
| Reconciliation to total non-current assets: |  |  |  |
| Pension assets | 2,507 | 2,489 | 2,407 |
| Financial and other investments | 842 | 798 | 880 |
| Derivative financial assets | 623 | 369 | 324 |
| Non-current assets | 100,796 | 92,410 | 87,946 |

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 149 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Notes to the consolidated financial statements cont. | | |  |  |  |

3. Revenue

![]()

|  |  |  |
| --- | --- | --- |
|  |  |  |
|  |  |  |
|  | Revenue arises in the course of ordinary activities and principally comprises:  – transmission services;  – distribution services; and  – generation services.  Transmission services, distribution services and certain other services (excluding  rental income) fall within the scope of IFRS 15 ‘Revenue from Contracts with Customers’,  whereas generation services (which solely relate to the contract with LIPA in the US)  are accounted for under IFRS 16 ‘Leases’ as rental income, also presented within revenue.  Revenue is recognised to reflect the transfer of goods or services to customers at an  amount that reflects the consideration to which the Group expects to be entitled to in  exchange for those goods or services and excludes amounts collected on behalf of third  parties and value added tax. The Group recognises revenue when it transfers control  over a product or service to a customer.  Revenue in respect of regulated activities is determined by regulatory agreements that  set the price to be charged for services in a given period based on pre-determined allowed  revenues. Variances in service usage can result in actual revenue collected exceeding  (over-recoveries) or falling short (under-recoveries) of allowed revenues. Where regulatory  agreements allow the recovery of under-recoveries or require the return of over-recoveries,  the allowed revenue for future periods is typically adjusted. In these instances, no assets  or liabilities are recognised for under- or over-recoveries respectively, because the  adjustment relates to future customers and services that have not yet been delivered.  Revenue in respect of non-regulated activities includes the sale of capacity on our  interconnectors, which is determined at auctions and capacity market income. Capacity is  sold in either day, month, quarter or year-ahead tranches. The price charged is determined  by market fundamentals rather than regulatory agreement. The interconnectors are subject  to regulation with regard to the levels of returns they are allowed to earn. Where amounts  fall below this range they receive top-up revenues and where amounts exceed this range  they must pass back the excess. In these instances, assets or liabilities are recognised for  the top-up or pass-back respectively. |  |
|  |  |  |

Below, we include a description of principal activities, by reportable segment, from which the Group

generates its revenue. For more detailed information about our segments, see note  2 .

(a) UK Electricity Transmission

The UK Electricity Transmission segment principally generates revenue by providing electricity

transmission services in England and Wales. Our business operates as a monopoly regulated by Ofgem,

which has established price control mechanisms that set the amount of annual allowed returns our

business can earn (along with the Scottish and Offshore transmission operators amongst others).

The transmission of electricity encompasses the following principal services:

– the supply of high-voltage electricity – revenue is recognised based on usage. Our performance

obligation is satisfied over time as our customers make use of our network. We bill monthly in advance

and our payment terms are up to 60 days. Price is determined prior to our financial year end with

reference to the regulated allowed returns and estimated annual volumes; and

– construction work (principally for connections) – revenue is recognised over time, as we provide access

to our network. Customers can either pay over the useful life of the connection or up front. Where the

customer pays up front, revenues are deferred as a contract liability and released over the life of the

asset.

For other construction where there is no consideration for any future services (for example diversions),

revenues are recognised as the construction work is completed.

(b) UK Electricity Distribution

The UK Electricity Distribution segment principally generates revenue by providing electricity distribution

services in the Midlands and South West of England and South Wales. Similar to UK Electricity

Transmission, UK Electricity Distribution operates as a monopoly in the jurisdictions that it operates

in and is regulated by Ofgem.

The distribution of electricity encompasses the following principal services:

– electricity distribution – revenue is recognised based on usage by customers (over time), based upon

volumes and price. The price control mechanism that determines our annual allowances is similar to

UK Electricity Transmission. Revenues are billed monthly and payment terms are typically within

14 days; and

– construction work (principally for connections) – revenue is recognised over time as we provide access

to our network. Where the customer pays up front, revenues are deferred as a contract liability and

released over the life of the asset.

For other construction where there is no consideration for any future services, revenues are recognised

as the construction work is completed.

(c) New England

The New England segment principally generates revenue by providing electricity and gas supply

and distribution services and high-voltage electricity transmission services in New England. Supply and

distribution services are regulated by the Massachusetts Department of Public Utilities (MADPU) and

transmission services are regulated by the Federal Energy Regulatory Commission (FERC), both of

whom regulate the rates that can be charged to customers.

The supply and distribution of electricity and gas and the provision of electricity transmission facilities

encompasses the following principal services:

– electricity and gas supply and distribution and electricity transmission – revenue is recognised based

on usage by customers (over time). Revenues are billed monthly and payment terms are 30 days; and

– construction work (principally for connections) – revenue is recognised over time as we provide

access to our network. Where the customer pays up front, revenues are deferred as a contract liability

or customer contributions (where they relate to government entities) and released over the life of

the connection.

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 150 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Notes to the consolidated financial statements cont. | | |  |  |  |

3. Revenuecont.

(d) New York

The New York segment principally generates revenue by providing electricity and gas supply and

distribution services and high-voltage electricity transmission services in New York. Supply and distribution

services are regulated by the New York Public Service Commission (NYPSC) and transmission services

are regulated by the FERC, both of which regulate the rates that can be charged to customers.

The supply and distribution of electricity and gas and the provision of electricity transmission facilities

encompasses the following principal services:

– electricity and gas supply and distribution and electricity transmission – revenue is recognised based

on usage by customers (over time). Revenues are billed monthly and payment terms are 30 days; and

– construction work (principally for connections) – revenue is recognised over time as we provide

access to our network. Where the customer pays up front, revenues are deferred as a contract liability

or customer contributions (where they relate to government entities) and released over the life of

the connection.

(e) National Grid Ventures

National Grid Ventures generates revenue from electricity interconnectors, LNG at the Isle of Grain in the

UK and Providence, Rhode Island in the US, NG Renewables and rental income.

The Group recognises revenue from transmission services through interconnectors and LNG importation

at the Isle of Grain and Providence by means of customers’ use of capacity and volumes. Revenue is

recognised over time and is billed monthly. Payment terms are up to 30 days. The Group disposed of its

interest in Grain LNG in November 2025 (see note 10).

Electricity generation revenue is earned from the provision of energy services and supply capacity to

produce energy for the use of customers of LIPA through a power supply agreement, where LIPA receives

all of the energy and capacity from the asset until at least 2028. The arrangement is treated as an operating

lease within the scope of the leasing standard where we act as lessor, with rental income being recorded

as other revenue, which forms part of total revenue. Lease payments (capacity payments) are recognised

on a straight-line basis and variable lease payments are recognised as the energy is generated.

Other revenue in the scope of IFRS 15 principally includes sales of renewables projects from NG Renewables

to Emerald Energy Venture LLC (Emerald), which was jointly controlled by National Grid and Washington

State Investment Board (WSIB). The Group disposed of its interest in NG Renewables, together with

Emerald, in May 2025 (see note 10). NG Renewables developed wind and solar generation assets in

the US, while Emerald had a right of first refusal to buy, build and operate those assets. Revenue was

recognised as it was earned.

Other revenue, recognised in accordance with standards other than IFRS 15, primarily comprises

adjustments in respect of the interconnector cap and floor and Use of Revenue regimes constructed

by Ofgem for certain wholly owned interconnector subsidiaries. Under the cap and floor regime, where

an interconnector expects to exceed its total five-year cap, a provision and reduction in revenue is

recognised in the current reporting period (see note 26). Where an interconnector does not expect to

reach its five-year floor, either an asset will be recognised where a future inflow of economic benefits is

considered virtually certain, or a contingent asset will be disclosed where the future inflow is concluded

to be probable. Under the Use of Revenue framework, any revenues in excess of an agreed incentive

level must be passed on as savings to consumers. Where the obligation to transfer excess revenues

arises, a payable and reduction in revenue is recognised in the current reporting period.

(f) Other

Revenue in Other relates to our UK commercial property business. Revenue is predominantly recognised in

accordance with standards other than IFRS 15 and comprises property sales by our UK commercial property

business. Property sales are recorded when the sale is legally completed.

(g) UK Electricity System Operator

The Group disposed of the UK Electricity System Operator on 1 October 2024. Prior to its disposal

and the formation of the NESO, the UK Electricity System Operator earned revenue for balancing supply

and demand of electricity on Great Britain’s electricity transmission system, where it acted as principal.

Balancing services are regulated by Ofgem and revenue payable by generators and suppliers of electricity

was recognised as the service was provided.

The UK Electricity System Operator also collected revenues on behalf of transmission operators,

principally National Grid Electricity Transmission plc and the Scottish and Offshore transmission operators,

from users (electricity suppliers) who connect to or use the transmission system. As the UK Electricity

System Operator acted as an agent in this capacity, transmission network revenues were recorded net

of payments to transmission operators.

(h) Disaggregation of revenue

In the following tables, revenue is disaggregated by primary geographical market and major service lines.

The table below reconciles disaggregated revenue with the Group’s reportable segments (see note 2).

|  |  |  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |  |  |
| Revenue for the year  ended 31 March 2026 | UK Electricity  Transmission  £m | UK Electricity  Distribution  £m | New  England  £m | New  York  £m | National  Grid  Ventures  £m | Other  £m | Total  £m |
| Revenue under IFRS 15 |  |  |  |  |  |  |  |
| Transmission | 2,597 | — | 55 | 355 | 713 | — | 3,720 |
| Distribution | — | 1,859 | 4,061 | 7,204 | — | — | 13,124 |
| Other 1 | 29 | 73 | 9 | 17 | 20 | 4 | 152 |
| Total IFRS 15 revenue | 2,626 | 1,932 | 4,125 | 7,576 | 733 | 4 | 16,996 |
| Other revenue |  |  |  |  |  |  |  |
| Generation | — | — | — | — | 364 | — | 364 |
| Other 2 | 185 | 5 | 49 | 42 | (40) | 86 | 327 |
| Total other revenue | 185 | 5 | 49 | 42 | 324 | 86 | 691 |
| Total revenue from  continuing operations | 2,811 | 1,937 | 4,174 | 7,618 | 1,057 | 90 | 17,687 |

1. The UK Electricity Distribution other IFRS 15 revenue principally relates to engineering recharges, which are the recovery of costs incurred

for construction work requested by customers, such as the rerouting of existing network assets.

2. Other revenue, recognised in accordance with accounting standards other than IFRS 15, includes property sales by our UK commercial

property business, rental income, income arising in connection with the Transition Services Agreements following the sale of the ESO,

and an adjustment to NGV revenue in respect of the interconnector cap and floor and Use of Revenue regimes constructed by Ofgem.

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 151 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Notes to the consolidated financial statements cont. | | |  |  |  |

3. Revenuecont.

(h) Disaggregation of revenue cont.

|  |  |  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |  |  |
| Geographical split for the year  ended  31 March 2026 | UK Electricity  Transmission  £m | UK Electricity  Distribution  £m | New  England  £m | New  York  £m | National  Grid  Ventures  £m | Other  £m | Total  £m |
| Revenue under IFRS 15 |  |  |  |  |  |  |  |
| UK | 2,626 | 1,932 | — | — | 713 | — | 5,271 |
| US | — | — | 4,125 | 7,576 | 20 | 4 | 11,725 |
| Total IFRS 15 revenue | 2,626 | 1,932 | 4,125 | 7,576 | 733 | 4 | 16,996 |
| Other revenue |  |  |  |  |  |  |  |
| UK | 185 | 5 | — | — | (61) | 72 | 201 |
| US | — | — | 49 | 42 | 385 | 14 | 490 |
| Total other revenue | 185 | 5 | 49 | 42 | 324 | 86 | 691 |
| Total revenue from  continuing operations | 2,811 | 1,937 | 4,174 | 7,618 | 1,057 | 90 | 17,687 |

|  |  |  |  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |  |  |  |
| Revenue for the year  ended  31 March 2025 | UK Electricity  Transmission  £m | UK Electricity  Distribution  £m | UK  Electricity  System  Operator  £m | New  England  £m | New  York  £m | National  Grid  Ventures  £m | Other  £m | Total  £m |
| Revenue under IFRS 15 |  |  |  |  |  |  |  |  |
| Transmission 1 | 2,265 | — | 46 | 85 | 252 | 879 | 1 | 3,528 |
| Distribution | — | 2,327 | — | 4,193 | 6,371 | — | — | 12,891 |
| System Operator | — | — | 966 | — | — | — | — | 966 |
| Other 2 | 29 | 90 | — | 9 | 16 | 171 | 3 | 318 |
| Total IFRS 15 revenue | 2,294 | 2,417 | 1,012 | 4,287 | 6,639 | 1,050 | 4 | 17,703 |
| Other revenue |  |  |  |  |  |  |  |  |
| Generation | — | — | — | — | — | 384 | — | 384 |
| Other 3 | 190 | 4 | — | 19 | 50 | (84) | 112 | 291 |
| Total other revenue | 190 | 4 | — | 19 | 50 | 300 | 112 | 675 |
| Total revenue from  continuing operations | 2,484 | 2,421 | 1,012 | 4,306 | 6,689 | 1,350 | 116 | 18,378 |

1. The UK Electricity System Operator transmission revenue generated in the period up until its disposal represented transmission revenues

collected, net of payments made to transmission owners.

2. The UK Electricity Distribution other IFRS 15 revenue principally relates to engineering recharges, which are the recovery of costs incurred

for construction work requested by customers, such as the rerouting of existing network assets. Within NGV, the other IFRS 15 revenue

principally relates to revenue generated from our NG Renewables business.

3. Other revenue, recognised in accordance with accounting standards other than IFRS 15, includes property sales by our UK commercial

property business, rental income, income arising in connection with the Transition Services Agreements following the sales of NECO, the

UK Gas Transmission business and the ESO, and an adjustment to NGV revenue in respect of the interconnector cap and floor and Use

of Revenue regimes constructed by Ofgem.

|  |  |  |  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |  |  |  |
| Geographical split for the year  ended  31 March 2025 | UK  Electricity  Transmission  £m | UK  Electricity  Distribution  £m | UK  Electricity  System  Operator  £m | New  England  £m | New  York  £m | National  Grid  Ventures  £m | Other  £m | Total  £m |
| Revenue under IFRS 15 |  |  |  |  |  |  |  |  |
| UK | 2,294 | 2,417 | 1,012 | — | — | 889 | 1 | 6,613 |
| US | — | — | — | 4,287 | 6,639 | 161 | 3 | 11,090 |
| Total IFRS 15 revenue | 2,294 | 2,417 | 1,012 | 4,287 | 6,639 | 1,050 | 4 | 17,703 |
| Other revenue |  |  |  |  |  |  |  |  |
| UK | 190 | 4 | — | — | — | (111) | 11 | 94 |
| US | — | — | — | 19 | 50 | 411 | 101 | 581 |
| Total other revenue | 190 | 4 | — | 19 | 50 | 300 | 112 | 675 |
| Total revenue from  continuing operations | 2,484 | 2,421 | 1,012 | 4,306 | 6,689 | 1,350 | 116 | 18,378 |

|  |  |  |  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |  |  |  |
| Revenue for the year  ended  31 March 2024 | UK  Electricity  Transmission  £m | UK  Electricity  Distribution  £m | UK  Electricity  System  Operator  £m | New  England  £m | New  York  £m | National  Grid  Ventures  £m | Other  £m | Total  £m |
| Revenue under IFRS 15 |  |  |  |  |  |  |  |  |
| Transmission 1 | 2,591 | — | (10) | 73 | 493 | 869 | — | 4,016 |
| Distribution | — | 1,712 | — | 3,786 | 5,500 | — | — | 10,998 |
| System Operator | — | — | 3,763 | — | — | — | — | 3,763 |
| Other 2 | 25 | 73 | — | 8 | 15 | 168 | 4 | 293 |
| Total IFRS 15 revenue | 2,616 | 1,785 | 3,753 | 3,867 | 6,008 | 1,037 | 4 | 19,070 |
| Other revenue |  |  |  |  |  |  |  |  |
| Generation | — | — | — | — | — | 360 | — | 360 |
| Other 3 | 79 | 5 | — | 81 | 86 | (65) | 234 | 420 |
| Total other revenue | 79 | 5 | — | 81 | 86 | 295 | 234 | 780 |
| Total revenue from  continuing operations | 2,695 | 1,790 | 3,753 | 3,948 | 6,094 | 1,332 | 238 | 19,850 |

1. The UK Electricity System Operator transmission revenue generated in the year represents transmission revenues collected, net of

payments made to transmission owners.

2. The UK Electricity Transmission and UK Electricity Distribution other IFRS 15 revenue principally relates to engineering recharges, which

are the recovery of costs incurred for construction work requested by customers, such as the rerouting of existing network assets. Within

NGV, the other IFRS 15 revenue principally relates to revenue generated from our NG Renewables business.

3. Other revenue, recognised in accordance with accounting standards other than IFRS 15, includes property sales by our UK commercial

property business, rental income, income arising in connection with the Transition Services Agreements following the sales of The

Narragansett Electric Company (NECO) and the UK Gas Transmission business, and a provision and adjustment to NGV revenue in

respect of the interconnector cap and floor and Use of Revenue regimes constructed by Ofgem.

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 152 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Notes to the consolidated financial statements cont. | | |  |  |  |

3. Revenuecont.

(h) Disaggregation of revenue cont.

|  |  |  |  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |  |  |  |
| Geographical split for the year  ended  31 March 2024 | UK  Electricity  Transmission  £m | UK  Electricity  Distribution  £m | UK  Electricity  System  Operator  £m | New  England  £m | New  York  £m | National  Grid  Ventures  £m | Other  £m | Total  £m |
| Revenue under IFRS 15 |  |  |  |  |  |  |  |  |
| UK | 2,616 | 1,785 | 3,753 | — | — | 878 | 1 | 9,033 |
| US | — | — | — | 3,867 | 6,008 | 159 | 3 | 10,037 |
| Total IFRS 15 revenue | 2,616 | 1,785 | 3,753 | 3,867 | 6,008 | 1,037 | 4 | 19,070 |
| Other revenue |  |  |  |  |  |  |  |  |
| UK | 79 | 5 | — | — | — | (76) | 22 | 30 |
| US | — | — | — | 81 | 86 | 371 | 212 | 750 |
| Total other revenue | 79 | 5 | — | 81 | 86 | 295 | 234 | 780 |
| Total revenue from  continuing operations | 2,695 | 1,790 | 3,753 | 3,948 | 6,094 | 1,332 | 238 | 19,850 |

Contract liabilities (see note 23) represent revenue to be recognised in future periods relating to

contributions in aid of construction of £2,809 million (2025: £2,514 million; 2024: £2,246 million). Revenue

is recognised over the life of the asset. The asset lives for connections in UK Electricity Transmission, UK

Electricity Distribution, New England and New York are up to 40 years, 69 years, 51 years and 51 years

respectively. The weighted average amortisation period over which revenue for contract liabilities is

recognised is 26 years.

Future revenues in relation to unfulfilled performance obligations amount to £1.4 billion (2025: £1.5 billion;

2024: £6.1 billion). £1.4 billion (2025: £1.5 billion; 2024: £1.9 billion) relates to connection contracts in UK

Electricity Transmission which will be recognised as revenue over a weighted average of 25 years.

The amount of revenue recognised for the year ended 31 March 2026 from performance obligations

satisfied (or partially satisfied) in previous periods, mainly due to changes in the estimate of the stage of

completion, is £nil (2025: £nil; 2024: £nil).

![]()

4. Other operating costs

|  |  |  |
| --- | --- | --- |
|  |  |  |
|  |  |  |
|  | Below we have presented separately certain items included in our operating costs from  continuing operations. These include a breakdown of payroll costs (including disclosure  of amounts paid to key management personnel) and fees paid to our external auditors. |  |
|  |  |  |

|  |  |  |  |  |  |  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |  |  |  |  |  |  |
|  | Before exceptional items  and remeasurements | | |  | Exceptional items  and remeasurements | | |  | Total | | |
|  | 2026 | 2025 | 2024 |  | 2026 | 2025 | 2024 |  | 2026 | 2025 | 2024 |
|  | £m | £m | £m |  | £m | £m | £m |  | £m | £m | £m |
| Depreciation,  amortisation  and impairment¹ | 2,247 | 2,175 | 2,061 |  | — | — | — |  | 2,247 | 2,175 | 2,061 |
| Payroll costs | 1,990 | 2,093 | 2,007 |  | 2 | 50 | 36 |  | 1,992 | 2,143 | 2,043 |
| Purchases of  electricity | 1,531 | 1,501 | 1,487 |  | (42) | (72) | 10 |  | 1,489 | 1,429 | 1,497 |
| Purchases of gas | 2,060 | 1,633 | 1,323 |  | 31 | (55) | (34) |  | 2,091 | 1,578 | 1,289 |
| Property and other  taxes | 1,443 | 1,402 | 1,279 |  | — | — | — |  | 1,443 | 1,402 | 1,279 |
| UK electricity  balancing costs | — | 1,143 | 2,486 |  | — | — | — |  | — | 1,143 | 2,486 |
| Impairment of joint  venture | — | — | — |  | — | 303 | — |  | — | 303 | — |
| Other 2 | 3,129 | 3,466 | 3,578 |  | 111 | (395) | 975 |  | 3,240 | 3,071 | 4,553 |
| Other operating costs | 12,400 | 13,413 | 14,221 |  | 102 | (169) | 987 |  | 12,502 | 13,244 | 15,208 |
| Impairment losses on  financial assets | 243 | 200 | 179 |  | — | — | — |  | 243 | 200 | 179 |
| Total operating  costs from  continuing  operations | 12,643 | 13,613 | 14,400 |  | 102 | (169) | 987 |  | 12,745 | 13,444 | 15,387 |
| Operating costs from continuing operations include: | | | | | | | |  |  |  |  |
| Inventory consumed | | | | | | | |  | 454 | 506 | 408 |
| Research and development expenditure | | | | | | | |  | 38 | 43 | 32 |

1. Depreciation, amortisation and impairment relates to property, plant and equipment and other intangible assets. The charge is stated net

of depreciation and amortisation capitalised.

2. Included within Other are the costs incurred for the ongoing upkeep, repair, and management of infrastructure and assets necessary to

ensure reliable energy delivery and operational efficiency.

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 153 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Notes to the consolidated financial statements cont. | | |  |  |  |

4. Other operating costscont.

(a) Payroll costs

|  |  |  |  |
| --- | --- | --- | --- |
|  |  |  |  |
|  | 2026 | 2025 | 2024 |
|  | £m | £m | £m |
| Wages and salaries 1 | 3,515 | 3,497 | 3,206 |
| Social security costs | 313 | 279 | 256 |
| Defined contribution scheme costs | 152 | 144 | 129 |
| Defined benefit pension costs | 73 | 114 | 96 |
| Share-based payments | 45 | 37 | 37 |
| Severance costs (excluding pension costs) | 16 | 10 | 12 |
|  | 4,114 | 4,081 | 3,736 |
| Less: payroll costs capitalised | (2,122) | (1,938) | (1,693) |
| Total payroll costs from continuing operations | 1,992 | 2,143 | 2,043 |

1. Included within wages and salaries are US other post-retirement benefit costs of £27 million ( 2025: £25 million; 2024: £26 million).

For further information, refer to note 25.

(b) Number of employees

|  |  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |  |
|  | 31 March  2026 | Monthly  average  2026 | 31 March  2025 | Monthly  average  2025 | 31 March  2024 | Monthly  average  2024 |
| UK | 14,554 | 14,105 | 13,477 | 13,919 | 13,956 | 13,439 |
| US | 18,472 | 18,286 | 18,177 | 17,888 | 17,469 | 17,406 |
| Total number  of employees  (continuing operations) | 33,026 | 32,391 | 31,654 | 31,807 | 31,425 | 30,845 |

(c) Key management compensation

|  |  |  |  |
| --- | --- | --- | --- |
|  |  |  |  |
|  | 2026 | 2025 | 2024 |
|  | £m | £m | £m |
| Short-term employee benefits | 11 | 8 | 7 |
| Share-based payments | 7 | 4 | 5 |
| Total key management compensation | 18 | 12 | 12 |

Key management compensation relates to the Board, including the Executive Directors and Non-executive

Directors, for the years presented.

(d) Directors’ emoluments

Details of Executive Directors’ emoluments are contained in the Remuneration Report on page 111 and

those of Non-executive Directors on page 122. The Remuneration Report does not form part of these

financial statements.

(e) Auditor’s remuneration

Auditor’s remuneration is presented below in accordance with the requirements of the Companies Act

2006 and the principal accountant fees and services disclosure requirements of Item 16C of Form 20-F:

|  |  |  |  |
| --- | --- | --- | --- |
|  |  |  |  |
|  | 2026 | 2025 | 2024 |
|  | £m | £m | £m |
| Audit fees payable to the Parent Company’s auditor and  their associates in respect of: |  |  | |
| Audit of the Parent Company’s individual and consolidated  financial statements  1 | 2.6 | 2.8 | 2.8 |
| The auditing of accounts of any associate of the Company | 8.6 | 8.7 | 8.8 |
| Other services supplied 2 | 6.9 | 7.2 | 7.3 |
|  | 18.1 | 18.7 | 18.9 |
| Total other services 3 |  |  |  |
| All other fees: |  |  |  |
| Other assurance services4 | 1.5 | 1.0 | 4.0 |
| Other non-audit services not covered above | 0.1 | — | — |
|  | 1.6 | 1.0 | 4.0 |
| Total auditor’s remuneration | 19.7 | 19.7 | 22.9 |

1. Audit fees in each year represent fees for the audit of the Company’s financial statements for the years ended 31 March 2026, 2025

and 2024.

2. Other services supplied represent fees payable for services in relation to other statutory filings or engagements that are required to be

carried out by the auditor. In particular, this includes fees for reports under section 404 of the US Public Company Accounting Reform

and Investor Protection Act of 2002 (Sarbanes-Oxley Act), audit reports on regulatory returns and the review of interim financial

statements for the six-month periods ended 30 September 2025, 2024 and 2023 respectively.

3. There were no tax compliance or tax advisory fees and no audit-related fees as described in Item 16C(b) of Form 20-F.

4. In all years, principally relates to assurance services provided in relation to comfort letters for debt issuances and reporting accountant

services. The years ended 31 March 2026 and 31 March 2025 also includes fees for ESG reporting assurance.

The Audit & Risk Committee considers and makes recommendations to the Board, to be put to

shareholders for approval at each AGM, in relation to the appointment, reappointment, removal and

oversight of the Company’s independent auditor. The Committee, under authority granted at the AGM,

also considers and approves the audit fees on behalf of the Board in accordance with the Competition

and Markets Authority Audit Order 2014. Details of our policies and procedures in relation to non-audit

services to be provided by the independent auditor are set out on page [104](#if11c3cbaf3d84000b36cff578f5ee47e_358983) of the Corporate

Governance Report.

Certain services are prohibited from being performed by the external auditor under the Sarbanes-Oxley

Act and the FRC’s 2024 Revised Ethical Standard. Of the above services, none were prohibited.

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 154 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Notes to the consolidated financial statements cont. | | |  |  |  |

5. Exceptional items and remeasurements

![]()

|  |  |  |
| --- | --- | --- |
|  |  |  |
|  |  |  |
|  | To monitor our financial performance, we use an adjusted profit measure that excludes exceptional items and remeasurements. We exclude certain income and expenses from adjusted  profit because, if included, these items could distort understanding of our performance for the year and the comparability between periods. This note analyses these items, which are  included in our results for the year but are excluded from adjusted profit. |  |
|  |  |  |

|  |  |  |  |
| --- | --- | --- | --- |
|  |  |  |  |
| Exceptional items and remeasurements from continuing operations | 2026 | 2025 | 2024 |
| £m | £m | £m |
| Included within operating profit |  |  |  |
| Exceptional items: |  |  |  |
| Net loss on disposal of NG Renewables | (96) | — | — |
| Net gain on the sale of Grain LNG | 489 | — | — |
| Transaction, separation and integration costs 1 | (17) | (65) | (44) |
| Changes in environmental provisions | — | 146 | (496) |
| Net gain on the sale of the ESO | — | 187 | — |
| Provision for UK electricity balancing costs | — | 151 | (498) |
| Impairment of joint venture | — | (303) | — |
| Major transformation programme | — | (74) | — |
| Cost efficiency programme | — | — | (65) |
| IFA fire | — | — | 92 |
|  | 376 | 42 | (1,011) |
| Remeasurements – commodity contract derivatives | 11 | 127 | 24 |
|  | 387 | 169 | (987) |
| Included within finance income and costs |  |  |  |
| Remeasurements: |  |  |  |
| Net gains on financial assets at fair value through profit and loss | 2 | 1 | 4 |
| Net (losses)/gains on financing derivatives | (56) | 3 | 11 |
|  | (54) | 4 | 15 |
| Included within share of post-tax results of joint ventures and associates |  |  |  |
| Remeasurements: |  |  |  |
| Net losses on financial instruments | — | (2) | (64) |
| Total included within profit before tax | 333 | 171 | (1,036) |
| Included within tax |  |  |  |
| Tax on exceptional items | 8 | 76 | 159 |
| Tax on remeasurements | 8 | (36) | (7) |
|  | 16 | 40 | 152 |
| Total exceptional items and remeasurements after tax | 349 | 211 | (884) |
| Analysis of total exceptional items and remeasurements after tax |  |  |  |
| Exceptional items after tax | 384 | 118 | (852) |
| Remeasurements after tax | (35) | 93 | (32) |
| Total exceptional items and remeasurements after tax | 349 | 211 | (884) |

1. Transaction, separation and integration costs represent the aggregate of distinct activities undertaken by the Group in the years presented.

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 155 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Notes to the consolidated financial statements cont. | | |  |  |  |

5. Exceptional items and remeasurementscont.

#### Exceptional items

Management uses an exceptional items framework that has been discussed and approved by the Audit

& Risk Committee. This follows a three-step process which considers the nature of the event, the financial

materiality involved and any particular facts and circumstances. In considering the nature of the event,

management focuses on whether the event is within the Group’s control and how frequently such an

event typically occurs. With respect to restructuring costs, these represent additional expenses incurred

that are not related to the normal business and day-to-day activities. These can take place over multiple

reporting periods given the scale of the Group, the nature and complexity of the transformation initiatives

and due to the impact of strategic transactions. In determining the facts and circumstances, management

considers factors such as ensuring consistent treatment between favourable and unfavourable

transactions, the precedent for similar items, the number of periods over which costs will be spread or

gains earned, and the commercial context for the particular transaction. The exceptional items framework

was last updated in March 2022.

Items of income or expense that are considered by management for designation as exceptional items

include significant restructurings, write-downs or impairments of non-current assets, significant changes

in environmental or decommissioning provisions, integration of acquired businesses, gains or losses on

disposals of businesses or investments and significant debt redemption costs as a consequence of

transactions such as significant disposals or issues of equity, and the related tax, as well as deferred

tax arising on changes to corporation tax rates.  Costs arising from efficiency and transformation

programmes include redundancy costs. Redundancy costs are charged to the consolidated income

statement in the year in which a commitment is made to incur the costs and the main features of the

restructuring plan have been announced to affected employees.

Set out below are details of the transactions against which we have considered the application of our

exceptional items framework in each of the years for which results are presented.

2026

Net loss on disposal of NG Renewables

In the year the Group recognised a net loss of £96 million (before tax) on the disposal of its interest in

National Grid Renewables Development LLC (NG Renewables) to Brookfield Asset Management for cash

consideration of £1,531 million ($2,061 million) (see note 10). The receipt of cash has been recognised

within net cash used in investing activities within the consolidated cash flow statement.

Net gain on disposal of Grain LNG

In the year the Group recognised a net gain of £489 million on the disposal of its interest in Grain LNG to

a consortium of multinational energy company, Centrica plc and energy transition infrastructure investment

firm, Energy Capital Partners LLC, part of Bridgepoint Group plc for expected consideration of £1,375 million,

which includes an estimate for an adjustment to the consideration under the Sale and Purchase

Agreement (see note 10). The receipt of cash has been recognised within net cash used in investing

activities within the consolidated cash flow statement.

Transaction, separation and integration costs

In May 2024, we announced the sale of NG Renewables and Grain LNG as part of our strategic focus

on becoming a leading pureplay networks business. Both disposals were completed in the current year,

and the transaction costs were included in gain or loss on disposal (see note 10). Separation costs

of £17 million were incurred in relation to the disposals of NG Renewables and Grain LNG. The costs

incurred primarily related to professional fees and employee costs. These costs have been classified

as exceptional in accordance with our exceptional items policy. While the costs incurred in isolation

are not sufficiently material to warrant classification as an exceptional item, when taken in aggregate

with the respective disposals, the impact to the consolidated income statement incurred over both

years is sufficiently material to be classified as exceptional in line with our policy. The total cash outflow

for the year was £44 million.

Changes in environmental provisions

In the US, we recognise environmental provisions related to the remediation of the Gowanus Canal,

Newtown Creek and the former manufacturing gas plant facilities previously owned or operated by

the Group or its predecessor companies. The sites are subject to both state and federal environmental

remediation laws in the US. Potential liability for the historical contamination may be imposed on

responsible parties jointly and severally, without regard to fault, even if the activities were lawful when

they occurred. The provisions and the Group’s share of estimated costs are re-evaluated at each

reporting period. In the year, following discussions with the Environmental Protection Agency on the

scope and design of remediation activities related to the Gowanus and Newtown Creek, we have re-

evaluated our estimates of total costs and recognised a net movement in the associated provision of £nil.

Under the terms of our rate plans, we are entitled to recovery of environmental clean-up costs from rate

payers in future reporting periods. Such recoveries through overall allowed revenues are not classified

as exceptional in the future periods that they occur due to the extended duration over which such costs

are recovered and the immateriality of the recoveries in any given year.

Major transformation programme

Following the appointment of a new Chief Executive Officer in November 2025, strategic priorities were

updated and as a result the transformation programme launched in 2024 has been reshaped. The costs

expected to be incurred in aggregate going forward no longer meet the quantitative threshold to be

presented as exceptional. Accordingly, in line with our exceptional items policy, these costs have been

reclassified from exceptional items to other operating costs before exceptional items and remeasurements.

2025

Changes in environmental provisions

In the prior year, following discussions with the New York State Department of Environmental

Conservation and the Environmental Protection Agency on the scope and design of remediation activities

related to certain of our responsible sites, we re-evaluated our estimates of total costs and recognised a

net decrease of £64 million in relation to our provisions. Under the terms of our rate plans, we are entitled

to recovery of environmental clean-up costs from rate payers in future reporting periods. Such recoveries

through overall allowed revenues are not classified as exceptional in the future periods that they occur due

to the extended duration over which such costs are recovered and the immateriality of the recoveries in

any given year.

In the year ended 31 March 2025, the real discount rate applied to the Group’s environmental provisions

was also revised to 2.0% to reflect the substantial and sustained change in US Government bond yield

curves (see note 26). The principal impact of this rate increase was a £82 million decrease in our US

environmental provisions. The weighted average remaining duration of our cash flows was around 10 years.

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 156 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Notes to the consolidated financial statements cont. | | |  |  |  |

5. Exceptional items and remeasurementscont.

#### Exceptional items cont.

Net gain on disposal of the ESO

In the year ended 31 March 2025, the Group completed the disposal of the ESO to the UK Government

for consideration of £673 million. As a result, the Group derecognised net assets of £486 million, resulting

in a gain of £187 million. The receipt of cash was recognised within net cash used in investing activities

within the consolidated cash flow statement.

Provision for UK electricity balancing costs

In the year ended 31 March 2024, the ESO’s operating profit increased due to a substantial over-recovery

of allowed revenues received under its regulatory framework. Under IFRS a corresponding liability is not

recognised for the return of over-recoveries as this relates to future customers and services that have not

yet been delivered. Following legislation to enable the separation of the ESO and the formation of the

NESO, the Group recognised a liability of £498 million in the year ended 31 March 2024 representing the

element of the over-recovery that was expected to be settled through the sale process. In the prior year,

the liability was remeasured at £347 million to reflect the final amount of over-recovered revenues that

transferred through with the ESO on disposal on 1 October 2024.

Impairment of joint venture

In the prior year, we agreed with our joint venture partner, RWE Renewables, that our investment in

Community Offshore Wind, LLC will pause project development for the time being. The Group determined

that the investment has negligible value and an impairment of £303 million was recognised (see note 16).

Transaction, separation and integration costs

In the year ended 31 March 2025, transaction and separation costs of £26 million were incurred in

relation to the planned disposal of NG Renewables and £8 million in relation to the planned disposal of

Grain LNG. The costs incurred primarily related to professional fees and employee costs. In remeasuring

the NG Renewables disposal group to fair value less costs to sell in accordance with IFRS 5, the Group

also recognised a £31 million impairment loss. These costs were classified as exceptional in accordance

with our exceptional items policy. While the costs incurred in isolation were not sufficiently material to

warrant classification as an exceptional item, when taken in aggregate with the respective disposals, the

impact to the consolidated income statement incurred over both years would be sufficiently material to be

classified as exceptional in line with our policy. The total cash outflow for the year was £6 million.

Major transformation programme

Following the announcement of our strategic priorities in May 2024, the Group entered into a new

four‑year transformation programme designed to implement our refreshed strategy to be a pre-eminent

pureplay networks business. In the prior year, the Group incurred £74 million of costs in relation to the

programme. The costs recognised primarily related to technology implementation costs, employee

costs and professional fees incurred in delivering the programme. While the costs incurred since the

commencement of the programme did not meet the quantitative threshold to be classified as exceptional

on a standalone basis, when taken in aggregate with the costs expected to be incurred over the duration

of the programme, we concluded that the costs should be classified as exceptional in line with our

exceptional items policy. The total cash outflow for the period was £62 million.

2024

Provision for UK electricity balancing costs

As described above, during the year ended 31 March 2024 the ESO’s operating profit increased due

to a substantial over-recovery of allowed revenues received under its regulatory framework. The Group

recognised a liability for the over-recovered revenues which were forecasted to transfer through the

sales process.

Changes in environmental provisions

In the year ended 31 March 2024, following discussions with the New York State Department of

Environmental Conservation and the Environmental Protection Agency on the scope and design of

remediation activities related to certain of our responsible sites, we re-evaluated our estimates of total

costs and increased our US environmental provision by £496 million. Under the terms of our rate plans,

we are entitled to recovery of environmental clean-up costs from rate payers in future reporting periods.

Transaction, separation and integration costs

Separation costs of £11 million were incurred in relation to the disposal of NECO, £6 million in relation

to the disposal of the UK Gas Transmission business and £27 million in connection with the integration

of NGED. The costs incurred primarily related to professional fees, relocation costs and employee costs.

The costs were classified as exceptional in accordance with our exceptional items policy. While the

transaction, separation and integration costs incurred during the year did not meet the quantitative

threshold to be classified as exceptional on a standalone basis, when taken in aggregate with the

£340 million of costs in previous periods, the costs qualified for exceptional treatment in line with our

exceptional items policy. The total cash outflow for the period was £33 million. The Group is entitled

to cost recovery in relation to the separation of the ESO. Accordingly, these costs were not classified

as exceptional.

Cost efficiency programme

During the year ended 31 March 2024, the Group incurred £65 million of costs in relation to the major

cost efficiency programme announced in November 2021, that targeted at least £400 million savings

per annum across the Group by the end of three years. The costs recognised in the period primarily

related to redundancy provisions, employee costs and professional fees incurred in delivering the

programme. While the costs incurred during the year did not meet the quantitative threshold to be

classified as exceptional on a standalone basis, when taken in aggregate with the £142 million of costs

incurred since the announcement of the programme, the costs qualified for exceptional treatment in line

with our exceptional items policy. The total cash outflow for the year was £53 million. The cost efficiency

programme completed in the year ended 31 March 2024.

Fire at IFA converter station

In September 2021, a fire at the IFA1 converter station in Sellindge, Kent caused significant damage to

infrastructure on site. In the period, the Group recognised net insurance claims of £92 million, which were

recognised as exceptional in line with our exceptional items policy and consistent with related claims in the

preceding year. The total cash inflow in the period in relation to the insurance proceeds was £92 million.

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 157 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Notes to the consolidated financial statements cont. | | |  |  |  |

5. Exceptional items and remeasurementscont.

#### Remeasurements

Remeasurements comprise unrealised gains or losses recorded in the consolidated income statement

arising from changes in the fair value of certain of our financial assets and liabilities accounted for at fair

value through profit and loss (FVTPL). Once the fair value movements are realised (for example, when

the derivative matures), the previously recognised fair value movements are then reversed through

remeasurements and recognised within earnings before exceptional items and remeasurements. These

assets and liabilities include commodity contract derivatives and financing derivatives to the extent that

hedge accounting is not available or is not fully effective.

The unrealised gains or losses reported in profit and loss on certain additional assets and liabilities treated

at FVTPL are also classified within remeasurements. These relate to financial assets (which fail the ‘solely

payments of principal and interest test’ under IFRS 9), the money market fund investments used by Group

Treasury for cash management purposes and the net foreign exchange gains and losses on borrowing

activities. These are offset by foreign exchange gains and losses on financing derivatives measured at fair

value. In all cases, these fair values increase or decrease because of changes in foreign exchange,

commodity or other financial indices over which we have no control.

We report unrealised gains or losses relating to certain discrete classes of financial assets accounted

for at FVTPL within adjusted profit. These comprise our portfolio of investments made by National Grid

Partners and our investment in Sunrun Neptune 2016 LLC (both within NGV). The performance of these

assets (including changes in fair value) is included in our assessment of adjusted profit for the relevant

business units.

Remeasurements excluded from adjusted profit are made up of the following categories:

i. Net gains/(losses) on commodity contract derivatives represent mark-to-market movements on certain

physical and financial commodity contract obligations in the US and UK. These contracts primarily

relate to the forward purchase of energy for supply to customers, or to the economic hedging thereof,

that are required to be measured at fair value and that do not qualify for hedge accounting. Under the

existing rate plans in the US, commodity costs are recoverable from customers although the timing of

recovery may differ from the pattern of costs incurred;

ii. Net gains/(losses) on financing derivatives comprise gains and losses arising on derivative financial

instruments, net of interest accrued, used for the risk management of interest rate and foreign

exchange exposures and the offsetting foreign exchange losses and gains on the associated borrowing

activities. These exclude gains and losses for which hedge accounting has been effective and have

been recognised directly in the consolidated statement of other comprehensive income or are offset

by adjustments to the carrying value of debt (see notes 17 and 32). Net foreign exchange gains and

losses on financing derivatives used for the risk management of foreign exchange exposures are offset

by foreign exchange losses and gains on borrowing activities; and

iii. Net gains/(losses) on financial assets measured at FVTPL comprise gains and losses on the investment

funds held by our insurance captives which are categorised as FVTPL (see note 15).

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 158 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Notes to the consolidated financial statements cont. | | |  |  |  |

6. Finance income and costs

|  |  |  |
| --- | --- | --- |
|  |  |  |
|  |  |  |
|  | This note details the interest income generated by our financial assets and interest expense incurred on our financial liabilities, primarily our financing portfolio (including our financing  derivatives). It also includes the net interest on our pensions and other post-retirement assets. In reporting adjusted profit, we adjust net financing costs to exclude any net gains or losses  on financial instruments included in remeasurements (see note 5 ). |  |
|  |  |  |

![]()

Finance income and costs remeasurements include unrealised gains and losses on certain assets and liabilities treated at FVTPL. The effective interest income and interest expense and dividends on these items

are included in finance income and finance costs before remeasurements respectively.

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
|  |  |  | 2026 | 2025 | 2024 |
|  | Notes |  | £m | £m | £m |
| Finance income (excluding remeasurements) |  |  |  |  |  |
| Net interest income on pensions and other post-retirement benefit obligations | 25 |  | 114 | 98 | 100 |
| Interest income on financial instruments: |  |  |  |  |  |
| Bank deposits and other financial assets |  |  | 263 | 341 | 139 |
| Dividends received on equities held at fair value through other comprehensive income (FVOCI) |  |  | — | 1 | 1 |
| Other income |  |  | 1 | 9 | 4 |
|  |  |  | 378 | 449 | 244 |
| Finance costs (excluding remeasurements) |  |  |  |  |  |
| Interest expense on financial liabilities held at amortised cost: |  |  |  |  |  |
| Bank loans and overdrafts |  |  | (115) | (110) | (140) |
| Other borrowings1 |  |  | (1,591) | (1,553) | (1,424) |
| Interest on derivatives |  |  | (229) | (285) | (277) |
| Unwinding of discount on provisions and other payables |  |  | (123) | (130) | (102) |
| Other interest |  |  | (15) | (26) | (31) |
| Less: interest capitalised 2 |  |  | 424 | 294 | 251 |
|  |  |  | (1,649) | (1,810) | (1,723) |
| Remeasurements – Finance income |  |  |  |  |  |
| Net gains on FVTPL financial assets |  |  | 2 | 1 | 4 |
|  |  |  | 2 | 1 | 4 |
| Remeasurements – Finance costs |  |  |  |  |  |
| Net (losses)/gains on financing derivatives³ |  |  |  |  |  |
| Derivatives designated as hedges for hedge accounting |  |  | (24) | 4 | 13 |
| Derivatives not designated as hedges for hedge accounting |  |  | (32) | (1) | (2) |
|  |  |  | (56) | 3 | 11 |
| Total remeasurements – Finance income and costs |  |  | (54) | 4 | 15 |
|  |  |  |  |  |  |
| Finance income |  |  | 380 | 450 | 248 |
| Finance costs4 |  |  | (1,705) | (1,807) | (1,712) |
| Net finance costs from continuing operations |  |  | (1,325) | (1,357) | (1,464) |

1. Includes interest expense on lease liabilities (see note 13  for details) .

2. Interest on funding attributable to assets in the course of construction in the current year was capitalised at a rate of 4.4% (2025:  4.3%; 2024 : 4.7%). In the UK, capitalised interest qualifies for a current year tax deduction with tax relief claimed of £65 million (2025: £39 million;

2024: £39 million). In the US, capitalised interest is added to the cost of property, plant and equipment, and qualifies for tax depreciation allowances.

3. Includes a net foreign exchange loss on borrowing and investment activities of £711 million  (2025: £241 million gain ;  2024: £271 million gain) offset by foreign exchange gains and losses on financing derivatives measured at fair value and the impacts of hedge accounting.

4. Finance costs include principal accretion on inflation-linked liabilities of  £168 million  (2025: £152 million; 2024: £208 million ).

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 159 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Notes to the consolidated financial statements cont. | | |  |  |  |

7. Tax

![]()

|  |  |  |
| --- | --- | --- |
|  |  |  |
|  |  |  |
|  | Tax is payable in the territories where we operate, mainly the UK and the US. This note  gives further details of the total tax charge and tax liabilities, including current and deferred  tax. Current tax charge is the tax payable on this year’s taxable profits. Deferred tax is an  accounting adjustment to provide for tax that is expected to arise in the future due to  differences in the accounting and tax bases. |  |
|  |  |  |

The tax charge for the period is recognised in the income statement, the statement of comprehensive

income or directly in the statement of changes in equity, according to the accounting treatment of the

related transaction. The tax charge comprises both current and deferred tax.

Current tax assets and liabilities are measured at the amounts expected to be recovered from or paid

to the tax authorities. The tax rates and tax laws used to compute the amounts are those that have been

enacted or substantively enacted by the reporting date.

The Group operates internationally in territories with different and complex tax codes. Management

exercises judgement in relation to the level of provision required for uncertain tax outcomes. Where there

are tax positions not yet agreed with the tax authorities, different interpretations of legislation could lead to

a range of outcomes. Judgements are made for each position having regard to particular circumstances

and advice obtained.

Deferred tax is provided for, using the balance sheet liability method and is recognised on temporary

differences between the carrying amount of assets and liabilities in the financial statements and the

corresponding tax bases.

Deferred tax liabilities are generally recognised on all taxable temporary differences and deferred tax

assets are recognised to the extent that it is probable that taxable profits will be available against which

deductible temporary differences can be utilised. However, deferred tax assets and liabilities are not

recognised if the temporary differences arise from the initial recognition of goodwill or from the initial

recognition of other assets and liabilities in a transaction (other than a business combination) that

affects neither the accounting nor the taxable profit or loss.

Deferred tax liabilities are recognised on taxable temporary differences arising on investments in

subsidiaries and joint arrangements except where the Company is able to control the reversal of

the temporary difference and it is probable that the temporary difference will not reverse in the

foreseeable future.

Deferred tax is calculated at the tax rates that are expected to apply in the period when the liability

is settled or the asset is realised, based on the tax rates and tax laws that have been enacted or

substantively enacted by the reporting date.

The carrying amount of deferred tax assets is reviewed at each reporting date and reduced to the extent

that it is no longer probable that sufficient taxable profits will be available to allow all or part of the deferred

tax asset to be recovered. Unrecognised deferred tax assets are reassessed at each reporting date and

are recognised to the extent that it has become probable that future taxable profits will allow the deferred

tax asset to be recovered.

Deferred tax assets and liabilities are offset when there is a legally enforceable right to offset current tax

assets against current tax liabilities and when they relate to income taxes levied by the same tax authority,

and the Company and its subsidiaries intend to settle their current tax assets and liabilities on a net basis.

Tax charged to the consolidated income statement – continuing operations

|  |  |  |  |
| --- | --- | --- | --- |
|  |  |  |  |
|  | 2026 | 2025 | 2024 |
|  | £m | £m | £m |
| Tax before exceptional items and remeasurements | 955 | 861 | 983 |
| Total tax reported within exceptional items and remeasurements | (16) | (40) | (152) |
| Total tax charge from continuing operations | 939 | 821 | 831 |

Tax as a percentage of profit before tax – continuing operations

|  |  |  |  |
| --- | --- | --- | --- |
|  |  |  |  |
|  | 2026 | 2025 | 2024 |
|  | % | % | % |
| Before exceptional items and remeasurements –  continuing operations | 24.8 | 24.7 | 24.1 |
| After exceptional items and remeasurements –  continuing operations | 22.5 | 22.5 | 27.3 |

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 160 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Notes to the consolidated financial statements cont. | | |  |  |  |

7. Taxcont.

The tax charge for the year can be analysed as follows:

|  |  |  |  |
| --- | --- | --- | --- |
|  |  |  |  |
|  | 2026 | 2025 | 2024 |
|  | £m | £m | £m |
| Current tax: |  |  |  |
| UK corporation tax at 25% ( 2025 :  25% ;  2024 :  25% ) | 9 | 66 | 410 |
| UK corporation tax adjustment in respect of prior years | (4) | (36) | (36) |
|  | 5 | 30 | 374 |
| Overseas corporation tax | 9 | 47 | 82 |
| Overseas corporation tax adjustment in respect of prior years | (168) | (39) | (90) |
|  | (159) | 8 | (8) |
| Total current tax from continuing operations | (154) | 38 | 366 |
| Deferred tax: |  |  |  |
| UK deferred tax | 642 | 524 | 388 |
| UK deferred tax adjustment in respect of prior years | (7) | 25 | 43 |
|  | 635 | 549 | 431 |
| Overseas deferred tax | 289 | 195 | (40) |
| Overseas deferred tax adjustment in respect of prior years | 169 | 39 | 74 |
|  | 458 | 234 | 34 |
| Total deferred tax from continuing operations | 1,093 | 783 | 465 |
|  |  |  |  |
| Total tax charge from continuing operations | 939 | 821 | 831 |

Tax charged/(credited) to the consolidated statement of comprehensive income and equity

|  |  |  |  |
| --- | --- | --- | --- |
|  |  |  |  |
|  | 2026 | 2025 | 2024 |
|  | £m | £m | £m |
| Current tax: |  |  |  |
| Share-based payments | (1) | (1) | (2) |
| Deferred tax: |  |  |  |
| Investments at fair value through other comprehensive income | — | — | 1 |
| Cash flow hedges, cost of hedging and own credit reserve | (16) | 36 | 56 |
| Remeasurements of pension assets and post-retirement  benefit obligations | 39 | (23) | (50) |
| Share-based payments | (9) | 2 | — |
|  | 13 | 14 | 5 |
| Total tax recognised in the statements of comprehensive income  from continuing operations | 23 | 13 | 7 |
| Total tax relating to share-based payments recognised directly  in equity from continuing operations | (10) | 1 | (2) |
|  | 13 | 14 | 5 |

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 161 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Notes to the consolidated financial statements cont. | | |  |  |  |

7. Taxcont.

The tax charge for the year, after exceptional items and remeasurements for continuing operations, is lower (2025: lower tax charge; 2024: higher tax charge) than at the standard rate of corporation tax in the UK

of 25% (2025: 25%; 2024: 25%):

|  |  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |  |
|  | Before  exceptional  items and  remeasurements | After  exceptional  items and  remeasurements | Before  exceptional  items and  remeasurements | After  exceptional  items and  remeasurements | Before  exceptional  items and  remeasurements | After  exceptional  items and  remeasurements |
|  | 2026 | 2026 | 2025 | 2025 | 2024 | 2024 |
|  | £m | £m | £m | £m | £m | £m |
| Profit before tax from continuing operations |  |  |  |  |  |  |
| Before exceptional items and remeasurements | 3,849 | 3,849 | 3,479 | 3,479 | 4,084 | 4,084 |
| Exceptional items and remeasurements | — | 333 | — | 171 | — | (1,036) |
| Profit before tax from continuing operations | 3,849 | 4,182 | 3,479 | 3,650 | 4,084 | 3,048 |
| Profit before tax from continuing operations multiplied by UK corporation tax rate of 25% (2025 :  25% ; 2024 :  25%) | 962 | 1,046 | 870 | 913 | 1,021 | 762 |
| Effect of: |  |  |  |  |  |  |
| Adjustments in respect of prior years 1 | (10) | (10) | (11) | (11) | (9) | (9) |
| Expenses not deductible for tax purposes | 35 | 58 | 32 | 40 | 28 | 155 |
| Non-taxable income 2 | (29) | (150) | (18) | (107) | (18) | (43) |
| Adjustment in respect of foreign tax rates | 15 | 14 | 5 | 4 | (10) | (20) |
| Deferred tax impact of change in UK tax rate | — | — | — | — | — | — |
| Adjustment in respect of post-tax profits of joint ventures and associates included within profit before tax | (19) | (19) | (19) | (18) | (25) | (9) |
| Other 3 | 1 | — | 2 | — | (4) | (5) |
| Total tax charge from continuing operations | 955 | 939 | 861 | 821 | 983 | 831 |
|  |  |  |  |  |  |  |
|  | % | % | % | % | % | % |
| Effective tax rate – continuing operations | 24.8 | 22.5 | 24.7 | 22.5 | 24.1 | 27.3 |

1. The prior year adjustments are primarily due to agreement of prior period tax returns.

2. Includes tax on chargeable disposals after the offset of capital losses. The gains on disposal of Grain LNG in the current year and the ESO in the prior year were both subject to the Substantial Shareholding Exemption.

3. Other primarily comprises the movement in the deferred tax asset on previously unrecognised capital losses, claims for land remediation relief and claims for Research & Development credit.

Factors that may affect future tax charges

The main UK corporation tax rate is 25% and deferred tax balances as at 31 March 2026 have been calculated at 25%.

There are currently no legislative federal tax proposals being considered in the US that would impact National Grid. Therefore, the income tax balances as of 31 March 2026 have been calculated at the prevailing

tax rates based on the current tax laws.

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 162 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Notes to the consolidated financial statements cont. | | |  |  |  |

7. Taxcont.

Tax included within the statement of financial position

The following are the major deferred tax assets and liabilities recognised, and the movements thereon,

during the current and prior reporting periods:

|  |  |  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |  |  |
|  | Regulatory  licences  £m | Accelerated  tax  depreciation  £m | Share-  based  payments  £m | Pensions  and other  post-  retirement  benefits  £m | Financial  instruments  £m | Other net  temporary  differences1  £m | Total  £m |
| Deferred tax liabilities/  (assets) |  |  |  |  |  |  |  |
| At 1 April 2024 | 429 | 8,816 | (25) | 461 | (275) | (1,887) | 7,519 |
| Exchange adjustments  and other 2 | — | (147) | — | (5) | — | 57 | (95) |
| Charged/(credited) to  income statement | — | 925 | (3) | 58 | 62 | (256) | 786 |
| (Credited)/charged to  other comprehensive  income and equity | — | — | 2 | (23) | 38 | — | 17 |
| Disposals | — | (60) | — | — | — | (5) | (65) |
| Reclassification to held  for sale (note 10) | — | (122) | — | — | — | (2) | (124) |
| At 1 April 2025 | 429 | 9,412 | (26) | 491 | (175) | (2,093) | 8,038 |
| Exchange adjustments  and other 2 | — | (144) | — | (4) | — | 51 | (97) |
| Charged/(credited) to  income statement | — | 1,158 | (5) | 6 | 24 | (88) | 1,095 |
| (Credited)/charged to  other comprehensive  income and equity | — | — | (9) | 39 | (14) | — | 16 |
| Disposals | — | (12) | — | — | — | — | (12) |
| At 31 March 2026 | 429 | 10,414 | (40) | 532 | (165) | (2,130) | 9,040 |

1. The deferred tax asset of £2,130 million as at 31 March 2026 (2025:  £2,093 million) in respect of other net temporary differences relates

to losses of £456 million (2025: £298 million), US contract and lease liabilities of £632 million (2025: £603 million), US environmental

provisions of £558 million (2025: £575 million), US bad debt provision of £161 million (2025: £155 million) and other short-term temporary

differences of £323 million (2025: £462 million).

2. Exchange adjustments and other primarily comprises foreign exchange arising on translation of the US dollar deferred tax balances.

Deferred tax assets and liabilities are only offset where there is a legally enforceable right of offset and

there is an intention to settle the balances net. The deferred tax balances (after offset) for statement of

financial position purposes consist solely of deferred tax liabilities of £9,040 million (2025: £8,038 million).

Deferred tax assets in respect of some capital losses as well as trading losses and non-trade deficits have

not been recognised as their future recovery is uncertain or not currently anticipated. The total deferred

tax assets not recognised are as follows:

|  |  |  |
| --- | --- | --- |
|  |  |  |
|  | 2026 | 2025 |
|  | £m | £m |
| Capital losses | 2,482 | 2,484 |
| Trading losses | 9 | 9 |

The capital losses arose in the UK on disposal of certain businesses or assets. They are available to carry

forward indefinitely but can only be offset against future capital gains.

At 31 March 2026 and 31 March 2025, there were no recognised deferred tax liabilities for taxes that

would be payable on the unremitted earnings of the Group’s subsidiaries or its associates as there are

no significant corporation tax consequences of the Group’s UK, US or overseas subsidiaries or associates

paying dividends to their parent companies. There are also no significant income tax consequences for

the Group from the payment of dividends by the Group to its shareholders.

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 163 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Notes to the consolidated financial statements cont. | | |  |  |  |

8. Earnings per share (EPS)

![]()

|  |  |  |
| --- | --- | --- |
|  |  |  |
|  |  |  |
|  | EPS is the amount of profit after tax attributable to each ordinary share. Basic EPS is  calculated as profit after tax for the year attributable to equity shareholders divided by the  weighted average number of shares in issue during the year. Diluted EPS shows what the  impact would be if all outstanding share options were exercised and treated as ordinary  shares at year end. The weighted average number of shares is increased by additional  shares issued as scrip dividends and reduced by shares repurchased by the Company  during the year. The earnings per share calculations are based on profit after tax attributable  to equity shareholders of the Company which excludes non-controlling interests. |  |
|  |  |  |

Adjusted earnings and EPS, which exclude exceptional items and remeasurements, are provided to reflect

the adjusted profit subtotals used by the Company. We have included reconciliations from this additional

EPS measure to earnings for both basic and diluted EPS to provide additional detail for these items. For

further details of exceptional items and remeasurements, see note 5.

(a) Basic EPS

|  |  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |  |
|  | Earnings | EPS | Earnings | EPS | Earnings | EPS |
|  | 2026 | 2026 | 2025 | 2025 | 2024 | 2024 |
|  | £m | pence | £m | pence | £m | pence |
| Adjusted earnings from  continuing operations | 2,892 | 58.5 | 2,615 | 55.6 | 3,100 | 77.7 |
| Exceptional items and  remeasurements after tax from  continuing operations (see note 5) | 349 | 7.0 | 211 | 4.4 | (884) | (22.2) |
| Earnings from continuing  operations | 3,241 | 65.5 | 2,826 | 60.0 | 2,216 | 55.5 |
| Adjusted earnings from  discontinued operations  (see note 10) | — | — | 4 | — | 13 | 0.3 |
| Exceptional items and  remeasurements after tax  from discontinued operations | — | — | 72 | 1.6 | 61 | 1.6 |
| Earnings from discontinued  operations | — | — | 76 | 1.6 | 74 | 1.9 |
| Total adjusted earnings | 2,892 | 58.5 | 2,619 | 55.6 | 3,113 | 78.0 |
| Total exceptional items and  remeasurements after tax  (including discontinued operations) | 349 | 7.0 | 283 | 6.0 | (823) | (20.6) |
| Total earnings | 3,241 | 65.5 | 2,902 | 61.6 | 2,290 | 57.4 |
|  |  |  |  |  |  |  |
|  |  | 2026 |  | 2025 |  | 2024 |
|  |  | millions |  | millions |  | millions |
| Weighted average number  of ordinary shares – basic |  | 4,946 |  | 4,707 |  | 3,991 |

(b) Diluted EPS

|  |  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |  |
|  | Earnings | EPS | Earnings | EPS | Earnings | EPS |
|  | 2026 | 2026 | 2025 | 2025 | 2024 | 2024 |
|  | £m | pence | £m | pence | £m | pence |
| Adjusted earnings from  continuing operations | 2,892 | 58.2 | 2,615 | 55.4 | 3,100 | 77.3 |
| Exceptional items and  remeasurements after tax from  continuing operations (see note 5) | 349 | 7.0 | 211 | 4.4 | (884) | (22.0) |
| Earnings from continuing  operations | 3,241 | 65.2 | 2,826 | 59.8 | 2,216 | 55.3 |
| Adjusted earnings from  discontinued operations | — | — | 4 | — | 13 | 0.3 |
| Exceptional items and  remeasurements after tax  from discontinued operations  (see note 10) | — | — | 72 | 1.6 | 61 | 1.5 |
| Earnings from discontinued  operations | — | — | 76 | 1.6 | 74 | 1.8 |
| Total adjusted earnings | 2,892 | 58.2 | 2,619 | 55.4 | 3,113 | 77.6 |
| Total exceptional items and  remeasurements after tax  (including discontinued operations) | 349 | 7.0 | 283 | 6.0 | (823) | (20.5) |
| Total earnings | 3,241 | 65.2 | 2,902 | 61.4 | 2,290 | 57.1 |
|  |  |  |  |  |  |  |
|  |  | 2026 |  | 2025 |  | 2024 |
|  |  | millions |  | millions |  | millions |
| Weighted average number  of ordinary shares – diluted |  | 4,971 |  | 4,729 |  | 4,008 |

(c) Reconciliation of basic to diluted average number of shares

|  |  |  |  |
| --- | --- | --- | --- |
|  |  |  |  |
|  | 2026 | 2025 | 2024 |
|  | millions | millions | millions |
| Weighted average number of ordinary shares – basic | 4,946 | 4,707 | 3,991 |
| Effect of dilutive potential ordinary shares – employee share plans | 25 | 22 | 17 |
| Weighted average number of ordinary shares – diluted | 4,971 | 4,729 | 4,008 |

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 164 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Notes to the consolidated financial statements cont. | | |  |  |  |

9. Dividends

Interim dividends are recognised when they become payable to the Company’s shareholders. Final

dividends are recognised when they are approved by shareholders.

|  |  |  |  |  |  |  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |  |  |  |  |  |  |
|  | 2026 | | |  | 2025 | | |  | 2024 | | |
|  | Pence  per  share | Cash  dividend  £m | Scrip  dividend  £m |  | Pence  per share | Cash  dividend  £m | Scrip  dividend  £m |  | Pence  per share | Cash  dividend  £m | Scrip  dividend  £m |
| Final dividend  in respect of the  prior year | 30.88 | 894 | 617 |  | 39.12 | 811 | 643 |  | 37.60 | 1,325 | 56 |
| Interim dividend  in respect of the  current year | 16.35 | 729 | 80 |  | 15.84 | 718 | 59 |  | 19.40 | 393 | 320 |
|  | 47.23 | 1,623 | 697 |  | 54.96 | 1,529 | 702 |  | 57.00 | 1,718 | 376 |

The Directors are proposing a final dividend for the year ended 31 March 2026 of 32.14p per share

that would absorb approximately  £1,598 million  of shareholders’ equity (assuming all amounts are

settled in cash). It will be paid on 23 July 2026 to shareholders who are on the register of members

at 29 May  2026  (subject to shareholders’ approval at the AGM). A scrip dividend will be offered as

an alternative.

10. Assets held for sale and discontinued operations

![]()

|  |  |  |
| --- | --- | --- |
|  |  |  |
|  |  |  |
|  | The results and cash flows of significant assets or businesses sold during the year  are shown separately from our continuing operations and presented within discontinued  operations in the income statement and cash flow statement. Assets and businesses  are classified as held for sale when their carrying amounts are expected to be recovered  through sale rather than through continuing use. They only meet the held for sale condition  when the assets are ready for immediate sale in their present condition, management is  committed to the sale and it is highly probable that the sale will complete within one year.  Depreciation ceases on assets and businesses when they are classified as held for sale  and the assets and businesses are impaired if the proceeds less sale costs fall short  of the carrying value. |  |
|  |  |  |

National Grid Renewables

On 24 February 2025, the Group agreed to sell NG Renewables, its US onshore renewables business,

to Brookfield Asset Management. The disposal subsequently completed on 29 May 2025 for consideration

of £1,531 million ($2,061 million). As NG Renewables did not represent a separate major line of business

or geographical operation, it did not meet the criteria for classification as discontinued operations and

therefore the results for the period until disposal are not separately disclosed on the face of the

income statement.

Financial information relating to the loss arising on the disposal of NG Renewables is set out below:

|  |  |
| --- | --- |
|  |  |
|  | £m |
| Goodwill | 51 |
| Property, plant and equipment | 438 |
| Investment in joint venture | 906 |
| Trade and other receivables | 141 |
| Cash and cash equivalents | 58 |
| Financial investments | 41 |
| Other assets | 66 |
| Total assets on disposal | 1,701 |
| Borrowings | (2) |
| Other liabilities | (159) |
| Total liabilities on disposal | (161) |
| Net assets on disposal | 1,540 |
|  |  |
| Satisfied by: |  |
| Proceeds | 1,531 |
| Total consideration | 1,531 |
|  |  |
| Less: |  |
| Disposal-related costs | (11) |
| Loss on disposal before tax and reclassification of foreign currency  translation reserve | (20) |
|  |  |
| Reclassification of foreign currency translation reserve¹ | (76) |
| Tax | 5 |
| Post-tax loss on disposal | (91) |

1. The reclassification of the foreign currency translation reserve attributable to NG Renewables comprises a loss of £84 million relating to

the retranslation of NG Renewables’ operations offset by a gain of £8 million relating to borrowings, cross-currency swaps and foreign

exchange forward contracts used to hedge the Group’s net investment in NG Renewables.

NG Renewables generated a loss after tax of £14 million for the period until 29 May 2025 (2025: £60 million

loss; 2024: £65 million loss).

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 165 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Notes to the consolidated financial statements cont. | | |  |  |  |

10. Assets held for sale and discontinued operationscont.

Grain LNG

On 14 August 2025, the Group agreed to sell Grain LNG, its UK LNG asset, to a consortium of

multinational energy companies, Centrica plc and energy transition infrastructure investment firm,

Energy Capital Partners LLC, part of Bridgepoint Group plc. The disposal subsequently completed on

28 November 2025. As Grain LNG did not represent a separate major line of business or geographical

operation, it did not meet the criteria for classification as discontinued operations and therefore the

results for the period until disposal are not separately disclosed on the face of the income statement.

The Group has recognised a £124 million liability as an adjustment to the consideration under the Sale

and Purchase Agreement for post closing capital project obligations based on management’s best estimate

of the expected outflow. Given the inherent complexity of the project, and the number of parties involved,

the Group has considered a range of potential outcomes, including the risk that costs could exceed our

estimates. The Group has concluded the risk of a materially adverse impact to our operations, cash flows

or financial position is remote.

Financial information relating to the gain arising on the disposal of Grain LNG is set out below:

|  |  |
| --- | --- |
|  |  |
|  | £m |
| Other intangible assets | 27 |
| Property, plant and equipment | 962 |
| Trade and other receivables | 27 |
| Cash and cash equivalents | 163 |
| Other assets | 20 |
| Total assets on disposal | 1,199 |
| Borrowings | (135) |
| Other liabilities | (196) |
| Total liabilities on disposal | (331) |
| Net assets on disposal | 868 |
|  |  |
| Satisfied by: |  |
| Proceeds | 1,375 |
| Total consideration | 1,375 |
|  |  |
| Less: |  |
| Disposal-related costs | (18) |
| Gain on disposal | 489 |

Grain LNG generated a profit after tax of £89 million for the period until 28 November 2025 (2025:

£120 million; 2024: £114 million).

The UK Gas Transmission business

In July 2024, the Group sold its remaining 20% equity interest in the UK Gas Transmission business

(held through its holding in GasT TopCo Limited). This interest had been classified as held for sale from

31 January 2023 until the date of disposal, as detailed in the Annual Report and Accounts for the year

ended 31 March 2025. The total sales proceeds were £686 million and the gain on disposal, after

transaction costs, was £25 million.

The disposal of the Group’s remaining interest in GasT TopCo Limited was the final stage of the plan to

dispose of the UK Gas Transmission business first announced in 2021. As a result, the gain on disposal

and any remeasurements pertaining to the financial derivatives noted above are shown separately from

the continuing business for all periods presented on the face of the income statement as a discontinued

operation. This is also reflected in the statement of comprehensive income, as well as earnings per share

(EPS) being shown split between continuing and discontinued operations.

The summary income statements for the years ended 31 March 2025 and 2024 are as follows:

|  |  |  |  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |  |  |  |
|  | Before exceptional items  and remeasurements | |  | Exceptional items  and remeasurements | |  | Total | |
|  | 2025 | 2024 |  | 2025 | 2024 |  | 2025 | 2024 |
|  | £m | £m |  | £m | £m |  | £m | £m |
| Operating profit | — | — |  | — | — |  | — | — |
| Finance income | 5 | 17 |  | — | — |  | 5 | 17 |
| Finance costs1 | — | — |  | 47 | 62 |  | 47 | 62 |
| Profit before tax | 5 | 17 |  | 47 | 62 |  | 52 | 79 |
| Tax | (1) | (4) |  | — | 3 |  | (1) | (1) |
| Profit after tax from  discontinued operations | 4 | 13 |  | 47 | 65 |  | 51 | 78 |
| Gain/(loss) on disposal | — | — |  | 25 | (4) |  | 25 | (4) |
| Total profit after tax from  discontinued operations | 4 | 13 |  | 72 | 61 |  | 76 | 74 |

1. Exceptional finance costs included the remeasurement of the Further Acquisition Agreement option and the Remaining Acquisition

Agreement, as detailed in the Annual Report and Accounts for the year ended 31 March 2025.

The summary statements of comprehensive income for the years ended 31 March 2025 and 2024 are

as follows:

|  |  |  |
| --- | --- | --- |
|  |  |  |
|  | 2025 | 2024 |
|  | £m | £m |
| Profit after tax from discontinued operations | 76 | 74 |
| Other comprehensive (loss)/income from discontinued operations |  |  |
| Items from discontinued operations that may be reclassified subsequently to  profit or loss: |  |  |
| Net (losses)/gains on investments in debt instruments measured at fair value  through other comprehensive income | (13) | 13 |
| Tax on items that may be reclassified subsequently to profit or loss | 3 | (3) |
| Total (losses)/gains from discontinued operations that may be  reclassified subsequently to profit or loss | (10) | 10 |
| Other comprehensive (loss)/income for the year, net of tax from  discontinued operations | (10) | 10 |
| Total comprehensive income for the year from discontinued  operations | 66 | 84 |

Details of the cash flows relating to discontinued operations are set out within the consolidated cash

flow statement.

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 166 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Notes to the consolidated financial statements cont. | | |  |  |  |

11. Goodwill

![]()

|  |  |  |
| --- | --- | --- |
|  |  |  |
|  |  |  |
|  | Goodwill represents the excess of what we paid to acquire businesses over the fair value  of their net assets at the acquisition date. We assess whether goodwill is recoverable by  performing an impairment review annually or more frequently if events or changes in  circumstances indicate a potential impairment. |  |
|  |  |  |

Goodwill and fair value adjustments arising on the acquisition of a foreign entity are treated as assets and

liabilities of the foreign entity and translated at the closing exchange rate. Goodwill is allocated to CGUs,

or groups of CGUs, and this allocation is made to those CGUs that are expected to benefit from the

acquisition in which the goodwill arose.

Impairment is recognised where there is a difference between the carrying value of the CGU and the

estimated recoverable amount of the CGU to which that goodwill has been allocated. Any impairment

is recognised immediately in the income statement and is not subsequently reversed. Any impairment

loss is first allocated to the carrying value of the goodwill and then to the other assets within the CGU.

Recoverable amount is defined as the higher of fair value less costs to sell and estimated value-in-use

at the date the impairment review is undertaken. Value-in-use represents the present value of expected

future cash flows, discounted using a pre-tax discount rate that reflects current market assessments

of the time value of money and the risks specific to the asset for which the estimates of future cash

flows have not been adjusted.

|  |  |
| --- | --- |
|  |  |
|  | Total  £m |
| Net book value at 1 April 2024 | 9,729 |
| Exchange adjustments | (117) |
| Reclassification to held for sale (note 10) | (80) |
| Net book value at 1 April 2025 | 9,532 |
| Exchange adjustments | (115) |
| Net book value at 31 March 2026 | 9,417 |

There was no significant accumulated impairment charge as at 31 March 2026 or 31 March 2025.

Impairment review of goodwill and indefinite-lived intangibles

Goodwill and indefinite-lived intangibles (see note 12) are reviewed annually for impairment and the

recoverability is assessed by comparing the carrying amount of our operations with the expected

recoverable amount on a value-in-use basis which uses pre-financing and pre-tax cash flow projections

based on the Group’s financial plans, approved by the Directors. See below for a summary of which

operations our goodwill and indefinite-lived intangibles are allocated to.

|  |  |  |
| --- | --- | --- |
|  |  |  |
|  | 2026 | 2025 |
| CGU or group of CGUs | £m | £m |
| Goodwill: |  |  |
| National Grid Ventures – US | 97 | 100 |
| New England | 1,471 | 1,506 |
| New York | 3,128 | 3,205 |
| UK Electricity Distribution 1 | 4,721 | 4,721 |
| Total goodwill | 9,417 | 9,532 |
|  |  |  |
| Indefinite-lived intangibles (regulatory licences related  to UK Electricity Distribution): |  |  |
| West Midlands | 518 | 518 |
| East Midlands | 519 | 519 |
| South Wales | 257 | 257 |
| South West | 420 | 420 |
| Total indefinite-lived intangibles | 1,714 | 1,714 |

1. This is a combination of the West Midlands, East Midlands, South Wales and South West CGUs, reflecting the level at which the goodwill

is monitored.

In each assessment, the value-in-use has been calculated assuming a stable regulatory framework and

is based on projections that incorporate our best estimates of future cash flows, including costs, changes

in commodity prices, future rates and growth. Such projections reflect our current regulatory agreements

and allow for future agreements and recovery of investment, including those related to achieving the net

zero plans of the jurisdictions that we operate in. Our plans have proved to be reliable guides in the past

and the Directors believe the estimates are appropriate.

(a) Cash flow periods, terminal value and discount rate assumptions

We select cash flow durations longer than five years, when our forecasts are considered reliable. The cash

flow durations selected reflect our knowledge and understanding of the regulatory environments in which

we operate, and most significantly, where markets have legislated decarbonisation commitments by 2050,

we may utilise longer cash flow forecasts that reflect the investment required to deliver those commitments

before applying a terminal value at the point those commitments are due to be fulfilled and market growth

is expected to stabilise. For our regulated UK ED operations, we consider cash flow durations that run

until 2050, reflecting the expected investment required in the network, in excess of economy‑wide

long‑term growth rates in order to deliver the energy transition. Total expenditure forecasts, comprising

capital and operating expenditure, are estimated with reference to the Group’s strategic modelling and

expectations around a reasonable energy transition based upon the policies and commitments in place

today. Cash flows related to uncommitted future restructurings and enhancement capital expenditure

(beyond activity to reinforce the network and build new connections) are excluded from the projections.

For our regulated US operations (New York and New England CGUs), we use a five-year cash flow

forecast. For our National Grid Ventures operations, we typically model cash flows extending out to

the end of each project’s operational life based on the long-term horizon of our projects.

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 167 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Notes to the consolidated financial statements cont. | | |  |  |  |

11. Goodwillcont.

(a) Cash flow periods, terminal value and discount rate assumptions cont.

For our UK ED business, a nominal terminal growth rate of 1.6% (2025:  1.8%) is assumed upon

the terminal year cash flows, reflecting management’s best view, based on market and operational

experience, of the expected long-term growth in the relevant market. For our regulated US operations

we apply a growth rate of 2.4% (2025: 2.3%). This has been determined with regard to data on industry

growth projections, specifically related to the energy transition, and projected growth in real Gross

Domestic Product (GDP) for the territory within which the CGU is based.

Pre-tax cash flows are discounted by applying a pre-tax discount rate reflecting the time value of money

and the risks specific to the group of assets. In practice, the post-tax discount rate for the group of

assets in question is derived from a post-tax weighted average cost of capital. The assumptions used

in the calculation of the weighted average cost of capital are benchmarked to externally available data.

The determined discount rate is independent of the entity’s capital structure and reflects a market

participant’s view of a risk adjusted discount rate specific to the CGU or group of CGUs. The post-tax

discount rate is then grossed up to a pre-tax discount rate that is applied to pre-tax cash flows. The

pre‑tax discount rates used for the year ended 31 March 2026 were as follows: UK ED Group 5.2%

(2025: 5.4%); UK ED distribution network operators 5.2% (2025: 5.3%); New York 5.1% (2025: 6.3%);

New England 5.0% (2025: 6.2%); and National Grid Ventures – US 5.3% (2025: 6.7%).

(b) Key inputs and sensitivity analysis

In assessing the carrying value of goodwill and licences, we have sensitised our forecasts to factor

in adjustments to key inputs to each model. While regulatory licences are tested for impairment before

we test goodwill, we consider the sensitivity for goodwill attributable to UK ED and our regulated

US operations and those related to licences separately below.

Goodwill – UK ED, regulated US operations (New York and New England) and National Grid

Ventures – US

While key assumptions underpinning the goodwill valuations will change over time, the Directors

consider that no reasonably foreseeable change would result in an impairment of goodwill. This is in

view of the long-term nature of the key assumptions, including those used in determining an appropriate

discount rate, and specifically the risk-free rate and total market return, the margin by which the estimated

value-in-use exceeds the carrying amount and the nature of the regulatory regimes that UK ED and our

regulated US businesses operate under.

Indefinite-lived regulatory licences – UK ED

No reasonably possible changes to inputs to the impairment test performed over the South West,

East Midlands, West Midlands and South Wales Distribution Network Operator licences were identified

as resulting in an impairment.

![]()

12. Other intangible assets

|  |  |  |
| --- | --- | --- |
|  |  |  |
|  |  |  |
|  | Other intangible assets are the software assets controlled by us and the electricity  distribution licences which provide us with the right to operate and invest in the relevant  network that operates as a monopoly in the licensed geographical area. The regulatory  licences were acquired following the Group’s acquisition of NGED. |  |
|  |  |  |

Our electricity distribution licences are indefinite-lived intangible assets for which there is no foreseeable

limit to the period over which they are expected to generate net cash inflows. Once granted by Ofgem,

the licence is issued to a licensee on the basis that it remains active into perpetuity. On that basis, the

value attributed to the electricity distribution network licence assets is considered to have an indefinite

useful life. The regulatory licence assets are subject to a review for impairment annually, or more

frequently if events or circumstances indicate a potential impairment (see note 11 for details of

impairment tests performed over indefinite-lived intangible assets). Any impairment is charged to

the income statement as it arises.

Software is recorded at cost less accumulated amortisation and any provision for impairment. Our

software assets are tested for impairment only if there is an indication that their carrying values may

have been impaired. Impairments of assets are calculated as the difference between the carrying value

of the asset and the recoverable amount, if lower. Where such an asset does not generate cash flows

that are independent from other assets, the recoverable amount of the CGU to which that asset belongs

is estimated. Impairments are recognised in the consolidated income statement within other operating

costs. Any assets which suffered impairment in a previous period are reviewed for possible reversal

of the impairment at each reporting date.

Internally generated intangible assets are recognised only if: i) an asset is created that can be identified;

ii) it is probable that the asset created will generate future economic benefits; and iii) the development cost

of the asset can be measured reliably. Where no internally generated intangible asset can be recognised,

development expenditure is recorded as an expense in the period in which it is incurred.

Cloud computing arrangements are reviewed to determine if the Group has control of the software

intangible asset. Control is considered to exist where the Group has the right to take possession of the

software and run it on its own or a third party’s computer infrastructure or if the Group has exclusive rights

to use the software such that the supplier is unable to make the software available to other customers.

Costs relating to configuring or customising the software in a cloud computing arrangement are assessed

to determine if there is a separate intangible asset over which the Group has control. If an asset is

identified, it is capitalised and amortised over the useful economic life of the asset. To the extent that no

separate intangible asset is identified, then the costs are either expensed when incurred or recognised as

a prepayment and spread over the term of the arrangement if the costs are concluded to not be distinct.

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 168 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Notes to the consolidated financial statements cont. | | |  |  |  |

12. Other intangible assetscont.

(a) Analysis of other intangible assets

|  |  |  |  |  |
| --- | --- | --- | --- | --- |
|  |  |  |  |  |
|  | Regulatory  licences  £m | Software  £m | Assets in the  course of  construction  £m | Total  £m |
| Cost at 1 April 2024 | 1,714 | 3,093 | 392 | 5,199 |
| Exchange adjustments | — | (61) | (7) | (68) |
| Additions | — | 16 | 462 | 478 |
| Disposals | — | (7) | — | (7) |
| Reclassifications 1 | — | 376 | (363) | 13 |
| Reclassification to held for sale (note 10) | — | (16) | — | (16) |
| Cost at 1 April 2025 | 1,714 | 3,401 | 484 | 5,599 |
| Exchange adjustments | — | (56) | (8) | (64) |
| Additions | — | 84 | 609 | 693 |
| Disposals | — | (10) | — | (10) |
| Reclassifications¹ | — | 547 | (556) | (9) |
| Cost at 31 March 2026 | 1,714 | 3,966 | 529 | 6,209 |
| Accumulated amortisation at 1 April 2024 | — | (1,758) | (10) | (1,768) |
| Exchange adjustments | — | 36 | — | 36 |
| Amortisation charge for the year | — | (323) | — | (323) |
| Accumulated amortisation of disposals | — | 7 | — | 7 |
| Reclassifications¹ | — | 2 | — | 2 |
| Reclassification to held for sale (note 10) | — | 11 | — | 11 |
| Accumulated amortisation at 1 April 2025 | — | (2,025) | (10) | (2,035) |
| Exchange adjustments | — | 25 | — | 25 |
| Amortisation charge for the year | — | (339) | — | (339) |
| Accumulated amortisation of disposals | — | 10 | 10 | 20 |
| Reclassifications¹ | — | (1) | — | (1) |
| Accumulated amortisation at 31 March 2026 | — | (2,330) | — | (2,330) |
| Net book value at 31 March 2026² | 1,714 | 1,636 | 529 | 3,879 |
| Net book value at 31 March 2025 | 1,714 | 1,376 | 474 | 3,564 |

1. Reclassifications includes amounts transferred to property, plant and equipment (see note 13 ).

2. The Group has capitalised £224 million (2025: £271 million) in relation to the Gas Business Enablement system in the US, of which

£224 million (2025: £271 million) is in service and is being amortised over 10 years, with the remainder included within assets in the course

of construction. A further £72 million (2025: £82 million) relates to our UK general ledger system within software and is being amortised

over 10 years.

(b) Asset useful economic lives

No amortisation is provided on regulatory licences. Software is amortised over the period we expect to

receive a benefit from the asset. An amortisation expense is charged to the income statement to reflect

the reduced value of the asset over time. Amortisation is calculated by estimating the number of years we

expect the asset to be used (its useful economic life or UEL) and charging the cost of the asset to the

income statement equally over this period.

|  |  |  |  |  |
| --- | --- | --- | --- | --- |
|  |  |  |  |  |
|  |  |  |  | Years |
| Software |  |  |  | 3 to  10 |
| Regulatory licences |  |  |  | Indefinite |

13. Property, plant and equipment

|  |  |  |
| --- | --- | --- |
|  |  |  |
|  |  |  |
|  | Property, plant and equipment are the physical assets controlled by us. The Group’s interest  comprises legally protected statutory or contractual rights of use. Property, plant and  equipment is recorded at cost, less accumulated depreciation and any impairment losses. |  |
|  |  |  |

![]()

The cost of property, plant and equipment primarily represents the amount initially paid or the fair value

on the date of acquisition of a business. Cost includes the purchase price of the asset; any payroll and

finance costs incurred which are directly attributable to the construction of property, plant and equipment

together with an appropriate portion of overheads which are directly linked to the capital work performed;

and the cost of any associated asset retirement obligations.

Additions represent the purchase or construction of new assets, including capital expenditure for safety

and environmental assets, and extensions to, enhancements to, or replacement of, existing assets.

All costs associated with projects or activities which have not been fully commissioned at the period

end are classified within assets in the course of construction.

A depreciation expense is charged to the income statement to reflect annual wear and tear and the

reduced value of the asset over time. Depreciation is calculated by estimating the number of years we

expect the asset to be used (its useful economic life or UEL) and charging the cost of the asset to the

income statement equally over this period.

Items within property, plant and equipment are tested for impairment only if there is some indication

that the carrying value of the assets may have been impaired. Impairments of assets are calculated as

the difference between the carrying value of the asset and the recoverable amount, if lower. Where such

an asset does not generate cash flows that are independent from other assets, the recoverable amount

of the cash-generating unit to which that asset belongs is estimated. Impairments are recognised in the

income statement and, if immaterial, are included within the depreciation charge for the year.

We operate an energy networks business and therefore have a significant physical asset base. We

continue to invest in our networks to maintain reliability, create new customer connections and ensure

our networks are flexible, resilient and prepared for the transition to net zero. Our business plan envisages

these additional investments will be funded through a mixture of cash generated from operations and the

issue of new debt and equity.

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 169 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Notes to the consolidated financial statements cont. | | |  |  |  |

13. Property, plant and equipmentcont.

(a) Analysis of property, plant and equipment

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
|  | Land and  buildings  £m | Plant and  machinery  £m | Assets  in the  course of  construction  £m | Motor  vehicles  and office  equipment  £m | Total  £m |
| Cost at 1 April 2024 | 4,210 | 74,551 | 7,022 | 1,350 | 87,133 |
| Exchange adjustments | (55) | (965) | (91) | (21) | (1,132) |
| Additions1 | 60 | 1,172 | 7,529 | 220 | 8,981 |
| Disposals | (59) | (387) | (9) | (239) | (694) |
| Adjustment for change in discount rate on  decommissioning provisions (note 26) | — | 7 | — | — | 7 |
| Reclassifications 2 | 198 | 4,583 | (4,876) | 83 | (12) |
| Reclassification to held for sale (note 10) | (110) | (1,195) | (502) | (19) | (1,826) |
| Cost at 1 April 2025 | 4,244 | 77,766 | 9,073 | 1,374 | 92,457 |
| Exchange adjustments | (55) | (934) | (91) | (20) | (1,100) |
| Additions1 | 108 | 1,362 | 8,696 | 259 | 10,425 |
| Disposals | (47) | (363) | (28) | (164) | (602) |
| Adjustment for change in discount rate on  decommissioning provisions (note 26) | (22) | (66) | — | — | (88) |
| Reclassifications 2 | 192 | 5,607 | (5,834) | 84 | 49 |
| Cost at 31 March 2026 | 4,420 | 83,372 | 11,816 | 1,533 | 101,141 |
| Accumulated depreciation at 1 April 2024 | (758) | (16,730) | (67) | (671) | (18,226) |
| Exchange adjustments | 12 | 200 | — | 11 | 223 |
| Depreciation charge for the year3 | (93) | (1,632) | 4 | (203) | (1,924) |
| Disposals | 49 | 387 | 9 | 236 | 681 |
| Reclassifications 2 | (32) | 33 | 3 | (5) | (1) |
| Reclassification to held for sale (note 10) | 51 | 817 | — | 13 | 881 |
| Accumulated depreciation at 1 April 2025 | (771) | (16,925) | (51) | (619) | (18,366) |
| Exchange adjustments | 12 | 197 | — | 11 | 220 |
| Depreciation charge for the year3 | (96) | (1,665) | 2 | (230) | (1,989) |
| Disposals | 29 | 361 | 1 | 163 | 554 |
| Reclassifications 2 | 18 | (44) | (16) | 2 | (40) |
| Accumulated depreciation at 31 March 2026 | (808) | (18,076) | (64) | (673) | (19,621) |
| Net book value at 31 March 2026 | 3,612 | 65,296 | 11,752 | 860 | 81,520 |
| Net book value at 31 March 2025 | 3,473 | 60,841 | 9,022 | 755 | 74,091 |

1. Additions include right-of-use assets recognised during the year.

2. Represents amounts transferred between categories, (to)/from other intangible assets (see note 12) , (to)/from inventories.

3. Depreciation of assets in the course of construction relates to impairment provision adjustments.

(b) Asset useful economic lives

No depreciation is provided on freehold land or assets in the course of construction. Other items of

property, plant and equipment are depreciated, on a straight-line basis, at rates estimated to write off

their book values over their estimated UELs. In assessing UELs, consideration is given to any contractual

arrangements and operational requirements relating to particular assets. The assessments of estimated

UELs and residual values of assets are performed annually.

Certain network assets are depreciated using the group method of depreciation, in which a single

composite depreciation rate is applied to a particular class of property, plant and equipment. This method

pools similar assets together, and then depreciates each group as a whole over their respective useful

lives. In the US, the Company conducts independent depreciation studies on a periodic basis as part of

the regulatory ratemaking process to estimate group depreciation rates. These depreciation studies are

subject to review and approval by the US state and federal regulators, with the depreciation expense

recovered through rates charged to customers. Likewise in the UK, the composite depreciation rates are

benchmarked to internal engineering studies and known asset performance lives. Depreciation expense

includes a component for the original cost of assets and a component for estimated cost of future

removal, net of any salvage value at retirement. Upon retirement of components of the Company’s

network assets, the original cost of the retired assets, net of salvage value, is charged against

accumulated depreciation, with no gain or loss recognised.

Unless otherwise determined by operational requirements, the depreciation periods for the principal

categories of property, plant and equipment are shown in the table that follows split between the UK

and US, along with the weighted average remaining UEL for each class of property, plant and equipment

(which is calculated by dividing the net book value of that class of asset by the respective annual

depreciation charge).

|  |  |  |  |
| --- | --- | --- | --- |
|  |  |  |  |
|  |  | Years |  |
|  | UK | US | Weighted  average  remaining  UEL |
| Freehold and leasehold buildings | up to 65 | up to 100 | 43 |
| Plant and machinery: |  |  |  |
| Electricity transmission plant and wires | up to 100 | 10 to 85 | 32 |
| Electricity distribution plant | 14 to  99 | 5 to 85 | 46 |
| Electricity generation plant | n/a | 15 to 93 | 8 |
| Interconnector plant and other | 5 to 70 | 5 to  54 | 25 |
| Gas plant – mains, services and regulating equipment | n/a | 20 to 95 | 54 |
| Gas plant – storage | n/a | 20 to 60 | 24 |
| Gas plant – meters | n/a | 14 to  45 | 26 |
| Motor vehicles and office equipment | up to 30 | up to 34 | 3 |

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 170 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Notes to the consolidated financial statements cont. | | |  |  |  |

13. Property, plant and equipmentcont.

(c) Gas asset lives

The role that our US gas networks play in the pathway to achieving the greenhouse gas emissions

reductions targets set in the jurisdictions in which we operate remains subject to uncertainty.

Policymakers in New York and Massachusetts continue to indicate an increase in electrification to meet

their respective decarbonisation targets, while as a Group we are committed in our transition to net zero.

However, developments during the current financial year indicate that, despite some regulation changes

and customer incentive schemes favouring electrification, the pathway to full electrification remains

uncertain due to barriers such as heightened affordability concerns and increased regulatory uncertainty.

As a result, there is a reduced risk that the UELs of certain elements of our gas networks may be

shortened in line with future policy, regulatory frameworks and planning systems aimed to support the

decarbonisation of the energy sector.

In the US, our gas distribution asset lives are assessed as part of detailed depreciation studies completed

as part of each separate rate proceeding. Depreciation studies consider the physical condition of assets

and the expected operational life of an asset. The weighted average remaining UEL for our US gas

distribution fixed asset base is circa 54 years; however, a proportion of our assets are assumed to have

UELs which extend beyond 2080. In assessing these UELs, we consider a range of different pathways

related to our gas assets. These pathways factor in the net zero ambitions of the Group and the jurisdictions

that we operate in, anticipated changes in customer behaviour, developments in new technology, the

feasibility and affordability of electrification, and the ability to decarbonise fuel through the use of renewable

natural gas (RNG) and green hydrogen. On balance of the different pathways considered, we continue

to believe the lives identified by rate proceedings are the best estimate of the assets’ UELs given the

need to provide safe, affordable and reliable heating services. We keep this assumption under review

and we continue to actively engage and support our regulators to enable the clean energy transition.

Asset depreciation lives feed directly into our US regulatory recovery mechanisms, such that any

shortening of asset lives and regulatory recovery periods as agreed with regulators should be recoverable

through future rates, subject to agreement, over future periods, as part of wider considerations around

ensuring the continuing affordability of gas in our service territories.

Given the uncertainty described relating to the UELs of our gas assets, below we provide a sensitivity

analysis for the depreciation charge for our New York and New England segments were a shorter UEL

presumed. It should be noted that the net zero pathways which we consider probable all suggest some

role for gas in heating buildings beyond 2050, so our sensitivity analysis for 2050 illustrates an unlikely

worst-case scenario.

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
|  | Increase in depreciation expense for  the year ended  31 March 2026 | |  | Increase in depreciation expense for  the year ended  31 March 2025 | |
|  | New York  £m | New England  £m |  | New York  £m | New England  £m |
| UELs limited to 2050 | 277 | 90 |  | 235 | 78 |
| UELs limited to 2060 | 130 | 37 |  | 110 | 32 |
| UELs limited to 2070 | 64 | 11 |  | 54 | 9 |

Note that this sensitivity calculation excludes any assumptions regarding the residual value for our asset

base and the effect that shortening asset depreciation lives would be expected to have on our regulatory

recovery mechanisms. In the event that any of the US gas distribution assets are stranded, the Group

would expect to recover the associated costs. While recovery is not guaranteed and is determined by

regulators in the US, there are precedents for stranded asset cost recovery for US utility companies.

(d) Right-of-use assets

The Group leases various properties, land, equipment and cars. New lease arrangements entered into

are recognised as a right-of-use asset and a corresponding liability at the date at which the leased asset

is available for use by the Group. The right-of-use asset and associated lease liability arising from a lease

are initially measured at the present value of the lease payments expected over the lease term. The lease

payments include fixed payments, any variable lease payments dependent on an index or a rate, and any

break fees or renewal option costs that we are reasonably certain to incur. The discount rate applied is

the rate implicit in the lease or, if that is not available, the incremental rate of borrowing for a similar term

and similar security. The liabilities for the majority of the Group’s lease portfolio are calculated using the

incremental borrowing rate. This is determined based on observable data for borrowing rates for the

specific Group entity that has entered into the lease, with specific adjustments for the term of the lease

and any lease-specific risk premium. The lease term takes account of extension options that are at

our option if we are reasonably certain to exercise the option and any lease termination options unless

we are reasonably certain not to exercise the option. Each lease payment is allocated between the liability

and finance cost. The finance cost is charged to the income statement over the lease period using the

effective interest rate method. The right-of-use asset is depreciated over the shorter of the asset’s useful

life and the lease term on a straight-line basis. For short-term leases (lease term of 12 months or less)

and leases of low-value assets (such as computers), the Group continues to recognise a lease expense

on a straight-line basis.

The table that follows shows the movements in the net book value of right-of-use assets included within

property, plant and equipment at 31 March 2026 and 31 March 2025, split by category. The associated

lease liabilities are disclosed in note 21.

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
|  | Land and  buildings  £m | Plant and  machinery  £m | Assets  in the  course of  construction  £m | Motor  vehicles  and office  equipment  £m | Total  £m |
| Net book value at 1 April 2024 | 293 | 128 | — | 307 | 728 |
| Exchange adjustments | (6) | (2) | — | (7) | (15) |
| Additions | 39 | 2 | — | 159 | 200 |
| Reclassification to held for sale  (note 10) | (2) | (15) | — | — | (17) |
| Disposals | — | — | — | (3) | (3) |
| Depreciation charge for the year | (21) | (12) | — | (87) | (120) |
| Net book value at 31 March 2025 | 303 | 101 | — | 369 | 773 |
| Exchange adjustments | (6) | (2) | — | (6) | (14) |
| Additions | 23 | — | — | 199 | 222 |
| Disposals | (11) | — | — | (2) | (13) |
| Depreciation charge for the year | (24) | (6) | — | (102) | (132) |
| Net book value at 31 March 2026 | 285 | 93 | — | 458 | 836 |

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 171 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Notes to the consolidated financial statements cont. | | |  |  |  |

13. Property, plant and equipmentcont.

(d) Right-of-use assets cont.

The following balances have been included in the income statement for the years ended 31 March 2026

and 31 March 2025 in respect of right-of-use assets:

|  |  |  |
| --- | --- | --- |
|  |  |  |
|  | 2026 | 2025 |
|  | £m | £m |
| Included within net finance income and costs: |  |  |
| Interest expense on lease liabilities | (41) | (40) |
| Included within revenue: |  |  |
| Lease income 1 | 385 | 406 |
| Included within operating expenses: |  |  |
| Expense relating to short-term and low-value leases | (27) | (24) |

1. Included within lease income is £364 million (2025: £384 million) of variable lease payments, the majority of which relates to the power

supply arrangement entered into with LIPA (see note 3).

14. Other non-current assets

|  |  |  |
| --- | --- | --- |
|  |  |  |
|  |  |  |
|  | Other non-current assets include assets that do not fall into specific non-current asset  categories (such as goodwill or property, plant and equipment) where the benefit to be  received from the asset is not due to be received until after 31 March  2027. |  |
|  |  |  |

![]()

|  |  |  |
| --- | --- | --- |
|  |  |  |
|  | 2026 | 2025 |
|  | £m | £m |
| Other receivables¹ | 291 | 299 |
| Non-current tax assets | 20 | — |
| Prepayments² | 1,073 | 660 |
|  | 1,384 | 959 |

1. Primarily comprises amounts due in relation to property sales to The Berkeley Group. These amounts will be fully received by 2031.

2. Included within prepayments are capital expenditure prepayments made to suppliers to secure production capacity for certain of our

capital projects. The associated cash flows for capital expenditure prepayments are included within purchases of property, plant and

equipment within the consolidated cash flow statement.

![]()

15. Financial and other investments

|  |  |  |
| --- | --- | --- |
|  |  |  |
|  |  |  |
|  | The Group holds a range of financial and other investments. These investments include  short-term money market funds, quoted investments in bonds of other companies,  investments in our venture capital portfolio (National Grid Partners), and investments  that cannot be readily used in operations, principally collateral deposited in relation  to derivatives. |  |
|  |  |  |

The classification of each investment held by the Group is determined based on two main factors:

– its contractual cash flows – whether the asset’s cash flows are solely payments of the principal and

interest on the financial asset on pre‑determined dates or whether the cash flows are determined

by other factors such as the performance of a company; and

– the business model for holding the investments – whether the intention is to hold onto the investment

for the longer term (collect the contractual cash flows) or to sell the asset with the intention of managing

any gain or loss on sale or to manage any liquidity requirements.

The three categories of financial and other investments are as follows:

– Financial assets at amortised cost – debt instruments that have contractual cash flows that are solely

payments of principal and interest, and which are held within a business model whose objective is to

collect contractual cash flows, are held at amortised cost. This category includes our receivables in

relation to deposits and collateral;

– FVOCI debt and other investments – debt investments, such as bonds, that have contractual cash

flows that are solely payments of principal and interest, and which are held within a business model

whose objective is both to collect the contractual cash flows and to sell the debt instruments, are

measured at FVOCI, with gains or losses recognised in the consolidated statement of comprehensive

income instead of through the income statement. On disposal, any gains or losses are recognised

within finance income in the income statement (see note 6). Other investments include insurance

contracts which are held to back the present value of unfunded pension liabilities (see note 25 ); and

– FVTPL investments – other financial investments are subsequently measured at fair value with any

gains or losses recognised in the income statement (FVTPL). This primarily comprises our money

market funds, insurance company fund investments and corporate venture capital investments held

by National Grid Partners.

Financial and other investments are initially recognised on trade date. Subsequent to initial recognition,

the fair values of financial assets that are quoted in active markets are based on bid prices. When

independent prices are not available, fair values are determined by applying valuation techniques used by

the relevant markets, including observable market data where possible (see note 32(g) for further details).

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 172 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Notes to the consolidated financial statements cont. | | |  |  |  |

15. Financial and other investments cont.

|  |  |  |
| --- | --- | --- |
|  |  |  |
|  | 2026 | 2025 |
|  | £m | £m |
| Non-current |  |  |
| FVOCI debt and other investments | 385 | 384 |
| FVTPL investments | 450 | 407 |
| Financial assets at amortised cost | 7 | 7 |
|  | 842 | 798 |
| Current |  |  |
| FVTPL investments | 1,914 | 5,156 |
| Financial assets at amortised cost | 539 | 597 |
|  | 2,453 | 5,753 |
|  | 3,295 | 6,551 |
| Financial and other investments include the following: |  |  |
| Investments in short-term money market funds | 1,370 | 4,725 |
| Investments held by National Grid Partners | 387 | 346 |
| Investments in Sunrun | 63 | 60 |
| Balances that are restricted or not readily used in operations: |  |  |
| Collateral 1 | 438 | 506 |
| Insurance company and non-qualified plan investments | 676 | 578 |
| Cash surrender value of life insurance policies | 252 | 238 |
| Other investments | 109 | 98 |
|  | 3,295 | 6,551 |

1. The collateral balance includes £404 million (2025: £477 million) of collateral placed with counterparties with whom we have entered into

a credit support annex to the International Swaps and Derivatives Association (ISDA) Master Agreement; £30 million (2025: £24 million)

of restricted amounts allocated for specific projects within National Grid Electricity Transmission plc and National Grid Electricity

Distribution plc; £4 million (2025: £5 million) insurance captive letters of credit.

FVTPL and FVOCI investments are recorded at fair value. The carrying value of current financial assets

at amortised cost approximates their fair values, primarily due to short-dated maturities. The exposure

to credit risk at the reporting date is the fair value of the financial investments. For further information on

our credit risk, refer to note 32(a).

For the purposes of impairment assessment, the investments in bonds are considered to be low risk as

they are investment grade securities; life insurance policies are held with regulated insurance companies;

and deposits, collateral receivable and other financial assets at amortised cost have an average credit

rating on a weighted basis of AA or better at all times based on investment policy. All financial assets

held at FVOCI or amortised cost are therefore considered to have low credit risk and have an immaterial

impairment loss allowance equal to 12-month expected credit losses.

In determining the expected credit losses for these assets, some or all of the following information has

been considered: credit ratings, the financial position of counterparties, the future prospects of the

relevant industries and general economic forecasts.

No FVOCI or amortised cost financial assets have had modified cash flows during the period. There has

been no change in the estimation techniques or significant assumptions made during the year in assessing

the loss allowance for these financial assets. There were no significant movements in the gross carrying

value of financial assets during the year that contribute to changes in the loss allowance. No collateral is

held in respect of any of the financial investments in the above table. No balances are more than 30 days

past due and no balances were written off during the year.

16. Investments in joint ventures and associates

![]()

|  |  |  |
| --- | --- | --- |
|  |  |  |
|  |  |  |
|  | Investments in joint ventures and associates represent businesses we do not control but  over which we exercise joint control or significant influence. They are accounted for using  the equity method. A joint venture is an arrangement established to engage in economic  activity, which the Group jointly controls with other parties and has rights to a share of the  net assets of the arrangement. An associate is an entity which is neither a subsidiary nor  a joint venture, but over which the Group has significant influence. |  |
|  |  |  |

|  |  |  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |  |  |
|  | 2026 | | |  | 2025 | | |
|  | Associates  £m | Joint  ventures  £m | Total  £m |  | Associates  £m | Joint  ventures  £m | Total  £m |
| Share of net assets  at 1 April | 174 | 434 | 608 |  | 158 | 1,262 | 1,420 |
| Exchange adjustments | (17) | 30 | 13 |  | (4) | (46) | (50) |
| Additions | 23 | 4 | 27 |  | 23 | 93 | 116 |
| Share of post-tax results  for the year | 15 | 61 | 76 |  | 11 | 62 | 73 |
| Impairment | — | — | — |  | — | (303) | (303) |
| Dividends received | (18) | (82) | (100) |  | (18) | (53) | (71) |
| Disposals | — | — | — |  | (1) | — | (1) |
| Reclassification to held  for sale (note 10) | — | — | — |  | — | (582) | (582) |
| Other movements | — | — | — |  | 5 | 1 | 6 |
| Share of net assets  at 31 March | 177 | 447 | 624 |  | 174 | 434 | 608 |

A list of joint ventures and associates, including the name and proportion of ownership, is provided

in note 34. Transactions with and outstanding balances with joint ventures and associates are shown

in note 31. The joint ventures and associates have no significant contingent liabilities to which the Group

is exposed and the Group has no significant contingent liabilities in relation to its interests in the joint

ventures and associates. The Group has capital commitments in relation to its joint ventures and

associates of  £526 million  (2025 :  £635 million), which primarily relate to the funding of new capital

investment projects.

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 173 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Notes to the consolidated financial statements cont. | | |  |  |  |

16. Investments in joint ventures and associatescont.

The following table describes the Group’s material joint ventures and associates at 31 March 2026:

|  |  |  |  |
| --- | --- | --- | --- |
|  |  |  |  |
| Joint venture 1 | % stake |  |  |
| BritNed Development  Limited  1 | 50% |  | BritNed is a joint venture with the Dutch transmission system operator,  TenneT, and operates the subsea electricity interconnector between  Great Britain and the Netherlands, commissioned in 2011. |
| Nemo Link Limited 1 | 50% |  | Nemo is a joint venture with the Belgian transmission operator,  Elia, and operates the subsea electricity interconnector between  Great Britain and Belgium, which became operational in 2019. |

1. The joint ventures have reporting periods ending on 31 December with monthly management reporting information provided to the Group.

The Group also held a 51% interest in Emerald Energy Venture, LLC, a joint venture with Washington

State Investment Board which builds and operates wind and solar assets. In the prior year, the Group

classified its interest in Emerald, together with NG Renewables, as held for sale and ceased equity

accounting for its share of results (see note 10). The disposal subsequently completed on 29 May 2025.

In March 2021, the Group entered into an offshore partnership agreement with RWE Renewables to form

Community Offshore Wind, LLC. The purpose of the joint venture is to explore, develop, and eventually

construct and operate renewable facilities in the northeastern US offshore wind market. In February 2022,

the partnership successfully bid in the New York Bight seabed lease auction. The Group’s investment in

Community Offshore Wind represents our share of the seabed lease and initial development costs

incurred to date. As of 31 March 2025, the project had not yet reached the construction stage.

In the prior year, an Executive Memorandum was issued by the US Administration on wind power,

temporarily suspending offshore wind leasing, ordering a review of existing leases and directing a review

and pause on permitting. Accordingly, we agreed with RWE Renewables to place a temporary pause on

development of the project. As detailed in the Annual Report and Accounts for the year ended 31 March

2025, we considered the potential impact on our valuation of our investment in Community Offshore

Wind and determined that the investment had a negligible value. Accordingly, the carrying value of the

£303 million investment was fully impaired. The impairment charge was recognised in the NGV operating

segment and classified as exceptional in line with our exceptional items framework (see note 5). Whilst

development activity is currently suspended, we continue to consider Community Offshore Wind could

play an important role in New York’s future energy strategy. We will reassess the project development

pause should market conditions improve in the future.

Summarised financial information as at 31 March, together with the carrying amount of material

investments, is as follows:

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
|  | BritNed Development  Limited | |  | Nemo Link  Limited | |
| 2026 | 2025 |  | 2026 | 2025 |
| £m | £m |  | £m | £m |
| Statement of financial position |  |  |  |  |  |
| Non-current assets | 338 | 352 |  | 448 | 447 |
| Cash and cash equivalents | 65 | 76 |  | 128 | 118 |
| All other current assets | 59 | 48 |  | 11 | 8 |
| Non-current liabilities | (38) | (51) |  | (25) | (3) |
| Non-current financial liabilities | (33) | (32) |  | (11) | (32) |
| Current liabilities | (44) | (39) |  | (103) | (109) |
| Net assets | 347 | 354 |  | 448 | 429 |
|  |  |  |  |  |  |
| Carrying amount of the Group’s investment | 174 | 177 |  | 224 | 215 |

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
|  | BritNed Development  Limited | |  | Nemo Link  Limited | |
|  | 2026 | 2025 |  | 2026 | 2025 |
|  | £m | £m |  | £m | £m |
| Income statement |  |  |  |  |  |
| Revenue | 151 | 108 |  | 108 | 102 |
| Depreciation and amortisation | (16) | (16) |  | (24) | (23) |
| Other costs | (20) | (23) |  | (16) | (16) |
| Operating profit | 115 | 69 |  | 68 | 63 |
| Net interest (expense)/income | (2) | (1) |  | 1 | 1 |
| Profit before tax | 113 | 68 |  | 69 | 64 |
| Income tax expense | (26) | (18) |  | (17) | (16) |
| Profit for the year | 87 | 50 |  | 52 | 48 |
| Group’s share of post-tax results for the year | 44 | 25 |  | 26 | 24 |

The aggregate information of associates and joint ventures that are not individually material is as follows:

|  |  |  |
| --- | --- | --- |
|  |  |  |
|  | 2026 | 2025 |
|  | £m | £m |
| Share of post-tax results for the year | 6 | 24 |
| Impairment | — | (303) |
| Share of total comprehensive income | 6 | (279) |
| Aggregate carrying value of the Group’s interests | 226 | 216 |

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 174 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Notes to the consolidated financial statements cont. | | |  |  |  |

17. Derivative financial instruments

![]()

|  |  |  |
| --- | --- | --- |
|  |  |  |
|  |  |  |
|  | Derivatives are financial instruments that derive their value from the price of an underlying  item such as interest rates, foreign exchange rates, credit spreads, commodities, equities  or other indices. In accordance with policies approved by the Board, derivatives are  transacted generally to manage exposures to fluctuations in interest rates, foreign exchange  rates and commodity prices. Our derivatives balances comprise two broad categories:  – financing derivatives – these are used to manage our exposure to interest rates and  foreign exchange rates. Specifically, we use these derivatives to manage our financing  portfolio, holdings in foreign operations and contractual operational cash flows; and  – commodity contract derivatives – these are used to manage exposure to price and  supply risks related to our US customers and UK business. Some forward contracts  for the purchase of commodities meet the definition of derivatives. We also enter into  derivative financial instruments linked to commodity prices, including options and swaps,  which are used to manage market price volatility. |  |
|  |  |  |

Derivatives are initially recognised at fair value and subsequently remeasured to fair value at each

reporting date. Changes in fair values are recorded in the period they arise, in either the consolidated

income statement or other comprehensive income. Where the gains or losses recorded in the income

statement arise from changes in the fair value of derivatives to the extent that hedge accounting is

not applied or is not fully effective, these are recorded as remeasurements, detailed in notes  5  and 6.

Where the fair value of a derivative is positive it is carried as a derivative asset, and where negative

as a derivative liability.

The fair value of derivative financial instruments is calculated by taking the present value of future

cash flows, primarily incorporating market observable inputs where available. The various inputs

include foreign exchange spot and forward rates, yield curves of the respective currencies, currency

basis spreads between the respective currencies, interest rate and inflation curves, the forward rate

curves of underlying commodities and, for those positions that are not fully cash collateralised, the

credit quality of the counterparties.

Certain clauses embedded in non-derivative financial instruments or other contracts are presented

as derivatives because they impact the risk profile of their host contracts and they are deemed to

have risks or rewards not closely related to those host contracts.

Further information on how derivatives are valued and used for risk management purposes is presented

in note 32. Information on commodity contracts and other commitments not meeting the definition of

derivatives is presented in note 30.

The fair values of derivatives by category are as follows:

|  |  |  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |  |  |
|  | 2026 | | |  | 2025 | | |
|  | Assets  £m | Liabilities  £m | Total  £m |  | Assets  £m | Liabilities  £m | Total  £m |
| Current | 215 | (268) | (53) |  | 113 | (381) | (268) |
| Non-current | 623 | (750) | (127) |  | 369 | (821) | (452) |
|  | 838 | (1,018) | (180) |  | 482 | (1,202) | (720) |
|  |  |  |  |  |  |  |  |
| Financing derivatives | 717 | (950) | (233) |  | 375 | (1,138) | (763) |
| Commodity contract  derivatives | 121 | (68) | 53 |  | 107 | (64) | 43 |
|  | 838 | (1,018) | (180) |  | 482 | (1,202) | (720) |

(a) Financing derivatives

The fair values of financing derivatives by type are as follows:

|  |  |  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |  |  |
|  | 2026 | | |  | 2025 | | |
|  | Assets  £m | Liabilities  £m | Total  £m |  | Assets  £m | Liabilities  £m | Total  £m |
| Interest rate swaps | 129 | (216) | (87) |  | 98 | (196) | (98) |
| Cross-currency interest rate  swaps | 448 | (528) | (80) |  | 193 | (766) | (573) |
| Foreign exchange forward  contracts ¹ | 114 | (120) | (6) |  | 53 | (81) | (28) |
| Inflation-linked swaps | 26 | (86) | (60) |  | 31 | (95) | (64) |
|  | 717 | (950) | (233) |  | 375 | (1,138) | (763) |

1. Included within the foreign exchange forward contracts balance are £19 million (2025: £45 million) of derivative liabilities in relation to the

hedging of capital expenditure.

The maturity profile of financing derivatives is as follows:

|  |  |  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |  |  |
|  | 2026 | | |  | 2025 | | |
|  | Assets  £m | Liabilities  £m | Total  £m |  | Assets  £m | Liabilities  £m | Total  £m |
| Current |  |  |  |  |  |  |  |
| Less than 1 year | 123 | (237) | (114) |  | 19 | (355) | (336) |
|  | 123 | (237) | (114) |  | 19 | (355) | (336) |
| Non-current |  |  |  |  |  |  |  |
| In 1 to 2 years | 88 | (86) | 2 |  | 46 | (61) | (15) |
| In 2 to 3 years | 69 | (45) | 24 |  | 41 | (77) | (36) |
| In 3 to 4 years | 34 | (17) | 17 |  | 47 | (73) | (26) |
| In 4 to 5 years | 51 | (8) | 43 |  | 6 | (25) | (19) |
| More than 5 years | 352 | (557) | (205) |  | 216 | (547) | (331) |
|  | 594 | (713) | (119) |  | 356 | (783) | (427) |
|  | 717 | (950) | (233) |  | 375 | (1,138) | (763) |

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 175 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Notes to the consolidated financial statements cont. | | |  |  |  |

17. Derivative financial instruments

#### cont.

(a) Financing derivatives cont.

The notional contract amounts of financing derivatives by type are as follows:

|  |  |  |
| --- | --- | --- |
|  |  |  |
|  | 2026 | 2025 |
|  | £m | £m |
| Interest rate swaps | (7,113) | (7,763) |
| Cross-currency interest rate swaps | (16,413) | (16,019) |
| Foreign exchange forward contracts | (11,508) | (7,761) |
| Inflation-linked swaps | (2,970) | (3,190) |
|  | (38,004) | (34,733) |

(b) Commodity contract derivatives

The fair values of commodity contract derivatives by type are as follows:

|  |  |  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |  |  |
|  | 2026 | | |  | 2025 | | |
|  | Assets  £m | Liabilities  £m | Total  £m |  | Assets  £m | Liabilities  £m | Total  £m |
| Commodity purchase contracts  accounted for as derivative contracts |  |  |  |  |  |  |  |
| Forward purchases of gas | — | — | — |  | 3 | (7) | (4) |
| Gas options | 3 | (3) | — |  | — | — | — |
| Derivative financial instruments  linked to commodity prices |  |  |  |  |  |  |  |
| Electricity capacity | 7 | (10) | (3) |  | 2 | (17) | (15) |
| Electricity swaps | 110 | (44) | 66 |  | 74 | (38) | 36 |
| Electricity options | — | — | — |  | 1 | (1) | — |
| Gas swaps | — | (8) | (8) |  | 15 | (1) | 14 |
| Gas options | 1 | (3) | (2) |  | 12 | — | 12 |
|  | 121 | (68) | 53 |  | 107 | (64) | 43 |

The maturity profile of commodity contract derivatives is as follows:

|  |  |  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |  |  |
|  | 2026 | | |  | 2025 | | |
|  | Assets  £m | Liabilities  £m | Total  £m |  | Assets  £m | Liabilities  £m | Total  £m |
| Current |  |  |  |  |  |  |  |
| Less than one year | 92 | (31) | 61 |  | 94 | (26) | 68 |
|  | 92 | (31) | 61 |  | 94 | (26) | 68 |
| Non-current |  |  |  |  |  |  |  |
| In 1 to 2 years | 27 | (24) | 3 |  | 12 | (20) | (8) |
| In 2 to 3 years | 1 | (11) | (10) |  | 1 | (12) | (11) |
| In 3 to 4 years | 1 | (2) | (1) |  | — | (2) | (2) |
| In 4 to 5 years | — | — | — |  | — | (2) | (2) |
| More than 5 years | — | — | — |  | — | (2) | (2) |
|  | 29 | (37) | (8) |  | 13 | (38) | (25) |
|  | 121 | (68) | 53 |  | 107 | (64) | 43 |

The notional quantities of commodity contract derivatives by type are as follows:

|  |  |  |
| --- | --- | --- |
|  |  |  |
|  | 2026 | 2025 |
| Forward purchases of gas1 | 13m Dth | 74m Dth |
| Electricity capacity | 4 TWh | 5 TWh |
| Electricity swaps | 15,514 GWh | 14,040 GWh |
| Electricity options | 241 GWh | 334 GWh |
| Gas swaps | 28m Dth | 30m Dth |
| Gas options | 139m Dth | 89m Dth |

1. Forward gas purchases have terms up to one month  (2025: three years). The contractual obligations under these contracts are £21 million

(2025 : £46 million).

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 176 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Notes to the consolidated financial statements cont. | | |  |  |  |

18. Inventories

|  |  |  |
| --- | --- | --- |
|  |  |  |
|  |  |  |
|  | Inventories represent assets that we intend to use in order to generate revenue in the  short term, either by selling the asset itself (for example fuel stocks) or by using it to fulfil  a service to a customer or to maintain our network (consumables). |  |
|  |  |  |

![]()

Inventories are stated at the lower of weighted average cost and net realisable value. Where applicable,

cost comprises direct materials and direct labour costs as well as those overheads that have been directly

incurred in bringing the inventories to their present location and condition.

Emission allowances, principally relating to the emissions of carbon dioxide in the UK and sulphur and

nitrous oxides in the US, are recorded as inventory. They are initially recorded at cost and subsequently

at the lower of cost and net realisable value. A liability is recorded in respect of the obligation to deliver

emission allowances and emission charges are recognised in the income statement in the period

in which emissions are made.

|  |  |  |
| --- | --- | --- |
|  |  |  |
|  | 2026 | 2025 |
|  | £m | £m |
| Fuel stocks | 90 | 95 |
| Raw materials and consumables | 357 | 356 |
| Emission allowances | 112 | 106 |
|  | 559 | 557 |

There is a provision for obsolescence of £1 million against inventories as at 31 March 2026 (2025: £1 million).

19. Trade and other receivables

|  |  |  |
| --- | --- | --- |
|  |  |  |
|  |  |  |
|  | Trade and other receivables include amounts which are due from our customers for  services we have provided, accrued income which has not yet been billed, prepayments  and other receivables that are expected to be settled within 12 months. |  |
|  |  |  |

![]()

Trade and other receivables are initially recognised at fair value, except for trade receivables that do not

have a significant financing component which are measured at transaction price, and are subsequently

measured at amortised cost, less any appropriate allowances for estimated irrecoverable amounts.

|  |  |  |
| --- | --- | --- |
|  |  |  |
|  | 2026 | 2025 |
|  | £m | £m |
| Trade receivables | 3,091 | 3,050 |
| Accrued income | 882 | 1,083 |
| Provision for impairment of receivables and accrued income | (603) | (578) |
| Trade receivables and accrued income, net | 3,370 | 3,555 |
| Prepayments | 336 | 340 |
| Other receivables | 161 | 197 |
|  | 3,867 | 4,092 |

Trade receivables are non-interest-bearing and generally have a term of up to 60 days. Due to their short

maturities, the fair value of trade and other receivables approximates their carrying value. The maximum

exposure of trade and other receivables to credit risk is the carrying amount reported on the balance sheet.

Provision for impairment of receivables

A provision for credit losses is recognised at an amount equal to the expected credit losses that will arise

over the lifetime of the trade receivables and accrued income.

|  |  |  |
| --- | --- | --- |
|  |  |  |
|  | 2026 | 2025 |
|  | £m | £m |
| At 1 April | 578 | 559 |
| Exchange adjustments | (13) | (11) |
| Charge for the year, net of recoveries | 243 | 200 |
| Uncollectible amounts written off | (205) | (168) |
| Reclassification to held for sale (note 10) | — | (2) |
| At 31 March | 603 | 578 |

The trade receivables balance, accrued income balance and provisions balance split by geography are

as follows:

|  |  |  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |  |  |
|  | As at 31 March 2026 | | |  | As at 31 March 2025 | | |
|  | UK | US | Total |  | UK | US | Total |
|  | £m | £m | £m |  | £m | £m | £m |
| Trade receivables | 194 | 2,897 | 3,091 |  | 265 | 2,785 | 3,050 |
| Accrued income | 289 | 593 | 882 |  | 513 | 570 | 1,083 |
| Provision for impairment of  receivables and accrued income | (5) | (598) | (603) |  | (3) | (575) | (578) |
|  | 478 | 2,892 | 3,370 |  | 775 | 2,780 | 3,555 |

There are no retail customers in the UK businesses. A provision matrix is not used in the UK, as an

assessment of expected losses on individual debtors is performed and the provision is not material.

In the US, £2,824 million (2025: £2,813 million) of the gross trade receivables and accrued income

balance is attributable to retail customers. For non-retail US customer receivables, a provision matrix

is not used and expected losses are determined on individual debtors.

The provision for retail customer receivables in the US is calculated based on a series of provision

matrices which are prepared by regulated entity and by customer type. The expected loss rates in each

provision matrix are based on historical loss rates adjusted for current and forecast economic conditions

at the balance sheet date. The inclusion of forward-looking information in the provision matrix-setting process

under IFRS 9 results in loss rates that reflect expected future economic conditions and the recognition of

an expected loss on all debtors even where no loss event has occurred.

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 177 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Notes to the consolidated financial statements cont. | | |  |  |  |

19. Trade and other receivablescont.

Provision for impairment of receivables cont.

In calculating our provision for impairment of receivables at 31 March 2026, we incorporate actual

cash collection levels experienced over a three-year period (placing greater weight on the most recent

study, gradually decreasing for older periods) to determine the expected loss rates per category

of outstanding receivable by operating company. These are benchmarked against provision matrices

run on pre‑COVID-19 behaviour and data. Factored into our analysis are expected cash collections

based on the collection activities in New England and New York, as well as the outlook for the wider

macroeconomic environment. The resulting rates are summarised in the provision matrix shown below.

Based on our review, we recognised a charge of £243 million (2025: £200 million), which represents

our best estimate based on the information available. We based our review on certain macroeconomic

factors, including unemployment levels, inflation, average commodity rate changes and our experience

regarding debtor recoverability.

The average expected loss rates and gross balances for the retail customer receivables in our US operations

are set out below.

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
|  | 2026 | |  | 2025 | |
|  | % | £m |  | % | £m |
| Accrued income | 4 | 554 |  | 5 | 546 |
| 0 – 30 days past due | 4 | 1,040 |  | 5 | 1,033 |
| 30 – 60 days past due | 15 | 288 |  | 16 | 313 |
| 60 – 90 days past due | 23 | 158 |  | 24 | 154 |
| 3 – 6 months past due | 30 | 174 |  | 31 | 172 |
| 6 – 12 months past due | 37 | 181 |  | 38 | 186 |
| Over 12 months past due | 59 | 429 |  | 53 | 409 |
|  |  | 2,824 |  |  | 2,813 |

US retail customer receivables are not collateralised. Trade receivables are written off when regulatory

requirements are met. Write-off policies vary between jurisdictions as they are aligned with the local

regulatory requirements, which differ between regulators. There were no significant amounts written off

during the period that were still subject to enforcement action. Our internal definition of default is aligned

with that of the individual regulators in each jurisdiction.

For further information on our wholesale and retail credit risk, refer to note 32(a).

![]()

20. Cash and cash equivalents

|  |  |  |
| --- | --- | --- |
|  |  |  |
|  |  |  |
|  | Cash and cash equivalents include cash balances, together with short-term investments  with an original maturity of three months or less that are readily convertible to cash. |  |
|  |  |  |

The carrying amounts of cash and cash equivalents approximate their fair values.

Cash at bank earns interest at floating rates based on daily bank deposit rates. Short-term deposits

are made for periods varying between one day and three months, depending on the immediate cash

requirements, and earn interest at the respective short-term deposit rates.

Cash and cash equivalents held in currencies other than sterling have been converted into sterling

at year‑end exchange rates. For further information on currency exposures, refer to note 32(c).

Cash and cash equivalents at 31 March 2026 include  £nil  (2025: £nil) that is restricted.

|  |  |  |
| --- | --- | --- |
|  |  |  |
|  | 2026 | 2025 |
|  | £m | £m |
| Cash at bank | 375 | 625 |
| Short-term deposits | — | 553 |
| Cash and cash equivalents | 375 | 1,178 |

21. Borrowings

![]()

|  |  |  |
| --- | --- | --- |
|  |  |  |
|  |  |  |
|  | We borrow money primarily in the form of bonds and bank loans. These are for a fixed  term and may have fixed or floating interest rates or are linked to inflation indices. We  use derivatives to manage risks associated with interest rates, inflation rates and foreign  exchange. Lease liabilities are also included within borrowings.  Our price controls and rate plans lead us to fund our networks within a certain ratio  of debt to equity or regulatory asset value and, as a result, we have issued a significant  amount of debt. As we continue to invest in our networks, the amount of debt is expected  to increase over time. To maintain a strong balance sheet and to allow us to access  capital markets at commercially acceptable interest rates, we balance the amount of  debt we issue with the value of our assets, and we take account of certain other metrics  used by credit rating agencies. |  |
|  |  |  |

Borrowings, which include interest-bearing and inflation-linked debt, overdrafts and collateral payable,

are initially recorded at fair value. This normally reflects the proceeds received (net of direct issue costs

for liabilities measured at amortised cost). Subsequently, borrowings are stated at amortised cost.  Where

a borrowing is held at amortised cost, any difference between the proceeds after direct issue costs and

the redemption value is recognised over the term of the borrowing in the income statement using the

effective interest rate method.

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 178 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Notes to the consolidated financial statements cont. | | |  |  |  |

21. Borrowingscont.

|  |  |  |
| --- | --- | --- |
|  |  |  |
|  | 2026 | 2025 |
|  | £m | £m |
| Current |  |  |
| Bank loans | 975 | 488 |
| Bonds | 2,780 | 1,828 |
| Commercial paper | — | 2,226 |
| Lease liabilities | 145 | 120 |
|  | 3,900 | 4,662 |
| Non-current |  |  |
| Bank loans | 1,045 | 1,834 |
| Bonds | 41,062 | 40,334 |
| Lease liabilities | 748 | 709 |
|  | 42,855 | 42,877 |
| Total borrowings | 46,755 | 47,539 |

Total borrowings are repayable as follows:

|  |  |  |
| --- | --- | --- |
|  |  |  |
|  | 2026 | 2025 |
|  | £m | £m |
| Less than 1 year | 3,900 | 4,662 |
| In 1 to 2 years | 2,513 | 3,283 |
| In 2 to 3 years | 4,369 | 2,458 |
| In 3 to 4 years | 2,322 | 4,281 |
| In 4 to 5 years | 3,138 | 2,261 |
| More than 5 years: |  |  |
| By instalments | 264 | 337 |
| Other than by instalments | 30,249 | 30,257 |
|  | 46,755 | 47,539 |

The fair value of borrowings, excluding lease liabilities, at 31 March 2026 was £42,505 million

( 2025: £43,137 million ). Where market values were available, the fair value of borrowings (Level 1)

was £35,727 million  ( 2025: £34,639 million). Where market values were not available, the fair value

of borrowings (Level 2) was £6,778 million (2025: £8,498 million) and calculated by discounting cash

flows at prevailing interest rates. The notional amount outstanding of the debt portfolio at 31 March 2026

was £46,113 million  (2025: £46,739 million).

Collateral is placed with or received from any derivative counterparty where we have entered into a

credit support annex to the ISDA Master Agreement once the current mark-to-market valuation of the

trades between the parties exceeds an agreed threshold. Included in current bank loans is £47 million

(2025: £49 million) in respect of cash received under collateral agreements. For further details of our

borrowing facilities, refer to note 33. For further details of our bonds in issue, please refer to the debt

investor section of our website. Unless included herein, the information on our website is unaudited.

Lease liabilities

Lease liabilities are initially measured at the present value of the lease payments expected over the lease

term. The discount rate applied is the rate implicit in the lease or, if that is not available, the incremental

rate of borrowing for a similar term and similar security. The lease term takes account of exercising any

extension options that are at our option if we are reasonably certain to exercise the option as well as any

lease termination options, unless we are reasonably certain not to exercise the option. Each lease

payment is allocated between the liability and finance cost. The finance cost is charged to the income

statement over the lease period using the effective interest rate method. The associated right-of-use

assets are disclosed in note 13.

|  |  |  |
| --- | --- | --- |
|  |  |  |
|  | 2026 | 2025 |
|  | £m | £m |
| Gross lease liabilities are repayable as follows: |  |  |
| Less than 1 year | 172 | 143 |
| 1 to 5 years | 491 | 425 |
| More than 5 years | 456 | 494 |
|  | 1,119 | 1,062 |
| Less: finance charges allocated to future periods | (226) | (233) |
|  | 893 | 829 |
| The present value of lease liabilities are as follows: |  |  |
| Less than 1 year | 145 | 120 |
| 1 to 5 years | 407 | 347 |
| More than 5 years | 341 | 362 |
|  | 893 | 829 |

22. Trade and other payables

|  |  |  |
| --- | --- | --- |
|  |  |  |
|  |  |  |
|  | Trade and other payables include amounts owed to suppliers, tax authorities and other  parties which are due to be settled within 12 months. The total also includes deferred  amounts, some of which represent monies received from customers but for which we have  not yet delivered the associated service. These amounts are recognised as revenue when  the service is provided. |  |
|  |  |  |

![]()

Trade and other payables are initially recognised at fair value and subsequently measured at amortised cost.

|  |  |  |
| --- | --- | --- |
|  |  |  |
|  | 2026 | 2025 |
|  | £m | £m |
| Trade payables | 3,374 | 2,965 |
| Deferred payables | 423 | 401 |
| Customer contributions1 | 30 | 32 |
| Social security and other taxes | 95 | 131 |
| Other payables2 | 1,127 | 943 |
|  | 5,049 | 4,472 |

1. Relates to amounts received from government-related entities for connecting to our networks, where we have obligations remaining under

the contract.

2. Included within Other payables are employee benefit accruals.

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 179 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Notes to the consolidated financial statements cont. | | |  |  |  |

23. Contract liabilities

|  |  |  |
| --- | --- | --- |
|  |  |  |
|  |  |  |
|  | Contract liabilities primarily relate to the advance consideration received from customers  for construction contracts, mainly in relation to connections, for which revenue is  recognised over the life of the asset. |  |
|  |  |  |

![]()

|  |  |  |
| --- | --- | --- |
|  |  |  |
|  | 2026 | 2025 |
|  | £m | £m |
| Current | 110 | 96 |
| Non-current | 2,699 | 2,418 |
|  | 2,809 | 2,514 |

Significant changes in the contract liabilities balances during the period are as follows:

|  |  |  |
| --- | --- | --- |
|  |  |  |
|  | 2026 | 2025 |
|  | £m | £m |
| As at 1 April | 2,514 | 2,246 |
| Exchange adjustments | (28) | (28) |
| Revenue recognised that was included in the contract liability balance at the  beginning of the period | (97) | (129) |
| Increases due to cash received, excluding amounts recognised as revenue  during the period | 420 | 425 |
| At 31 March | 2,809 | 2,514 |

24. Other non-current liabilities

![]()

|  |  |  |
| --- | --- | --- |
|  |  |  |
|  |  |  |
|  | Other non-current liabilities include deferred income and customer contributions which will  not be recognised as income until after 31 March  2027 . It also includes other payables that  are not due until after that date. |  |
|  |  |  |

Other non-current liabilities are initially recognised at fair value and subsequently measured at amortised cost.

|  |  |  |
| --- | --- | --- |
|  |  |  |
|  | 2026 | 2025 |
|  | £m | £m |
| Deferred income | 6 | 6 |
| Customer contributions1 | 401 | 403 |
| Other payables² | 707 | 467 |
|  | 1,114 | 876 |

1. Relates to amounts received from government-related entities for connecting to our networks, where we have obligations remaining under

the contract.

2. Included within other payables are payments due in respect of the IFA1 interconnector in accordance with the Use of Revenue regime,

and the IFA2 and North Sea Link interconnector in accordance with the interconnector cap and floor regime constructed by Ofgem.

The fair value of Other payables approximates their carrying value.

25. Pensions and other post-retirement benefits

|  |  |  |
| --- | --- | --- |
|  |  |  |
|  |  |  |
|  | All of our employees are eligible to participate in a pension plan. We have defined  contribution (DC) and defined benefit (DB) pension plans in the UK and the US. In the US,  we also provide post-retirement benefits to eligible employees in the form of healthcare  cover and life insurance. The fair value of associated plan assets and present value  of DB obligations are updated annually in accordance with IAS 19 ‘Employee Benefits’.  We separately present our UK and US pension plans to show the geographical split.  Below we provide a more detailed analysis of the amounts recorded in the primary  financial statements and the actuarial assumptions used to value the DB obligations. |  |
|  |  |  |

![]()

UK pension plans

Defined contribution plan

UK employees are eligible to join the National Grid UK Retirement Plan (NGUKRP), a section of a Master

Trust arrangement managed by Legal & General. National Grid pays contributions into the NGUKRP to

provide DC benefits on behalf of its employees, generally providing a double match of member

contributions up to a maximum Company contribution of 12% of salary.

Investment risks are borne by the member and there is no legal or constructive obligation on National Grid

to pay additional contributions in the instance that investment performance is poor. Payments to this DC

plan are charged as an expense as they fall due.

Defined benefit plans

National Grid operates various DB pension arrangements in the UK. These include Section A of the

National Grid UK Pension Scheme (NGUKPS), three sections of the industry-wide Electricity Supply

Pension Scheme (ESPS), a legacy scheme (WPUPS), a DB section within WPPS and some unfunded

pension obligations. These plans each hold assets in separate Trustee administered funds and are

managed by Trustee companies with boards consisting of company and member appointed Directors.

These plans are all closed to new members, except for the ESPS schemes in very rare circumstances.

The arrangements are subject to independent actuarial funding valuations carried out by the Trustees

every three years. Following consultation and agreement with the Company, the qualified actuary certifies

the employers’ contributions which, together with the specified contributions payable by the employees

and proceeds from the plans’ assets, are expected to be sufficient to fund the benefits payable. The latest

full actuarial valuations for each of the DB plans were carried out at 31 March 2025, with one of the plans

showing a funding shortfall at the valuation date. This shortfall will be funded via recovery plan payments

from the Company of £18 million per annum from 1 April 2026. The Company also funds the cost of

future benefit accrual (over and above member contributions) for each of the DB plans, with the aggregate

level of ongoing contributions (excluding recovery plan payments) over the year to 31 March 2026 totalling

£93 million (2025 : £100 million). For some of the DB plans, the Company also pays contributions in

respect of the costs of plan administration.

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 180 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Notes to the consolidated financial statements cont. | | |  |  |  |

25. Pensions and other post-retirement benefitscont.

UK pension plans cont.

Defined benefit plans cont.

The Company has also established security arrangements with two of its DB plans. For National Grid

Electricity Group (NGEG) of ESPS, the Company provides contingent security in the form of surety bonds,

letters of credit or cash payments which are implemented if certain trigger events occur in respect of

National Grid Electricity Transmission plc. This security would become payable to the scheme on certain

company-related events, such as loss of licence or insolvency, however the amount payable is currently

capped at £nil for the next three years given the strong funding position of the scheme. In respect of

Section A of NGUKPS, there is a guarantee in place which is enforceable on insolvency or on failure to

pay pension obligations to Section A and can be claimed against National Grid plc, National Grid Holdings

One plc or Lattice Group Limited.

In July 2025, the Trustees of NGUKPS completed a further bulk annuity transaction with Rothesay

covering approximately £0.9 billion of pensioner liabilities, meaning broadly three quarters of scheme

liabilities have now been insured. This transaction reflected National Grid’s continued strategy to insure

pension risk when affordable and efficient to do so.

US pension plans

The US pension plans are governed by the Retirement Plan Committee (RPC), a fiduciary committee. The

RPC is structured in accordance with US laws governing retirement plans under the Employee Retirement

Income Security Act (ERISA) and comprises appointed employees of the Company.

Defined contribution plan

National Grid has a DC pension plan which allows employee as well as Company contributions. Non-union

employees hired after 1 January 2011, as well as most new hire union employees, receive a core

contribution into the DC plan ranging from 3% to 9% of salary, irrespective of the employee’s contribution

into the plan. Most employees also receive a matching contribution that varies between 25% and 50%

of employee contributions up to a maximum Company contribution of 8%. The assets of the plans are

held in trusts and administered by the RPC.

Defined benefit plans

National Grid sponsors four non-contributory qualified DB pension plans, which provide vested non-union

employees hired before 1 January 2011, and vested eligible union employees, with retirement benefits

within prescribed limits as defined by the US Internal Revenue Service. National Grid also provides non-

qualified DB pension arrangements for a closed group of current and former employees with designated

company investments set aside to fund these obligations. Benefits under the DB plans generally reflect

age, years of service and compensation, and are paid in the form of an annuity or lump sum. The Company

funds the DB plans by contributing no less than the minimum amount required, but no more than the

maximum tax-deductible amount allowed under US Internal Revenue Service regulations. The range of

contributions determined under these regulations can vary significantly depending upon the funded status

of the plans. At present, there is some flexibility in the amount that is contributed on an annual basis.

In general, the Company’s policy for funding the US pension plans is to contribute the amounts collected

in rates and capitalised in the rate base during the year, to the extent that the funding is no less than the

minimum amount required. For the current financial year, these contributions amounted to approximately

£19 million (2025: £27 million).

During the year, some of our US DB pension plans undertook annuity buyout transactions in which

a portion of existing retiree pension payments were transferred to a reputable insurance company in

exchange for single bulk premium payments. As a result, all associated financial, governance and

administrative responsibilities for those payments were transferred to the selected insurer.

US other post-retirement benefits

National Grid provides post-retirement healthcare and life insurance benefits to eligible employees.

Eligibility is based on certain age and length of service requirements and, in most cases, retirees

contribute to the cost of their healthcare coverage. In the US, there is no governmental requirement to

pre-fund post-retirement healthcare and life insurance plans. However, in general, the Company’s policy

for funding the US retiree healthcare and life insurance plans is to contribute amounts collected in rates

and capitalised in the rate base during the year. For the current financial year, these contributions

amounted to £8 million (2025: £10 million).

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 181 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Notes to the consolidated financial statements cont. | | |  |  |  |

25. Pensions and other post-retirement benefitscont.

Actuarial assumptions

On retirement, members of DB plans receive benefits whose value is dependent on factors such as

salary and length of pensionable service. National Grid’s obligation in respect of DB pension plans is

calculated separately for each DB plan by projecting the estimated amount of future benefit payments

that employees have earned for their pensionable service in the current and prior periods. These future

benefit payments are discounted to determine the present value of the liabilities.

Advice is taken from independent actuaries relating to the appropriateness of the key assumptions

applied, including life expectancy, expected salary and pension increases, and inflation. Comparatively

small changes in the assumptions used may have a significant effect on the amounts recognised in

the consolidated income statement, the consolidated statement of other comprehensive income and

the net asset or liability recognised in the consolidated statement of financial position. The sensitivities

to significant risks are disclosed in note 35. Remeasurements of pension assets and post-retirement

benefit obligations are recognised in full in the period in which they occur in the consolidated statement

of other comprehensive income.

The Company has applied the following financial assumptions in assessing DB liabilities:

|  |  |  |  |  |  |  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |  |  |  |  |  |  |
|  | UK pensions | | |  | US pensions | | |  | US other post-retirement  benefits | | |
|  | 2026 | 2025 | 2024 |  | 2026 | 2025 | 2024 |  | 2026 | 2025 | 2024 |
|  | % | % | % |  | % | % | % |  | % | % | % |
| Discount rate – past  service | 6.00 | 5.73 | 4.87 |  | 5.60 | 5.50 | 5.15 |  | 5.60 | 5.50 | 5.15 |
| Discount rate – future  service | 6.35 | 5.95 | 4.92 |  | 5.60 | 5.50 | 5.15 |  | 5.60 | 5.50 | 5.15 |
| Rate of increase in RPI  – past service | 3.17 | 2.99 | 3.05 |  | n/a | n/a | n/a |  | n/a | n/a | n/a |
| Rate of increase in RPI  – future service | 3.06 | 2.85 | 2.92 |  | n/a | n/a | n/a |  | n/a | n/a | n/a |
| Salary increases | 3.32 | 3.08 | 3.10 |  | 4.50 | 4.50 | 4.50 |  | 4.50 | 4.50 | 4.50 |
| Initial healthcare cost  trend rate | n/a | n/a | n/a |  | n/a | n/a | n/a |  | 7.10 | 7.80 | 7.10 |
| Ultimate healthcare  cost trend rate | n/a | n/a | n/a |  | n/a | n/a | n/a |  | 4.50 | 4.50 | 4.50 |

For UK pensions, single equivalent financial assumptions are shown above for presentational purposes,

although full yield curves have been used in our calculations. The discount rate is determined by reference

to high-quality UK corporate bonds at the reporting date. The rate of increase in salaries has been set

using a promotional scale where appropriate. The rates of increases stated are not indicative of historical

increases awarded or a guarantee of future increase, but merely an appropriate assumption used in

assessing DB liabilities. Our DB plans in the UK provide for pension increases that are generally linked

to the Retail Price Index (RPI), subject to relevant caps and floors.

Discount rates for US pension liabilities have been determined by reference to appropriate yields on high-

quality US corporate bonds at the reporting date based on the duration of plan liabilities. The healthcare

cost trend rate is expected to reach the ultimate trend rate by 2037 (2025: 2033).

The table below sets out the projected life expectancies adopted for the UK and US pension arrangements:

|  |  |  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |  |  |
|  | UK pensions | | |  | US pensions | | |
|  | 2026 | 2025 | 2024 |  | 2026 | 2025 | 2024 |
|  | years | years | years |  | years | years | years |
| Assumed life expectation for a  retiree aged 65 |  |  |  |  |  |  |  |
| Males | 21.9 | 21.5 | 21.5 |  | 21.9 | 21.8 | 21.6 |
| Females | 24.2 | 23.9 | 23.5 |  | 23.9 | 23.8 | 23.9 |
| In 20 years: |  |  |  |  |  |  |  |
| Males | 22.9 | 22.4 | 22.6 |  | 23.5 | 23.4 | 23.3 |
| Females | 25.6 | 25.3 | 24.9 |  | 25.5 | 25.4 | 25.5 |

The weighted average duration of the DB obligation for each category of plan is 10 years for UK pension

plans, 11 years for US pension plans and 11 years for US other post-retirement benefit plans. The table

below summarises the split of DB obligations by status for each category of plan:

|  |  |  |  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |  |  |  |
|  | UK pensions | |  | US pensions | |  | US other  post-retirement benefits | |
|  | 2026 | 2025 |  | 2026 | 2025 |  | 2026 | 2025 |
|  | % | % |  | % | % |  | % | % |
| Active members | 10 | 11 |  | 42 | 40 |  | 30 | 28 |
| Deferred members | 7 | 7 |  | 10 | 10 |  | — | — |
| Pensioner members | 83 | 82 |  | 48 | 50 |  | 70 | 72 |

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 182 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Notes to the consolidated financial statements cont. | | |  |  |  |

25. Pensions and other post-retirement benefitscont.

Amounts recognised in the consolidated statement of financial position

The geographical split of pensions and other post-retirement benefits is as shown below:

|  |  |  |  |  |  |  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |  |  |  |  |  |  |
|  | UK pensions | |  | US pensions | |  | US other  post-retirement benefits | |  | Total | |
|  | 2026 | 2025 |  | 2026 | 2025 |  | 2026 | 2025 |  | 2026 | 2025 |
|  | £m | £m | £m | £m | £m | £m |  | £m | £m |
| Present value of funded obligations | (9,319) | (9,424) |  | (4,009) | (4,508) |  | (1,770) | (2,222) |  | (15,098) | (16,154) |
| Fair value of plan assets | 10,441 | 10,603 |  | 4,608 | 5,180 |  | 2,731 | 2,658 |  | 17,780 | 18,441 |
|  | 1,122 | 1,179 |  | 599 | 672 |  | 961 | 436 |  | 2,682 | 2,287 |
| Present value of unfunded obligations | (51) | (51) |  | (186) | (196) |  | (10) | — |  | (247) | (247) |
| Other post-employment liabilities | — | — |  | — | — |  | (44) | (47) |  | (44) | (47) |
|  | 1,071 | 1,128 |  | 413 | 476 |  | 907 | 389 |  | 2,391 | 1,993 |
| Restrictions on asset recognised | — | — |  | — | — |  | (244) | (77) |  | (244) | (77) |
| Net defined benefit asset | 1,071 | 1,128 |  | 413 | 476 |  | 663 | 312 |  | 2,147 | 1,916 |
| Represented by: |  |  |  |  |  |  |  |  |  |  |  |
| Liabilities | (51) | (51) |  | (186) | (196) |  | (123) | (326) |  | (360) | (573) |
| Assets | 1,122 | 1,179 |  | 599 | 672 |  | 786 | 638 |  | 2,507 | 2,489 |
|  | 1,071 | 1,128 |  | 413 | 476 |  | 663 | 312 |  | 2,147 | 1,916 |

The extent to which pension assets have been recognised in the UK and in the US reflects legal and actuarial advice that we have taken regarding recognition of surpluses under IFRIC 14. In the UK, the Group has

an unconditional right to a refund in the event of a winding up. In the US, surplus assets of a plan may be used to pay for future benefits expected to be earned under that plan.

At 31 March 2026, the Group has an irrecoverable surplus of £244 million (2025: £77 million) related to one OPEB plan. The economic benefit from reductions in future contributions to the plan is not sufficient to

cover the surplus and this plan does not have an unconditional right to a refund of surplus assets in the event of a winding up without incurring significant tax charges.

Amounts recognised in the income statement and statement of other comprehensive income

The expense or income arising from all Group retirement benefit arrangements recognised in the Group income statements is shown below:

|  |  |  |  |
| --- | --- | --- | --- |
|  |  |  |  |
|  | 2026 | 2025 | 2024 |
|  | £m | £m | £m |
| Included within operating costs |  |  |  |
| Administration costs | 27 | 22 | 22 |
| Included within payroll costs |  |  |  |
| Defined benefit plan costs: |  |  |  |
| Current service cost 1 | 123 | 138 | 143 |
| Past service cost – augmentations and redundancies | 2 | 1 | 9 |
| Gains on settlement | (25) | — | (30) |
|  | 100 | 139 | 122 |
| Included within finance income and costs |  |  |  |
| Net interest income adjusted for change to irrecoverable surplus | (114) | (98) | (100) |
| Total expense included in income statement | 13 | 63 | 44 |
|  |  |  |  |
| Exchange losses | (14) | (20) | (6) |
| Remeasurement gains/(losses) of pension assets and post-retirement benefit obligations | 287 | (29) | (218) |
| Adjustments for restrictions on the defined benefit asset | (155) | (77) | — |
| Total gain/(loss) included in the statement of other comprehensive income | 118 | (126) | (224) |

1. Of the current service cost, £33 million (2025: £34 million; 2024: £35 million) has been capitalised to property, plant and equipment.

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 183 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Notes to the consolidated financial statements cont. | | |  |  |  |

25. Pensions and other post-retirement benefitscont.

Amounts recognised in the income statement and statement of other comprehensive income cont.

The geographical split of pensions and other post-retirement benefits is shown below:

|  |  |  |  |  |  |  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |  |  |  |  |  |  |
|  | UK pensions | | |  | US pensions | | |  | US other post-retirement benefits | | |
|  | 2026 | 2025 | 2024 |  | 2026 | 2025 | 2024 |  | 2026 | 2025 | 2024 |
|  | £m | £m | £m |  | £m | £m | £m |  | £m | £m | £m |
| Included within operating costs |  |  |  |  |  |  |  |  |  |  |  |
| Administration costs | 19 | 14 | 13 |  | 6 | 6 | 7 |  | 2 | 2 | 2 |
| Included within payroll costs |  |  |  |  |  |  |  |  |  |  |  |
| Defined benefit plan costs: |  |  |  |  |  |  |  |  |  |  |  |
| Current service cost | 34 | 45 | 45 |  | 62 | 68 | 72 |  | 27 | 25 | 26 |
| Past service cost – augmentations and redundancies | 2 | 1 | 9 |  | — | — | — |  | — | — | — |
| Gains on settlement | — | — | — |  | (25) | — | (30) |  | — | — | — |
|  | 36 | 46 | 54 |  | 37 | 68 | 42 |  | 27 | 25 | 26 |
| Included within finance income and costs |  |  |  |  |  |  |  |  |  |  |  |
| Net interest income adjusted for change to irrecoverable surplus | (58) | (68) | (84) |  | (22) | (19) | (13) |  | (34) | (11) | (3) |
| Total (income)/expense included in income statement | (3) | (8) | (17) |  | 21 | 55 | 36 |  | (5) | 16 | 25 |
| Exchange losses | — | — | — |  | (7) | (10) | (5) |  | (7) | (10) | (1) |
| Remeasurement (losses)/gains of pension assets and post-retirement benefit obligations | (156) | (257) | (474) |  | (54) | 106 | 99 |  | 497 | 122 | 157 |
| Adjustments for restrictions on the defined benefit asset | — | — | — |  | — | — | — |  | (155) | (77) | — |
| Total (loss)/gain included in the statement of other comprehensive income | (156) | (257) | (474) |  | (61) | 96 | 94 |  | 335 | 35 | 156 |

Reconciliation of the net defined benefit asset

|  |  |  |  |  |  |  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |  |  |  |  |  |  |
|  | UK pensions | |  | US pensions | |  | US other  post-retirement benefits | |  | Total | |
|  | 2026 | 2025 |  | 2026 | 2025 |  | 2026 | 2025 |  | 2026 | 2025 |
|  | £m | £m |  | £m | £m |  | £m | £m |  | £m | £m |
| Opening net defined benefit asset | 1,128 | 1,261 |  | 476 | 408 |  | 389 | 145 |  | 1,993 | 1,814 |
| Income/(cost) recognised in the income statement before adjustment for irrecoverable surplus | 3 | 8 |  | (21) | (55) |  | 16 | (16) |  | (2) | (63) |
| Remeasurement and foreign exchange effects recognised in the statement of other comprehensive income | (156) | (257) |  | (61) | 96 |  | 491 | 112 |  | 274 | (49) |
| Employer contributions | 93 | 112 |  | 19 | 27 |  | 8 | 143¹ |  | 120 | 282 |
| Other movements | 3 | 4 |  | — | — |  | 3 | 5 |  | 6 | 9 |
|  | 1,071 | 1,128 |  | 413 | 476 |  | 907 | 389 |  | 2,391 | 1,993 |
|  |  |  |  |  |  |  |  |  |  |  |  |
| Restrictions on the defined benefit asset | — | — |  | — | — |  | (244) | (77) |  | (244) | (77) |
| Closing net defined benefit asset | 1,071 | 1,128 |  | 413 | 476 |  | 663 | 312 |  | 2,147 | 1,916 |

1. In addition to the regular employer contributions that are described above, the Company made a one-off contribution of £133 million to the OPEB schemes in the prior year.

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 184 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Notes to the consolidated financial statements cont. | | |  |  |  |

25. Pensions and other post-retirement benefitscont.

Changes in the present value of defined benefit obligations (including unfunded obligations)

The table below shows the movement in defined benefit obligations across our DB plans over the year.

|  |  |  |  |  |  |  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |  |  |  |  |  |  |
|  | UK pensions | |  | US pensions | |  | US other  post-retirement benefits | |  | Total | |
|  | 2026 | 2025 |  | 2026 | 2025 |  | 2026 | 2025 |  | 2026 | 2025 |
|  | £m | £m |  | £m | £m |  | £m | £m |  | £m | £m |
| Opening defined benefit obligations | (9,475) | (10,521) |  | (4,704) | (4,912) |  | (2,222) | (2,434) |  | (16,401) | (17,867) |
| Current service cost | (34) | (45) |  | (62) | (68) |  | (27) | (25) |  | (123) | (138) |
| Interest cost | (452) | (533) |  | (241) | (246) |  | (92) | (120) |  | (785) | (899) |
| Actuarial (losses)/gains – experience | (40) | (41) |  | (88) | (4) |  | (5) | 116 |  | (133) | 71 |
| Actuarial gains/(losses) – demographic assumptions | (98) | (74) |  | — | (22) |  | 419 | 19 |  | 321 | (77) |
| Actuarial gains/(losses) – financial assumptions | 11 | 989 |  | 31 | 156 |  | (15) | 36 |  | 27 | 1,181 |
| Past service cost – augmentations and redundancies | (2) | (1) |  | — | — |  | — | — |  | (2) | (1) |
| Liabilities extinguished on settlements | — | — |  | 468 | — |  | — | — |  | 468 | — |
| Medicare subsidy received | — | — |  | — | — |  | (37) | (31) |  | (37) | (31) |
| Employee contributions | (5) | (5) |  | — | — |  | — | — |  | (5) | (5) |
| Benefits paid | 725 | 756 |  | 280 | 282 |  | 142 | 165 |  | 1,147 | 1,203 |
| Exchange adjustments | — | — |  | 121 | 110 |  | 57 | 52 |  | 178 | 162 |
| Closing defined benefit obligations | (9,370) | (9,475) |  | (4,195) | (4,704) |  | (1,780) | (2,222) |  | (15,345) | (16,401) |

Changes in the value of plan assets

The table below shows the movement in pension assets across our DB plans over the year.

|  |  |  |  |  |  |  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |  |  |  |  |  |  |
|  | UK pensions | |  | US pensions | |  | US other  post-retirement benefits | |  | Total | |
|  | 2026 | 2025 |  | 2026 | 2025 |  | 2026 | 2025 |  | 2026 | 2025 |
|  | £m | £m |  | £m | £m |  | £m | £m |  | £m | £m |
| Opening fair value of plan assets | 10,603 | 11,782 |  | 5,180 | 5,320 |  | 2,658 | 2,631 |  | 18,441 | 19,733 |
| Interest income | 510 | 601 |  | 263 | 265 |  | 137 | 131 |  | 910 | 997 |
| Return on plan assets (less than)/in excess of interest1 | (29) | (1,131) |  | 3 | (24) |  | 98 | (49) |  | 72 | (1,204) |
| Administration costs | (19) | (14) |  | (6) | (6) |  | (2) | (2) |  | (27) | (22) |
| Assets distributed on settlements | — | — |  | (443) | — |  | — | — |  | (443) | — |
| Employer contributions | 93 | 112 |  | 19 | 27 |  | 8 | 143 |  | 120 | 282 |
| Employee contributions | 5 | 5 |  | — | — |  | — | — |  | 5 | 5 |
| Benefits paid | (722) | (752) |  | (280) | (282) |  | (105) | (134) |  | (1,107) | (1,168) |
| Exchange adjustments | — | — |  | (128) | (120) |  | (63) | (62) |  | (191) | (182) |
| Closing fair value of plan assets | 10,441 | 10,603 |  | 4,608 | 5,180 |  | 2,731 | 2,658 |  | 17,780 | 18,441 |
| Actual return on plan assets | 481 | (530) |  | 266 | 241 |  | 235 | 82 |  | 982 | (207) |
| Expected contributions to plans in the following year | 55 | 89 |  | 28 | 19 |  | 10 | — |  | 93 | 108 |

1. For the year ended 31 March 2026 this included actuarial losses of £60 million resulting from the purchase of a bulk annuity policy with Rothesay.

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 185 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Notes to the consolidated financial statements cont. | | |  |  |  |

25. Pensions and other post-retirement benefitscont.

Asset allocations

The allocation of assets by asset class is set out below. Within these asset allocations there is significant diversification across regions, asset managers, currencies and bond categories.

|  |  |  |  |  |  |  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |  |  |  |  |  |  |
| UK pensions | 2026 | | |  | 2025 | | |  | 2024 | | |
| Quoted | Unquoted | Total |  | Quoted | Unquoted | Total |  | Quoted | Unquoted | Total |
| £m | £m | £m |  | £m | £m | £m |  | £m | £m | £m |
| Equities | 842 | 103 | 945 |  | 716 | 123 | 839 |  | 576 | 153 | 729 |
| Corporate bonds | 1,018 | — | 1,018 |  | 1,338 | (1) | 1,337 |  | 1,910 | — | 1,910 |
| Government securities and liability-driven investments | — | 3,378 | 3,378 |  | — | 3,938 | 3,938 |  | — | 5,259 | 5,259 |
| Property 1 | — | 403 | 403 |  | — | 451 | 451 |  | — | 679 | 679 |
| Diversified alternatives | 412 | 231 | 643 |  | 381 | 428 | 809 |  | 669 | 572 | 1,241 |
| Bulk annuity policies | — | 4,059 | 4,059 |  | — | 3,239 | 3,239 |  | — | 2,060 | 2,060 |
| Longevity swap | — | — | — |  | — | — | — |  | — | (94) | (94) |
| Cash and cash equivalents | — | — | — |  | 1 | — | 1 |  | 3 | — | 3 |
| Other (including net current assets and liabilities) | — | (5) | (5) |  | — | (11) | (11) |  | — | (5) | (5) |
|  | 2,272 | 8,169 | 10,441 2 |  | 2,436 | 8,167 | 10,603 2 |  | 3,158 | 8,624 | 11,782 2 |

1. The allocation in property includes £284 million (2025: £294 million, 2024: £288 million) of investments in forestry funds.

2. The fair value of plan assets set out above includes employer-related investment exposure of £nil (2025: £nil, 2024: £44 million). The investment strategies for some of the DB plans use repurchase agreements to increase market exposure of their liability-driven investments, with the fair

value of these instruments totalling approximately £2.5 billion at 31 March 2026 (2025: £2.9 billion, 2024: £2.7 billion).

|  |  |  |  |  |  |  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |  |  |  |  |  |  |
| US pensions | 2026 | | |  | 2025 | | |  | 2024 | | |
| Quoted | Unquoted | Total |  | Quoted | Unquoted | Total |  | Quoted | Unquoted | Total |
| £m | £m | £m |  | £m | £m | £m |  | £m | £m | £m |
| Equities | — | 848 | 848 |  | — | 887 | 887 |  | 99 | 1,224 | 1,323 |
| Corporate bonds | 1,682 | 339 | 2,021 |  | 1,955 | 401 | 2,356 |  | 1,987 | 403 | 2,390 |
| Government securities | 621 | 460 | 1,081 |  | 737 | 467 | 1,204 |  | 360 | 444 | 804 |
| Property | — | 163 | 163 |  | — | 196 | 196 |  | — | 237 | 237 |
| Diversified alternatives | — | 357 | 357 |  | — | 384 | 384 |  | 54 | 502 | 556 |
| Cash and cash equivalents | 130 | — | 130 |  | 152 | — | 152 |  | 9 | — | 9 |
| Other (including net current assets and liabilities) | 4 | 4 | 8 |  | (2) | 3 | 1 |  | 1 | — | 1 |
|  | 2,437 | 2,171 | 4,608 |  | 2,842 | 2,338 | 5,180 |  | 2,510 | 2,810 | 5,320 |

|  |  |  |  |  |  |  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |  |  |  |  |  |  |
| US other post-retirement benefits | 2026 | | |  | 2025 | | |  | 2024 | | |
| Quoted | Unquoted | Total |  | Quoted | Unquoted | Total |  | Quoted | Unquoted | Total |
| £m | £m | £m |  | £m | £m | £m |  | £m | £m | £m |
| Equities | 36 | 553 | 589 |  | 31 | 522 | 553 |  | 37 | 524 | 561 |
| Corporate bonds | 1,217 | 161 | 1,378 |  | 1,350 | 47 | 1,397 |  | 1,351 | 46 | 1,397 |
| Government securities | 455 | 1 | 456 |  | 441 | 1 | 442 |  | 410 | 1 | 411 |
| Diversified alternatives | 121 | — | 121 |  | 103 | — | 103 |  | 92 | 9 | 101 |
| Other (including insurance contracts) | 2 | 185 | 187 |  | — | 163 | 163 |  | — | 161 | 161 |
|  | 1,831 | 900 | 2,731 |  | 1,925 | 733 | 2,658 |  | 1,890 | 741 | 2,631 |

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 186 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Notes to the consolidated financial statements cont. | | |  |  |  |

25. Pensions and other post-retirement benefitscont.

Main defined benefit risks

National Grid underwrites the financial and demographic risks associated with the Group’s DB plans.

Although the governing bodies have sole responsibility for setting investment strategies and managing risks,

National Grid closely works with and supports the governing bodies of each plan, to assist them in mitigating

the risks associated with their plans and to ensure that the plans are funded to meet their obligations.

The most significant risks associated with the DB plans are as follows:

|  |  |
| --- | --- |
|  |  |
| Main risks | Description and mitigation |
| Investment risk | The plans invest in a variety of asset classes, with actual returns likely to differ from the  underlying discount rate adopted, impacting on the funding position of the plan through  the net balance sheet asset or liability. Each plan seeks to balance the level of  investment return required with the risk that it can afford to take, to design the most  appropriate investment portfolio. |
| Changes in  bond yields | Liabilities will fluctuate as yields change. Volatility of the net balance sheet asset or  liability is controlled through liability-matching strategies. The investment strategies  allow for the use of synthetic as well as physical assets to be used for hedging. |
| Inflation risk | Changes in inflation will affect current and future pensions but are partially mitigated  through investing in inflation-matching assets and hedging instruments as well as bulk  annuity policies. The investment strategies allow for the use of synthetic as well as  physical assets to be used for hedging. |
| Member  longevity | Improvements in life expectancy will lead to pension payments being paid for longer  than expected and benefits ultimately being more expensive. This risk has been partly  mitigated by the investment in bulk annuity policies for NGEG of ESPS and NGUKPS. |
| Counterparty  risk | This is managed by having a diverse range of counterparties and through having a  strong collateralisation process. Measurement and management of counterparty risk  is delegated to the relevant investment managers. For our bulk annuity policies, various  termination provisions were included in the contracts, managing our exposure to  counterparty risk. The insurers’ operational performance and financial strength are  monitored on a regular basis. |
| Default risk | Debt investments are predominantly made in regulated markets in assets considered  to be of investment grade. Where investments are made either in non-investment grade  assets or outside of regulated markets, investment levels are kept to prudent levels and  subject to agreed ranges, to control the risk. |
| Liquidity risk | The pension plans hold sufficient cash to meet benefit requirements, with other  investments being held in liquid or realisable assets to meet unexpected cash flow  requirements. These could include collateral calls relating to the plans’ liability-matching  assets which could result from extreme market movements. Should the plans not have  sufficient liquidity to meet cash flow requirements, they could be forced to take sub-  optimal investment decisions such as selling assets at a reduced price. The plans  generally do not borrow money, or act as guarantor, to provide liquidity to other parties. |
| Currency risk | Fluctuations in the value of foreign denominated assets due to exposure to currency  exchange rates are managed through currency hedging overlay and currency hedging  carried out by some of the investment managers. |

In June 2023, the UK High Court issued a ruling in the case of Virgin Media Limited versus NTL Pension

Trustees II Limited and others relating to the validity of certain historical pension changes. A subsequent

appeal was dismissed in July 2024 by the Court of Appeal. The Group has performed its review of past

significant changes made to its UK defined benefit pension arrangements and it has concluded that

there is no financial impact from the ruling of the case.

Investment strategies

The Trustees and RPC, after taking advice from professional investment advisors and in consultation

with National Grid, set their key principles, including expected returns, risk and liquidity requirements.

They formulate an investment strategy to manage risk through diversification, taking into account

expected contributions, maturity of the pension liabilities and, in the UK, the strength of the covenant.

These strategies allocate investments between return-seeking assets such as equities and property,

and liability-matching assets such as bulk annuity policies, government securities and corporate bonds

which are intended to protect the funding position.

The approximate investment allocations for our plans at 31 March 2026 are as follows:

|  |  |  |  |
| --- | --- | --- | --- |
|  |  |  |  |
|  | UK pensions | US pensions | US other post-  retirement benefits |
|  | % | % | % |
| Return-seeking assets | 19 | 30 | 26 |
| Liability-matching assets | 81 | 70 | 74 |

The governing bodies generally delegate responsibility for the selection of specific bonds, securities and

other investments to appointed investment managers, who are selected based on the required skills,

expertise in those markets, process and financial security to manage the investments. Their performance

is regularly reviewed against measurable objectives, consistent with each pension plan’s long-term

objectives and accepted risk levels.

In the UK, each of our pension plans has Responsible Investment (RI) Policies, which consider ESG

factors and generally incorporate the six UN‑backed Principles for Responsible Investment (UNPRI).

While each Trustee board understands its fiduciary responsibility to maximise return on investments

based on an appropriate level of risk, they each also recognise that ESG factors can be material to

financial outcomes and can have a potential impact on the quality and sustainability of long-term

investment returns. The principal defined contribution arrangement in the UK embeds ESG factors

in the investment options offered to members. As well as offering a range of self‑select ethical funds,

it directly incorporates its Climate Impact Pledge into the default investment options, which act to align

the funds to a carbon net zero future.

While in the US there is no regulatory requirement to have ESG-specific principles embedded in investment

policies, our investment managers consider ESG principles to inform their decision-making process.

US DC plan members can access ESG investment funds through the mutual fund brokerage window.

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 187 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Notes to the consolidated financial statements cont. | | |  |  |  |

26. Provisions

|  |  |  |
| --- | --- | --- |
|  |  |  |
|  |  |  |
|  | Provisions are recognised where a legal or constructive obligation exists at the reporting  date, as a result of a past event, where the outflow of economic benefit is probable and  where the amount of the obligation can be reliably estimated. |  |
|  |  |  |

![]()

Provisions are recognised for the costs of environmental remediation; decommissioning costs for certain

assets that we are required to remove at the end of their useful economic lives; restructuring costs; and

for certain other situations where the above thresholds are met.

Long-term provisions are measured based on management’s best estimates of the likely cash flows,

discounted at an appropriate discount rate. The unwinding of the discount is included within the income

statement within finance costs. Short-term provisions are measured at the expected cash outflow and

are not discounted.

|  |  |  |  |  |
| --- | --- | --- | --- | --- |
|  |  |  |  |  |
|  | Environmental  £m | Decommissioning  £m | Other  £m | Total  provisions  £m |
| At 1 April 2024 | 2,418 | 353 | 338 | 3,109 |
| Exchange adjustments | (47) | (5) | (1) | (53) |
| Additions | 60 | 45 | 211 | 316 |
| Unused amounts reversed | (126) | (8) | (16) | (150) |
| Adjustment for change in discount rate1 | (82) | 7 | — | (75) |
| Unwinding of discount | 105 | 13 | 5 | 123 |
| Utilised | (139) | (6) | (58) | (203) |
| Reclassification to held for sale (note 10) | (17) | — | (1) | (18) |
| At 31 March 2025 | 2,172 | 399 | 478 | 3,049 |
| Exchange adjustments | (49) | (4) | (4) | (57) |
| Additions | 59 | 43 | 200 | 302 |
| Unused amounts reversed | (53) | (50) | (26) | (129) |
| Adjustment for change in discount rate | (2) | (88) | — | (90) |
| Unwinding of discount | 101 | 12 | 3 | 116 |
| Utilised | (135) | (4) | (113) | (252) |
| Reclassifications to other payables (note 24) | — | — | (178) | (178) |
| At 31 March 2026 | 2,093 | 308 | 360 | 2,761 |

|  |  |  |  |
| --- | --- | --- | --- |
|  |  |  |  |
|  | 2026 |  | 2025 |
|  | £m |  | £m |
| Current | 425 |  | 357 |
| Non-current | 2,336 |  | 2,692 |
|  | 2,761 |  | 3,049 |

1. In the prior year, US environmental provisions decreased by  £82 million as a result of the change in the real discount rate from 1.5%

to 2.0% (see note 5 for details).

Environmental provisions

We recognise environmental provisions for the estimated restoration and remediation costs relating to

a number of sites owned and managed by subsidiary undertakings, together with certain US sites that

National Grid no longer owns. The environmental provision is as follows:

|  |  |  |  |  |  |  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |  |  |  |  |  |  |
|  | 2026 | | | | |  | 2025 | | | | |
|  | Discounted  £m |  | Real  undiscounted  £m |  | Real  discount  rate |  | Discounted  £m |  | Real  undiscounted  £m |  | Real  discount  rate |
| UK sites | 82 |  | 91 |  | 1.4% |  | 107 |  | 115 |  | 1.0% |
| US sites | 2,011 |  | 2,340 |  | 2.0% |  | 2,065 |  | 2,440 |  | 2.0% |
|  | 2,093 |  | 2,431 |  |  |  | 2,172 |  | 2,555 |  |  |

Remediation expenditure in the US is expected to be incurred until 2079 , of which the majority relates

to two Superfund sites (being sites where hazardous substances are present as a result of the historical

operations of manufacturing gas plants previously owned or operated by the Group or its predecessor

companies in Brooklyn, New York). The weighted average duration of the forecasted cash flows is 9 years.

Under the terms of our rate plans, we are entitled to recovery of environmental clean-up costs from

rate payers.

Remediation expenditure in the UK relates to old gas manufacturing sites and also to electricity

transmission sites. Cash flows are expected to be incurred until 2070.

The real undiscounted amount is management’s best estimate of the actual cash flows that will be

required. The provisions are calculated based on these cash flows discounted at the appropriate real

discount rate for the jurisdiction, which is determined using the relevant government bond yield curve

and the weighted average life of the provisions.

Numerous estimation uncertainties affect the calculation of these provisions, including the impact of and

possibility of changes to regulatory requirements, the accuracy of site surveys, unexpected contaminants,

the scope of remediation work, transportation costs, the impact of alternative technologies, the expected

timing, cost and duration of cash flows, and changes in the real discount rate. These provisions incorporate

our best estimate of the financial effect of these uncertainties, but future changes in any of the assumptions

could materially impact the calculation of the provision.

Changes in the provision arising from revised estimates, discount rates or changes in the expected

timing of expenditure are recognised in the income statement. A sensitivity of the impact of changes

to the US environmental provision real discount rate and changes in estimated future cash flows is shown

in note 35. The facts and circumstances relating to particular cases are evaluated regularly in determining

whether an environmental provision should be revised (see note 30).

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 188 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Notes to the consolidated financial statements cont. | | |  |  |  |

26. Provisionscont.

Decommissioning provisions

We recognise provisions for decommissioning costs for various assets we are required to remove at

the end of their lives, including the safe removal of asbestos for certain of our generation units and the

restoration of seabeds in respect of our interconnectors. Provisions to decommission significant portions

of our regulated transmission and distribution assets are not recognised where no legal obligations

exist and where a realistic alternative exists to incurring costs to decommission the assets at the end

of their lives.

An initial estimate of decommissioning costs attributable to property, plant and equipment is recorded

as part of the cost of the related property, plant and equipment. Changes in the provision arising from

revised estimates, discount rates or changes in the expected timing of expenditure that relates to

property, plant and equipment are recorded as adjustments to their carrying value and depreciated

prospectively over their remaining estimated useful economic lives. Expenditure is expected to be

incurred until 2116.

Other provisions

Included within other provisions at 31 March 2026 are the following amounts:

– £167 million (2025: £172 million) of estimated liabilities in respect of past events insured by

subsidiary undertakings and policy excesses incurred by operating companies. Estimates are

based on experience from previous years. We expect that cash flows will be incurred until 2055;

– £nil (2025: £159 million) of estimated liabilities in respect of interconnector excess revenues are

recognised at the reporting date, as the first assessment period of the interconnector cap and floor

regime for IFA2 and North Sea Link (see note 3(e)) concluded on 31 March 2026. Based on the

respective interconnectors’ performance against their cumulative caps, the liability has been finalised

at £178 million and has been reclassified to other payables within non-current liabilities (see note 24).

Cash outflows will be required to settle these liabilities by the financial year ending 31 March 2028; and

– £80 million (2025: £39 million) in respect of emissions provisions, expected to be utilised by 2027

through the delivery of emission allowances.

![]()

27. Share capital

|  |  |  |
| --- | --- | --- |
|  |  |  |
|  |  |  |
|  | Ordinary share capital represents the total number of shares issued which are publicly  traded. We also disclose the number of treasury shares the Company holds, which are  shares that the Company has bought itself, predominantly to actively manage and settle  employee share option and reward plan liabilities. |  |
|  |  |  |

Share capital is accounted for as an equity instrument. An equity instrument is any contract that includes a

residual interest in the consolidated assets of the Company after deducting all its liabilities and is recorded at

the proceeds received, net of direct issue costs, with an amount equal to the nominal amount of the shares

issued included in the share capital account and the balance recorded in the share premium account.

|  |  |  |
| --- | --- | --- |
|  |  |  |
|  | Allotted, called-up and fully paid | |
|  | Shares  million | Nominal value  £m |
| At 1 April 2024 | 3,967 | 493 |
| Rights Issue | 1,085 | 135 |
| Issued during the year in lieu of dividends1 | 81 | 10 |
| At 31 March 2025 | 5,133 | 638 |
| Issued during the year in lieu of dividends1 | 66 | 9 |
| At 31 March 2026 | 5,199 | 647 |

1. The issue of shares under the scrip dividend programme is considered to be a bonus issue under the terms of the Companies Act 2006,

and the nominal value of the shares is charged to the share premium account.

The share capital of the Company consists of ordinary shares of  12 204⁄473 pence nominal value each

including ADSs. The ordinary shares and ADSs (each of which represents five ordinary shares) allow

holders to receive dividends and vote at general meetings of the Company. The Company holds treasury

shares but may not exercise any rights over these shares, including the entitlement to vote or receive

dividends. There are no restrictions on the transfer or sale of ordinary shares.

In line with the provisions of the Companies Act 2006, the Company has amended its Articles of Association

and ceased to have authorised share capital.

The Company conducts a share forfeiture programme following the completion of a tracing and notification

exercise to any shareholders who have not had contact with the Company over the past 12 years, in

accordance with the provisions set out in the Company’s Articles of Association. Under the share forfeiture

programme, the shares and dividends associated with shares of untraced members have been forfeited,

with the resulting proceeds transferred to the Company to use in line with the Company’s strategy in

relation to corporate responsibility. During the financial year, the Company received £2 million (2025:

£5 million) of proceeds from the sale of untraced shares and derecognised £1 million  (2025: £3 million)

of liabilities related to unclaimed dividends, which are reflected in share premium and the income

statement respectively.

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 189 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Notes to the consolidated financial statements cont. | | |  |  |  |

27. Share capital

#### cont.

Rights Issue

In June 2024, the Company completed a Rights Issue to support the future capital investment plans

of the Group. The Company raised £6,839 million (net of expenses of £162 million) through the issue

of 1,085 million new ordinary shares at 645 pence each on the basis of 7 new ordinary shares for every

24 existing ordinary shares. The issue price represented a discount of 33% to the closing ex-dividend

share price on 23 May 2024, the announcement date of the Rights Issue. The structure of the Rights

Issue gave rise to a merger reserve, representing the net proceeds of the Rights Issue less the nominal

value of the new shares issued. Following the receipt of the cash proceeds through the structure,

the excess of the net proceeds over the nominal value of the share capital issued was considered

realised and transferred from the merger reserve to retained earnings.

Treasury shares

At 31 March 2026, the Company held 226 million (2025: 235 million) of its own shares. The market

value of these shares as at 31 March 2026 was £2,863 million (2025:  £2,377 million).

For the benefit of employees and in connection with the operation of the Company’s various share

plans, the Company made the following transactions in respect of its own shares during the year

ended 31 March 2026:

– During the year, 5 million (2025: 9 million) treasury shares were gifted to National Grid Employee

Share Trusts and 5 million (2025: 3 million) treasury shares were reissued in relation to employee

share schemes, in total representing approximately 0.2% (2025: 0.2%) of the ordinary shares in

issue as at 31 March 2026. The nominal value of these shares was £1 million (2025: £1 million)

and the total proceeds received were £40 million (2025: £18 million).

– During the year, the Company made payments totalling £3 million (2025: £11 million) to National

Grid Employee Share Trusts to enable the Trustees to make purchases of National Grid plc shares

to settle share awards in relation to all employee share plans and discretionary reward plans. The

cost of such purchases is deducted from retained earnings in the period that the transaction occurs.

The maximum number of ordinary shares held in Treasury during the year was 235 million (2025: 247 million),

representing approximately 4.5% (2025: 4.8%) of the ordinary shares in issue as at 31 March 2026 and

having a nominal value of £29 million (2025: £31 million).

![]()

28. Other equity reserves

|  |  |  |
| --- | --- | --- |
|  |  |  |
|  |  |  |
|  | Other equity reserves are different categories of equity as required by accounting standards  and represent the impact of a number of our historical transactions or fair value movements  on certain financial instruments that the Company holds. |  |
|  |  |  |

Other equity reserves comprise the translation reserve (see note  1 C), cash flow hedge reserve and

the cost of hedging reserve (see note  32 ), debt instruments at fair value through other comprehensive

income reserve (FVOCI debt) (see note 15), the capital redemption reserve and the merger reserve.

The merger reserve arose as a result of the application of merger accounting principles under the then

prevailing UK GAAP, which under IFRS 1 was retained for mergers that occurred prior to the IFRS

transition date. Under merger accounting principles, the difference between the carrying amount of

the capital structure of the acquiring vehicle and that of the acquired business was treated as a merger

difference and included within reserves. The merger reserve represents the difference between the

carrying value of subsidiary undertaking investments and their respective capital structures following

the Lattice demerger from BG Group plc and the 1999 Lattice refinancing.

The cash flow hedge reserve will either amortise as the committed future cash flows from borrowings are

paid, be capitalised in fixed assets, or amortise as committed future cash flows from revenue are received

(as described in note 32). See note 15 for further detail on FVOCI debt and note 32 in respect of cost of

hedging reserve.

As the amounts included in other equity reserves are not attributable to any of the other classes of equity

presented, they have been disclosed as a separate classification of equity.

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 190 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Notes to the consolidated financial statements cont. | | |  |  |  |

28. Other equity reservescont.

|  |  |  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |  |  |
|  | Translation  £m | Cash flow  hedge  £m | Cost of  hedging  £m | FVOCI  debt  £m | Capital  redemption  £m | Merger  £m | Total  £m |
| At 1 April 2023 | 1,306 | (61) | (38) | 79 | 19 | (5,165) | (3,860) |
| Exchange adjustments 1 | (335) | — | — | — | — | — | (335) |
| Net gains taken to equity | — | 16 | 37 | 34 | — | — | 87 |
| Transferred to profit or loss | — | 224 | (11) | — | — | — | 213 |
| Net losses in respect of cash flow  hedging of capital expenditure | — | (37) | — | — | — | — | (37) |
| Tax | — | (50) | (6) | (4) | — | — | (60) |
| Cash flow hedges transferred to the  statement of financial position, net of tax | — | 2 | — | — | — | — | 2 |
| At 1 April 2024 | 971 | 94 | (18) | 109 | 19 | (5,165) | (3,990) |
| Exchange adjustments 1 | (352) | — | — | — | — | — | (352) |
| Net gains/(losses) taken to equity | — | 30 | (46) | (12) | — | — | (28) |
| Transferred to profit or loss | — | 188 | (6) | — | — | — | 182 |
| Rights Issue | — | — | — | — | — | 6,704 | 6,704 |
| Transfer to retained earnings | — | — | — | — | — | (6,704) | (6,704) |
| Net losses in respect of cash flow  hedging of capital expenditure | — | (16) | — | — | — | — | (16) |
| Tax | — | (50) | 13 | 3 | — | — | (34) |
| Cash flow hedges transferred to the  statement of financial position, net of tax | — | 5 | — | — | — | — | 5 |
| At 1 April 2025 | 619 | 251 | (57) | 100 | 19 | (5,165) | (4,233) |
| Exchange adjustments¹ | (348) | — | — | — | — | — | (348) |
| Exchange differences reclassified to  the consolidated income statement  on disposal  2 | 76 | — | — | — | — | — | 76 |
| Net gains taken to equity | — | 368 | 40 | 7 | — | — | 415 |
| Transferred to profit or loss | — | (489) | (4) | — | — | — | (493) |
| Net gains in respect of cash flow  hedging of capital expenditure | — | 22 | — | — | — | — | 22 |
| Tax | — | 25 | (9) | — | — | — | 16 |
| Cash flow hedges transferred to the  statement of financial position, net of tax | — | 3 | — | — | — | — | 3 |
| At 31 March 2026 | 347 | 180 | (30) | 107 | 19 | (5,165) | (4,542) |

1. The exchange adjustments recorded in the translation reserve comprise a loss of £380 million (2025: loss of £408 million; 2024:  loss

of £397 million) relating to the translation of foreign operations, offset by a gain of £32 million (2025: gain of £56 million ; 2024: gain

of £62 million) relating to borrowings, cross-currency swaps and foreign exchange forward contracts used to hedge the net investment

in non sterling-denominated subsidiaries.

2. The reclassification of the foreign currency translation reserve relates to the disposal of NG Renewables and comprises a loss of £84 million

relating to the retranslation of NG Renewables’ operations offset by a gain of £8 million relating to borrowings, cross-currency swaps and

foreign exchange forward contracts used to hedge the Group’s net investment in NG Renewables.

29. Net debt

![]()

|  |  |  |
| --- | --- | --- |
|  |  |  |
|  |  |  |
|  | We define net debt as the amount of borrowings and financing derivatives less cash and  current financial investments. |  |
|  |  |  |

(a)  Composition of net debt

|  |  |  |  |
| --- | --- | --- | --- |
|  |  |  |  |
|  | 2026 | 2025 | 2024 |
|  | £m | £m | £m |
| Cash and cash equivalents (see note 20) | 375 | 1,178 | 559 |
| Current financial investments (see note 15) | 2,453 | 5,753 | 3,699 |
| Borrowings (see note 21) | (46,755) | (47,539) | (47,072) |
| Financing derivatives1 (see note 17) | (233) | (763) | (793) |
|  | (44,160) | (41,371) | (43,607) |

1. The financing derivatives balance included in net debt excludes the commodity derivatives (see note  17 )

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 191 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Notes to the consolidated financial statements cont. | | |  |  |  |

29. Net debtcont.

(b) Analysis of changes in net debt

|  |  |  |  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |  |  |  |
|  | Notes | Borrowings  £m | Financing derivatives  used to hedge debt  £m | Total liabilities from  financing activities  £m | Cash  and cash  equivalents  £m | Financial  investments  £m | Other financing  derivatives  £m | Total 1  £m |
| At 1 April 2025 |  | (47,539) | (733) | (48,272) | 1,178 | 5,753 | (30) | (41,371) |
| Net decrease in cash and cash equivalents |  | — | — | — | (948) | — | — | (948) |
| Included within financing cash flows: |  |  |  |  |  |  |  |  |
| Proceeds received from loans |  | (4,172) | — | (4,172) | — | — | — | (4,172) |
| Repayment of loans |  | 2,961 | — | 2,961 | — | — | — | 2,961 |
| Payments of lease liabilities |  | 145 | — | 145 | — | — | — | 145 |
| Net movements in short-term borrowings |  | 2,225 | — | 2,225 | — | — | — | 2,225 |
| Cash inflows on derivatives |  | — | (93) | (93) | — | — | — | (93) |
| Cash outflows on derivatives |  | — | 38 | 38 | — | — | — | 38 |
| Interest paid |  | 1,659 | 273 | 1,932 | — | — | — | 1,932 |
| Non-net debt financing cash flows |  | (33) | — | (33) | — | — | — | (33) |
| Included within investing cash flows: |  |  |  |  |  |  |  |  |
| Net movements in short-term financial investments |  | — | — | — | — | (3,285) | — | (3,285) |
| Cash inflows on derivatives |  | — | — | — | — | — | (20) | (20) |
| Cash outflows on derivatives |  | — | — | — | — | — | 6 | 6 |
| Derivative cash flows included in capital expenditure |  | — | — | — | — | — | 5 | 5 |
| Interest received |  | — | — | — | — | (231) | — | (231) |
| Derivative cash flows included in revenue |  | — | — | — | — | — | 1 | 1 |
| Fair value gains and losses |  | 118 | 549 | 667 | — | 5 | — | 672 |
| Foreign exchange movements |  | (190) | — | (190) | (8) | (17) | — | (215) |
| Interest (charges)/income | 6 | (1,706) | (246) | (1,952) | — | 230 | 17 | (1,705) |
| Other non-cash movements2 |  | (223) | — | (223) | — | — | — | (223) |
| Reclassification to held for sale 3 |  | — | — | — | 153 | (2) | — | 151 |
| At 31 March 2026 |  | (46,755) | (212) | (46,967) | 375 | 2,453 | (21) | (44,160) |
| Balances at 31 March 2026 comprise: |  |  |  |  |  |  |  |  |
| Non-current assets |  | — | 587 | 587 | — | — | 7 | 594 |
| Current assets |  | — | 77 | 77 | 375 | 2,453 | 46 | 2,951 |
| Current liabilities |  | (3,900) | (191) | (4,091) | — | — | (46) | (4,137) |
| Non-current liabilities |  | (42,855) | (685) | (43,540) | — | — | (28) | (43,568) |
|  |  | (46,755) | (212) | (46,967) | 375 | 2,453 | (21) | (44,160) |

1. The net debt balance at 31 March 2026 includes accrued interest of £459 million.

2. Other non-cash movements primarily comprise additions to lease liabilities.

3. Reclassification to held for sale represents the disposals of NG Renewables and Grain LNG (see note 10).

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 192 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Notes to the consolidated financial statements cont. | | |  |  |  |

29. Net debt

#### cont.

(b) Analysis of changes in net debt cont.

|  |  |  |  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |  |  |  |
|  | Notes | Borrowings  £m | Financing derivatives  used to hedge debt  £m | Total liabilities from  financing activities  £m | Cash  and cash  equivalents  £m | Financial  investments  £m | Other financing  derivatives  £m | Total¹  £m |
| At 1 April 2024 |  | (47,072) | (764) | (47,836) | 559 | 3,699 | (29) | (43,607) |
| Net increase in cash and cash equivalents |  | — | — | — | 765 | — | — | 765 |
| Included within financing cash flows: |  |  |  |  |  |  |  |  |
| Proceeds received from loans |  | (3,237) | — | (3,237) | — | — | — | (3,237) |
| Repayment of loans |  | 2,861 | — | 2,861 | — | — | — | 2,861 |
| Payments of lease liabilities |  | 130 | — | 130 | — | — | — | 130 |
| Net movements in short-term borrowings |  | (925) | — | (925) | — | — | — | (925) |
| Cash inflows on derivatives |  | — | (62) | (62) | — | — | — | (62) |
| Cash outflows on derivatives |  | — | 106 | 106 | — | — | — | 106 |
| Interest paid |  | 1,608 | 312 | 1,920 | — | — | — | 1,920 |
| Non-net debt financing cash flows |  | (8) | — | (8) | — | — | — | (8) |
| Included within investing cash flows: |  |  |  |  |  |  |  |  |
| Net movements in short-term financial investments |  | — | — | — | — | 2,606 | — | 2,606 |
| Cash inflows on derivatives |  | — | — | — | — | — | (11) | (11) |
| Cash outflows on derivatives |  | — | — | — | — | — | 6 | 6 |
| Derivative cash flows included in capital expenditure |  | — | — | — | — | — | 9 | 9 |
| Interest received |  | — | — | — | — | (332) | — | (332) |
| Derivative cash flows included in revenue |  | — | — | — | — | — | (8) | (8) |
| Fair value gains and losses |  | (26) | (30) | (56) | — | 1 | (7) | (62) |
| Foreign exchange movements |  | 866 | — | 866 | (23) | (25) | — | 818 |
| Interest (charges)/income | 6 | (1,663) | (295) | (1,958) | — | 338 | 10 | (1,610) |
| Other non-cash movements2 |  | (207) | — | (207) | — | — | — | (207) |
| Reclassification to held for sale 3 | 10 | 134 | — | 134 | (123) | (534) | — | (523) |
| At 31 March 2025 |  | (47,539) | (733) | (48,272) | 1,178 | 5,753 | (30) | (41,371) |

1. The net debt balance at 31 March 2025 includes accrued interest of £477 million.

2. Other non-cash movements primarily comprise additions to lease liabilities.

3. Reclassification to held for sale represents the closing net debt position of NG Renewables and Grain LNG and the disposal of the ESO (see note 10).

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 193 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Notes to the consolidated financial statements cont. | | |  |  |  |

29. Net debtcont.

(b) Analysis of changes in net debt cont.

|  |  |  |  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |  |  |  |
|  | Notes | Borrowings  £m | Financing derivatives  used to hedge debt  £m | Total liabilities from  financing activities  £m | Cash  and cash  equivalents  £m | Financial  investments  £m | Other financing  derivatives  £m | Total1  £m |
| At 1 April 2023 |  | (42,985) | (793) | (43,778) | 163 | 2,605 | 37 | (40,973) |
| Net increase in cash and cash equivalents |  | — | — | — | 427 | — | — | 427 |
| Included within financing cash flows: |  |  |  |  |  |  |  |  |
| Proceeds received from loans |  | (5,563) | — | (5,563) | — | — | — | (5,563) |
| Repayment of loans |  | 1,701 | — | 1,701 | — | — | — | 1,701 |
| Payments of lease liabilities |  | 118 | — | 118 | — | — | — | 118 |
| Net movements in short-term borrowings |  | (544) | — | (544) | — | — | — | (544) |
| Cash inflows on derivatives |  | — | (86) | (86) | — | — | — | (86) |
| Cash outflows on derivatives |  | — | 58 | 58 | — | — | — | 58 |
| Interest paid |  | 1,330 | 297 | 1,627 | — | — | — | 1,627 |
| Non-net debt financing cash flows |  | (18) | — | (18) | — | — | — | (18) |
| Included within investing cash flows: |  |  |  |  |  |  |  |  |
| Net movements in short-term financial investments |  | — | — | — | — | 1,141 | — | 1,141 |
| Cash inflows on derivatives |  | — | — | — | — | — | (123) | (123) |
| Cash outflows on derivatives |  | — | — | — | — | — | — | — |
| Derivative cash flows included in capital expenditure |  | — | — | — | — | — | 5 | 5 |
| Interest received |  | — | — | — | — | (148) | — | (148) |
| Derivative cash flows included in revenue |  | — | — | — | — | — | (11) | (11) |
| Fair value gains and losses |  | (69) | 40 | (29) | — | 4 | 60 | 35 |
| Foreign exchange movements |  | 718 | — | 718 | (1) | (49) | — | 668 |
| Interest (charges)/income | 6 | (1,564) | (284) | (1,848) | — | 152 | 7 | (1,689) |
| Other non-cash movements2 |  | (209) | 4 | (205) | — | — | (4) | (209) |
| Reclassification to held for sale 3 |  | 13 | — | 13 | (30) | (6) | — | (23) |
| At 31 March 2024 |  | (47,072) | (764) | (47,836) | 559 | 3,699 | (29) | (43,607) |

1. The net debt balance at 31 March 2024 includes accrued interest of £490 million.

2. Other non-cash movements primarily comprise additions to lease liabilities.

3. Reclassification to held for sale represents the closing net debt position of the ESO (see note 10).

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 194 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Notes to the consolidated financial statements cont. | | |  |  |  |

30. Commitments and contingencies

![]()

|  |  |  |
| --- | --- | --- |
|  |  |  |
|  |  |  |
|  | Commitments are those amounts that we are contractually required to pay in the  future as long as the other party meets its obligations. These commitments primarily  relate to energy purchase agreements and contracts for the purchase of assets which,  in many cases, extend over a long period of time. Contingent assets are disclosed  where the Group concludes that an inflow of economic benefits is probable. |  |
|  |  |  |

|  |  |  |
| --- | --- | --- |
|  |  |  |
|  | 2026 | 2025 |
|  | £m | £m |
| Future capital expenditure |  |  |
| Contracted for but not provided | 7,085 | 5,017 |
| Energy purchase commitments1 |  |  |
| Less than 1 year | 1,527 | 1,265 |
| In 1 to 2 years | 1,360 | 1,259 |
| In 2 to 3 years | 1,343 | 1,147 |
| In 3 to 4 years | 1,191 | 1,011 |
| In 4 to 5 years | 1,031 | 927 |
| More than 5 years | 10,305 | 8,271 |
|  | 16,757 | 13,880 |

1. Energy purchase commitments relate to contractual commitments to purchase electricity or gas that are used to satisfy physical delivery

requirements to our customers or for energy that we use ourselves (i.e. normal purchase, sale or usage) and hence are accounted for as

ordinary purchase contracts (see note  32(f)). Details of commodity contract derivatives that do not meet the normal purchase, sale or

usage criteria, and hence are accounted for as derivative contracts, are shown in note  17(b).

Through the ordinary course of our operations, we are party to various litigation, claims and investigations,

including Ofgem’s investigation into the North Hyde substation incident. These investigations are ongoing.

The potential maximum penalty for a licence breach following an Ofgem investigation is 10% of turnover.

We continue to monitor this position and engage with ongoing investigations. We do not expect the

ultimate resolution of any proceedings, including the Ofgem investigation, to have a material adverse

effect on our results of operations, cash flows or financial position. A description of the Group’s post-

closing capital project obligations in relation to the Grain LNG disposal is provided in note 10.

Contingent liabilities

The Group is subject to national and local laws governing the clean-up of sites used previously in its

operations. These laws and associated regulations require the Group to take future actions to remediate

the effects on the environment of the release of chemicals and other substances. Such contingencies

may exist for various sites, including manufactured gas plants, power stations and water courses that

were impacted by those activities. The ultimate costs of these clean-ups involve estimation uncertainty

as work may be impacted by changing regulations and additional work may be required once sites

have been fully surveyed. The estimated clean-up costs have been provided for in note 26 based upon

management’s best estimate of the likely future cash flows. While the amounts of future possible costs

that are not provided for could be material to the Group’s results in the period when they are recognised,

it is not possible to reliably estimate the amounts involved at this time. As environmental remediation

costs are recoverable through the Group’s rate-setting processes, the Group does not expect these

costs to have a material impact on its liquidity.

31. Related party transactions

![]()

|  |  |  |
| --- | --- | --- |
|  |  |  |
|  |  |  |
|  | Related parties include joint ventures, associates, investments and key management  personnel. |  |
|  |  |  |

The following significant transactions with related parties were in the normal course of business. Amounts

receivable from and payable to related parties are due on normal commercial terms.

|  |  |  |  |
| --- | --- | --- | --- |
|  |  |  |  |
|  | 2026 | 2025 | 2024 |
|  | £m | £m | £m |
| Sales: Goods and services supplied to joint ventures1 | 36 | 153 | 221 |
| Sales: Goods and services supplied to associates | 1 | 1 | 1 |
| Sales: Goods and services supplied to subsidiary of an associate1 | — | 51 | 70 |
| Purchases: Goods and services received from joint ventures | — | — | 6 |
| Purchases: Goods and services received from associates2 | — | 29 | 4 |
| Purchases: Goods and services received from subsidiaries  of an associate | — | — | 1 |
| Purchases: Goods and services received from a pension plan | 2 | — | — |
| Interest received from joint ventures | — | 6 | — |
| Interest paid to joint ventures | 1 | 2 | — |
|  |  |  |  |
| Receivables from joint ventures 3 | 4 | 323 | 80 |
| Receivables from associates | — | 1 | — |
| Receivables from subsidiaries of an associate | — | — | 8 |
| Payables to joint ventures | 11 | 15 | — |
| Payables to associates | — | — | 1 |
|  |  |  |  |
| Dividends received from joint ventures4 | 83 | 62 | 152 |
| Dividends received from associates 5 | 18 | 39 | 117 |

1. During the year, £3 million  of sales were made to Emerald Energy Venture LLC (2025 :  £114 million; 2024: £126 million),  £11 million

(2025: £12 million;  2024: £71 million) of sales were made to Nemo Link Limited and £nil (2025: £51 million ; 2024: £70 million) of sales

were made to National Gas Transmission Plc up until its disposal.

2. Includes decommissioning expense in relation to associates.

3. Amounts receivable from joint ventures include £nil ( 2025: £320 million; 2024 : £77 million) from Emerald Energy Venture LLC.

4. Includes dividends of £54 million  ( 2025: £22 million; 2024 : £116 million) received from BritNed Development Limited and  £26 million

( 2025:  £26 million ; 2024:  £17 million) from Nemo Link Limited.

5. Includes dividends received during the year from New York Transco LLC of £18 million (2025: £17 million; 2024: £12 million). In the

prior year, dividends of £22 million were received up to the disposal of GasT TopCo Limited (2024: £102 million).

Details of investments in principal subsidiary undertakings, joint ventures and associates are disclosed

in note  34, and information relating to pension fund arrangements is disclosed in note 25. For details

of Directors’ and key management remuneration, refer to the Directors’ Remuneration Report on

pages 107 – 126 and note 4(c).

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 195 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Notes to the consolidated financial statements cont. | | |  |  |  |

32. Financial risk management

![]()

|  |  |  |
| --- | --- | --- |
|  |  |  |
|  |  |  |
|  | Our activities expose us to a variety of financial risks, including credit risk, liquidity risk,  capital risk, currency risk, interest rate risk, inflation risk and commodity price risk. Our risk  management programme focuses on the unpredictability of financial markets and seeks to  minimise potential volatility of financial performance from these risks. We use financial  instruments, including derivative financial instruments, to manage these risks. |  |
|  |  |  |

Risk management related to financing activities is carried out by a central treasury department under

policies approved by the Audit & Risk Committee of the Board. The objective of the treasury department

is to manage funding and liquidity requirements, including managing associated financial risks, to within

acceptable boundaries. The Audit & Risk Committee provides written principles for overall risk management

and written policies covering the following specific areas: foreign exchange risk, interest rate risk, credit

risk, liquidity risk, use of derivative financial instruments and non-derivative financial instruments, and

investment of excess liquidity. The Audit & Risk Committee has delegated authority to administer the

commodity price risk policy and credit policy for US‑based commodity transactions to the Energy

Procurement Risk Management Committee and the National Grid USA Board of Directors. Details

of key activities in the current year are set out in the Audit & Risk Committee report on page [100](#i2193c7e7fbee4753bdbe2d16888565c8_166).

We have exposure to the following risks, which are described in more detail below:

– credit risk;

– liquidity risk;

– currency risk;

– interest rate risk;

– commodity price risk;

– fair value risk; and

– capital risk.

Where appropriate, derivatives and other financial instruments used for hedging currency and interest

rate risk exposures are formally designated as fair value, cash flow or net investment hedges as defined

in IFRS 9. Hedge accounting allows the timing of the profit or loss impact of qualifying hedging instruments

to be recognised in the same reporting period as the corresponding impact of hedged exposures.

To qualify for hedge accounting, documentation is prepared specifying the risk management objective

and strategy, the component transactions and methodology used for measurement of effectiveness.

Hedge accounting relationships are designated in line with risk management activities further described

below. The categories of hedging entered into are as follows:

– currency risk arising from our forecast foreign currency transactions (capital expenditure or revenues)

is designated in cash flow hedges;

– currency risk arising from our net investments in foreign operations is designated in net investment

hedges; and

– currency and interest rate risk arising from borrowings are designated in cash flow or fair value hedges.

Critical terms of hedging instruments and hedged items are transacted to match on a 1:1 ratio by notional

values. Hedge ineffectiveness can nonetheless arise from inherent differences between derivatives and

non-derivative instruments and other market factors, including credit, correlations, supply and demand,

and market volatilities. Ineffectiveness is recognised in the remeasurements component of finance income

and costs (see note 6). Hedge accounting is discontinued when a hedging relationship no longer qualifies

for hedge accounting.

Certain hedging instrument components are treated separately as costs of hedging with the gains and

losses deferred in a component of other equity reserves and released systematically into profit or loss

to correspond with the timing and impact of hedged exposures, or released in full to finance costs upon

an early discontinuation of a hedging relationship.

Refer to sections (c) currency risk and (d) interest rate risk below for further details on hedge accounting.

(a) Credit risk

We are exposed to the risk of loss resulting from counterparties’ default on their commitments, including

failure to pay or make a delivery on a contract. This risk is inherent in our commercial business activities.

Exposure arises from derivative financial instruments, deposits with banks and financial institutions, trade

receivables and committed transactions with wholesale and retail customers.

Treasury credit risk

Counterparty risk arises from the investment of surplus funds and from the use of derivative financial

instruments. As at 31 March 2026, the following limits were in place for investments and derivative

financial instruments held with banks and financial institutions:

|  |  |  |  |  |
| --- | --- | --- | --- | --- |
|  |  |  |  |  |
|  | Maximum limit  £m | Utilisation of  maximum limit  £m | Long-term limit  £m | Utilisation of  long-term limit  £m |
| Triple ‘A’ G7 sovereign entities (AAA) | 3,308 | — | 2,481 | — |
| Triple ‘A’ vehicles (AAA) | 500 | 275 | — | — |
| Triple ‘A’ range institutions and  non-G7 sovereign entities (AAA) | 3,008 | — | 2,256 | — |
| Double ‘A+’ G7 sovereign entities (AA+) | 3,008 | — | 2,256 | — |
| Double ‘A’ range institutions (AA) | 1,805 to  2,406 | 0 to  358 | 1,353 to  1,805 | 0 to  340 |
| Single ‘A’ range institutions (A) | 602 to  1,203 | 0 to  676 | 451 to  902 | 0 to  424 |

The maximum limit applies to all transactions, including long-term transactions. The long-term limit applies

to transactions which mature in more than 12 months’ time.

As at 31 March 2026 and 2025, we had a number of exposures to individual counterparties. In accordance

with our treasury policies, counterparty credit exposure utilisations are monitored daily against the

counterparty credit limits. Counterparty credit ratings and market conditions are reviewed continually, with

limits being revised and utilisation adjusted, if appropriate. Management does not expect any significant

losses from non-performance by these counterparties. Investments associated with insurance and

employee benefit trusts, such as the investments held at FVOCI, sit outside of treasury credit risk and

are managed to individual mandates aligned to their regulated purpose.

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 196 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Notes to the consolidated financial statements cont. | | |  |  |  |

32. Financial risk managementcont.

(a) Credit risk cont.

Commodity credit risk

The credit policy for UK- and US-based commodity transactions is owned by the Audit & Risk Committee

of the Board, which establishes controls and procedures to determine, monitor and minimise the credit

exposure to counterparties.

Wholesale and retail credit risk

Our principal commercial exposure is in the US, where we are required to supply electricity and gas under

state regulations. Our policies and practices are designed to limit credit exposure by collecting security

deposits prior to providing utility services, or after utility services have commenced if certain applicable

regulatory requirements are met. Collection activities are managed on a daily basis. Sales to retail

customers are usually settled in cash, cheques, electronic bank payments or by using major credit cards.

We are committed to measuring, monitoring, minimising and recording counterparty credit risk in our

wholesale business. The utilisation of credit limits is regularly monitored, and collateral is collected against

these accounts when necessary. See note 19 for further details.

Offsetting financial assets and liabilities

The following tables set out our financial assets and liabilities which are subject to offset and to enforceable

master netting arrangements or similar agreements. The tables show the amounts which are offset and

reported net in the statement of financial position. Amounts which cannot be offset under IFRS, but which

could be settled net under terms of master netting arrangements if certain conditions arise, and with

collateral received or pledged, are presented to show National Grid’s net exposure.

Financial assets and liabilities on different transactions would only be reported net in the balance sheet

if the transactions were with the same counterparty, a currently enforceable legal right of offset exists

and the cash flows were intended to be settled on a net basis.

Amounts which do not meet the criteria for offsetting on the statement of financial position, but could be

settled net in certain circumstances, principally relate to derivative transactions under ISDA agreements,

where each party has the option to settle amounts on a net basis in the event of default of the other party.

Commodity contract derivatives that have not been offset on the balance sheet may be settled net in

certain circumstances under ISDA or North American Energy Standards Board (NAESB) agreements.

The Group has no offsetting arrangements in relation to bank account balances and bank overdrafts

as at 31 March 2026 (2025: £nil).

The gross amounts offset for trade payables and receivables, which are subject to general terms

and conditions, are insignificant.

|  |  |  |  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |  |  |  |
|  |  |  |  |  | Related amounts  available to be offset but  not offset in statement  of financial position | |  |  |
| At 31 March 2026 | Gross  carrying  amounts  £m | Gross  amounts  offset  £m | Net amount  presented in  statement of  financial  position  £m |  | Financial  instruments  £m | Cash  collateral  received/  pledged  £m |  | Net amount  £m |
| Assets |  |  |  |  |  |  |  |  |
| Financing derivatives | 717 | — | 717 |  | (413) | (27) |  | 277 |
| Commodity contract  derivatives | 121 | — | 121 |  | (33) | (24) |  | 64 |
|  | 838 | — | 838 |  | (446) | (51) |  | 341 |
| Liabilities |  |  |  |  |  |  |  |  |
| Financing derivatives | (950) | — | (950) |  | 413 | 361 |  | (176) |
| Commodity contract  derivatives | (68) | — | (68) |  | 33 | — |  | (35) |
|  | (1,018) | — | (1,018) |  | 446 | 361 |  | (211) |
|  |  |  |  |  |  |  |  |  |
|  | (180) | — | (180) |  | — | 310 |  | 130 |

|  |  |  |  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |  |  |  |
|  |  |  |  |  | Related amounts  available to be offset but  not offset in statement  of financial position | |  |  |
| At 31 March 2025 | Gross  carrying  amounts  £m | Gross  amounts  offset  £m | Net amount  presented in  statement of  financial  position  £m |  | Financial  instruments  £m | Cash  collateral  received/  pledged  £m |  | Net amount  £m |
| Assets |  |  |  |  |  |  |  |  |
| Financing derivatives | 375 | — | 375 |  | (296) | (12) |  | 67 |
| Commodity contract  derivatives | 107 | — | 107 |  | (20) | — |  | 87 |
|  | 482 | — | 482 |  | (316) | (12) |  | 154 |
| Liabilities |  |  |  |  |  |  |  |  |
| Financing derivatives | (1,138) | — | (1,138) |  | 296 | 462 |  | (380) |
| Commodity contract  derivatives | (64) | — | (64) |  | 20 | (7) |  | (51) |
|  | (1,202) | — | (1,202) |  | 316 | 455 |  | (431) |
|  |  |  |  |  |  |  |  |  |
|  | (720) | — | (720) |  | — | 443 |  | (277) |

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 197 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Notes to the consolidated financial statements cont. | | |  |  |  |

32. Financial risk managementcont.

(b) Liquidity risk

Our policy is to determine our liquidity requirements by the use of both short-term and long-term cash

flow forecasts. These forecasts are supplemented by a financial headroom analysis which is used to

assess funding requirements for at least a 24-month period and maintain adequate liquidity for

a continuous 12-month period.

We believe our contractual obligations, including those shown in commitments and contingencies in

note 30, can be met from existing cash and investments, operating cash flows and other financing that we

reasonably expect to be able to secure in the future, together with the use of committed facilities if required.

Our debt agreements and banking facilities contain covenants, including those relating to the periodic

and timely provision of financial information by the issuing entity, restrictions on disposals and financial

covenants, such as restrictions on the level of subsidiary indebtedness. Failure to comply with these

covenants, or to obtain waivers of those requirements, could in some cases trigger a right, at the lender’s

discretion, to require repayment of some of our debt and may restrict our ability to draw upon our facilities

or access the capital markets.

The following is a payment profile of our financial liabilities and derivatives:

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| At 31 March 2026 | Less than  1 year  £m | 1 to 2  years  £m | 2 to 3  years  £m | More than  3 years  £m | Total  £m |
| Non-derivative financial liabilities |  |  |  |  |  |
| Borrowings, excluding lease liabilities | (3,217) | (2,417) | (4,289) | (35,279) | (45,202) |
| Interest payments on borrowings 1 | (1,645) | (1,533) | (1,426) | (15,433) | (20,037) |
| Lease liabilities | (172) | (158) | (136) | (653) | (1,119) |
| Other non-interest-bearing liabilities | (4,501) | (707) | — | — | (5,208) |
| Derivative financial liabilities |  |  |  |  |  |
| Financing derivatives – receipts2 | 5,298 | 4,237 | 1,818 | 2,657 | 14,010 |
| Financing derivatives – payments2 | (5,637) | (4,559) | (1,943) | (3,294) | (15,433) |
| Commodity contract derivatives – receipts2 | 4 | 3 | 1 | — | 8 |
| Commodity contract derivatives – payments2 | (31) | (11) | (3) | (1) | (46) |
| Derivative financial assets |  |  |  |  |  |
| Financing derivatives – receipts2 | 5,536 | 4,436 | 1,458 | 4,417 | 15,847 |
| Financing derivatives – payments2 | (5,412) | (4,242) | (1,429) | (4,189) | (15,272) |
| Commodity contract derivatives – receipts2 | 90 | 25 | — | — | 115 |
| Commodity contract derivatives – payments2 | (39) | (41) | (31) | (21) | (132) |
|  | (9,726) | (4,967) | (5,980) | (51,796) | (72,469) |

1. The interest on borrowings is calculated based on borrowings held at 31 March without taking account of future issues. Floating rate

interest is estimated using a forward interest rate curve as at 31 March. Payments are included on the basis of the earliest date on which

the Company can be required to settle.

2. The receipts and payments line items for derivatives comprise gross undiscounted future cash flows, after considering any contractual

netting that applies within individual contracts. Where cash receipts and payments within a derivative contract are settled net, and the

amount to be received/(paid) exceeds the amount to be paid/(received), the net amount is presented within derivative receipts/(payments).

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| At 31 March 2025 | Less than  1 year  £m | 1 to 2  years  £m | 2 to 3  years  £m | More than  3 years  £m | Total  £m |
| Non-derivative financial liabilities |  |  |  |  |  |
| Borrowings, excluding lease liabilities | (4,111) | (3,159) | (2,404) | (36,381) | (46,055) |
| Interest payments on borrowings 1 | (1,552) | (1,497) | (1,397) | (16,707) | (21,153) |
| Lease liabilities | (143) | (131) | (117) | (671) | (1,062) |
| Other non-interest-bearing liabilities | (3,908) | (467) | — | — | (4,375) |
| Derivative financial liabilities |  |  |  |  |  |
| Financing derivatives – receipts2 | 4,236 | 3,179 | 4,710 | 2,822 | 14,947 |
| Financing derivatives – payments2 | (4,777) | (3,514) | (5,072) | (3,380) | (16,743) |
| Commodity contract derivatives – receipts2 | 9 | 5 | 1 | — | 15 |
| Commodity contract derivatives – payments2 | (67) | (36) | (29) | (43) | (175) |
| Derivative financial assets |  |  |  |  |  |
| Financing derivatives – receipts2 | 1,907 | 4,032 | 2,598 | 1,460 | 9,997 |
| Financing derivatives – payments2 | (1,897) | (3,970) | (2,467) | (1,369) | (9,703) |
| Commodity contract derivatives – receipts2 | 84 | 8 | — | — | 92 |
| Commodity contract derivatives – payments2 | (16) | (6) | (3) | — | (25) |
|  | (10,235) | (5,556) | (4,180) | (54,269) | (74,240) |

1. The interest on borrowings is calculated based on borrowings held at 31 March without taking account of future issues. Floating rate

interest is estimated using a forward interest rate curve as at 31 March. Payments are included on the basis of the earliest date on which

the Company can be required to settle.

2. The receipts and payments line items for derivatives comprise gross undiscounted future cash flows, after considering any contractual

netting that applies within individual contracts. Where cash receipts and payments within a derivative contract are settled net, and the

amount to be received/(paid) exceeds the amount to be paid/(received), the net amount is presented within derivative receipts/(payments).

(c) Currency risk

National Grid operates internationally with mainly pound sterling as the functional currency for the UK

companies and US dollar for the US businesses. Currency risk arises from three major areas: funding

activities, capital investment and related revenues, and holdings in foreign operations. This risk is

managed using financial instruments including derivatives as approved by policy, typically cross-currency

interest rate swaps, foreign exchange swaps and forwards.

Funding activities – we borrow in various debt markets across the world. Foreign currency funding gives

rise to risk of volatility in the amount of functional currency cash to be repaid. This risk is reduced by

swapping principal and interest back into the functional currency of the issuer. All foreign currency debt

and transactions are hedged except where they provide a natural offset to assets elsewhere in the Group.

Capital investment and related revenues – capital projects often incur costs or generate revenues in a

foreign currency, most often euro transactions done by the UK business. Our policy for managing foreign

exchange transaction risk is to hedge contractually committed foreign currency cash flows over a

prescribed minimum size, typically by buying euro forwards to hedge future expenditure and selling euro

forwards to hedge future revenues. For hedges of forecast cash flows, our policy is to hedge a proportion

of highly probable cash flows.

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 198 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Notes to the consolidated financial statements cont. | | |  |  |  |

32. Financial risk managementcont.

(c) Currency risk cont.

Holdings in foreign operations – we are exposed to fluctuations on the translation into pounds sterling

of our foreign operations. The policy for managing this translation risk is to issue foreign currency debt

or to replicate foreign debt using derivatives that pay cash flows in the currency of the foreign operation.

The primary managed exposure arises from dollar denominated assets and liabilities held by our US

operations, with a smaller euro exposure in respect of joint venture investments.

Derivative financial instruments were used to manage foreign currency risk as follows:

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
|  | 2026 | | | | |
|  | Sterling  £m | Euro  £m | Dollar  £m | Other  £m | Total  £m |
| Cash and cash equivalents | 287 | 2 | 86 | — | 375 |
| Financial investments | 1,769 | — | 684 | — | 2,453 |
| Borrowings | (12,161) | (13,552) | (19,469) | (1,573) | (46,755) |
| Pre-derivative position | (10,105) | (13,550) | (18,699) | (1,573) | (43,927) |
| Derivative effect | (7,984) | 15,022 | (9,141) | 1,870 | (233) |
| Net debt position | (18,089) | 1,472 | (27,840) | 297 | (44,160) |

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
|  | 2025 | | | | |
|  | Sterling  £m | Euro  £m | Dollar  £m | Other  £m | Total  £m |
| Cash and cash equivalents | 1,047 | — | 131 | — | 1,178 |
| Financial investments | 5,129 | — | 624 | — | 5,753 |
| Borrowings | (13,913) | (12,968) | (19,217) | (1,441) | (47,539) |
| Pre-derivative position | (7,737) | (12,968) | (18,462) | (1,441) | (40,608) |
| Derivative effect | (8,539) | 13,886 | (7,755) | 1,645 | (763) |
| Net debt position | (16,276) | 918 | (26,217) | 204 | (41,371) |

The exposure to dollars largely relates to our net investment hedge activities and exposure to euros largely

relates to hedges for our future non‑sterling capital expenditure and associated revenues.

The currency exposure on other financial instruments is as follows:

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
|  | 2026 | | | | |
|  | Sterling  £m | Euro  £m | Dollar  £m | Other  £m | Total  £m |
| Trade and other receivables | 353 | — | 2,318 | — | 2,671 |
| Other non-current assets | 223 | — | 68 | — | 291 |
| Trade and other payables | (1,868) | — | (2,633) | — | (4,501) |
| Other non-current liabilities | (360) | — | (347) | — | (707) |

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
|  | 2025 | | | | |
|  | Sterling  £m | Euro  £m | Dollar  £m | Other  £m | Total  £m |
| Trade and other receivables | 424 | — | 2,272 | — | 2,696 |
| Other non-current assets | 243 | — | 56 | — | 299 |
| Trade and other payables | (1,359) | — | (2,549) | — | (3,908) |
| Other non-current liabilities | (171) | — | (296) | — | (467) |

The carrying amounts of other financial instruments are denominated in the above currencies, which

in most instances are the functional currency of the respective subsidiaries. Our exposure to dollars is

due to activities in our US subsidiaries. We do not have any other significant exposure to currency risk

on these balances.

Hedge accounting for currency risk

Where available, derivatives transacted for hedging are designated for hedge accounting. Economic

offset is qualitatively determined because the critical terms (currency and volume) of the hedging

instrument match the hedged exposure. If a forecast transaction was no longer expected to occur,

the cumulative gain or loss previously reported in equity would be transferred to the income statement.

This has not occurred in the current or comparative years.

Cash flow hedging of currency risk of capital expenditure and revenue are designated as either hedging

the exposure to movements in the spot or forward translation risk. Gains and losses on hedging

instruments arising from undesignated forward points and foreign currency basis spreads are excluded

from designation and are recognised immediately in profit or loss, along with any hedge ineffectiveness.

On recognition of the hedged purchase or sale in the financial statements, the associated hedge gains

and losses, deferred in the cash flow hedge reserve in other equity reserves, are transferred out of

reserves and included with the recognition of the underlying transaction. Where a non-financial asset

or a non-financial liability results from a forecast transaction or firm commitment being hedged, the

amounts deferred in reserves are included directly in the initial measurement of that asset or liability.

Net investment hedging is also designated as hedging the exposure to movements in spot translation

rates only: spot-related gains and losses on hedging instruments are presented in the cumulative

translation reserve within other equity reserves to offset gains or losses on translation of the hedged

balance sheet exposure. Any ineffectiveness is recognised immediately in the income statement.

Amounts deferred in the cumulative translation reserve with respect to net investment hedges are

subsequently recognised in the income statement in the event of disposal of the overseas operations

concerned. Any remaining amounts deferred in the cost of hedging reserve are also released to the

income statement over the life of the hedging instrument.

Hedges of foreign currency funding are designated as cash flow hedges or fair value hedges of forward

exchange risk (hedging both currency and interest rate risk together, where applicable). Gains and losses

arising from foreign currency basis spreads are excluded from designation and are treated as a cost

of hedging, deferred initially in other equity reserves and released into profit or loss over the life of the

hedging relationship. Hedge accounting for funding is described further in the interest rate risk section

that follows.

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 199 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Notes to the consolidated financial statements cont. | | |  |  |  |

32. Financial risk managementcont.

(d) Interest rate risk

National Grid’s interest rate risk arises from our long-term borrowings. Our interest rate risk management

policy is to seek to minimise total financing costs (being interest costs and changes in the market value

of debt). Hedging instruments principally consist of interest rate and cross-currency swaps that are used

to translate foreign currency debt into functional currency and to adjust the proportion of fixed rate and

floating rate in the borrowings portfolio to within a range set by the Audit & Risk Committee of the Board.

The benchmark interest rates hedged are currently based on Secured Overnight Financing Rate (SOFR)

for USD and Sterling Overnight Index Average (SONIA) for GBP.

We also consider inflation risk and hold some inflation-linked borrowings. We believe that these provide

a partial economic offset to the inflation risk associated with our UK inflation-linked revenues.

The table in note 21 sets out the carrying amount, by contractual maturity, of borrowings that are

exposed to interest rate risk before taking into account interest rate swaps.

Net debt was managed using derivative financial instruments to hedge interest rate risk as follows:

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
|  | 2026 | | | | |
|  | Fixed rate  £m | Floating  rate  £m | Inflation  linked  £m | Other 1  £m | Total  £m |
| Cash and cash equivalents | 85 | 290 | — | — | 375 |
| Financial investments | — | 2,419 | — | 34 | 2,453 |
| Borrowings² | (41,460) | (836) | (4,459) | — | (46,755) |
| Pre-derivative position | (41,375) | 1,873 | (4,459) | 34 | (43,927) |
| Derivative effect | 5,042 | (5,215) | (60) | — | (233) |
| Net debt position | (36,333) | (3,342) | (4,519) | 34 | (44,160) |

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
|  | 2025 | | | | |
|  | Fixed rate  £m | Floating  rate  £m | Inflation  linked  £m | Other 1  £m | Total  £m |
| Cash and cash equivalents | 131 | 1,047 | — | — | 1,178 |
| Financial investments | — | 5,719 | — | 34 | 5,753 |
| Borrowings² | (39,847) | (3,061) | (4,631) | — | (47,539) |
| Pre-derivative position | (39,716) | 3,705 | (4,631) | 34 | (40,608) |
| Derivative effect | 3,841 | (4,540) | (64) | — | (763) |
| Net debt position | (35,875) | (835) | (4,695) | 34 | (41,371) |

1. Represents financial instruments which are not directly affected by interest rate risk, such as investments in equity or other similar financial

instruments.

2. Commercial paper is presented as floating rate as it has short-term maturities between 1–7 months and is regularly refinanced at current

market rates.

Hedge accounting for interest rate risk

Borrowings paying variable or floating rates expose National Grid to cash flow interest rate risk, partially

offset by cash held at variable rates. Where a hedging instrument results in paying a fixed rate, it is

designated as a cash flow hedge because it has reduced the cash flow volatility of the hedged borrowing.

Changes in the fair value of the derivative are initially recognised in other comprehensive income as gains

or losses in the cash flow hedge reserve, with any ineffective portion recognised immediately in the

income statement.

Borrowings paying fixed rates expose National Grid to fair value interest rate risk. Where the hedging

instrument pays a floating rate, it is designated as a fair value hedge because it has reduced the fair

value volatility of the borrowing. Changes in the fair value of the derivative and changes in the fair value

of the hedged item in relation to the risk being hedged are both adjusted on the balance sheet and

offset in the income statement to the extent the fair value hedge is effective, with the residual difference

remaining as ineffectiveness.

Both types of hedges are designated as hedging the currency and interest rate risk arising from changes

in forward points. Amounts accumulated in the cash flow hedge reserve (cash flow hedges only) and the

deferred cost of hedging reserve (both cash flow and fair value hedges) are reclassified from reserves to

the income statement on a systematic basis as hedged interest expense is recognised. Adjustments

made to the carrying value of hedged items in fair value hedges are similarly released to the income

statement to match the timing of the hedged interest expense.

When hedge accounting is discontinued, any remaining cumulative hedge accounting balances continue

to be released to the income statement to match the impact of outstanding hedged items. Any remaining

amounts deferred in the cost of hedging reserve are released immediately to the income statement

as finance costs.

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 200 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Notes to the consolidated financial statements cont. | | |  |  |  |

32. Financial risk managementcont.

(e) Hedge accounting

In accordance with the requirements of IFRS 7, certain additional information about hedge accounting is disaggregated by risk type and hedge designation type in the tables below:

|  |  |  |  |  |
| --- | --- | --- | --- | --- |
|  |  |  |  |  |
| Year ended 31 March 2026 | Fair value hedges of  foreign currency and/or  interest rate risk  £m | Cash flow hedges of foreign  currency and/or interest rate  risk  £m | Cash flow hedges of foreign  currency risk  £m | Net investment hedges  £m |
| Consolidated statement of comprehensive income |  |  |  |  |
| Net gains/(losses) in respect of: |  |  |  |  |
| Cash flow hedges | — | 378 | 12 | — |
| Cost of hedging | 10 | 29 | — | 1 |
| Net investment hedges | — | — | — | 32 |
|  |  |  |  |  |
| Transferred to profit or loss in respect of: |  |  |  |  |
| Cash flow hedges | — | (484) | (5) | — |
| Cost of hedging | 1 | (1) | — | (4) |
| Reclassification of foreign currency translation reserve¹ | — | — | — | (8) |
|  |  |  |  |  |
| Consolidated statement of changes in equity |  |  |  |  |
| Other equity reserves – cost of hedging balances | (14) | (25) | — | — |
|  |  |  |  |  |
| Consolidated statement of financial position |  |  |  |  |
| Borrowings – carrying value of hedging instruments |  |  |  |  |
| Liabilities – non-current | — | — | — | (1,694) |
| Derivatives – carrying value of hedging instruments 2 |  |  |  |  |
| Assets – current | 9 | 20 | 2 | 7 |
| Assets – non-current | 62 | 424 | 4 | 2 |
| Liabilities – current | (118) | (23) | (12) | (2) |
| Liabilities – non-current | (458) | (103) | (15) | (14) |
|  |  |  |  |  |
| Profiles of the significant timing, price and rate information of hedging instruments |  |  |  |  |
| Maturity range | Jun 26 – Apr 2045 | Jun 26 – Apr 2042 | Apr 2026 – Jun 2031 | Jun 2026 – Jan 2034 |
| Spot foreign exchange range: |  |  |  |  |
| GBP:USD | n/a | 1.30 –  1.66 | 1.26 –  1.36 | 1.29 –  1.36 |
| GBP:EUR | 1.11 –  1.24 | 1.08 –  1.19 | 1.11 –  1.19 | 1.15 –  1.16 |
| EUR:USD | 1.05 –  1.15 | 1.06 –  1.15 | n/a | n/a |
| Interest rate range: |  |  |  |  |
| GBP | SONIA -261 bps/+ 374 bps | 0.976% –  7.410% | n/a | n/a |
| USD | SOFR +118 bps/+ 223 bps | 2.755% –  5.989% | n/a | n/a |

1. The reclassification of the net investment hedge on the disposal of NG Renewables has been included within Other operating costs.

2. The use of derivatives may entail a derivative transaction qualifying for more than one hedge type designation under IFRS 9. Therefore, the derivative amounts in the table above are grossed up by hedge type, whereas they are presented net at an instrument level in the statement

of financial position.

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 201 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Notes to the consolidated financial statements cont. | | |  |  |  |

32. Financial risk managementcont.

(e) Hedge accounting cont.

|  |  |  |  |  |
| --- | --- | --- | --- | --- |
|  |  |  |  |  |
| Year ended 31 March 2025 | Fair value hedges of  foreign currency and/or  interest rate risk  £m | Cash flow hedges of  foreign currency and/or  interest rate risk  £m | Cash flow hedges of  foreign currency risk  £m | Net investment hedges  £m |
| Consolidated statement of comprehensive income |  |  |  |  |
| Net gains/(losses) in respect of: |  |  |  |  |
| Cash flow hedges | — | 26 | (12) | — |
| Cost of hedging | (14) | (36) | — | 4 |
| Net investment hedges | — | — | — | 56 |
| Transferred to profit or loss in respect of: |  |  |  |  |
| Cash flow hedges | — | 182 | 6 | — |
| Cost of hedging | 1 | (3) | — | (4) |
|  |  |  |  |  |
| Consolidated statement of changes in equity |  |  |  |  |
| Other equity reserves – cost of hedging balances | (24) | (54) | — | 3 |
|  |  |  |  |  |
| Consolidated statement of financial position |  |  |  |  |
| Borrowings – carrying value of hedging instruments |  |  |  |  |
| Liabilities – non-current | — | — | — | (1,734) |
| Derivatives – carrying value of hedging instruments 1 |  |  |  |  |
| Assets – current | — | 1 | 3 | 6 |
| Assets – non-current | 32 | 194 | 1 | — |
| Liabilities – current | (253) | (50) | (6) | (2) |
| Liabilities – non-current | (397) | (183) | (41) | (1) |
|  |  |  |  |  |
| Profiles of the significant timing, price and rate information of hedging instruments |  |  |  |  |
| Maturity range | Jan 2026 – Sep 2044 | Jun 2025 – Nov 2040 | Apr 2025 – Jun 2031 | Apr 2025 – Jan 2034 |
| Spot foreign exchange range: |  |  |  |  |
| GBP:USD | n/a | 1.30 –  1.66 | 1.25 –  1.30 | 1.26 –  1.29 |
| GBP:EUR | 1.11 –  1.24 | 1.08 –  1.19 | 1.11 –  1.21 | 1.19 –  1.21 |
| EUR:USD | 1.05 –  1.15 | 1.06 –  1.15 | n/a | n/a |
| Interest rate range: |  |  |  |  |
| GBP | SONIA -260 bps/+ 374bps | 0.976% –  7.410% | n/a | n/a |
| USD | SOFR +83 bps/+ 223bps | 2.095% –  5.989% | n/a | n/a |

1. The use of derivatives may entail a derivative transaction qualifying for more than one hedge type designation under IFRS 9. Therefore, the derivative amounts in the table above are grossed up by hedge type, whereas they are presented net at an instrument level in the statement

of financial position.

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 202 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Notes to the consolidated financial statements cont. | | |  |  |  |

32. Financial risk managementcont.

(e) Hedge accounting cont.

The following tables show the effects of hedge accounting on financial position and year-to-date performance for each type of hedge.

(i) Fair value hedges of foreign currency and interest rate risk on recognised borrowings:

|  |  |  |  |  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |  |  |  |  |
| As at 31 March 2026 |  |  | Balance of fair value hedge adjustments in borrowings | |  | Change in value used for calculating ineffectiveness | |  |  |
|  | Hedging instrument notional |  | Continuing hedges | Discontinued hedges |  | Hedged item | Hedging instrument |  | Hedge ineffectiveness |
| Hedge type | £m |  | £m | £m |  | £m | £m |  | £m |
| Foreign currency and interest rate risk on borrowings 1 | (8,098) |  | 660 | (21) |  | (104) | 97 |  | (7) |

1. The carrying value of the hedged borrowings is £7,767 million , of which £314 million is current and £7,453 million is non-current.

|  |  |  |  |  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |  |  |  |  |
| As at 31 March 2025 |  |  | Balance of fair value hedge adjustments in borrowings | |  | Change in value used for calculating ineffectiveness | |  |  |
|  | Hedging instrument notional |  | Continuing hedges | Discontinued hedges |  | Hedged item | Hedging instrument |  | Hedge ineffectiveness |
| Hedge type | £m |  | £m | £m |  | £m | £m |  | £m |
| Foreign currency and interest rate risk on borrowings 1 | (6,767) |  | 756 | (25) |  | 106 | (94) |  | 12 |

1. The carrying value of the hedged borrowings was £6,414 million, of which £118 million was current and £6,296 million was non-current.

(ii) Cash flow hedges of foreign currency and interest rate risk:

|  |  |  |  |  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |  |  |  |  |
| As at 31 March 2026 |  |  | Balance in cash flow hedge reserve | |  | Change in value used for calculating ineffectiveness | |  |  |
|  | Hedging instrument notional |  | Continuing hedges | Discontinued hedges |  | Hedged item | Hedging instrument |  | Hedge ineffectiveness |
| Hedge type | £m |  | £m | £m |  | £m | £m |  | £m |
| Foreign currency and interest rate risk on borrowings  and forecast cash flows | (13,762) |  | 258 | — |  | (359) | 356 |  | (3) |
| Foreign currency risk on forecast cash flows | (2,715) |  | (22) | — |  | (21) | 21 |  | — |

|  |  |  |  |  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |  |  |  |  |
| As at 31 March 2025 |  |  | Balance in cash flow hedge reserve | |  | Change in value used for calculating ineffectiveness | |  |  |
|  | Hedging instrument notional |  | Continuing hedges | Discontinued hedges |  | Hedged item | Hedging instrument |  | Hedge ineffectiveness |
| Hedge type | £m |  | £m | £m |  | £m | £m |  | £m |
| Foreign currency and interest rate risk on borrowings and  forecast cash flows | (14,769) |  | 376 | — |  | (33) | 27 |  | (6) |
| Foreign currency risk on forecast cash flows | (1,907) |  | (43) | — |  | 12 | (12) |  | — |

(iii) Net investment hedges of foreign currency risk:

|  |  |  |  |  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |  |  |  |  |
| As at 31 March 2026 |  |  | Balance in translation reserve | |  | Change in value used for calculating ineffectiveness | |  |  |
|  | Hedging instrument notional |  | Continuing hedges | Discontinued hedges |  | Hedged item | Hedging instrument |  | Hedge ineffectiveness |
| Hedge type | £m |  | £m | £m |  | £m | £m |  | £m |
| Currency risk on foreign operations | (3,210) |  | 76 | (2,520) |  | (32) | 32 |  | — |

|  |  |  |  |  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |  |  |  |  |
| As at 31 March 2025 |  |  | Balance in translation reserve | |  | Change in value used for calculating ineffectiveness | |  |  |
|  | Hedging instrument notional |  | Continuing hedges | Discontinued hedges |  | Hedged item | Hedging instrument |  | Hedge ineffectiveness |
| Hedge type | £m |  | £m | £m |  | £m | £m |  | £m |
| Currency risk on foreign operations | (2,641) |  | 55 | (2,523) |  | (56) | 56 |  | — |

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 203 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Notes to the consolidated financial statements cont. | | |  |  |  |

32. Financial risk managementcont.

(f) Commodity price risk

We purchase electricity and gas to supply our customers in the US and to meet our own energy needs.

Substantially all our costs of purchasing electricity and gas for supply to customers are recoverable at an

amount equal to cost. The timing of recovery of these costs can vary between financial periods leading to

an under- or over-recovery within any particular year that can lead to large fluctuations in the income

statement. We follow approved policies to manage price and supply risks for our commodity activities.

Our energy procurement risk management policy and delegations of authority govern our US commodity

trading activities for energy transactions. The purpose of this policy is to ensure we transact within pre-

defined risk parameters and only in the physical and financial markets where we or our customers have a

physical market requirement. In addition, state regulators require National Grid to manage commodity risk

and cost volatility prudently through diversified pricing strategies. In some jurisdictions we are required to

file a plan outlining our strategy to be approved by regulators. In certain cases, we might receive guidance

with regard to specific hedging limits.

Energy purchase contracts for the forward purchase of electricity or gas that are used to satisfy physical

delivery requirements to customers, or for energy that the Group uses itself, meet the expected purchase

or usage requirements of IFRS 9. They are, therefore, not recognised in the financial statements until they

are realised. Disclosure of commitments under such contracts is made in note 30.

US states have introduced a variety of legislative requirements with the aim of increasing the proportion

of our electricity that is derived from renewable or other forms of clean energy. Annual compliance filings

regarding the level of Renewable Energy Certificates (and other similar environmental certificates) are

required by the relevant department of utilities. In response to the legislative requirements, National Grid

has entered into long-term, typically fixed-price, energy supply contracts to purchase both renewable

energy and environmental certificates. We are entitled to recover all costs incurred under these contracts

through customer billing.

Under IFRS, where these supply contracts are not accounted for as leases, they are considered to

comprise two components, being a forward purchase of power at spot prices and a forward purchase

of environmental certificates at a variable price (being the contract price less the spot power price).

With respect to our current contracts, neither of these components meets the requirement to be accounted

for as a derivative. The environmental certificates are currently required for compliance purposes, and at

present there are no liquid markets for these attributes. Furthermore, this component meets the expected

purchase or usage exemption of IFRS 9. We expect to enter into an increasing number of these contracts

in order to meet our compliance requirements in the short to medium term. In future, if and when liquid

markets develop, and to the extent that we are in receipt of environmental certificates in excess of our

required levels, this exemption may cease to apply and we may be required to account for forward

purchase commitments for environmental certificates as derivatives at fair value through profit and loss.

In the UK, financial transactions have been traded to manage exposures on the North Sea Link

interconnector. These bilateral transactions are cash-settled against the relevant day-ahead prices in

order to manage the risk associated with the sale of physical capacity on the link. The mark-to-market

exposure of any open positions is calculated based on futures products in the GB and Nordic markets.

(g) Fair value analysis

Included in the statement of financial position are financial instruments which are measured at fair value.

These fair values can be categorised into hierarchy levels that are representative of the inputs used in

measuring the fair value. The best evidence of fair value is a quoted price in an actively traded market.

In the event that the market for a financial instrument is not active, a valuation technique is used.

|  |  |  |  |  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |  |  |  |  |
|  | 2026 | | | |  | 2025 | | | |
|  | Level 1  £m | Level 2  £m | Level 3  £m | Total  £m |  | Level 1  £m | Level 2  £m | Level 3  £m | Total  £m |
| Assets |  |  |  |  |  |  |  |  |  |
| Investments held at FVTPL | 1,914 | — | 450 | 2,364 |  | 5,156 | — | 407 | 5,563 |
| Investments held at FVOCI 1 | — | 385 | — | 385 |  | — | 384 | — | 384 |
| Financing derivatives | — | 691 | 26 | 717 |  | — | 344 | 31 | 375 |
| Commodity contract derivatives | — | 111 | 10 | 121 |  | — | 102 | 5 | 107 |
|  | 1,914 | 1,187 | 486 | 3,587 |  | 5,156 | 830 | 443 | 6,429 |
| Liabilities |  |  |  |  |  |  |  |  |  |
| Financing derivatives | — | (864) | (86) | (950) |  | — | (1,043) | (95) | (1,138) |
| Commodity contract derivatives | — | (55) | (13) | (68) |  | — | (39) | (25) | (64) |
|  | — | (919) | (99) | (1,018) |  | — | (1,082) | (120) | (1,202) |
|  | 1,914 | 268 | 387 | 2,569 |  | 5,156 | (252) | 323 | 5,227 |

1. Investments held includes instruments which meet the criteria of IFRS 9 or IAS 19.

|  |  |
| --- | --- |
|  |  |
| Level 1: | Financial instruments with quoted prices for identical instruments in active markets. |
| Level 2: | Financial instruments with quoted prices for similar instruments in active markets or quoted  prices for identical or similar instruments in inactive markets, and financial instruments  valued using models where all significant inputs are based directly or indirectly on  observable market data. |
| Level 3: | Financial instruments valued using valuation techniques where one or more significant inputs  are based on unobservable market data. |

Our Level 1 financial investments and liabilities held at fair value are valued using quoted prices from liquid

markets and primarily comprise investments in short-term money market funds.

Our Level 2 financial investments held at fair value primarily include bonds with a tenor greater than one

year and are valued using quoted prices for similar instruments in active markets or quoted prices for

identical or similar instruments in inactive markets. Alternatively, they are valued using models where all

significant inputs are based directly or indirectly on observable market data.

Our Level 2 financing derivatives include cross-currency, interest rate and foreign exchange derivatives.

We value these by discounting all future cash flows by externally sourced market yield curves at the

reporting date, taking into account the credit quality of both parties. These derivatives can be priced using

liquidly traded interest rate curves and foreign exchange rates, and therefore we classify our vanilla trades

as Level 2 under the IFRS 13 framework.

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 204 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Notes to the consolidated financial statements cont. | | |  |  |  |

32. Financial risk managementcont.

(g) Fair value analysis cont.

Our Level 2 US commodity contract derivatives include over-the-counter gas and power swaps as well

as forward physical gas deals. We value our contracts based on market data obtained from the New York

Mercantile Exchange (NYMEX) and the Intercontinental Exchange (ICE), where monthly prices are available.

We discount based on externally sourced market yield curves at the reporting date, taking into account

the credit quality of both parties and liquidity in the market. Our commodity contracts can be priced using

liquidly traded swaps. Therefore, we classify our vanilla trades as Level 2 under the IFRS 13 framework.

Our Level 3 financing derivatives include inflation-linked swaps, where the market is illiquid. In valuing

these instruments, we use in‑house valuation models and obtain external valuations to support each

reported fair value.

Our Level 3 UK commodity contract derivatives consist of UK electricity capacity swaps.

Our Level 3 US commodity contract derivatives primarily consist of our forward purchases of electricity

and gas that we value using proprietary models. Derivatives are classified as Level 3 where significant

inputs into the valuation technique are neither directly nor indirectly observable (including our own

data, which are adjusted, if necessary, to reflect the assumptions market participants would use in

the circumstances).

Our Level 3 financial investments include equity investments accounted for at fair value through profit

and loss. These equity holdings are part of our corporate venture capital portfolio held by National Grid

Partners and comprise a series of relatively small, early-stage non-controlling minority interest unquoted

investments where prices or valuation inputs are unobservable. Nineteen equity investments (out of 42)

are fair valued based on the latest transaction price (a price within the last 12 months), either being the

price we paid for the investments, marked to a latest round of funding and adjusted for our preferential

rights or based on an internal model. In addition, we have 23 investments without a transaction in the

last 12 months that underwent an internal valuation process using the Black-Scholes Merton Option

Pricing Model (OPM Backsolve). Between 12 and 18 months, a blend between OPM Backsolve and

other techniques is utilised, such as proxy group revenue multiples, discounted cash flow, comparable

company analysis and probability weighted expected return approach, in order to triangulate a valuation.

After 18 months, the valuation is based on these alternative methods as the last fundraising price is no

longer a reliable basis for valuation.

Our Level 3 financial investments also include our investment in Sunrun Neptune 2016 LLC, which is

accounted for at fair value through profit and loss. The investment is fair valued by discounting expected

cash flows using a weighted average cost of capital specific to Sunrun Neptune 2016 LLC.

The changes in value of our Level 3 financial instruments are as follows:

|  |  |  |  |  |  |  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |  |  |  |  |  |  |
|  | Financing  derivatives | |  | Commodity  contract  derivatives | |  | Other 3 | |  | Total | |
|  | 2026 | 2025 |  | 2026 | 2025 |  | 2026 | 2025 |  | 2026 | 2025 |
|  | £m | £m |  | £m | £m |  | £m | £m |  | £m | £m |
| At 1 April | (64) | (64) |  | (20) | (13) |  | 407 | 483 |  | 323 | 406 |
| Net gains/(losses) for the year 1,2 | 4 | — |  | 51 | (41) |  | 21 | (77) |  | 76 | (118) |
| Purchases | — | — |  | — | — |  | 30 | 45 |  | 30 | 45 |
| Settlements | — | — |  | (34) | 25 |  | (8) | (44) |  | (42) | (19) |
| Reclassifications/transfers  out of Level 3⁴ | — | — |  | — | 9 |  | — | — |  | — | 9 |
| At 31 March | (60) | (64) |  | (3) | (20) |  | 450 | 407 |  | 387 | 323 |

1. Gain of £4 million (2025: £nil) is attributable to financing derivatives held at the end of the reporting period and has been recognised

in finance costs in the consolidated income statement.

2. Includes a loss of £2 million (2025: £6 million loss) attributable to commodity contract derivative financial instruments held at the end

of the reporting period and has been recognised in other operating costs in the consolidated income statement.

3. Other comprises our investments in Sunrun Neptune 2016 LLC and the investments made by National Grid Partners, which are accounted

for at fair value through profit and loss. Net gains and losses are recognised within revenue in the consolidated income statement.

4. £nil (2025: £9 million) of US Commodity contract derivatives were reclassified out of Level 3 to Level 2 in the period due to

improved observability of the fair value of these instruments.

The impacts on a post-tax basis of reasonably possible changes in significant Level 3 assumptions

are as follows:

|  |  |  |  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |  |  |  |
|  | Financing  derivatives | |  | Commodity  contract  derivatives | |  | Other 3 | |
|  | 2026 | 2025 |  | 2026 | 2025 |  | 2026 | 2025 |
|  | £m | £m |  | £m | £m |  | £m | £m |
| 10% increase in commodity prices1 | — | — |  | (6) | 8 |  | — | — |
| 10% decrease in commodity prices1 | — | — |  | 6 | (7) |  | — | — |
| +10% market area price change | — | — |  | (11) | — |  | — | — |
| -10% market area price change | — | — |  | 9 | — |  | — | — |
| +20 basis points change in Limited Price Inflation  (LPI) market curve² | (32) | (33) |  | — | — |  | — | — |
| -20 basis points change in LPI market curve² | 30 | 33 |  | — | — |  | — | — |
| +20 basis points increase between RPI  and Consumer Price Index (CPI) | 26 | 31 |  | — | — |  | — | — |
| -20 basis points decrease between RPI and CPI | (25) | (29) |  | — | — |  | — | — |
| +100 basis points change in discount rate | — | — |  | — | — |  | (6) | (6) |
| -100 basis points change in discount rate | — | — |  | — | — |  | 7 | 7 |
| +10% change in venture capital price | — | — |  | — | — |  | 29 | 26 |
| -10% change in venture capital price | — | — |  | — | — |  | (29) | (26) |

1. Level 3 commodity price sensitivity is included within the sensitivity analysis disclosed in note 35.

2. A reasonably possible change in assumption of other Level 3 derivative financial instruments is unlikely to result in a material change in fair values.

3. The investments acquired in the period were on market terms, and sensitivity is considered insignificant at 31 March 2026.

The impacts disclosed above were considered on a contract-by-contract basis, with the most significant

unobservable inputs identified.

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 205 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Notes to the consolidated financial statements cont. | | |  |  |  |

32. Financial risk managementcont.

(h) Capital risk management

The capital structure of the Group consists of shareholders’ equity, as disclosed in the consolidated

statement of changes in equity, and net debt (note 29). National Grid’s objectives when managing capital

are: to safeguard our ability to continue as a going concern; to remain within regulatory constraints of our

regulated operating companies; and to maintain an efficient mix of debt and equity funding, thus achieving

an optimal capital structure and cost of capital. We regularly review and manage the capital structure as

appropriate in order to achieve these objectives.

Maintaining appropriate credit ratings for our operating and holding companies is an important aspect

of our capital risk management strategy and balance sheet efficiency. We monitor our balance sheet

efficiency using several metrics, including funds from operations (FFO)/adjusted net debt, retained cash

flow (RCF)/adjusted net debt, regulatory gearing and interest cover. For the year ended 31 March 2026,

these metrics for the Group were 13.0% (2025: 13.7%), 9.3% (2025: 9.8%), 61% (2025: 61%) and

4.0x (2025: 3.8x), respectively – see pages [70](#ib9ca2c5b72fb4936a9d458c7bb253318_286545) and [241](#i4d298f0c87f34766961e584275cfa183_101491). We believe these are consistent with the

current credit ratings for National Grid plc in respect of the main companies of the Group, based on

guidance from the rating agencies.

We monitor the RAV gearing within National Grid Electricity Transmission plc (NGET) and the four

distribution network operators of National Grid Electricity Distribution plc (NGED). This is calculated

as net debt expressed as a percentage of RAV, and indicates the level of debt employed to fund our

UK‑regulated businesses. It is compared with the level of RAV gearing specified by Ofgem for the

respective notional companies, 55% for NGET and 60% for the four NGED distribution network operators.

We also monitor net debt as a percentage of rate base for our US operating companies, comparing this

with the allowed rate base gearing inherent within each of our agreed rate plans, typically around 50%.

As part of the Group’s debt financing arrangements, we are subject to a number of financial covenants

associated with existing borrowings and facility arrangements:

– subsidiary indebtedness relating to both non-US and US subsidiaries is required to be limited.

As at 31 March 2026 the lowest applicable limit of total subsidiary indebtedness in absolute terms

was £45 billion for non-US subsidiaries and $45 billion for US subsidiaries, and headroom on both

of these limits exceed £12 billion;

– the Articles of Association of National Grid plc limit Group total borrowings less cash and short-term

investments in absolute terms to £70 billion. As at 31 March 2026, headroom on the limit exceeds

£25 billion; and

– net debt to RAV gearing covenants limit gearing to 85% of RAV for each NGED operating company.

As at 31 March 2026, headroom on this covenant exceeds 30 percentage points for all impacted

companies based on the covenant definition of net debt. The carrying value of the bonds under this

covenant restriction is £2,889 million (2025: £3,005 million).

We consider the risk of breaching these covenants as remote given the level of headroom present.

The majority of our regulated operating companies in the US and the UK are subject to certain restrictions

on the payment of dividends by administrative order, contract and/or licence. The types of restrictions that

a company may have that would prevent a dividend being declared or paid unless they are met include

the following:

– the requirement to notify by certification regulators and certain lenders;

– dividends must be approved in advance by the relevant US state regulatory commission;

– the subsidiary must have one or two recognised rating agency credit ratings of at least investment

grade depending on contractual requirements;

– the securities of National Grid plc must maintain an investment grade credit rating, and if that rating is

the lowest investment grade bond rating it cannot have a negative watch/review for downgrade notice

by a credit rating agency;

– dividends must be limited to cumulative retained earnings, including pre-acquisition retained earnings

and in line with relevant company legislation;

– the subsidiary must not carry out any activities other than those permitted by the licences;

– the subsidiary must not create any cross-default obligations or give or receive any intra-group

cross‑subsidies;

– the percentage of equity compared with total capital of the subsidiary must remain above certain levels; and

– in relation to each of the NGED operating companies, the percentage of debt relative to the RAV must

remain below 85%.

These restrictions are subject to alteration in the US as and when a new rate case or rate plan is agreed

with the relevant regulatory bodies for each operating company and, in the UK, through the normal licence

review process.

As most of our business is regulated, at 31 March 2026 the majority of our net assets are subject to some

of the restrictions noted above. These restrictions are not considered to be significantly onerous, nor do

we currently expect they will prevent the planned payment of dividends in the future in line with our

dividend policy.

All the above requirements are monitored on a regular basis in order to ensure compliance. The Group

has complied with all externally imposed capital requirements to which it is subject.

33. Borrowing facilities

![]()

|  |  |  |
| --- | --- | --- |
|  |  |  |
|  |  |  |
|  | To support our liquidity requirements and provide backup to commercial paper and other  borrowings, we agree committed credit facilities with financial institutions over and above  the value of borrowings that may be required. These committed credit facilities are undrawn. |  |
|  |  |  |

An analysis of the maturity of our undrawn committed facilities as at   31 March 2026  is shown below:

|  |  |  |
| --- | --- | --- |
|  |  |  |
|  | 2026 | 2025 |
|  | £m | £m |
| Undrawn committed borrowing facilities expiring: |  |  |
| Less than 1 year | — | — |
| In 1 to 2 years | 5,408 | — |
| In 2 to 3 years | 604 | 5,982 |
| In 3 to 4 years | 1,745 | 105 |
| In 4 to 5 years | — | 1,745 |
| More than 5 years | 250 | — |
|  | 8,007 | 7,832 |

Of the unused facilities at 31 March 2026 ,  £7,968 million  ( 2025 : £7,792 million ) is available for liquidity

purposes, while £39 million  (2025:  £40 million) is available as backup to specific US borrowings.  Since

31 March 2026, £5,158 million of facilities due to mature in one to two years have been extended by

an additional year and have a new expiry date of 1 June 2028.

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 206 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Notes to the consolidated financial statements cont. | | |  |  |  |

34. Subsidiary undertakings, joint arrangements and associates

|  |  |  |
| --- | --- | --- |
|  |  |  |
|  |  |  |
|  | While we present consolidated results in these financial statements as if we were one company, our legal structure is such that there are a number of different operating and holding  companies that contribute to the overall result. This structure has evolved through acquisitions as well as regulatory requirements to have certain activities within separate legal entities. |  |
|  |  |  |

![]()

Subsidiary undertakings

A list of the Group’s subsidiaries as at  31 March 2026  is given below. The entire share capital of subsidiaries is held within the Group except where the Group’s ownership percentages are shown. These percentages

give the Group’s ultimate interest and therefore allow for the situation where subsidiaries are owned by partly owned intermediate subsidiaries. Where subsidiaries have different classes of shares, this is largely for

historical reasons, and the effective percentage holdings given represent both the Group’s voting rights and equity holding. Unless otherwise indicated against the company name, the share class held by the Group

in each undertaking is through ordinary shares (also referred to as common stock in certain countries). Where an alternative share class applies (including where there is no share capital), this is identified using the

following annotations: [a] Limited by Guarantee; [b] Membership interest; [c] Common stock and Preference shares; [d] Partnership interest. Shares in National Grid (US) Holdings Limited, National Grid Luxembourg

SARL, NGG Finance plc and NG Holdings Two PTE. Ltd are held directly by National Grid plc. All other holdings in subsidiaries are owned by other subsidiaries within the Group. All subsidiaries are consolidated in

the Group’s financial statements. The Group does not have any branches.

Principal Group companies are identified in bold. These companies are incorporated and principally operate in the countries under which they are shown. All entities incorporated in the US are taxed in the US

on their worldwide income other than where indicated in the footnotes below. Other entities are tax resident in their jurisdiction of incorporation other than where indicated in the footnotes below.

Incorporated in England and Wales

Registered office:

1–3 Strand, London, WC2N 5EH, UK

Birch Sites Limited

Carbon Sentinel Limited

Icelink Interconnector Limited

Lattice Group Limited

NatgridTW1 Limited

National Grid (US) Holdings Limited

National Grid (US) Investments 4 Limited

National Grid (US) Partner 1 Limited

National Grid Carbon Limited

National Grid Commercial Holdings Limited

National Grid Continental Limited

National Grid Distributed Energy Limited

National Grid Electricity Group Trustee Limited

National Grid Electricity Transmission plc

National Grid Energy Metering Limited

National Grid Holdings Limited

National Grid Holdings One plc

National Grid Hydrogen Limited

National Grid IFA 2 Limited

National Grid Interconnector Holdings Limited

National Grid Interconnectors Limited

National Grid International Limited

National Grid Lion Link Limited

National Grid Nautilus Limited

National Grid North Sea Link Limited

National Grid Offshore Limited

National Grid Partners Limited

National Grid Plus Limited

National Grid Property Holdings Limited

National Grid Twelve Limited

National Grid Twenty Eight Limited

National Grid Twenty Seven Limited

National Grid UK Limited

National Grid Ventures Limited

National Grid Viking Link Limited

National Grid William Limited

NGG Finance plc

Ngrid Intellectual Property Limited

Port Greenwich Limited

Registered Address:

Avonbank, Feeder Road, Bristol, BS2 0TB, United Kingdom

Central Networks Trustees Limited [a]

Kelston Properties 2 Limited

National Grid Electricity Distribution (East Midlands) plc

National Grid Electricity Distribution (South Wales) plc

National Grid Electricity Distribution (South West) plc

National Grid Electricity Distribution (West Midlands) plc

National Grid Electricity Distribution Generation Limited

National Grid Electricity Distribution Holdings Limited

National Grid Electricity Distribution Investments Limited

National Grid Electricity Distribution Midlands Limited

National Grid Electricity Distribution Network Holdings Limited

National Grid Electricity Distribution plc

National Grid Electricity Distribution Property Investments Limited

National Grid Helicopters Limited

National Grid Telecoms Limited

South Wales Electricity Share Scheme Trustees Limited

Western Power Pension Trustee Limited

WPD WEM Holdings Limited

WPD WEM Limited

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 207 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Notes to the consolidated financial statements cont. | | |  |  |  |

34. Subsidiary undertakings, joint arrangements and associatescont.

Registered Address:

Netley Old Hall Farm, Dorrington, Shrewsbury, United Kingdom, SY5 7JY

Sheet Road Management Company Limited (51%)

Registered Address:

Shire Hall, PO Box 9, Warwick, CV34 4RL, United Kingdom

Warwick Technology Park Management Company (No.2) Limited (60.56%)

In liquidation

Registered Address:

C/O Interpath Ltd, 10 Fleet Place, London, EC4M 7RB

NGC Employee Shares Trustee Limited

Incorporated in the US

Registered Address:

Corporation Service Company, 251 Little Falls Drive, Wilmington DE 19808, United States

Doorstep Community LLC [b]

Granite State Power Link LLC [b]

KeySpan CI Midstream Limited

KeySpan Energy Services Inc.

KeySpan International Corporation

KeySpan MHK, Inc.

KeySpan Midstream, Inc.

KSI Contracting, LLC [b]

KSI Electrical, LLC [b]

KSI Mechanical, LLC [b]

Metrowest Realty LLC [b]

National Grid Development Holdings Corp.

National Grid Glenwood Energy Center LLC [b]

National Grid LNG LLC [b]

National Grid North America Inc.

National Grid Partners LLC [b]

National Grid Port Jefferson Energy Center LLC [b]

National Grid Renewables, LLC [b]

National Grid Services Inc.

National Grid US LLC [b]

National Grid USA [c]

NGNE LLC [b]

NGV H2 Generation LLC [b]

NGV H2 Holdings LLC [b]

NGV OSW Holdings, LLC [b]

NGV US Distributed Energy Inc.

NGV US Transmission Inc.

NGV US, LLC [b]

Niagara Mohawk Energy, Inc.

North East Transmission Co., Inc.

Opinac North America, Inc.

Philadelphia Coke Co., Inc.

Registered Address:

Corporation Service Company, 80 State Street, Albany NY 12207-2543, United States

Grid NY LLC [b]

KeySpan Energy Corporation

KeySpan Gas East Corporation [c]

KeySpan Plumbing Solutions, Inc.

Land Management & Development, Inc.

Landwest, Inc.

National Grid Electric Services LLC [b]

National Grid Energy Trading Services LLC [b]

National Grid Engineering & Survey Inc.

National Grid Generation LLC [b]

National Grid Generation Ventures LLC [b]

National Grid IGTS Corp.

National Grid Partners Inc.

Niagara Mohawk Holdings, Inc.

Niagara Mohawk Power Corporation [c]

NM Properties, Inc.

Port of the Islands North, LLC [b]

The Brooklyn Union Gas Company [c]

Upper Hudson Development, Inc.

Registered Address:

Corporation Service Company, 84 State Street, Boston MA 02109, United States

Boston Gas Company

EUA Energy Investment Corporation

Massachusetts Electric Company [c]

Nantucket Electric Company

National Grid NE Holdings 2 LLC [b]

National Grid USA Service Company, Inc.

NEES Energy, Inc.

New England Energy Incorporated

New England Hydro Finance Company, Inc. (53.704%)

New England Hydro-Transmission Electric Company, Inc. (53.704%)

New England Power Company [c]

Transgas Inc.

Wayfinder Group, Inc.

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 208 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Notes to the consolidated financial statements cont. | | |  |  |  |

34. Subsidiary undertakings, joint arrangements and associatescont.

Registered Address:

Corporation Trust Company, 1209 Orange Street, Wilmington DE 19801, United States

Mystic Steamship Corporation

Registered Address:

100 Bank Street, Suite 630, Burlington, Chittenden County VT 05401, United States

National Grid Insurance USA Ltd

Registered Address:

Corporation Service Company, 10 Ferry Street S313, Concord NH 03301, United States

Broken Bridge Corp.

New England Electric Transmission Corporation

New England Hydro-Transmission Corporation (53.704%)

Registered Address:

Corporation Service Company, 222 Jefferson Boulevard, Suite 200, Warwick RI 02888, United States

Newport America Corporation

Incorporated in the Isle of Man

Registered office:

Third Floor, St George’s Court, Upper Church Street, Douglas, IM1 1EE, Isle of Man, UK

National Grid Insurance Company (Isle of Man) Limited

Incorporated in Luxembourg

Registered office:

412F, Route d’Esch, L-2086, Luxembourg, Grand Duchy of Luxembourg

National Grid Luxembourg SARL

Incorporated in Singapore

Registered office:

9 Raffles Place, #26-01, Republic Plaza, Singapore 048619

NG Holdings Two PTE. Ltd\*

\*Entity is tax resident in the UK

Joint ventures

A list of the Group’s joint ventures as at 31 March 2026 is given below. All joint ventures are included in

the Group’s financial statements using the equity method of accounting.

Incorporated in England and Wales

|  |  |  |
| --- | --- | --- |
|  |  |  |
| Company Name | Registered Office Address | Comments |
| BritNed Development  Limited ( 50%) | 1–3 Strand, London,  WC2N 5EH, UK. | National Grid Interconnector Holdings  Limited owns 284,500,000 €0.20  C Ordinary shares and one £1.00  Ordinary A share. |
| National Places LLP  ( 50%) | C/O Bdo Llp 5 Temple Square,  Temple Street, Liverpool,  L2 5RH, UK. | In liquidation. |
| Nemo Link Limited (50%) | 1–3 Strand, London,  WC2N 5EH, UK. | National Grid Interconnector Holdings  Limited owns 121,140,801 €1.00  Ordinary shares. |

Incorporated in the US

|  |  |
| --- | --- |
|  |  |
| Company Name | Registered Office Address |
| Community Offshore Wind, LLC  (27.27%) [b] | The Corporation Trust Company, Corporation Trust Center,  1209 Orange Street, Wilmington DE 19801, USA. |
| LI Energy Storage System, LLC  (50%) [b] | Corporation Service Company, 251 Little Falls Drive, Wilmington,  DE 19808, USA. |
| LI Solar Generation, LLC (50%) [b] | Corporation Service Company, 251 Little Falls Drive, Wilmington,  DE 19808, USA. |

Joint operations

A list of the Group’s incorporated joint operations as at 31 March 2026 is given below. All joint operations

are included in the Group’s financial statements under IFRS 11 Joint arrangements.

Incorporated in England and Wales

|  |  |  |
| --- | --- | --- |
|  |  |  |
| Company Name | Registered Office Address | Comments |
| Eastern Green Link 1  Limited ( 50%) | 1–3 Strand, London,  WC2N 5EH, UK. | National Grid Electricity Transmission plc  owns 50 £1.00 A Ordinary shares. |
| Eastern Green Link 2  Limited ( 50%) | No.1 Forbury Place, 43 Forbury  Road, Reading, RG1 3JH, UK. | National Grid Electricity Transmission plc  owns 250,000 £1.00 B Ordinary shares. |
| Eastern Green Link 3  Limited ( 50%) | No.1 Forbury Place, 43 Forbury  Road, Reading, RG1 3JH, UK. | National Grid Electricity Transmission plc  owns 250,000 £1.00 B Ordinary shares. |
| Eastern Green Link 4  Limited (50%) | 1–3 Strand, London,  WC2N 5EH, UK. | National Grid Electricity Transmission plc  owns 50 £1.00 A Ordinary shares. |
| NGET/SPT Upgrades  Limited (50%) | 1–3 Strand, London,  WC2N 5EH, UK. | National Grid Electricity Transmission plc  owns 50 £1.00 A Ordinary shares. |

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 209 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Notes to the consolidated financial statements cont. | | |  |  |  |

34. Subsidiary undertakings, joint arrangements and associatescont.

Associates

A list of the Group’s associates as at 31 March 2026 is given below. Unless otherwise stated, all

associates are included in the Group’s financial statements using the equity method of accounting.

Incorporated in England and Wales

|  |  |  |
| --- | --- | --- |
|  |  |  |
| Company Name | Registered Office Address | Comments |
| Joint Radio Company  Limited ( 25%) | Friars House, Manor House  Drive, Coventry, CV1 2TE, UK. | National Grid Electricity Transmission plc  owns one £0.50 A Ordinary share. |

Incorporated in the US

|  |  |
| --- | --- |
|  |  |
| Company Name | Registered Office Address |
| Clean Line Energy Partners LLC  ( 32%) [b] | The Corporation Trust Company, Corporation Trust Center, 1209  Orange Street, Wilmington DE 19801, USA. |
| Connecticut Yankee Atomic Power  Company ( 19.5%) | c/o Shae Hemingway, 362 Injun Hollow Road, East Hampton CT  06424-3099, USA. |
| Direct Global Power Inc. (26%) | The Corporation Trust Company, 1209 Orange Street, Wilmington  DE 19801, USA. |
| Energy Impact Fund LP (9.41%) [d] | Harvard Business Services, Inc., 16192 Coastal Highway, Lewes  DE 19958, USA. |
| KHB Venture LLC (33.33%) [b] | c/o de maximis, inc., 135 Beaver Street, 4th Floor, Waltham MA  02452, USA. |
| Maine Yankee Atomic Power  Company (24%) | Joseph D Fay, 321 Old Ferry Road, Wiscasset ME 04578, USA. |
| New York Transco LLC (28.3%) [b] | Corporation Service Company, 80 State Street, Albany NY  12207-2543, USA. |
| Yankee Atomic Electric Company  (34.5%) | Karen Sucharzewski, 49 Yankee Road, Rowe MA 01367, USA. |

Other investments

A list of the Group’s other investments as at 31 March 2026 is given below.

Incorporated in England and Wales

|  |  |
| --- | --- |
|  |  |
| Company Name | Registered Office Address |
| Energis plc (33.06%)  – (in liquidation) | 1 More London Place, London SE1 2AF, UK. |
| Electralink Limited (27.04%) | Third Floor, Northumberland House, 303–306 High Holborn,  London, WC1V 7JZ, UK. |

Our interests and activities are held or operated through the subsidiaries, joint arrangements or associates

as disclosed above. These interests and activities are established in – and subject to the laws and

regulations of – these jurisdictions.

The following UK subsidiaries will take advantage of the audit exemption set out within section 479A of

the Companies Act 2006 supported by guarantees issued by National Grid plc over their liabilities for the

year ended 31 March 2026:

|  |  |
| --- | --- |
|  |  |
| Company name | Company number |
| National Grid Holdings Limited | 3096772 |
| National Grid International Limited | 2537092 |
| National Grid (US) Holdings Limited | 2630496 |
| National Grid (US) Investments 4 Limited | 3867128 |
| National Grid (US) Partner 1 Limited | 4314432 |

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 210 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Notes to the consolidated financial statements cont. | | |  |  |  |

35. Sensitivities

![]()

|  |  |  |
| --- | --- | --- |
|  |  |  |
|  |  |  |
|  | In order to give a clearer picture of the impact on our results or financial position of  potential changes in significant estimates and assumptions, the following sensitivities  are presented. These sensitivities are based on assumptions and conditions prevailing  at the year end and should be used with caution. The effects provided are not necessarily  indicative of the actual effects that would be experienced because our actual exposures  are constantly changing. |  |
|  |  |  |

The sensitivities in the tables below show the potential impact in the income statement (and consequential

impact on net assets) for a reasonably possible range of different variables, each of which has been

considered in isolation (i.e. with all other variables remaining constant). There are a number of these

sensitivities which are mutually exclusive, and therefore if one were to happen another would not, meaning

a total showing how sensitive our results are to these external factors is not meaningful.

The sensitivities included in the tables below broadly have an equal and opposite effect if the sensitivity

increases or decreases by the same amount unless otherwise stated.

(a) Sensitivities on areas of estimation uncertainty

The table below sets out the sensitivity analysis for certain areas of estimation uncertainty set out

in note 1 D. These estimates are those that have a significant risk of resulting in a material adjustment

to the carrying values of assets and liabilities in the next year. This includes the impact of changes

in assumptions on the net assets recognised at the balance sheet date and the amount charged to

the income statement for the following year. Note that the sensitivity analysis for the useful economic

lives of our gas network assets is included in note 13.

|  |  |  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |  |  |
|  | 2026 | | |  | 2025 | | |
|  | Assumptions  used | Income  statement  £m | Net  assets  £m |  | Assumptions  used | Income  statement  £m | Net  assets  £m |
| Pensions and other post-  retirement benefit liabilities  (pre-tax): |  |  |  |  |  |  |  |
| UK discount rate change¹ | 1% | 15 | 880 |  | 1% | 20 | 920 |
| US discount rate change¹ | 1% | 16 | 671 |  | 1% | 18 | 784 |
| UK inflation rate change² | 1% | 5 | 648 |  | 1% | 6 | 701 |
| UK long-term rate of  increase in salaries change | 1% | 2 | 37 |  | 1% | 1 | 52 |
| US long-term rate of  increase in salaries change | 1% | 2 | 41 |  | 1% | 3 | 46 |
| UK change to life  expectancy at age 65  3 | one year | — | 317 |  | one year | — | 320 |
| US change to life  expectancy at age 65 | one year | 1 | 137 |  | one year | 2 | 181 |
| Assumed US healthcare  cost trend rates change | 1% | 15 | 195 |  | 1% | 19 | 245 |
|  |  |  |  |  |  |  |  |
| US environmental provision: |  |  |  |  |  |  |  |
| Change in the real  discount rate | 1% | 148 | 148 |  | 1% | 155 | 155 |
| Change in estimated  future cash flows | 20% | 402 | 402 |  | 20% | 413 | 413 |

1. A change in the discount rate is likely to be driven by changes in bond yields and, as such, would be expected to be offset to a significant

degree by a change in the value of the bond assets held by the plans. In the UK, there would also be a £329 million (2025: £288 million)

net assets offset from the buy-in policies, where the accounting value of the buy‑in asset is set equal to the associated liabilities.

2. The projected impact resulting from a change in RPI reflects the associated effect on escalation rates for pensions in payment and in

deferment and future salary increases. The buy‑in policies would have a £235 million (2025: £211 million) net assets offset to the above.

3. In the UK, the buy-in policies would have a £154 million (2025: £109 million) net assets offset to the above.

Pensions and other post-retirement benefits assumptions

Sensitivities have been prepared to show how the defined benefit obligations and forecast amounts

charged to the income statement for the following year could potentially be impacted by changes in the

relevant actuarial assumptions that were reasonably possible as at 31 March 2026. In preparing sensitivities,

the potential impact has been calculated by applying the change to each assumption in isolation and

assuming all other assumptions remain unchanged. This is with the exception of RPI in the UK where

the corresponding change to increases to pensions in payment, increases to pensions in deferment

and increases in salary are recognised.

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 211 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Notes to the consolidated financial statements cont. | | |  |  |  |

35. Sensitivitiescont.

(b) Sensitivities on financial instruments

We are further required to show additional sensitivity analysis under IFRS 7 and this is shown separately

in the following table due to the additional assumptions that are made in order to produce meaningful

sensitivity disclosures. The analysis is prepared assuming the amount of liability outstanding at the

reporting date was outstanding for the whole year.

Our net debt as presented in note  29 is sensitive to changes in market variables, primarily being UK and

US interest rates, the UK inflation rate and the dollar to sterling exchange rate. These impact the valuation

of our borrowings, deposits and derivative financial instruments. The analysis illustrates the sensitivity of

our financial instruments to reasonable possible changes in these market variables.

The following main assumptions were made in calculating the sensitivity analysis for continuing operations:

– the amount of net debt, the ratio of fixed to floating interest rates of the debt and derivatives portfolio,

and the proportion of financial instruments in foreign currencies are all constant and on the basis of

the hedge designations in place at 31 March 2026 and 2025 respectively;

– the statement of financial position sensitivity to interest rates relates to items presented at their fair

values: derivative financial instruments; and our investments measured at FVTPL and FVOCI. Further

debt and other deposits are carried at amortised cost and so their carrying value does not change

as interest rates move;

– the sensitivity of interest expense to movements in interest rates is calculated on net floating rate

exposures on debt, deposits and derivative instruments;

– changes in the carrying value of derivatives from movements in interest rates of designated cash

flow hedges are assumed to be recorded fully within equity; and

– changes in the carrying value of derivative financial instruments designated as net investment hedges

from movements in interest rates are presented in equity as costs of hedging, with a one-year release

to the income statement. The impact of movements in the dollar to sterling exchange rate is recorded

directly in equity.

|  |  |  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |  |  |
|  | 2026 | | |  | 2025 | | |
|  | Assumptions  used | Income  statement  £m | Other  equity  reserves  £m |  | Assumptions  used | Income  statement  £m | Other equity  reserves  £m |
| Financial risk (post tax): |  |  |  |  |  |  |  |
| UK inflation change¹ | 1% | 33 | — |  | 1% | 35 | — |
| UK interest rates change | 1% | 14 | 352 |  | 1% | 13 | 376 |
| US interest rates change | 1% | 11 | 151 |  | 1% | 18 | 134 |
| US dollar exchange  rate change² | 10% | 64 | 276 |  | 10% | 69 | 225 |

1. Excludes sensitivities to LPI curve. Further details on sensitivities are provided in note 32(g).

2. The other equity reserves impact does not reflect the exchange translation in our US subsidiaries’ net assets. It is estimated this would

change by £1,887 million (2025: £1,730 million) in the opposite direction if the dollar exchange rate changed by 10%.

Our commodity contract derivatives are sensitive to price risk. Additional sensitivities in respect to

commodity price risk and to our derivative fair values are as follows:

|  |  |  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |  |  |
|  | 2026 | | |  | 2025 | | |
|  | Assumptions  used | Income  statement  £m | Net  assets  £m |  | Assumptions  used | Income  statement  £m | Net  assets  £m |
| Commodity price risk  (post tax): |  |  |  |  |  |  |  |
| Increase in commodity  prices | 10% | 56 | 56 |  | 10% | 62 | 62 |
| Decrease in commodity  prices | 10% | (57) | (57) |  | 10% | (61) | (61) |
|  |  |  |  |  |  |  |  |
| Assets and liabilities carried  at fair value (post tax): |  |  |  |  |  |  |  |
| Fair value change in  derivative financial  instruments¹ | 10% | (18) | (18) |  | 10% | (57) | (57) |
| Fair value change in  commodity contract  derivative liabilities | 10% | 4 | 4 |  | 10% | 3 | 3 |

1. The effect of a 10% change in fair value assumes no hedge accounting.

36. Post balance sheet events

On 13 April 2026, National Grid North America Inc. entered into a 10-year loan of $864.9 million, with the

proceeds received on 21 April 2026. As the loan was entered into after the reporting date, it has not been

reflected in the consolidated statement of financial position as at 31 March 2026.

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 212 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Company accounting policies | | |  |  |  |

![]()

|  |  |  |
| --- | --- | --- |
|  |  |  |
|  |  |  |
|  | We are required to include the standalone balance sheet of our ultimate Parent Company,  National Grid plc, under the Companies Act 2006. |  |
|  |  |  |

A. Basis of preparation

National Grid plc is the Parent Company of the National Grid Group, which is engaged in the transmission

and distribution of electricity and gas in Great Britain and northeastern US. The Company is a public

limited company, limited by shares. The Company is incorporated and domiciled in England, with its

registered office at 1–3 Strand, London, WC2N 5EH.

The financial statements of National Grid plc for the year ended 31 March 2026 were approved by

the Board of Directors on 14 May 2026. The Company meets the definition of a qualifying entity under

Financial Reporting Standard 100 (FRS 100) issued by the Financial Reporting Council. Accordingly,

these individual financial statements of the Company have been prepared in accordance with Financial

Reporting Standard 101 ‘Reduced Disclosure Framework’ (FRS 101). In preparing these financial

statements the Company applies the recognition and measurement requirements of International

Financial Reporting Standards (IFRS) as adopted by the UK, but makes amendments where necessary

in order to comply with the provisions of the Companies Act 2006 and sets out below where advantage

of the FRS 101 disclosure exemptions has been taken.

These individual financial statements have been prepared on a historical cost basis, except for the

revaluation of financial instruments, and are presented in pounds sterling, which is the currency of the

primary economic environment in which the Company operates. The comparative financial information

has also been prepared on this basis.

These individual financial statements have been prepared on a going concern basis, which presumes

that the Company has adequate resources to remain in operation and that the Directors intend it

to do so, for at least one year from the date the financial statements are signed. As the Company is

part of a larger group, it participates in the Group’s centralised treasury arrangements and so shares

banking arrangements with its subsidiaries. The Company is expected to generate positive cash flows

or be in a position to obtain liquidity via its committed credit facilities to continue to operate for the

foreseeable future.

In accordance with the exemption permitted by section 408 of the Companies Act 2006, the Company

has not presented its own profit and loss account or statement of comprehensive income.

The following exemptions from the requirements of IFRS have been applied in the preparation of these

financial statements of the Company in accordance with FRS 101:

– a cash flow statement and related notes;

– disclosures in respect of transactions with wholly owned subsidiaries;

– disclosures in respect of capital management; and

– the effects of new but not yet effective IFRS standards.

The exemption from disclosing key management personnel compensation has not been taken as

there are no costs borne by the Company in respect of employees, and no related costs are recharged

to the Company.

As the consolidated financial statements of National Grid plc, which are available from the registered

office, include the equivalent disclosures, the Company has also taken the exemptions under FRS 101 in

respect of certain disclosures required by IFRS 13 ‘Fair Value Measurement’ and the disclosures required

by IFRS 7 ‘Financial Instruments: Disclosures’.

There are no areas of judgement or key sources of estimation uncertainty that are considered to have

a significant effect on the amounts recognised in the financial statements.

The balance sheet has been prepared in accordance with the Company’s accounting policies approved

by the Board and described below.

B. Fixed asset investments

Investments held as fixed assets are stated at cost less any provisions for impairment. Investments are

reviewed for impairment if events or changes in circumstances indicate that the carrying amount may not

be recoverable. Impairments are calculated such that the carrying value of the fixed asset investment is

the lower of its cost or recoverable amount. Recoverable amount is the higher of its fair value less costs

of disposal and its value-in-use. The Company accounts for common control transactions at cost.

C. Tax

Current tax for the current and prior periods is provided at the amount expected to be paid or

recovered using the tax rates and tax laws that have been enacted or substantively enacted by

the balance sheet date.

Deferred tax is provided in full on temporary differences which result in an obligation at the balance

sheet date to pay more tax, or the right to pay less tax, at a future date, at tax rates expected to apply

when the temporary differences reverse based on tax rates and tax laws that have been enacted or

substantively enacted by the balance sheet date. Deferred tax is provided for using the balance sheet

liability method and is recognised on temporary differences between the carrying amount of assets

and liabilities in the financial statements and the corresponding tax bases used in the computation

of taxable profit.

Deferred tax assets are recognised to the extent that it is regarded as more likely than not that they will

be recovered. Deferred tax assets and liabilities are not discounted.

D. Foreign currencies

Transactions in currencies other than the functional currency of the Company are recorded at the rates

of exchange prevailing on the dates of the transactions. At each balance sheet date, monetary assets and

liabilities that are denominated in foreign currencies are retranslated at closing exchange rates. Gains and

losses arising on retranslation of monetary assets and liabilities are included in the profit and loss account.

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 213 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Company accounting policies cont. | | |  |  |  |

E. Financial instruments

The Company’s accounting policies are the same as the Group’s accounting policies under IFRS,

namely IAS 32 ‘Financial Instruments: Presentation’, IFRS 9 ‘Financial Instruments’ and IFRS 7

‘Financial Instruments: Disclosures’. The Company applies these policies only in respect of the

financial instruments that it has, namely investments, derivative financial instruments, debtors, cash

at bank and in hand, borrowings and creditors.

The policies are set out in notes 15,  17, 19, 20, 21 and 22 to the consolidated financial statements.

The Company is taking the exemption for financial instruments disclosures, because IFRS 7 disclosures

are given in notes 32 and 35 to the consolidated financial statements.

F. Hedge accounting

The Company applies the same accounting policy as the Group in respect of fair value hedges and cash

flow hedges. This policy is set out in note 32 to the consolidated financial statements.

G. Parent Company guarantees

The Company has guaranteed the repayment of the principal sum, any associated premium and interest

on specific loans due by certain subsidiary undertakings primarily to third parties. Such guarantees

are accounted for by the Company as insurance contracts.

H. Share awards to employees of subsidiary undertakings

The issuance by the Company to employees of its subsidiaries of a grant over the Company’s options

represents additional capital contributions by the Company to its subsidiaries. An additional investment in

subsidiaries results in a corresponding increase in shareholders’ equity. The additional capital contribution

is based on the fair value of the option at the date of grant, allocated over the underlying grant’s vesting

period. Where payments are subsequently received from subsidiaries, these are accounted for as a return

of a capital contribution and credited against the Company’s investments in subsidiaries. The Company

has no employees except for the Group’s Non-executive Directors (refer to the Directors’ Remuneration

Report on page 122.

I. Dividends

Interim dividends are recognised when they are paid to the Company’s shareholders. Final dividends

are recognised when they are approved by shareholders.

J. Directors’ remuneration

Full details of Directors’ remuneration are disclosed on pages 107 – 126.

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 214 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Company balance sheet  as at 31 March | | |  |  |  |

|  |  |  |  |
| --- | --- | --- | --- |
|  |  |  |  |
|  |  | 2026 | 2025 |
|  | Notes | £m | £m |
| Fixed assets |  |  |  |
| Investments | 1 | 14,600 | 14,554 |
|  |  |  |  |
| Current assets |  |  |  |
| Debtors (amounts falling due within one year) | 2 | 17,770 | 14,502 |
| Debtors (amounts falling due after more than one year) | 2 | 164 | 101 |
| Investments | 5 | 1,148 | 4,566 |
| Cash at bank and in hand |  | 275 | 1,023 |
| Total current assets |  | 19,357 | 20,192 |
|  |  |  |  |
| Creditors (amounts falling due within one year) | 3 | (7,247) | (5,148) |
| Net current assets |  | 12,110 | 15,044 |
| Total assets less current liabilities |  | 26,710 | 29,598 |
|  |  |  |  |
| Creditors (amounts falling due after more than one year) | 3 | (7,344) | (8,846) |
| Net assets |  | 19,366 | 20,752 |
|  |  |  |  |
| Equity |  |  |  |
| Share capital | 7 | 647 | 638 |
| Share premium account |  | 1,285 | 1,292 |
| Cash flow hedge reserve |  | 81 | 121 |
| Cost of hedging reserve |  | (10) | (21) |
| Other equity reserves |  | 636 | 591 |
| Profit and loss account | 8 | 16,727 | 18,131 |
| Total shareholders’ equity |  | 19,366 | 20,752 |

The Company’s profit  after tax for the year was  £182 million ( 2025 : £318 million profit). Profits available for distribution by the Company to shareholders were  £17 billion  at 31 March 2026 . The financial statements

of the Company on pages 212 – 218 were approved by the Board of Directors on 13  May 2026  and were signed on its behalf by:

#### Zoë Yujnovich

Chief Executive

#### Andy Agg

Chief Financial Officer

#### National Grid plc

Registered number:  4031152

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 215 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Company statement of changes in equity  for the years ended 31 March | | |  |  |  |

|  |  |  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |  |  |
|  | Share  capital  £m | Share  premium account  £m | Cash flow  hedge  reserve  £m | Cost of hedging reserve  £m | Other  equity  reserves  £m | Profit  and loss  account  £m | Total shareholders’  equity  £m |
| At 1 April 2024 | 493 | 1,298 | 50 | (7) | 554 | 12,631 | 15,019 |
| Profit for the year1 | — | — | — | — | — | 318 | 318 |
| Other comprehensive profit/(loss) for the year |  |  |  |  |  |  |  |
| Transferred to/(from) equity (net of tax) | — | — | 71 | (14) | — | — | 57 |
| Total comprehensive profit/(loss) for the year | — | — | 71 | (14) | — | 318 | 375 |
| Other equity movements |  |  |  |  |  |  |  |
| Rights issue | 135 | — | — | — | 6,704 | — | 6,839 |
| Transfer between reserves | — | — | — |  | (6,704) | 6,704 | — |
| Scrip dividend-related share issue2 | 10 | (10) | — | — | — | — | — |
| Issue of treasury shares | — | — | — | — | — | 18 | 18 |
| Transactions in own shares | — | 4 | — | — | — | (11) | (7) |
| Share awards to employees of subsidiary undertakings | — | — | — | — | 37 | — | 37 |
| Equity dividends | — | — | — | — | — | (1,529) | (1,529) |
| At 31 March 2025 | 638 | 1,292 | 121 | (21) | 591 | 18,131 | 20,752 |
| Profit for the year1 | — | — | — | — | — | 182 | 182 |
| Other comprehensive profit/(loss) for the year |  |  |  |  |  |  |  |
| Transferred (from)/to equity (net of tax) | — | — | (40) | 11 | — | — | (29) |
| Total comprehensive (loss)/profit for the year | — | — | (40) | 11 | — | 182 | 153 |
| Other equity movements |  |  |  |  |  |  |  |
| Scrip dividend-related share issue2 | 9 | (9) | — | — | — | — | — |
| Issue of treasury shares | — | — | — | — | — | 40 | 40 |
| Transactions in own shares | — | 2 | — | — | — | (3) | (1) |
| Share awards to employees of subsidiary undertakings | — | — | — | — | 45 | — | 45 |
| Equity dividends | — | — | — | — | — | (1,623) | (1,623) |
| At 31 March 2026 | 647 | 1,285 | 81 | (10) | 636 | 16,727 | 19,366 |

1. Included within profit for the year is dividend income from subsidiaries of £nil  (2025 : £ nil).

2. Included within the share premium account are costs associated with scrip dividends.

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 216 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Notes to the Company financial statements | | |  |  |  |

1. Fixed asset investments

|  |  |
| --- | --- |
|  |  |
|  | Shares in subsidiary  undertakings  £m |
| Cost at 1 April 2024 | 16,937 |
| Additions | 37 |
| Disposals | (2,420) |
| Cost at 31 March 2025 | 14,554 |
| Additions | 46 |
| Disposals | — |
| Cost at 31 March 2026 | 14,600 |
| Provision at 1 April 2024 | (2,420) |
| Charge for the year | — |
| Disposals | 2,420 |
| Provision at 1 April 2025 | — |
| Charge for the year | — |
| Disposals | — |
| Provision at 31 March 2026 | — |
| Net book value at 31 March 2026 | 14,600 |
| Net book value at 31 March 2025 | 14,554 |

During the year, there was a capital contribution of  £46 million  ( 2025: £37 million ), which represents the

fair value of equity instruments granted to subsidiaries’ employees arising from equity-settled employee

share schemes.

The Company’s direct subsidiary undertakings as at 31 March 2026 were as follows: National Grid (US)

Holdings Limited, National Grid Luxembourg SARL, NGG Finance plc and NG Holdings Two PTE. Ltd.

Project SPV (Jersey) Investment Limited was dissolved during the year. The names of indirect subsidiary

undertakings, joint ventures and associates are included in note  34 to the consolidated financial statements.

The Directors believe that the carrying value of the investments is supported by the fair value of their

underlying net assets.

2. Debtors

|  |  |  |
| --- | --- | --- |
|  |  |  |
|  | 2026 | 2025 |
|  | £m | £m |
| Amounts falling due within one year |  |  |
| Derivative financial instruments (note 4) | 184 | 20 |
| Amounts owed by subsidiary undertakings | 17,579 | 14,469 |
| Other debtors | 7 | 13 |
|  | 17,770 | 14,502 |
| Amounts falling due after more than one year |  |  |
| Derivative financial instruments (note 4) | 164 | 101 |
|  | 164 | 101 |

The carrying values stated above are considered to represent the fair values of the assets. Amounts owed

by Group undertakings are unsecured, have no fixed date of repayment and are repayable on demand.

Where intercompany loans are interest-bearing, interest is charged at rates determined by Treasury. For

the purposes of the impairment assessment, loans to subsidiary undertakings are considered low credit

risk as the subsidiaries are solvent and are covered by the Group’s liquidity arrangements.

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 217 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Notes to the Company financial statements cont. | | |  |  |  |

3. Creditors

|  |  |  |
| --- | --- | --- |
|  |  |  |
|  | 2026 | 2025 |
|  | £m | £m |
| Amounts falling due within one year |  |  |
| Borrowings (note 6) | 701 | 116 |
| Derivative financial instruments (note 4) | 150 | 119 |
| Amounts owed to subsidiary undertakings | 6,364 | 4,881 |
| Other creditors | 32 | 32 |
|  | 7,247 | 5,148 |
| Amounts falling due after more than one year |  |  |
| Borrowings (note 6) | 6,532 | 6,964 |
| Derivative financial instruments (note 4) | 134 | 222 |
| Amounts owed to subsidiary undertakings | 655 | 1,627 |
| Deferred tax | 23 | 33 |
|  | 7,344 | 8,846 |
| Amounts owed to subsidiary undertakings falling due  after more than one year are repayable as follows: |  |  |
| In 1 to 2 years | — | — |
| In 2 to 3 years | — | — |
| In 3 to 4 years | — | — |
| In 4 to 5 years | — | — |
| More than 5 years | 655 | 1,627 |
|  | 655 | 1,627 |

The carrying values stated above are considered to represent the fair values of the liabilities.

Amounts owed to subsidiary undertakings falling due within one year are unsecured, have no fixed date

of repayment and are repayable on demand. Where intercompany loans are interest-bearing interest is

charged at normal commercial terms.

Amounts owed to subsidiary undertakings falling due after more than one year wholly comprise a back-to-

back loan from NGG Finance plc, which mirrors the terms of NGG Finance’s €750 million 2.125% fixed-

rate resettable capital securities issued and listed on the London Stock Exchange. The loan is denominated

in Euros, bears interest at a fixed rate consistent with the underlying bond and is repayable at maturity in

line with the external instrument.

4. Derivative financial instruments

The fair values of derivative financial instruments are as follows:

|  |  |  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |  |  |
|  | 2026 | | |  | 2025 | | |
|  | Assets  £m | Liabilities  £m | Total  £m |  | Assets  £m | Liabilities  £m | Total  £m |
| Amounts falling due  within one year | 184 | (150) | 34 |  | 20 | (119) | (99) |
| Amounts falling due after  more than one year | 164 | (134) | 30 |  | 101 | (222) | (121) |
|  | 348 | (284) | 64 |  | 121 | (341) | (220) |

For each class of derivative, the notional contract  1 amounts are as follows:

|  |  |  |
| --- | --- | --- |
|  |  |  |
|  | 2026 | 2025 |
|  | £m | £m |
| Interest rate swaps | (1,188) | (1,801) |
| Cross-currency interest rate swaps | (6,666) | (7,247) |
| Foreign exchange forward contracts | (18,060) | (10,826) |
|  | (25,914) | (19,874) |

1. The notional contract amounts of derivatives indicate the gross nominal value of transactions outstanding at the balance sheet date.

5. Investments

|  |  |  |
| --- | --- | --- |
|  |  |  |
|  | 2026 | 2025 |
|  | £m | £m |
| Investments in short-term money funds | 1,146 | 4,528 |
| Restricted balances – collateral | 2 | 38 |
|  | 1,148 | 4,566 |

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 218 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Notes to the Company financial statements cont. | | |  |  |  |

6. Borrowings

The following table analyses the Company’s total borrowings:

|  |  |  |
| --- | --- | --- |
|  |  |  |
|  | 2026 | 2025 |
|  | £m | £m |
| Amounts falling due within one year |  |  |
| Bank loans | 80 | 60 |
| Bonds | 621 | 56 |
|  | 701 | 116 |
| Amounts falling due after more than one year |  |  |
| Bank loans | 128 | 181 |
| Bonds | 6,404 | 6,783 |
|  | 6,532 | 6,964 |
| Total borrowings | 7,233 | 7,080 |

The maturity of total borrowings is as follows:

|  |  |  |
| --- | --- | --- |
|  |  |  |
|  | 2026 | 2025 |
|  | £m | £m |
| Total borrowings are repayable as follows: |  |  |
| Less than 1 year | 701 | 116 |
| In 1 to 2 years | 476 | 598 |
| In 2 to 3 years | 1,962 | 450 |
| In 3 to 4 years | 456 | 1,911 |
| In 4 to 5 years | 429 | 431 |
| More than 5 years | 3,209 | 3,574 |
|  | 7,233 | 7,080 |

The notional amount of borrowings outstanding as at 31 March 2026  was £7,333 million

(2025 :  £7,176 million).

7. Share capital

The called-up share capital amounting to £647 million  (2025 :  £638 million) consists of 5,198,968,690

ordinary shares of 12  204/473 pence each ( 2025 : 5,132,617,708  ordinary shares of 12  204/ 473 pence each).

For further information on share capital, refer to note  27 of the consolidated financial statements.

8. Shareholders’ equity and reserves

At 31 March 2026 , the profit and loss account reserve stood at  £16,727 million (2025 : £18,131 million), of

which profits available for distribution by the Company to shareholders were  £17 billion  ( 2025 : £18 billion).

For further details of dividends paid and payable to shareholders, refer to note  9  of the consolidated

financial statements.

9. Parent Company guarantees

The Company has guaranteed the repayment of the principal sum, any associated premium and interest

on specific loans due by certain subsidiary undertakings primarily to third parties. At  31 March 2026 , the

sterling equivalent amounted to  £1,632 million ( 2025:  £1,972 million). The guarantees are for varying terms

from less than one year to open-ended.

In addition, a guarantee covering insolvency or failure to pay pension obligations has been provided to

Section A of the National Grid UK Pension Scheme by National Grid plc, National Grid Holdings One plc

and Lattice Group Limited. The guarantee covers all obligations and payments due to Section A. No explicit

allowance has been made for this guarantee in the financial statements because of Section A’s funding

level, where the Trustee estimated Section A to be in surplus on a buyout measure at 31 December 2025

and contribution requirements are forecast to be minimal over the coming years. For more information on

this guarantee, refer to note 25 of the consolidated financial statements.

10. Audit fees

The audit fee in respect of the Parent Company was £34,000 (2025 :  £34,000). Fees payable to Deloitte

for non-audit services to the Company are not required to be disclosed as they are included within note  4

to the consolidated financial statements.

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc    Annual Report and Accounts  2025/26 | 219 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
|  | | |  |  |  |

![Additional info divider v3.jpg]()

## Additional information

|  |  |
| --- | --- |
|  |  |
| [220](#i2193c7e7fbee4753bdbe2d16888565c8_385) | The business in detail |
| [220](#i2193c7e7fbee4753bdbe2d16888565c8_385) | UK regulation |
| [223](#i1db516796de743568156f5fd89cfea10_114821) | US regulation |

|  |  |
| --- | --- |
|  |  |
| [226](#i2193c7e7fbee4753bdbe2d16888565c8_388) | Internal control and risk factors |
| [226](#i2193c7e7fbee4753bdbe2d16888565c8_388) | Disclosure controls |
| [226](#i2193c7e7fbee4753bdbe2d16888565c8_388) | Internal control over financial reporting |
| [226](#i2193c7e7fbee4753bdbe2d16888565c8_388) | Risk factors |

|  |  |
| --- | --- |
|  |  |
| [233](#i2193c7e7fbee4753bdbe2d16888565c8_394) | Other disclosures |
| [233](#i2193c7e7fbee4753bdbe2d16888565c8_394) | Change of control provisions |
| [233](#i2193c7e7fbee4753bdbe2d16888565c8_394) | Code of Ethics |
| [233](#i2193c7e7fbee4753bdbe2d16888565c8_394) | Conflicts of interest |
| [233](#i2193c7e7fbee4753bdbe2d16888565c8_394) | Corporate governance practices: differences from NYSE  listing standards |
| [234](#i5f794891492441e7a855126a592fd5a7_62461) | Directors’ indemnity and Directors’ and Officers’ liability  insurance |
| [234](#i5f794891492441e7a855126a592fd5a7_62462) | Unions |
| [234](#i5f794891492441e7a855126a592fd5a7_17131) | Human rights and modern slavery |
| [234](#i5f794891492441e7a855126a592fd5a7_17131) | Our people |
| [235](#i5f794891492441e7a855126a592fd5a7_17136) | Unresolved SEC staff comments |
| [235](#i5f794891492441e7a855126a592fd5a7_17133) | Property, plant, equipment and borrowings |
| [235](#i5f794891492441e7a855126a592fd5a7_17137) | UK Listing Rule 6.6.1 R cross-reference table |
| [235](#i5f794891492441e7a855126a592fd5a7_17127) | Political donations and expenditure |
| [235](#i5f794891492441e7a855126a592fd5a7_17128) | Material contracts |
| [235](#i5f794891492441e7a855126a592fd5a7_17129) | Research, development and innovation activity |

|  |  |
| --- | --- |
|  |  |
| [236](#i2193c7e7fbee4753bdbe2d16888565c8_400) | Other unaudited financial information |

|  |  |
| --- | --- |
|  |  |
| [248](#i2193c7e7fbee4753bdbe2d16888565c8_403) | Commentary on consolidated financial statements |

|  |  |
| --- | --- |
|  |  |
| [250](#i2193c7e7fbee4753bdbe2d16888565c8_391) | Shareholder information |
| [251](#i01de1c16a17046d497a42f2f76dda2a5_32905) | Articles of Association |
| [252](#i01de1c16a17046d497a42f2f76dda2a5_32902) | Depositary payments to the Company |
| [252](#i01de1c16a17046d497a42f2f76dda2a5_59524) | Documents on display |
| [252](#i01de1c16a17046d497a42f2f76dda2a5_32903) | Events after the reporting period |
| [252](#i01de1c16a17046d497a42f2f76dda2a5_32904) | Exchange controls |
| [252](#i01de1c16a17046d497a42f2f76dda2a5_32907) | Share information |
| [253](#i01de1c16a17046d497a42f2f76dda2a5_32898) | Material interests in shares |
| [253](#i01de1c16a17046d497a42f2f76dda2a5_32899) | Shareholder analysis |
| [253](#i01de1c16a17046d497a42f2f76dda2a5_32900) | Taxation |
| [255](#i01de1c16a17046d497a42f2f76dda2a5_32901) | UK stamp duty and stamp duty reserve tax (SDRT) |
| [255](#i01de1c16a17046d497a42f2f76dda2a5_58380) | All-employee share plans |

|  |  |
| --- | --- |
|  |  |
| [256](#i2193c7e7fbee4753bdbe2d16888565c8_409) | Definitions and glossary of terms |

|  |  |
| --- | --- |
|  |  |
| [262](#i2193c7e7fbee4753bdbe2d16888565c8_415) | Cautionary statement |

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 220 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| The business in detail | | |  |  |  |

#### UK regulation

#### Regulators

Our licences to participate in transmission, distribution and interconnection activities are established under

the Electricity Act 1989. These require us to develop, maintain and operate economic and efficient

networks and to facilitate competition in the supply of electricity in GB. They also give us statutory powers,

including the right to bury our pipes or cables under public highways and the ability to use compulsory

powers to purchase land so we can conduct our business.

Our licensed activities are regulated by Ofgem, which has a statutory duty under the Electricity Act 1989

to protect the interests of consumers. To protect consumers from the ability of companies to set unduly

high prices, Ofgem has established price controls that limit the amount of revenue such regulated

businesses can earn. In setting price controls, Ofgem must have regard to the need to secure that licence

holders are able to finance their obligations under the Electricity Act 1989. This should give us a level of

revenue for the duration of the price control that is sufficient to meet our statutory duties and licence

obligations with a reasonable return on our investments. Licensees and other affected parties can appeal

price controls or within period licence modifications which have errors, including in respect of

financeability.

Each of our UK ET and UK ED businesses operate under separate price controls, which cover our roles

as Transmission Owner (TO) and Distribution Network Operator (DNO). UK ET fulfils the TO function for

electricity and UK ED fulfils the DNO activities.

The transmission and distribution businesses follow the RIIO (Revenue = Incentives + Innovation +

Outputs) framework established by Ofgem. There are multiple price controls under this framework,

including:

– RIIO-T1 (electricity transmission, April 2013 – March 2021)

– RIIO-T2 (electricity transmission, April 2021 – March 2026)

– RIIO-T3 (electricity transmission, April 2026 – March 2031)

– RIIO-ED1 (electricity distribution, April 2015 – March 2023)

– RIIO-ED2 (electricity distribution, April 2023 – March 2028)

TOs and DNOs in the UK are natural monopolies and, to ensure value for money for consumers, UK ET and

UK ED are regulated by Ofgem. The operations are regulated under the respective transmission and

distribution licences which set the requirements that UK ET and UK ED need to deliver for their customers.

In addition to the base level of revenue which the TOs and DNOs are allowed to earn, there are incentives to

innovate and deliver various outputs relating to customer service, network performance, the environment,

connections, DSO activities and efficiency. The achievement or not of targets in relation to these activities

can result in rewards or penalties.

In addition to two regulated network price controls, there is also a tariff cap and floor price control applied

to regulation of our electricity interconnector interests.

RIIO price controls

Under RIIO, the outputs we deliver are explicitly articulated and our allowed revenues are linked to their

delivery, although some outputs and deliverables have only a reputational impact, penalty only

mechanism, or are linked to legislation. These outputs reflect what our stakeholders have told us they

want us to deliver and were determined through an extensive consultation process, which gave

stakeholders a greater opportunity to influence the decisions.

Using information we have submitted and, along with independent assessments, Ofgem determines the

efficient level of expected costs necessary for these deliverables to be achieved. Under RIIO, this is known

as ‘totex’, which is a component of total allowable expenditure and is broadly the sum of what was

defined in previous price controls as operating expenditure (opex) and capital expenditure (capex).

A number of assumptions are necessary in setting allowances for the outputs that we will deliver, including

the volumes of work that will be needed and the price of the various external inputs required to achieve

them. Consequently, there are a number of uncertainty mechanisms within the RIIO framework designed

to protect consumers and network companies by avoiding the need to set allowances when future needs

and costs are uncertain.

Where we under- or over-spend the allowed totex for reasons that are not covered by uncertainty

mechanisms, there is a ‘sharing’ factor. This means we share the under- or over-spend with customers

through an adjustment to allowed revenues in future years. This sharing factor provides an incentive for

us to provide the outputs efficiently, as we are able to keep a portion of savings we make, with the

remainder benefitting our customers. Likewise, it provides a level of protection for us if we need to spend

more than allowances. Alongside this, there are several specific areas where companies can submit

further claims for new allowances within the period, for instance to enable net zero.

Under RIIO, there are also number of Output Delivery Incentives (ODIs) to incentivise us to deliver

favourable outcomes for consumers. The ODI package has been enhanced in RIIO-T3 versus RIIO-T2 to

further incentivise us to deliver timely delivery and innovation to benefit consumers, while maintaining the

focus on reliability and customer focus.

Allowed revenue to fund totex costs is split between RIIO ‘fast’ and ‘slow’ money categories using

specified ratios that are fixed for the duration of the price control. Fast money represents the amount of

totex we are able to recover in the year of expenditure. Slow money is added to our RAV – effectively the

regulatory IOU.

For more details on the sharing factors under RIIO for our transmission businesses, please see the table

on page [222](#i985cb268fca24279b30b13b58259b61e_6-0-1-1-934309).

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 221 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| The business in detail cont. | | |  |  |  |

Regulation of UK ED: The RIIO-ED2 price control

RIIO-ED2, covering the period 1 April 2023 – 31 March 2028, is the second electricity distribution price

control to be set under the RIIO model. It builds on from the framework established in the first price

control, RIIO-ED1, that ran for eight years from 1 April 2015 to 31 March 2023.

Our RIIO-ED2 business plan was co-created with our stakeholders, through our largest ever stakeholder

consultation process with the broadest range of representatives. In order to enable us to actively drive the

nation’s move to decarbonisation, our RIIO-ED2 business plan has been designed to achieve four crucial

outcomes for our customers:

– Affordability: We aim to continue to deliver high standards of safety, reliability and customer service

that customers have come to expect from us, while keeping our portion of consumer bills affordable.

– Sustainability: We will support the UK’s ambitions to achieve net zero carbon emissions by 2050,

driving crucial changes in energy usage and customer green behaviour. We will set the benchmark by

achieving net zero in our own operations by 2043 (excluding Scope 3 emissions) and we will work

towards ensuring the network is ready to enable local authorities to achieve similar ambitions in

their regions. We will also actively work with the industry and government to achieve Clean Power 2030,

within which at least 95% of the country’s generation will come from clean sources including

renewables. This will see both UK ET and UK ED actively engaging with areas of reform to ensure that

the grid is decarbonised in a sustainable way.

– Connectability: We will strive to ensure that a lack of network capacity is not a barrier for our

customers. We will ensure that the network can cater for the increasing demand of low-carbon

technologies and renewable energy over RIIO-ED2, while recognising that the generation mix needs to

be balanced to retain resilience for security of supply. We will actively work with Ofgem and the industry

to reform the connections processes, including continuing engagement on a review of the end-to-end

connections journey. This will ensure that the connections process meets customers needs, while

enabling investment ahead of the need to support decarbonisation.

– Vulnerability: We will aim to deliver a first class programme of inclusive support. This will include

offering smart energy action plans for vulnerable customers each year, ensuring no one is left behind in

a smart future. We will also strive to more than double our ground breaking fuel poverty support to help

at least 113,000 fuel poor customers save £60 million on their energy bills over RIIO-ED2.

Regulation of UK ET: The RIIO-T2 price control

The RIIO-T2 price control built on the framework established for RIIO-T1, introduced a range of new

mechanisms to facilitate the transition to net zero, continued support for innovation, and incentivised us to

deliver outputs with ambitious targets aligned to our customers’ and stakeholders’ requirements.

The Independent User Group (IUG) includes a cross-section of the energy industry and represents the

interests of consumers, environmental and public interest groups, as well as large-scale and small-scale

customers. It was established in July 2018, acting as our critical liaison, to ensure stakeholders are at the

heart of our decision-making processes and our plan is fully reflective of customers’, consumers’ and

other stakeholders’ requirements.

The IUG’s enduring role in RIIO‑T2 focused on challenging business plans, enhancing transparency and

performance against commitments, and acting as a critical liaison on strategy, culture and key

stakeholder‑related areas.

Regulation of UK ET: The RIIO-T3 price control

RIIO‑T3 is Ofgem’s five‑year price control for electricity transmission running from April 2026 to March

2031, setting both the funding and regulatory framework under which NGET delivers and operates the

onshore transmission network. The framework is designed to enable a major expansion of the grid to

support decarbonisation and growth, while protecting consumers through ex‑ante scrutiny of costs,

defined outputs on reliability, connections and sustainability.

Funding is primarily set through ex‑ante allowances covering baseline operational expenditure and a large

programme of capital investment, supplemented by in‑period funding mechanisms, such as re‑openers

and pipeline arrangements to unlock additional funding as the need and scope of major projects become

clearer. NGET’s allowed revenue is adjusted for actual performance through a package of financial

incentives, including efficiency incentives on total expenditure, output‑based incentives, for example on

reliability, timely delivery of major projects and connections, and quality of service measures, alongside

innovation funding streams. Together, these mechanisms are intended to give NGET a “fair opportunity”

to earn its allowed return by delivering outputs efficiently and on time, while exposing it to downside risk

where performance falls short of consumers’ expectations, all within a licence framework that is central to

delivery and financeability under RIIO‑T3.

Competition in onshore transmission

We continue to support onshore competition where it can deliver benefits to consumers. The wider

landscape has shifted significantly since competition in onshore networks was first considered, and

continues to do so, particularly around the move to centralised network planning arrangements. We think

it is crucial that the competition framework is designed in the right way to incentivise innovation on design,

ensure timely and robust delivery and deliver benefits to customers. We are working closely with NESO,

DESNZ and Ofgem to support the development of the competition framework, ensuring that this is aligned

with the wider landscape, and to support identification of a suitable pipeline of projects.

Interconnectors regulation

Interconnectors primarily derive their revenues from sales of capacity to users who wish to move power

between market areas with different prices.

Under UK legislation, interconnection businesses must be separate from the transmission businesses.

There is a range of different regulatory models available for interconnector projects. These involve various

levels of regulatory intervention, ranging from fully merchant (where the project is fully reliant on sales of

interconnector capacity) to cap and floor.

The cap and floor regime is now the regulated route for interconnector investment in GB and may be

sought by project developers who do not qualify for, or do not wish to apply for, exemptions from UK and

European legislation which would facilitate a merchant development.

Offshore Hybrid Assets (OHA) combine interconnection with offshore wind. Ofgem established an OHA

pilot scheme and decided that an adjusted version of the cap and floor regulatory regime should apply to

those projects that receive approval within that scheme. The variations to the interconnector cap and floor

regime reflect the differing risks and characteristics of OHAs. In November 2024, Ofgem initially approved

the LionLink project between GB and the Netherlands, developed by National Grid Ventures with TenneT

Netherlands, for a pilot OHA regulatory regime.

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 222 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| The business in detail cont. | | |  |  |  |

Key parameters from Ofgem’s RIIO-ED2 determination for UK ED and RIIO-T2 and RIIO-T3 determination for UK ET

|  |  |  |  |  |
| --- | --- | --- | --- | --- |
|  |  |  |  |  |
|  |  | UK ED (ED2) | UK ET (T2) | UK ET (T3) |
| Allowed Return on Equity (RoE) 1 |  | 5.28 – 5.59% (real, relative to CPIH) at 60% gearing | 4.25 – 5.20% (real, relative to CPIH) at 55% gearing (4.52  – 5.59% at 60% gearing) | 5.70% (real, relative to CPIH) at 55% gearing (6.12% at  60% gearing) |
| Allowed debt funding |  | Calculated and updated each year using 17-year trailing  average of iBoxx Utilities 10+ year index, plus 25bps  additional cost of borrowing, 55bps calibration  adjustments, plus 6bps infrequent issuer premium for  West Midlands, South Wales and South West | Calculated and updated each year using an extending  ‘trombone-like’ trailing average of iBoxx Utilities 10+ year  index (increased from 10 years for 2021/22 to 14 years for  2025/26), plus 25bps additional borrowing costs | Implementation of a RAV weighting of the benchmark  index beginning from the start of RIIO-1  Calculated and updated each year using a 14-year  ‘trombone-like’ trailing average of iBoxx GBP A and iBoxx  BBB non-financial 10+ year index, plus 26bps additional  borrowing costs, plus 43bps calibration adjustments  Implementation of a nominal allowance for fixed rate debt  (index-linked debt assumption 10%) |
| Depreciation of RAV |  | Straight-line 45-year depreciation | Straight-line over 45 years for post-2021 RAV additions,  with pre-2021 RAV additions as per RIIO-T1 | Straight-line over 45 years for post-2021 RAV additions,  with pre-2021 RAV additions as per RIIO-T1 |
| Notional gearing |  | 60% | 55% | 55% |
| Split between fast/slow money |  | Capitalisation rate 1 slow money 77% – 79%  Capitalisation rate 2 slow money 85% | Fast: RIIO-T2 baseline 22%;  RIIO-T2 uncertainty mechanisms 15%  Slow: RIIO-T2 baseline 78%;  TO uncertainty mechanisms 85% | Fast: RIIO-T3 baseline 30%;  RIIO-T3 uncertainty mechanisms 15%  Slow: RIIO-T3 baseline 70%;  TO uncertainty mechanisms 85% |
| Sharing factor |  | 50% | 33% | 25% sharing up to 5% of over/under-spend  10% sharing at 5%-20% over/under-spend  5% sharing beyond 20% over/under-spend |
| Allowed totex (cumulative for  the five years of RIIO-ED2,  RIIO-T2 and of RIIO-T3) |  | £5.5 billion in 2020/21 prices | £5.8 billion in 2018/19 prices | £5.0 billion in 2023/24 prices |

1. The cost of equity in RIIO-ED2 is subject to annual adjustments that are calculated using the Capital Asset Pricing Model, through indexation of the ‘risk-free rate’ parameter. The range shown above is Ofgem’s estimate of the allowed RoE over the five years of RIIO-ED2, as updated in

the RIIO-ED2 Price Control Financial Model published in December 2023. The cost of equity in RIIO-T2 was subject to annual adjustments calculated using the Capital Asset Pricing Model, through indexation of the ‘risk-free rate’ parameter. The range shown above is Ofgem’s estimate

of the allowed RoE over the five years of RIIO-T2, as updated in the RIIO-T2 Price Control Financial Model published in January 2024. The cost of equity in RIIO-T3 is also subject to annual adjustments that are calculated using the Capital Asset Pricing Model, through indexation of the

‘risk-free rate’ parameter. 5.70% is the cost of equity for the first year of RIIO-T3 (2026/27) and Ofgem have not yet provided their estimate of the ‘risk free rate’ for the remainder of the period.

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 223 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| The business in detail cont. | | |  |  |  |

#### US regulation

#### Regulators

In the US, public utilities’ retail transactions are regulated by state utility commissions which serve as

economic regulators, approving cost recovery and authorised rates of return. The state commissions

establish the retail rates to recover the cost of transmission and distribution services within their

jurisdictions. They also serve the public interest by making sure utilities provide safe and reliable services

at just and reasonable prices. The commissions establish service standards and approve public utility

mergers and acquisitions. State commissions are also asked to approve a variety of programmes and

costs related to state energy and climate goals.

At the federal level, FERC regulates wholesale transactions for utilities, such as interstate transmission and

wholesale electricity sales, including rates for these services. FERC also regulates public utility holding

companies and centralised service companies, including those of our US businesses.

Regulatory process

The US regulatory regime is premised on allowing the utility the opportunity to recover its cost of service

and earn a reasonable return on its investments as determined by each commission. Utilities submit

formal rate filings (rate cases) to the relevant state regulator when additional revenues are necessary to

provide safe, reliable service to customers. Additionally, utilities can be compelled to file a rate case, either

due to complaints filed with the commission or at the commission’s own discretion.

The rate case is sometimes negotiated with parties representing customers and other interests. The utility

is required to prove that the requested rate change is just and reasonable, and the requested rate plan

can span multiple years. In the states where we operate, it can typically take 9 to 13 months for the

commission to render a final decision, although, in some instances, rules allow for longer negotiation

periods which may extend the length of the rate case proceeding. Unlike the state processes, FERC, as

the federal regulator, has no specified timeline for adjudicating a rate case; typically, it makes a final

decision retroactively when the case is completed.

Gas and electricity rates are established from a revenue requirement, or cost of service, equal to the

utility’s total cost of providing distribution or delivery services to its customers, as approved by the

commission in the rate case. This revenue requirement includes operating expenses, depreciation, taxes,

and a fair and reasonable return on shareholder capital invested in certain components of the utility’s

regulated asset base or ‘rate base’.

The final revenue requirement and rates for service are approved in the rate case decision. The revenue

requirement is derived from a comprehensive study of the utility’s total costs during a representative 12-

month period, referred to as a test year. Each commission has its own rules and standards for

adjustments to the test year. These may include forecast capital investments and operating costs.

Our rate plans

Each operating company has a set of rates for service. We have three electricity distribution companies:

(1) Niagara Mohawk Power Corporation, with operations in Upstate New York; (2) Massachusetts

Electric Company; and (3) Nantucket Electric Company, the latter two having operations

in Massachusetts.

We also have four gas distribution companies: (1) Niagara Mohawk Power Corporation, with operations

in Upstate New York; (2) The Brooklyn Union Gas Company, with operations in Downstate New York;

(3) KeySpan Gas East Corporation, with operations in Downstate New York; and (4) Boston Gas

Company, with operations in Massachusetts.

Our distribution companies have revenue decoupling mechanisms that delink their revenues

from the quantity of energy delivered and billed to customers. These mechanisms remove the natural

disincentive utility companies have for promoting and encouraging customer participation in

energy-efficiency programmes that lower energy end-use and distribution volumes.

We bill our customers for their use of electricity and gas services. Customer bills typically cover the cost of

the commodity (electricity or gas delivered) and charges covering our delivery service. Our customers are

allowed to select an unregulated competitive supplier for the commodity component of electricity and gas

utility services.

A substantial proportion of our costs, in particular electricity and gas commodity purchases, are pass-

through costs, fully recoverable from our customers. We recover pass-through costs through making

separate charges to customers, designed to recover those costs with no profit. We adjust the charges

from time to time, often annually to make sure that any over- or under-recovery of these costs is returned

to, or recovered from, our customers. Our rate plans are designed to a specific allowed RoE, by reference

to an allowed operating expense level and rate base. Some rate plans include earnings-sharing

mechanisms that allow us to retain a proportion of the earnings above our allowed RoE, achieved through

improving efficiency, with the balance benefiting customers. In addition, our performance under certain

rate plans is subject to service performance targets. We may be subject to monetary penalties in cases

where we do not meet those targets.

Our FERC-regulated transmission companies use formula rates (instead of periodic stated rate cases) to

set rates annually that recover their cost of service. Through the use of annual true-ups, formula rates

allow us to recover our actual costs incurred and the allowed RoE based on the actual transmission rate

base each year. We must make annual formula rate filings documenting the revenue requirement that

customers can review and challenge.

Revenue for our wholesale transmission businesses in New England and New York is collected from

wholesale transmission customers. These are typically other utilities and include our own New England

electricity distribution businesses. With the exception of Upstate New York, which continues to combine

retail transmission and distribution rates to end-use customers, these wholesale transmission costs are

generally incurred by distribution utilities on behalf of their customers. They are fully recovered as a pass-

through from end-use customers, as approved by each state commission.

Our Long Island generation plants sell capacity to the LIPA under 15-year and 25-year power supply

agreements and within wholesale tariffs approved by FERC.

Through the use of cost-based formula rates, these long-term contracts provide a similar economic effect

to cost-of-service rate regulation.

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 224 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| The business in detail cont. | | |  |  |  |

One measure used to monitor the performance of our regulated businesses is a comparison of achieved

RoE to allowed RoE. However, this measure cannot be used in isolation, as several factors may prevent

us from achieving the allowed RoE. These include financial market conditions, regulatory lag (e.g. the time

period after a rate or expense is approved for recovery but before we collect the same from customers)

and decisions by the regulator preventing cost recovery in rates from customers.

We work to increase achieved RoE through:

– productivity improvements

– positive performance against incentives or earned savings mechanisms, such as available energy-

efficiency programmes

– filing a new rate case when achieved returns are lower than those the Company could reasonably

expect to attain through a new rate case

US regulatory revenue requirement

![24140_Bar_US_Regulatory revenue requirement_3col_RGB.jpg]()

US regulatory filings

The objectives of our rate case filings are to make sure we have the right cost of service and are able to

earn a fair and reasonable rate of return, while providing a safe, reliable and affordable service. To achieve

these objectives and reduce regulatory lag, we have been successful in many cases in obtaining relief,

such as:

– revenue-decoupling mechanisms

– capital trackers

– commodity-related bad debt true-ups

– pension and other post-employment benefit true-ups, separately from base rates

– performance-based frameworks such as incentives and multi-year plans

We explain these terms in the table on page [225](#i1db516796de743568156f5fd89cfea10_87041).

Recent developments in rate filings and the regulatory environment are:

New York

– A joint proposal setting forth a three-year rate plan for Niagara Mohawk was approved by the NYPSC in

August 2025.

– A joint proposal setting forth a three-year rate plan for KEDNY and KEDLI was approved by the NYPSC

in August 2024.

Massachusetts

– In November 2023, we made a full rate case filing for Massachusetts Electric Company and Nantucket

Electric Company resulting in a five-year ratemaking plan in September 2024.

– In November 2020, we made a full rate case filing for Boston Gas Company resulting in a five-year

performance-based ratemaking plan in September 2021.

FERC

In March 2026, FERC issued an order regarding four long-pending New England Transmission Owners

(NETOs) base RoE complaints. The order set a lower base RoE and requires the NETOs to issue refunds

with interest. National Grid will challenge the decision through the required regulatory and legal

procedures. In April 2026, National Grid, together with other NETOs, filed a request with FERC under

Section 205 of the Federal Power Act proposing a forward-looking base return on equity of 11.39%. The

proposal reflects the application of the FERC current return on equity methodology using updated market

data.

Massachusetts

Massachusetts Electric Company and Nantucket Electric Company rate cases

On 30 September 2024, the MADPU issued its order on our petition for an increase in electric base

distribution rates for Massachusetts Electric Company and Nantucket Electric Company.

The MADPU approved a five-year rate plan with new rates effective 1 October 2024, an allowed Return on

Equity of 9.35% on an equity ratio of 52.83% and a revenue increase of $90.2 million. The order also

introduced a new regulatory recovery mechanism that provides timely funding for growing capital

investment requirements up to a cap, alongside a performance-based ratemaking recovery mechanism

for operating and maintenance costs. Additionally, it approved a multi-tiered low-income discount rate

along with performance incentives for low-income programme enrolment and distributed energy

resources interconnections.

Boston Gas Company rate case

On 16 January 2026, Boston Gas Company filed its gas rate case with the MADPU. Boston Gas

Company requested, among other things, an increase in distribution revenues by approximately $342

million, including the transfer of recoverable revenue requirement totalling approximately $198 million

associated with Gas System Enhancement Plan investments placed in service between 1 January 2020

through 31 December 2024, resulting in a net revenue increase of approximately $144 million. Boston

Gas Company further proposed a Return on Equity of 10.25% on an equity ratio of 53.85%. Boston Gas

Company also requested continuation of its performance-based ratemaking mechanism, a one-time

Liquefied Natural Gas roll-in, and a MADPU pipeline safety regulatory requirement tracker to recover costs

associated with mandated pipeline safety improvements. If approved, the requested rate increase would

be effective 1 December 2026.

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 225 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| The business in detail cont. | | |  |  |  |

New York

Downstate New York 2023 rate cases – KEDNY and KEDLI

KEDNY and KEDLI rate cases approved by the NYPSC on 15 August 2024 updated our allowed revenues

to reflect our cost of service more closely, while maintaining affordable energy for customers. The joint

proposal approved by the NYPSC sets forth a three-year rate plan for KEDNY and KEDLI with overall

annual revenue requirement increases, including $444 million for KEDNY and $246.5 million for KEDLI for

the year ending on 31 March 2025. The joint proposal reflects $1.57 billion in capital investments for

KEDNY and KEDLI in the first rate year to modernise KEDNY and KEDLI’s gas infrastructure to implement

safety improvements, enhance reliability and resilience, replace ageing and leak-prone facilities, and

reduce methane emissions. The joint proposal aligns with our 2050 vision to support a sustainable and

affordable path towards a low-carbon energy future. Additionally, the joint proposal includes initiatives to

expand low-income and energy-efficiency programmes, fund renewable natural gas projects, and

enhance customer service.

Upstate New York 2024 rate cases – NIMO

On 14 August 2025, the NYPSC approved a three‑year rate plan for NIMO that updates electric and gas

revenues to better reflect cost of service, while maintaining affordable energy for customers. The plan

includes levelled increases of $167 million for electric and $57 million for gas in the first rate year and

supports approximately $4.3 billion in electric and $1 billion in gas capital investments to modernise

infrastructure, enhance safety and reliability, and strengthen system resilience. It also incorporates IT

upgrades, storm‑response improvements, and targeted investments in battery storage and distributed

energy resources. Consistent with New York’s climate mandates and our 2050 vision to support a

sustainable and affordable path towards a low-carbon energy future, the plan advances electrification,

non‑pipe alternatives, and emissions‑reduction initiatives, while expanding customer affordability

programmes and support for disadvantaged communities.

Summary of US price controls and rate plans

|  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |
|  | | 2022 | 2023 | 2024 | 2025 | 2026 | 2027 | 2028 | Rate base  (31 Mar 2026) | Equity-to-  debt  ratio | Allowed  Return  on Equity | Achieved  Return  on Equity  (31 Mar 2026) | Revenue  decoupling  † | Capital  tracker ‡ | Commodity-  related bad  debt true-up § | Pension/  OPEB  true-up  ◊ |
| New York  Public Service  Commission | Niagara Mohawk1  (Upstate, electricity) |  |  |  |  |  |  |  | $10,000m | 48:52 | 9.5% | 8.3% | ü | P | P | ü |
| Niagara Mohawk  (Upstate, gas) |  |  |  |  |  |  |  | $2,569m | 48:52 | 9.5% | 7.5% | ü | P | P | ü |
| KEDNY (downstate) 2, 5 |  |  |  |  |  |  |  | $8,025m | 48:52 | 9.35% | 9.6% | ü | P | P | ü |
| KEDLI (downstate) 3, 5 |  |  |  |  |  |  |  | $4,760m | 48:52 | 9.35% | 10.5% | ü | P | P | ü |
|  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |
| Massachusetts  Department of  Public Utilities | Massachusetts  Electric/Nantucket Electric |  |  |  |  |  |  |  | $4,399m | 53:47 | 9.35% | 8.0% | ü | P | ü | n/a |
| Massachusetts Gas 5 |  |  |  |  |  |  |  | $5,867m | 53:47 | 9.7% | 9.4% | ü | P | ü | ü |
|  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |
| Federal Energy  Regulatory  Commission | Canadian Interconnector/  Other4 |  |  |  |  |  |  |  | $76m | 65:35 | 11.1% | 11.1% | n/a | ü | n/a | ü |
| New England Power |  |  |  |  |  |  |  | $3,271m | 60:40 | 9.57% | 10.1% | n/a | ü | n/a | ü |

![]()

![]()

![]()

![]()

![]()

![]()

![]()

![]()

![]()

![]()

![]()

![]()

1. Both transmission and distribution, excluding stranded costs.

2. KeySpan Energy Delivery New York (The Brooklyn Union Gas Company).

3. KeySpan Energy Delivery Long Island (KeySpan Gas East Corporation).

4. Equity ratio and Return on Equity values are for the Canadian Interconnector only.

5. The chart shows the anticipated date rates are to be in effect.

† Revenue decoupling

A mechanism that removes the link between a utility's revenue and sales volume so that the utility is indifferent to

changes in usage. Revenues are reconciled to a revenue target, with differences billed or credited to customers.

This allows the utility to support energy efficiency.

‡ Capital tracker

A mechanism that allows the recovery of the revenue requirement of incremental capital investment above that

embedded in base rates, including depreciation and a return on the incremental investment.

§ Commodity-related bad debt true-up

A mechanism that allows a utility to reconcile commodity-related bad debt either to actual commodity-related

bad debt or to a specified commodity-related bad debt write-off percentage. For electricity utilities, this

mechanism also includes working capital.

◊ Pension/OPEB true-up

A mechanism that reconciles the actual non-capitalised costs of pension and Other Post-Employment Benefits

(OPEB) and the actual amount recovered in base rates. The difference may be amortised and recovered over a

period or deferred for a future rate case.

|  |  |  |  |  |
| --- | --- | --- | --- | --- |
|  |  |  |  |  |
|  | Rate filing made |  | ü | Feature in place |
|  | New rates effective |  | P | Feature partially in place |
|  | Rate plan ends |  |  |  |
|  | Rates continue indefinitely |  |  |  |
|  | Multi-year rate plan |  |  |  |

![]()

![]()

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 226 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Internal control and risk factors | | |  |  |  |

![]()

|  |  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |  |
|  |  |  |  |  |  |  |
|  | Disclosure controls  Our management, including the Chief Executive and Chief  Financial Officer, have evaluated the effectiveness of the design  and operation of our disclosure controls and procedures as of 31  March 2026.  Our disclosure controls and procedures are designed to provide  reasonable assurance of achieving their objectives; however,  their effectiveness has limitations, including the possibility of  human error and the circumvention or overriding of the controls  and procedures.  Even effective disclosure controls and procedures provide only  reasonable assurance of achieving their objectives.  Based on the evaluation, the Chief Executive and Chief Financial  Officer concluded that the disclosure controls and procedures are  effective to provide reasonable assurance. The information  required for disclosure in the reports that we file and submit under  the Securities Exchange Act 1934 is recorded, processed,  summarised and reported as and when required and that such  information is accumulated and communicated to our  management, including the Chief Executive and Chief Financial  Officer, as appropriate, to allow timely decisions regarding  disclosure. |  | Internal control over financial reporting  Our management, including the Chief Executive and Chief  Financial Officer, have carried out an evaluation of our internal  control over financial reporting pursuant to the Disclosure  Guidance and Transparency Rules (DTR) and section 404 of the  Sarbanes-Oxley Act 2002. As required by section 404,  management is responsible for establishing and maintaining an  adequate system of internal control over financial reporting (as  defined in Rules 13(a) – 5(f) and 15(d) – 15(f) under the Securities  Exchange Act 1934).  Our internal control over financial reporting is designed to provide  reasonable assurance regarding the reliability of financial reporting  and the preparation of financial statements for external purposes,  in accordance with generally accepted accounting principles.  Because of its inherent limitations, internal control over financial  reporting may not prevent or detect misstatements. Also,  projections of any evaluation of effectiveness to future periods are  subject to the risk that controls may become inadequate because  of changes in conditions, or that the degree of compliance with the  policies or procedures may deteriorate. |  | Management’s evaluation of the effectiveness of the Company’s  internal control over financial reporting was based on the revised  Internal Control – Integrated Framework 2013 issued by the  Committee of Sponsoring Organizations of the Treadway  Commission. Using this evaluation, management concluded that  our internal control over financial reporting was effective as at 31  March 2026.  Deloitte LLP, which has audited our consolidated financial  statements for the year ended 31 March 2026, has also audited  the effectiveness of our internal control over financial reporting.  During the year, there were no changes that have materially  affected, or are reasonably likely to materially affect, our internal  control over financial reporting.  Risk factors  Management of our risks is an important part of our internal  control environment, as we describe on pages [226](#i2193c7e7fbee4753bdbe2d16888565c8_388) to [232](#i72a93cacb719482cadc6ab9717fa311e_1-0-1-1-944541).  In addition to Our Group Principal Risks listed, we face a number  of inherent risks that could have a material adverse effect on our  business, financial condition, results of operations and reputation,  as well as the value and liquidity of our securities. Any investment  decision regarding our securities and any forward-looking  statements made by us should be considered in light of these risk  factors and the cautionary statement set out on page  [262](#i2193c7e7fbee4753bdbe2d16888565c8_415). An  overview of the key inherent risks we face is provided on the  pages that follow. |  |
|  |  |  |  |  |  |  |

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 227 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Internal control and risk factors cont. | | |  |  |  |

#### Risk factors

Strategic risks

|  |  |  |
| --- | --- | --- |
|  |  |  |
| Law, regulation and political and economic uncertainty | | |
| Changes in law or regulation, or decisions by governmental bodies or regulators and increased political  and economic uncertainty, could adversely affect us in a material way.  Most of our businesses are utilities or networks subject to regulation by governments and other authorities.  Changes in law or regulation or regulatory policy and precedent, and decisions of governmental bodies or  regulators in the countries or states in which we operate could materially adversely affect us. Changes to regulatory  priorities could likewise affect us. For example, our costs and operating activities may be impacted by US Federal  Government actions, including tariffs or its focus on natural gas and pausing of offshore wind leasing, which  contrasts with the UK, where the energy transition remains at the forefront of government policy. In both  jurisdictions, increasing political focus on issues of affordability could also affect us. In the longer term, significant  changes to law or regulation regarding usage of electricity or gas in jurisdictions where we operate or on our  operating activities could limit the return expected on investment or regulated assets. More widely, the impacts of  international political and economic uncertainty and disruption could also have a material adverse consequence on  us. We may fail to deliver any one of our customer, investor and wider stakeholder propositions due to increased  political and economic uncertainty. |  | Decisions or rulings concerning the following (as examples) could have a material adverse impact on our results of  operations, cash flows, the financial condition of our businesses and the ability to develop those businesses in the  future:  – The RIIO (Revenue = Incentives + Innovation + Outputs) framework established by Ofgem, including the  implementation of the RIIO-T3 and RIIO-ED2 price controls and upcoming determination of RIIO-ED3 in the UK;  – The implementation of and periodic determination of US rate plans;  – Whether licences, approvals or agreements to operate or supply are granted, amended or renewed, whether  consents for construction projects are granted in a timely manner, or whether there has been any breach of the  terms of a licence, approval or regulatory requirement; and  – Timely recovery of incurred expenditure or obligations, the ability to pass through commodity costs, a decoupling  of energy usage and revenue, and other decisions relating to the impact of general economic conditions on us,  our markets and customers, implications of climate change and of advancing energy technologies, whether  aspects of our activities are contestable, and the level of permitted revenues and dividend distributions for our  businesses.  For further information, see pages [220](#i2193c7e7fbee4753bdbe2d16888565c8_385) to [225](#i1db516796de743568156f5fd89cfea10_118416), which explains our regulatory environment in detail. |
| Climate change commitments and targets |  |  |
| If we fail to meet our regulatory obligations, commitments or targets in relation to climate change and the  energy transition, our reputation and business may be materially and adversely affected.  We have set ambitious climate performance targets and commitments, including on reductions to greenhouse gas  emissions, and we aim to deliver the critical infrastructure necessary to achieve wider climate change objectives. If  we are unable to identify and/or deliver upon actions necessary to meet such targets, including due to third-party  action or inaction and/or evolving standards, oversight or other requirements, this could undermine our ability to  deliver our clean energy transition strategy, subject us to accusations of (or legal challenges related to)  greenwashing, damage our reputation and limit our ability to influence future energy policy. Achievement of our  climate commitments and targets is subject to risks and uncertainties, many of which are outside of our control  and depend on, among other factors, investment and changes in operating practices by other energy sector  participants, in particular risks related to generation of electricity by third parties and advances in technology and  regulatory requirements that could impact how individuals and households use electricity, as well as regulatory,  commercial and social trends (including the impact of energy prices on commercial and household consumption  and investment trends) in the jurisdictions where we operate. |  | These risks and uncertainties include, but are not limited to, the availability and cost of alternative fuels, global  electrical charging infrastructure, off-site renewable energy and other materials and components; the outcome of  research efforts and future technology developments, including the ability to scale projects and technologies on a  commercially competitive basis, such as carbon sequestration, hydrogen blending (and other uses of hydrogen)  and/or other related processes; labour-related regulations and requirements that restrict or prohibit our ability to  impose requirements on third-party contractors; customer acceptance of sustainable supply chain solutions; and  the consummation of an acquisition of, or merger with, another company that has not adopted similar goals or  whose progress toward reaching its goals is not as advanced as ours.  Failure to achieve or maintain our climate performance targets, credentials and leadership may result in significant  reputational harm, damage our relationship with key stakeholders, or result in regulatory enforcement and fines.  We measure and report on certain climate-related metrics where required by regulation, as well as for strategic and  management purposes. The processes involved in formulating and reporting against our climate and emissions  targets are complex, and are subject to significant uncertainties, including with respect to the methodology,  collection and verification of data, underlying estimates and assumptions, and the use of third-party information. In  particular, it is not possible to rely on historical data as a strong indicator of future trajectories, and the climate  scenarios employed in relation to climate metrics (and the models that analyse such scenarios) have limitations that  are sensitive to key assumptions and parameters, which are themselves subject to some uncertainty and cannot  fully capture all of the potential effects of climate, policy and technology driven outcomes. In addition, climate  change and emissions data, models and methodologies are relatively new, rapidly evolving and have not historically  been subject to the same or equivalent disclosure standards, historical reference points, benchmarks or globally  accepted accounting principles as financial and other information. As a result, such data may subsequently be  determined to be erroneous, and implementing systems to meet regulatory requirements may be complex, require  significant investment or impose additional demands on management time.  If our climate-related practices, reporting, regulatory compliance and performance do not meet investor or other  stakeholder expectations, we could be subject to significant fines or penalties and our reputation and consequently  our financial performance may be materially and adversely affected. |

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 228 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Internal control and risk factors cont. | | |  |  |  |

|  |  |  |
| --- | --- | --- |
|  |  |  |
| Growth and business development activity | | |
| Failure to respond to external market developments and execute our growth strategy may negatively affect  our performance. Conversely, new businesses or activities that we undertake alone or with partners, or the  cessation of existing business or activities, may not deliver target outcomes and may expose us to  additional operational and financial risk.  Failure to grow our core business sufficiently and have viable options for new future business over the longer term,  or failure to respond to the threats and opportunities presented by emerging technology or innovation (including for  the purposes of adapting our networks to meet the challenges of increasing distributed energy resources), could  negatively affect our credibility and reputation and jeopardise the achievement of intended financial returns.  Our business development activities (including the delivery of our growth ambition) involve acquisitions, disposals,  joint ventures, partnering and organic investment opportunities, such as development activities relating to changes  to the energy mix and the integration of distributed energy resources and other advanced technologies. |  | These are subject to a wide range of both external uncertainties (including the availability of potential investment  targets and attractive financing and the impact of competition for onshore transmission in both the UK and US) and  internal uncertainties (including actual performance of our existing operating companies and our business planning  model assumptions and ability to integrate acquired businesses effectively). As a result, we may suffer  unanticipated costs and liabilities and other unanticipated effects.  We may also be liable for the past acts, omissions or liabilities of companies or businesses we have acquired or  sold, which may be unforeseen or greater than anticipated. In the case of joint ventures, we may have limited  control over operations and our joint venture partners may have interests that diverge from our own. We may also  be required to seek additional licences or permits in connection with any such activities or initiatives, in particular  with respect to transmission lines or renewable or other generation projects, which we may not be able to obtain  on the timing, or terms anticipated, or at all.  The occurrence of any of these events could have a material adverse impact on our results of operations or  financial condition, and could also impact our ability to enter into other transactions.  We may also be required to undertake certain acquisitions, investments or divestitures as mandated by regulatory  bodies in the regions in which we operate, such as the divestment of NESO in 2024 to the UK Government,  pursuant to the UK Energy Act 2023. These could create financial or reputational risks or lead to changes to, or  limitations being placed on, regulated activities and potentially, over the longer term, result in impairment of  regulated assets and anticipated returns. |
| Business performance | | |
| Current and future business performance may not meet our expectations or those of our regulators and  shareholders.  Earnings maintenance and growth from our regulated gas and electricity businesses will be affected by our ability  to meet or exceed efficiency and cost targets and service quality standards set by, or agreed with, our regulators. |  | If we do not meet these targets and standards, or if we are not able to deliver our price controls and rate plans  successfully, we may not achieve the expected returns and benefits, our business may be materially adversely  affected and our performance, results of operations and reputation may be materially harmed and we may be in  breach of regulatory or contractual obligations. |
| Employees and others | | |
| We may fail to attract, develop and retain employees at all levels with the competencies (including  leadership and business capabilities), values and behaviours required to deliver our strategy and vision and  ensure they are engaged to act in our best interests.  Our ability to implement our strategy depends on the capabilities and performance of our employees and  leadership at all levels of the business. Our ability to implement our strategy and vision may be negatively affected  by the loss of key personnel or an inability to adequately identify and plan for personnel requirements, including to  attract, integrate, engage and retain appropriately qualified personnel (including people with the skills to help us  deliver across our investment projects). Our ability to implement our strategy and vision may be negatively affected  if significant disputes arise with our employees, such as failure to extend or renegotiate, as and when applicable,  agreements with relevant trade unions. |  | As a result, there may be a material adverse effect on our business, financial condition, results of operations and  prospects.  There is a risk that an employee, or someone acting on our behalf, may breach our internal controls or internal  governance framework, or may contravene applicable laws and regulations. This could have an impact on the  results of our operations, our reputation and our relationship with our regulators and other stakeholders. |

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 229 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Internal control and risk factors cont. | | |  |  |  |

|  |  |  |
| --- | --- | --- |
|  |  |  |
| Operational risks |  |  |
| Cyber or physical security breaches | | |
| Cyber or physical security breaches may impact our ability to operate our networks, initiate the loss of  critical operating or confidential data and expose us to significant liabilities.  As an owner and operator of critical infrastructure assets, we are subject to cyber and physical threats, including  from both internal and external parties who wish to disrupt our operations.  In the current geopolitical  environment, heightened cyber and physical security threats to national infrastructure remain, and there can be no  certainty that our security measures will be sufficient to prevent breaches from wherever they originate. |  | Malicious attack, sabotage or other intentional acts may also damage our assets (which include critical national  infrastructure), systems or data or otherwise significantly affect corporate activities and, as a consequence, have a  material adverse impact on our reputation, business, results of operations and financial condition. The third-party  technology systems, hardware, software, and technical applications and platforms which we use may also be  subject to attempts to disrupt the services they provide to us or used as a conduit to attack us.  Unauthorised access to, or deliberate breaches of, our IT systems may also lead to manipulation of our proprietary  business data or customer information. Unauthorised access to private customer information may make us liable  for a violation of data privacy regulations, which may in turn expose us to significant regulatory fines or liabilities.  Even where we establish business continuity controls and security against threats to our systems, these may not  be sufficient. As threats related to cyber security develop and grow, we may also find it necessary to make further  investments to protect our data and infrastructure, which may impact our results of operations and financial  condition. |
| Potentially harmful activities |  |  |
| Aspects of our activities could potentially harm employees, contractors, members of the public or the  environment.  Various potentially hazardous activities arise in connection with our business. For example, electricity and gas  utilities typically use and generate hazardous and potentially hazardous products and by-products. In addition,  there may be other aspects of our operations that are not currently regarded or proved to have adverse effects but  could become so.  A significant safety or environmental incident, a catastrophic failure of our assets or a failure of our safety processes  or of our occupational health plans, as well as the breach of our regulatory or contractual obligations or our climate  change targets, could materially adversely affect our results of operations and our reputation.  Safety is a fundamental priority for us, and we commit significant resources and expenditure to process safety and  to monitoring personal safety, occupational health and environmental performance, and to meeting our obligations  under negotiated settlements. |  | We are subject to laws and regulations in the UK and US governing health and safety matters to protect the public  and our employees and contractors, who could potentially be harmed by these activities, as well as laws and  regulations relating to pollution, the protection of the environment, and the use and disposal of hazardous  substances and waste materials, which are subject to change in the future.  These expose us to costs and liabilities relating to our operations and properties, including those inherited from  predecessor bodies, whether currently or formerly owned by us, and sites used for the disposal of our waste.  The cost of future environmental remediation obligations is often inherently difficult to estimate, and uncertainties  can include the extent of contamination, the appropriate corrective actions and our share of the liability. We are  subject to regulation in relation to climate change and related reporting requirements, which are subject to  significant change, and are affected by requirements to reduce our own carbon emissions as well as to enable  a reduction in energy use by our customers. If more onerous requirements are imposed on our own operating and  reporting requirements or our ability to recover these costs under regulatory frameworks changes, then this could  have a material adverse impact on our business, reputation, results of operations and financial position. |
| Infrastructure and systems impacting supply | | |
| We may suffer a major network failure or interruption, or may not be able to carry out critical operations  due to the failure of infrastructure or technology or a lack of supply, including as a result of bulk power  system failure.  Operational performance could be materially adversely affected by a failure to maintain the health of our assets or  networks, inadequate forecasting of demand, inadequate record keeping or control of data, as well as third-party  energy generators, including upstream failure or inability to produce adequate or reliable supply. Such events, in  turn, could cause us to fail to meet agreed standards of service, incentive and reliability targets, or to be in breach  of a licence, approval, regulatory requirement or contractual obligation. Even incidents that do not amount to  a breach could result in adverse regulatory and financial consequences, as well as harming our reputation.  Where demand for electricity or gas exceeds supply, including where we do not adequately forecast and respond  to disruptions in energy supplies, and our balancing mechanisms are not able to mitigate this fully, a lack of supply  to consumers may damage our reputation.  In addition to these risks, we may be affected by other potential events that are largely outside our control, such as  the impact of weather (including as a result of climate change and major storms), unlawful or unintentional acts of  third parties, outbreaks of hostilities or terrorist acts, insufficient or unreliable supply, or force majeure. |  | These items can affect financial performance, and we disclose in our underlying results to reflect, among other  items, major storm costs in the US that are recoverable in future periods where these are in excess of $100 million  (in aggregate) in the financial year. Severe weather that causes outages or damages infrastructure, together with  our actual or perceived response, could materially adversely affect operational and potentially business  performance and our reputation.  Our insurance coverage may not cover all of the costs and liabilities we incur as the result of any damage or  disruptions, including from these types of events outside our control, which in addition to any of the factors  mentioned above may materially and adversely impact our business, results of operations and financial condition. |

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 230 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Internal control and risk factors cont. | | |  |  |  |

|  |  |  |
| --- | --- | --- |
|  |  |  |
| Reliance on IT systems | | |
| A failure of our information technology infrastructure could adversely impact our business and results of  operations.  We rely upon the capacity, reliability and security of our IT hardware and software infrastructure and our ability to  expand and update this infrastructure, including with the increasing use of AI to meet our business requirements.  Our systems may be vulnerable to damage from a variety of attacks or disruptions (including cyber-attacks), natural  disasters, failures in hardware or software (including disruption to information systems of supporting technology,  the possibility of obsolescence and the risk of serial defects on technology implemented by the Group), power  fluctuations, unauthorised access to data and systems, loss or destruction of data (including confidential client  information), human error, and other similar disruptions. Not all of these sources of threat are within our control,  including fraud or malice on the part of third parties, accidental technological failure, electrical or telecommunication  outages, failures of computer servers or other damage to our property or assets, outbreaks of hostilities, or terrorist  acts. Further, the use of AI may expose us to additional risk from cyber events and our employees may not have  the experience to identify weaknesses in AI generated data. In addition we rely on third parties to support the  operation of our IT hardware, software infrastructure and software-as-a-service applications, and cloud services.  The security and privacy measures implemented by such third parties may not be sufficient to identify or prevent  disruptions or cyber-attacks. |  | We cannot give assurance that any security measures we have implemented or may in the future implement will be  sufficient to identify and prevent or mitigate such disruptions. Maintenance of these IT systems is important for our  ongoing service delivery, and investment may be required in the future to further develop our IT capabilities and to  protect against disruptions or security breaches.  The failure of our IT systems or those of our vendors to perform as anticipated for any reason or any significant  breach of security could disrupt our business and result in numerous adverse consequences, including reduced  effectiveness and efficiency of operations, inappropriate disclosure of confidential and proprietary information,  potentially significant reputational harm, increased overhead costs and loss of important information, and regulatory  fines or other liabilities, any of which could have a material adverse effect on our business and results of operations.  In addition, significant disruptions or breaches may require remedial steps to be taken, which could require us to  incur significant costs. Although we maintain business continuity and/or disaster recovery plans, they may not in all  circumstances be effective to timely resolve issues resulting from a disruption. |
| Supply chain disruptions | | |
| Supply chain disruption may materially and adversely affect our results of operations.  We may be impacted by supply chain disruptions and shortages of materials, equipment, labour and other  resources that are critical to our business operations, including the delivery of major projects. Such disruptions may  be further exacerbated by geopolitical tensions including the effects of conflicts in the Middle East and Ukraine and  also to other measures such as the imposition of tariffs by the US Federal Government. Long lead times for critical  equipment, network components and replacement parts could restrict the availability and delay the construction,  maintenance or repair of items that are needed to support our normal operations and may result in prolonged  customer outages, which could in turn lead to unrecovered costs for such service interruptions. Demand for  electric equipment is increasing due to utilities’ efforts to meet clean energy goals, planned capital expenditure  projects and in order to prepare for more frequent extreme weather events at a time when manufacturing capacity  and supply are decreasing. |  | Prices of materials, equipment, transportation and other resources have increased as a result of these supply chain  disruptions and shortages and may furthermore continue to increase as a result of inflation.  A prolonged continuation or a further increase in the severity of supply chain and inflationary pressures could result  in additional increases in the cost of certain goods, services and cost of capital, and may lead to projects delays,  which may materially and adversely impact our business, results of operations and financial condition. |
| Customers, suppliers and counterparties | | |
| Customers, suppliers and counterparties may not perform their obligations.  Our operations are exposed to the risk that customers, suppliers, banks and other financial institutions, and others  with whom we do business, will not satisfy their obligations, which could materially adversely affect our financial  position.  This risk is significant where our subsidiaries have concentrations of receivables from gas and electricity utilities and  their affiliates, as well as industrial customers and other purchasers, and may also arise where customers, including  consumers, are unable to pay us as a result of increasing commodity prices or adverse economic conditions  impacting affordability. |  | To the extent that counterparties are contracted with us for physical commodities (gas and electricity) and they  experience events that impact their own ability to deliver, we may suffer supply interruption.  There is also a risk to us where we invest excess cash or enter into derivatives and other financial contracts with  banks or other financial institutions. Banks that provide us with credit facilities may also fail to perform under those  contracts. |

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 231 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Internal control and risk factors cont. | | |  |  |  |

|  |  |  |
| --- | --- | --- |
|  |  |  |
| Investment projects | | |
| Our capital investment projects are subject to a number of risks and uncertainties, including availability of  supplies and personnel, cost and scheduling oversight, and regulatory requirements, approvals  and consents.  Our regulated utility businesses are highly capital intensive, and require significant ongoing investments in network  infrastructure including generation, transmission and distribution technologies and projects necessary to achieve  our own, and wider, environmental goals.  The successful completion of any such project depends on, or could be affected by, a variety of factors, including:  effective procurement strategies and supplier relationships; availability of qualified construction personnel, both  internal and contracted; changes in commodity and other prices, applicable tariffs, and/or availability of supplies,  materials and equipment needed for undertaking such projects and maintaining assets once in use; governmental  approvals and consents, permitting and planning; clarity in regulatory requirements and expectations, including  open engagement with regulators, and relevant stakeholders (including planning authorities and communities)  throughout the planning, approval, investment and operational stages; changes in environmental, legislative and  regulatory requirements; regulatory cost recovery; inflation, including of labour rates; increases in lead times; and  disruptions in supply chain distribution. |  | Delivery of ASTI projects awarded to National Grid in the UK will require an increase in the annual level of capital  investment over the next decade. Our capacity to meet our commitments under the ASTI framework depends on a  number of factors, including: the timely progression of awarded projects (including the planning stages and receipt  of relevant approvals and consents); avoidance of significant supply chain disruptions and the continued availability  of critical components; access to necessary labour and our ability to execute the relevant projects in line with  regulatory standards and expectations.  We are also undertaking significant capital investments in the US, including various renewable investment projects  and leak-prone pipe replacements, further electric sector modernisation plans in Massachusetts, the Propel NY  Energy Transmission Project in New York, and investments in furtherance of New York’s Climate Leadership and  Community Protection Act (CLCPA).  Adverse events associated with any of the factors set out above could materially impact our ability to achieve the  benefits of such projects, including our ability to comply with licensing and regulatory requirements and to further  our own, and the relevant governmental, net zero targets and commitments. |
| Pandemics and epidemics |  |  |
| We face risks related to health epidemics and other outbreaks.  As seen in the context of COVID-19, pandemics and their associated countermeasures may affect countries,  communities, supply chains and markets, including the UK and our service territory in the US. The spread of such  pandemics could have adverse effects on our workforce, which could affect our ability to maintain our networks  and provide service. In addition, disruption of supply chains could adversely affect our systems or networks.  Pandemics can also result in extraordinary economic circumstances in our markets which could negatively affect  our customers’ ability to pay their invoices in the US or the charges payable to the suppliers for transmission and  distribution services in the UK. Measures such as the suspension of debt collection and customer termination  activities across our service area in response to such pandemics are likely to result in near-term lower customer  collections, and could result in increasing levels of bad debt and associated provisions. |  | The extent to which pandemics may affect our liquidity, business, financial condition, results of operations and  reputation will depend on future developments, which are highly uncertain, and will depend on the severity of the  relevant pandemic, the scope, duration, cost to us and overall economic impact of actions taken to contain it or  treat its effects. |

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 232 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Internal control and risk factors cont. | | |  |  |  |

Financial risks

|  |  |  |
| --- | --- | --- |
|  |  |  |
| Financing and liquidity |  |  |
| An inability to access capital markets on commercially acceptable terms could affect how we maintain and  grow our businesses.  We have historically financed our growth through a combination of funding sources, including retained operating  cash flows, use of scrip dividend programme and issuances of senior and hybrid debt securities. As part of our  upgraded five-year financial framework, we anticipate making at least £70 billion of capital investments between  2025/26 and 2030/31, which we expect to finance through a package of funding sources that includes a  combination of these sources of liquidity, as well as the net proceeds of the 2024 Rights Issue of around £7 billion,  completed in June 2024. As further discussed below, reliance on these sources of liquidity can expose us to the  risk of higher financing costs and the imposition of restrictions on our business.  Some of the debt we issue is rated by credit rating agencies and changes to these ratings may affect both our  borrowing capacity and borrowing costs. In addition, restrictions imposed by regulators, such as limits on debt to  equity or regulatory asset values ratios, may also limit how we service the financial requirements of our current  businesses or the financing of newly acquired or developing businesses.  Financial markets can be subject to periods of volatility, including with respect to interest rates, and shortages  of liquidity, for example as a result of unexpected political or economic events (such as the current conflicts in  Ukraine and the Middle East). If we were unable to access the capital markets or other sources of finance on  commercially acceptable terms, our cost of financing may increase, and the manner in which we implement our  strategy may need to be reassessed. Such events could have a material adverse impact on our business, results of  operations and prospects.  Some of our regulatory agreements and/or specific regulatory entities impose lower limits for the credit ratings that  certain companies or securities issued by certain companies within the Group must hold or the amount of equity  within their capital structures, including a limit requiring certain entities within the Group or securities issued by them  to hold an investment-grade credit rating. |  | In addition, some of our regulatory arrangements impose restrictions on the way we can operate. These include  regulatory requirements for us to maintain adequate financial resources within certain parts of our operating  businesses and may restrict the ability of National Grid plc and some of our subsidiaries to engage in certain  transactions, including paying dividends, lending cash and levying charges.  The inability to meet such requirements, or the occurrence of any such restrictions, may have a material adverse  impact on our business and financial condition.  Our debt agreements and banking facilities contain covenants, including those relating to the periodic and timely  provision of financial information by the borrowing entity, restrictions on disposals and financial covenants, such as  restrictions on the level of subsidiary indebtedness and minimum credit rating requirements.  Failure to comply with these covenants, or to obtain waivers of those requirements, could in some cases trigger a  right, at the lender’s discretion, to require repayment of some of our debt and may restrict our ability to draw upon  our facilities or access the capital markets. |
| Exchange rates, interest rates and commodity price indices | | |
| Changes in foreign currency rates, interest rates or commodity prices could materially impact our earnings  or financial condition.  We have significant operations in the US and are therefore subject to the exchange rate risks normally associated  with non-UK operations, including the need to translate US assets and liabilities, and income and expenses, into  sterling (our reporting currency).  As part of our ongoing capital expenditure requirements and investment projects, as well as projects planned  under the ASTI programme, we are also exposed to currency fluctuations related to the purchase of equipment  and components in currencies other than sterling. |  | In addition, our results of operations and net debt position may be affected because a significant proportion of  our borrowings, derivative financial instruments and commodity contracts are affected by changes in interest  rates, commodity price indices and exchange rates, in particular the dollar-to-sterling exchange rate.  Furthermore, our cash flow may be materially affected as a result of settling hedging arrangements entered into to  manage our exchange rate, interest rate and commodity price exposure (such as those relating to the purchase of  electricity and gas in the US), or by cash collateral movements relating to derivative market values, which also  depend on the sterling or US dollar exchange rate into euro and other currencies. |
| Post-retirement benefits | | |
| We may be required to make significant contributions to fund pension and other post-retirement benefits.  We participate in a number of pension schemes that together cover substantially all our employees. In both the UK  and US, such schemes include various large defined benefit schemes where the scheme assets are held  independently of our own financial resources.  In the US, we also have other post-retirement benefit schemes. Estimates of the amount and timing of future  funding for the UK and US schemes are based on actuarial assumptions and other factors, including: the actual  and projected market performance of the scheme assets; future long-term bond yields; average life expectancies;  and relevant legal requirements. |  | Actual performance of scheme assets may be affected by volatility in debt and equity markets.  Changes in these assumptions or other factors may require us to make additional contributions to these pension  schemes which, to the extent they are not recoverable under our price controls or state rate plans, could materially  adversely affect the results of our operations and financial condition. |

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 233 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Other disclosures | | |  |  |  |

![]()

|  |  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |  |
|  |  |  |  |  |  |  |
|  | Index to Directors’ Report and other disclosures, as required under the Companies Act 2006 | | | | |  |
|  | AGM | [252](#i01de1c16a17046d497a42f2f76dda2a5_58435) |  | Events after the reporting period | [252](#i01de1c16a17046d497a42f2f76dda2a5_32903) |  |
|  | Articles of Association | [251](#i01de1c16a17046d497a42f2f76dda2a5_32905) |  | Financial instruments | [174](#i2193c7e7fbee4753bdbe2d16888565c8_265) – [175](#ib54d4e703c53461f9c0fefe0aeb0db83_8144) and  [217](#i2193c7e7fbee4753bdbe2d16888565c8_358) |  |
|  | Audit information | [129](#i2193c7e7fbee4753bdbe2d16888565c8_196) – [136](#i2201c2e79c914a7a8756bd17f3402ab2_5613) |  | Future developments | [12](#i2193c7e7fbee4753bdbe2d16888565c8_31) – [13](#i2193c7e7fbee4753bdbe2d16888565c8_34),  [18](#i2193c7e7fbee4753bdbe2d16888565c8_5161) – [22](#i832cdf411ee540298e53c648eaa4e669_1-1-1-2-942406) |  |
|  | Board of Directors | [91](#i2193c7e7fbee4753bdbe2d16888565c8_145) –  [93](#i4997ac40020447c895a078c99bce5833_0-0-1-1-921425) |  | Greenhouse gas emissions | [27](#i153c4aa816c546d29e1df5f53c4ccfbe_1-6-1-1-945231) |  |
|  | Business model | [12](#i2193c7e7fbee4753bdbe2d16888565c8_31) – [13](#i2193c7e7fbee4753bdbe2d16888565c8_34) |  | Human rights | [50](#if05dc6fa9b1c45cd9c0112e45388d907_107519) and [234](#i5f794891492441e7a855126a592fd5a7_17131) |  |
|  | Change of control provisions | [233](#i5f794891492441e7a855126a592fd5a7_17124) |  | Important events affecting the Company during the year | [14](#i2193c7e7fbee4753bdbe2d16888565c8_4723) – [15](#ibc34be43004d44f18e5a84d7aadf4206_0-1-1-1-945161) |  |
|  | Code of Ethics | [233](#i5f794891492441e7a855126a592fd5a7_17125) |  | Internal control | [30](#i2193c7e7fbee4753bdbe2d16888565c8_61) |  |
|  | Unions | [234](#i5f794891492441e7a855126a592fd5a7_62462) |  | Internal control over financial reporting | [226](#i2193c7e7fbee4753bdbe2d16888565c8_388) |  |
|  | Conflicts of interest | [233](#i5f794891492441e7a855126a592fd5a7_17132) |  | UK Listing Rule 6.6.1 R cross-reference table | [235](#i5f794891492441e7a855126a592fd5a7_17137) |  |
|  | Directors’ indemnity | [234](#i5f794891492441e7a855126a592fd5a7_62461) |  | Material interests in shares | [253](#i01de1c16a17046d497a42f2f76dda2a5_32898) |  |
|  | Directors’ service contracts and letters of appointment | [123](#ifb753f61964c48f58ba791324ef6fea3_226868) |  | Political donations and expenditure | [235](#i5f794891492441e7a855126a592fd5a7_17127) |  |
|  | Directors’ share interests | [119](#ifb753f61964c48f58ba791324ef6fea3_226863) |  | Research, development and innovation activity | [235](#i5f794891492441e7a855126a592fd5a7_17129) |  |
|  | Diversity | [99](#i8c2e0c88a0484d6aa4d679eb2139fafc_1-1-1-6-945058) |  | Risk management | [30](#i2193c7e7fbee4753bdbe2d16888565c8_61) – [37](#i5b716aa667c3427e93e3ed5359a2f216_69413) |  |
|  | Dividends | [250](#i01de1c16a17046d497a42f2f76dda2a5_58436) |  | Share capital | [188](#i2193c7e7fbee4753bdbe2d16888565c8_295) – [189](#i8e6b6cf2afa34a6a88793e8bfebafc0a_26856) |  |

#### Change of control provisions

No compensation would be paid for loss of office of Directors on a

change of control of the Company. As at 31 March 2026, the

Company had borrowing facilities of £6.2 billion available and loans of

£0.2 billion with a number of banks, which, on a change of control of

the Company following a takeover bid, may alter or terminate. All of

the Company’s share plans contain provisions relating to a change of

control. Outstanding awards and options would normally vest and

become exercisable on a change of control, subject to the

satisfaction of any performance conditions at that time. In the event

of a change of control of the Company, a number of governmental

and regulatory consents or approvals are likely to be required, arising

from laws or regulations of the UK or the US. Such consents or

approvals may also be required for acquisitions of equity securities

that do not amount to a change of control.

No other agreements that take effect, alter or terminate upon a

change of control of the Company following a takeover bid are

considered to be significant in terms of their potential impact on the

business as a whole.

#### Code of Ethics

The Board has adopted a Code of Ethics. The Group’s Code of

Ethics is available on our website [nationalgrid.com/about-us/our-](https://www.nationalgrid.com/about-us/our-vision-and-values)

[vision-and-values](https://www.nationalgrid.com/about-us/our-vision-and-values).

#### Conflicts of interest

In accordance with the Companies Act 2006, the Board has a policy

and procedure in place for the disclosure and authorisation

(if appropriate) of actual and potential conflicts of interest. The Board

continues to monitor and note possible conflicts of interest that each

Director may have, including a review on appointment. The Directors

are regularly reminded of their continuing obligations in relation to

conflicts, and are required to review and confirm their external

interests annually.

#### Corporate governance practices: differences from

#### NYSE listing standards

The Company is listed on the NYSE and is therefore required to

disclose differences in its corporate governance practices adopted as

a UK listed company, compared with those of a US company. The

corporate governance practices of the Company are primarily based

on the requirements of the Code but substantially conform to those

required of US companies listed on the NYSE.

The following is a summary of the significant ways in which the

Company’s corporate governance practices differ from those

followed by US companies under section 303A of the Corporate

Governance Standards of the NYSE.

The NYSE rules and the Code apply different tests for the

independence of Board members.

The NYSE rules require a separate nominating/corporate governance

committee composed entirely of independent directors. There is

no requirement for a separate corporate governance committee in

the UK. Under the Company’s corporate governance policies,

all Directors on the Board discuss and decide upon governance

issues, and the People & Remuneration Committee makes

recommendations to the Board with regard to certain responsibilities

of a corporate governance committee.

The NYSE rules require listed companies to adopt and disclose

corporate governance guidelines. While the Company reports

compliance with the Code in each Annual Report and Accounts, the

UK requirements do not require the Company to adopt and disclose

separate corporate governance guidelines.

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 234 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Other disclosures cont. | | |  |  |  |

The NYSE rules require a separate audit committee composed of at

least three independent members. While the Company’s Audit & Risk

Committee exceeds the NYSE’s minimum independent Non-

executive Director membership requirements, it should be noted that

the quorum for a meeting of the Audit & Risk Committee, of two

independent Non-executive Directors, is less than the minimum

membership requirements under the NYSE rules.

The NYSE rules require a compensation committee composed

entirely of independent directors, and prescribe criteria to evaluate

the independence of the committee’s members and its ability to

engage external compensation advisors. While the Code prescribes

different independence criteria, the Non-executive Directors on the

Company’s People & Remuneration Committee have each been

deemed independent by the Board under the NYSE rules. Although

the evaluation criteria for appointment of external advisors differ under

the Code, the People & Remuneration Committee is solely

responsible for the appointment, retention and termination of such

advisors.

#### Directors’ indemnity and Directors’ and Officers’

#### liability insurance

The Company has arranged, in accordance with the Companies Act

2006 and the Articles, qualifying third-party indemnities against

financial exposure that Directors may incur in the course of their

professional duties. Equivalent qualifying third-party indemnities were,

and remain, in force for the benefit of those Directors who stood

down from the Board in prior financial years for matters arising when

they were Directors of the Company. Alongside these indemnities,

the Company places Directors’ and Officers’ liability insurance cover

for each Director. To the extent appropriate and required, similar

indemnities have also been given to Directors of subsidiary and other

associated companies, who also benefit from Directors’ and Officers’

liability insurance cover.

#### Unions

We recognise and negotiate with recognised unions in both the US

and UK. It is our policy to maintain well-developed communications

and consultation programmes with the Unions that represent our

employees and there have been no material disruptions to our

operations from labour disputes during the past four years. National

Grid believes that it can conduct its relationships with trade unions

and employees in a satisfactory manner. Further details on the

Company’s colleagues can be found on page [47](#i70b5ee7f594547dc9723654471a95a7c_89103).

#### Human rights and modern slavery

As a responsible business, we take pride in treating all employees

and those working on our behalf fairly to ensure that they thrive in a

respectful, safe, and inclusive environment. Our commitment to

maintaining the highest standards of ethical conduct is reflected in

our robust policies and procedures.

Our Supplier Code of Conduct sets out our expectations for

respecting, protecting and promoting human rights. This aligns with

the UN Guiding Principles on Business and Human Rights, the ten

Principles of the United Nations Global Compact (UNGC), the

International Labour Organization (ILO) core labour standards, the

Ethical Trading Initiative (ETI) Base Code, the UK Modern Slavery Act

2015, the US Victims of Trafficking and Violence Protection Act 2000,

the US Department of State Guiding Principles to Combat Human

Trafficking, and the requirements of the Living Wage Foundation for

UK suppliers. Additionally, our Supplier Code of Conduct adheres to

US wage and hour laws, such as the Fair Labor Standards Act. This

code is reviewed, updated and communicated to our suppliers

annually to ensure continued collaboration and alignment with

evolving best practice.

We have a global Human Rights Policy setting our commitment to

respecting the rights of our workforce and those in our supply chains.

We also produce an annual Modern Slavery Statement that outlines

the actions we take to assess potential risks in our wider operations

and the steps taken to mitigate risks identified. This includes working

collaboratively in our sector with non-government organisations

including the Slave Free Alliance, Action Sustainability and the Supply

Chain Sustainability School, to build awareness and capability within

our supply chain. We publish our Statement on the UK Home Office

Modern Slavery Statement Registry and encourage our UK suppliers

to publish a modern slavery statement, regardless of whether they

have a legal obligation to do so.

We have engaged with Churches, Charities and Local Authorities

(CCLA) Investment Management Limited, which established ‘Find it,

Fix it, Prevent it’ as a collaborative investor engagement programme

with the aim of using investor leverage to help companies identify,

address and prevent modern slavery in their supply chains. In 2025,

CCLA published their third FTSE 100 benchmarking report, and we

have maintained an ‘Evolving Good Practices’ assessment.

As a signatory member of the UNGC, we participated in its Business

and Human Rights Accelerator programme to increase our

awareness of key considerations in this area, while also gaining

guidance on how an organisation can develop its strategy for

managing any actual or potential risks associated with modern

slavery.

#### Our people

Our employees are at the heart of what we do, which is why we

participated in the 2025 Workforce Disclosure Initiative (WDI).

National Grid has completed the WDI survey for the past eight years

and we continue to improve transparency and enhance our data

year-on-year, obtaining a scorecard of 88% overall for our 2025

submission, above the utilities sector average.

In the UK, we are committed to paying our employees, trainees, and

contractors working on our behalf at least the Real Living Wage, as

determined by the Living Wage Foundation. In the US, we ensure that

all our employees are paid above statutory minimums.

Our Global recruitment policy is designed to provide equal

opportunities, comply with local legislation, and guarantee that all

employees have the appropriate rights to work.

For contingent workers we use employment agency partners for

attracting temporary workers and uphold the same standards of

employment that we offer our direct employees. Contract managers

actively oversee these agencies, ensuring they meet our rigorous

employment requirements, including relevant screenings, paying the

Real Living Wage in the UK and state legal minimum wage in the US,

and adhering to the ‘employer pays’ principle, which is a commitment

by employers to cover all costs associated with the recruitment of

workers, rather than passing these costs on to the workers

themselves. This means that no employee should ever have to pay to

become a temporary or permanent worker within our organisation or

supply chain.

We have been actively involved in the Supply Chain Sustainability

School (SCSS) Labour working group and we were the first client

level signatory, alongside many of our main contractors of the People

Matter Charter. The People Matter Charter was created to help

organisations and their supply chain address potential human rights,

safety and inclusion challenges in one workforce strategy. The

Charter has eight commitments that can apply to any organisation, of

any size. This flexibility provides us with a holistic approach to

addressing potential labour issues in the industry. We promote the

Charter with our supply chain to provide them with a framework that

can support their due diligence in their own value chain.

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 235 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Other disclosures cont. | | |  |  |  |

#### Unresolved SEC staff comments

There are no unresolved SEC staff comments required to be

reported.

#### Property, plant, equipment and borrowings

This information can be found in note 13 to the financial statements

(Property, plant and equipment) on page [168](#i2193c7e7fbee4753bdbe2d16888565c8_253), and note 21

(Borrowings) on page [177](#i2193c7e7fbee4753bdbe2d16888565c8_277). The Group does not have any

encumbrances on material operational assets. At present,

environmental issues are not preventing our UK and US businesses

from utilising any material operating assets in the course of their

operations. It is inherent in our business that assets may be affected

by environmental issues, see risk factors included on page [229](#i5653694f11c84ef3b1eca0e39a8a9bdb_3-0-1-1-952686) on

potentially harmful activities.

UK principal offices

In the UK, our core regulated businesses focus on electricity

transmission and distribution.

– Owned office space: Bristol, Cardiff, Castle Donnington, Plymouth

and Warwick.

– Leased office space: London.

US principal offices

In North America, our core regulated businesses focus on

transmission, distribution and retail of gas and electricity.

– Owned office space: Syracuse, Buffalo, Albany, Hicksville and

Melville in New York. Northborough in Massachusetts.

– Leased office space: Waltham and Boston in Massachusetts.

Brooklyn in New York.

UK

#### Listing Rule 6.6.1 R cross-reference table

Information required to be disclosed by UK LR 6.6.1 R (starting on

page indicated):

|  |  |
| --- | --- |
|  |  |
| Interest capitalised | Page [158](#i2193c7e7fbee4753bdbe2d16888565c8_232) |
| Publication of unaudited financial information | Page [236](#i2193c7e7fbee4753bdbe2d16888565c8_400) |
| Details of long-term incentive schemes | Page [110](#i2193c7e7fbee4753bdbe2d16888565c8_6379) |
| Waiver of emoluments by a Director | Not applicable |
| Waiver of future emoluments by a Director | Not applicable |
| Non-pre-emptive issues of equity for cash | Not applicable |
| Item (7) in relation to major subsidiary undertakings | None |
| Parent participation in a placing by a listed  subsidiary | Not applicable |

|  |  |
| --- | --- |
|  |  |
| Contracts of significance | Page [235](#i5f794891492441e7a855126a592fd5a7_17128) |
| Provision of services by a controlling shareholder | Not applicable |
| Shareholder waivers of dividends | Page [253](#i01de1c16a17046d497a42f2f76dda2a5_58437) |
| Shareholder waivers of future dividends | Page [253](#i01de1c16a17046d497a42f2f76dda2a5_58437) |
| Agreements with controlling shareholders | Not applicable |

#### Political donations and expenditure

At this year’s AGM, the Directors will again seek authority from

shareholders, on a precautionary basis, for the Company and its

subsidiaries to make donations to registered political parties and

other political organisations and/or incur political expenditure as such

terms are defined in the Companies Act 2006. In each case,

donations will be in amounts not exceeding £125,000 in aggregate.

The definitions of these terms in the Companies Act 2006 are very

wide. As a result, this can cover bodies such as those concerned

with policy review, law reform and the representation of the business

community (for example, trade organisations). It could include special

interest groups, such as those with environment interests, which the

Company and its subsidiaries might wish to support, even though

these activities are not designed to support or influence support for a

particular party. The Companies Act 2006 states that all-party

parliamentary groups are not political organisations for these

purposes, meaning the authority to be sought from shareholders is

not relevant to interactions with such groups. The Company has no

intention of changing its current practice of not making political

donations or incurring political expenditure within the ordinary

meaning of those words. This authority is, therefore, being sought to

ensure that none of the Company’s activities inadvertently infringe

these rules. National Grid made no political donations and did not

incur any political expenditure during the year, as such terms are

defined for the purposes of the Companies Act 2006 and the Political

Parties, Elections and Referendums Act 2000. However, in

accordance with applicable law, National Grid operates voluntary

Federal and New York State employee Political Action Committees

(PACs) that raise funds from certain eligible employees and contribute

them to support political candidates in the United States, as set out in

our Global Corporate Policy on Political Contributions. National Grid

US’s affiliated New York and federal PACs made political

contributions in the US totalling $60,800 during the year.

National Grid US’s affiliated New York PAC (NYPAC) and National

Grid US’s affiliated federal PAC were funded wholly by voluntary

employee contributions. Neither PAC received any corporate

contributions during the past fiscal year.

#### Material contracts

Each of our Executive Directors has a service agreement and each

Non-executive Director has a letter of appointment. Apart from these,

no contract (other than contracts entered into in the ordinary course

of business) has been entered into by the Group within the two years

immediately preceding the date of this report that is, or may be,

material; or which contains any provision under which any member of

the Group has any obligation or entitlement which is material to the

Group at the date of this report.

#### Research, development and innovation activity

Indications of our activities in the field of research and development

and innovation are provided throughout the Strategic Report and the

Directors’ report, including:

– In our business unit sections on pages [18](#i2193c7e7fbee4753bdbe2d16888565c8_5161) – [22](#i832cdf411ee540298e53c648eaa4e669_1-1-1-2-942406).

– Within UK ET, we are working towards delivering up to £31 billion

in our RIIO-T3 investment plan, acting as an engine for growth and

powering the country through the shift to a cleaner economy.

– In UK ED, we added an additional 250MVA of capacity to our

distribution network and are on track to deliver an increase in

capital investment of over £100 million.

– In US NY, we delivered approximately $4.6 billion in capital

investment, up $440 million year over year, and remain on track

against our $23 billion five-year capital framework. Under the

approved KEDNY and KEDLI rate plans, we replaced over 220

miles of leak prone pipe to modernise gas infrastructure.

– In US NE, we invested $2.7 billion in 2025/26, $500 million more

than last year, to deliver a smarter, stronger, cleaner electric grid

and to ensure the safety and reliability of our gas system. One of

the ways we improved reliability was by incorporating AI tools,

such as AiDASH which uses satellite imagery and AI to predict and

remove vegetation threats, reducing outages by nearly 30%.

– This year, NGV US announced the world’s first 100% hydrogen-

fuelled commercial linear generator at Northport power plant to

demonstrate the capability of H2 generation with a small-scale pilot

project.

Further examples of our innovation activity can be found in

performance against our strategic priorities on pages [16](#i2193c7e7fbee4753bdbe2d16888565c8_4819) and [17](#i947bc4a754fc4373b34aecf29c0e8234_1-2-1-1-943198).

Investment in research and development during the year for the Group

was £38 million (2024/25: £43 million). We only disclose directly

incurred expenditure, and not those amounts our partners contribute to

joint or collaborative projects. Collaborating across the industry

has played a crucial role in our ability to develop new programmes and

deliver value to our stakeholders throughout 2025/26.

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 236 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Other unaudited financial information | | |  |  |  |

#### Alternative performance measures/non-IFRS reconciliations

Within the Annual Report, a number of financial measures are presented. These measures have been

categorised as alternative performance measures (APMs), as per the European Securities and Markets

Authority (ESMA) guidelines and the Securities and Exchange Commission (SEC) conditions for use of

non-GAAP financial measures.

An APM is a financial measure of historical or future financial performance, financial position, or cash

flows, other than a financial measure defined under IFRS. The Group uses a range of these measures

to provide a better understanding of its underlying performance. APMs are reconciled to the most

directly comparable IFRS financial measure where practicable.

The Group has defined the following financial measures as APMs derived from IFRS: net revenue, the

various adjusted operating profit, earnings and earnings per share metrics detailed in the ‘adjusted profit

measures’ section below, net debt, funds from operations (FFO), FFO interest cover and retained cash

flow (RCF)/adjusted net debt. For each of these we present a reconciliation to the most directly comparable

IFRS measure. We present ‘constant currency’ comparative period performance and capital investment

by applying the current year average exchange rate to the relevant US dollar amounts in the comparative

periods presented, to remove the year-on-year impact of foreign exchange translation.

We also have a number of APMs derived from regulatory measures which have no basis under IFRS;

we call these Regulatory Performance Measures (RPMs). They comprise: Group RoE, operating company

RoE, regulated asset base, regulated financial performance, regulatory gearing, asset growth and

regulated asset growth. These measures include the inputs used by utility regulators to set the allowed

revenues for many of our businesses.

We use RPMs to monitor progress against our regulatory agreements and certain aspects of our strategic

objectives. Further, targets for certain of these performance measures are included in the Company’s

APP and LTPP and contribute to how we reward our employees. As such, we believe that they provide

close correlation to the economic value we generate for our shareholders and are therefore important

supplemental measures for our shareholders to understand the performance of the business and to

ensure a complete understanding of Group performance.

As the starting point for our RPMs is not IFRS, and these measures are not governed by IFRS, we are

unable to provide meaningful reconciliations to any directly comparable IFRS measures, as differences

between IFRS and the regulatory recognition rules applied have built up over many years. Instead, for

each of these we present an explanation of how the measure has been determined and why it is

important, and an overview as to why it would not be meaningful to provide a reconciliation to IFRS.

#### Alternative performance measures

Net revenue and underlying net revenue

‘Net revenue’ is revenue less pass-through costs, such as UK system balancing costs and gas and

electricity commodity costs in the US. Pass-through costs are fully recoverable from our customers and

are recovered through charges that are designed to recover those costs with no profit. Where revenue

received or receivable exceeds the maximum amount permitted by our regulatory agreement, adjustments

will be made to future prices to reflect this over-recovery. No liability is recognised, as such an adjustment

to future prices relates to the provision of future services. Similarly, no asset is recognised where a

regulatory agreement permits adjustments to be made to future prices in respect of an under-recovery.

‘Underlying net revenue’ further adjusts net revenue to remove the impact of ‘timing’, i.e. the in‑year

difference between allowed and collected revenues, including revenue incentives, as governed by our

rate plans in the US or regulatory price controls in the UK (but excluding totex-related allowances in

NGET and certain other adjustments).

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| Year ended 31 March 2026 | Gross  revenue  £m | Pass-  through  costs  £m | Net  revenue  £m | Timing  £m | Underlying  net revenue  £m |
| UK Electricity Transmission | 2,898 | (391) | 2,507 | 77 | 2,584 |
| UK Electricity Distribution | 1,937 | (184) | 1,753 | 116 | 1,869 |
| New England | 4,174 | (1,451) | 2,723 | (94) | 2,629 |
| New York | 7,618 | (3,113) | 4,505 | 537 | 5,042 |
| National Grid Ventures | 1,098 | — | 1,098 | — | 1,098 |
| Other | 97 | — | 97 | — | 97 |
| Sales between segments | (135) | — | (135) | — | (135) |
| Total | 17,687 | (5,139) | 12,548 | 636 | 13,184 |

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| Year ended 31 March 2025 | Gross  revenue  £m | Pass-  through  costs  £m | Net  revenue  £m | Timing  £m | Underlying  net revenue  £m |
| UK Electricity Transmission | 2,619 | (455) | 2,164 | 151 | 2,315 |
| UK Electricity Distribution | 2,424 | (185) | 2,239 | (407) | 1,832 |
| UK Electricity System Operator | 1,029 | (1,217) | (188) | 479 | 291 |
| New England | 4,306 | (1,658) | 2,648 | (61) | 2,587 |
| New York | 6,689 | (2,487) | 4,202 | 343 | 4,545 |
| National Grid Ventures | 1,397 | — | 1,397 | — | 1,397 |
| Other | 122 | — | 122 | — | 122 |
| Sales between segments | (208) | — | (208) | — | (208) |
| Total | 18,378 | (6,002) | 12,376 | 505 | 12,881 |

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 237 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Other unaudited financial information cont. | | |  |  |  |

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| Year ended 31 March 2024 | Gross  revenue  £m | Pass-  through  costs  £m | Net  revenue  £m | Timing  £m | Underlying  net revenue  £m |
| UK Electricity Transmission | 2,735 | (225) | 2,510 | (363) | 2,147 |
| UK Electricity Distribution | 1,795 | (233) | 1,562 | 159 | 1,721 |
| UK Electricity System Operator | 3,788 | (2,605) | 1,183 | (800) | 383 |
| New England | 3,948 | (1,653) | 2,295 | 69 | 2,364 |
| New York | 6,094 | (2,057) | 4,037 | 20 | 4,057 |
| National Grid Ventures | 1,389 | — | 1,389 | — | 1,389 |
| Other | 244 | — | 244 | — | 244 |
| Sales between segments | (143) | — | (143) | — | (143) |
| Total | 19,850 | (6,773) | 13,077 | (915) | 12,162 |

Adjusted profit measures

In considering the financial performance of our business and segments, we use various adjusted profit

measures in order to aid comparability of results year-on-year. The various measures are presented on

pages  [69](#i2193c7e7fbee4753bdbe2d16888565c8_127) – [80](#ib9ca2c5b72fb4936a9d458c7bb253318_286629) and reconciled below.

Adjusted results – these exclude the impact of exceptional items and remeasurements that are treated

as discrete transactions under IFRS and can accordingly be classified as such. This is a measure used

by management that is used to derive part of the incentive target set annually for remunerating certain

Executive Directors, and further details of these items are included in note 5 to the financial statements.

Underlying results  – further adapts our adjusted results for continuing operations to take account of

volumetric and other revenue timing differences arising due to the in-year difference between allowed and

collected revenues, including revenue incentives, as governed by our rate plans in the US or regulatory

price controls in the UK (but excluding certain totex-related allowances in NGET and adjustments or

allowances for pension deficit contributions). For 2025/26, as highlighted below, our underlying results

exclude £636 million (2024/25: £505 million) of timing differences, but did include $52 million (£39 million)

of major storm costs (net of in-year allowances and deductibles) as in the current year these did not exceed

our $100 million threshold to be excluded from underlying results. In 2024/25, we incurred $110 million

(£87 million) of major storm costs (net of in‑year allowances) which were excluded from our underlying

results. We expect to recover major storm costs incurred through regulatory mechanisms in the US.

Underlying results also exclude deferred tax in our UK regulated businesses (NGET and NGED). Our UK

regulated revenues contain an allowance for current tax, but not for deferred tax, so excluding the IFRS

deferred tax charge aligns our underlying results APM more closely with our regulatory performance measures.

Constant currency – the adjusted profit measures are also shown on a constant currency basis to show

the year-on-year comparisons excluding any impact of foreign currency translation movements.

Reconciliation of statutory, adjusted and underlying profits from continuing operations

at actual exchange rates

|  |  |  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |  |  |
| Year ended 31 March 2026 | Statutory  £m | Exceptionals and  remeasurements  £m | Adjusted  £m | Timing  £m | Major  storm  costs  £m | Deferred tax  on underlying  profits in  NGET and  NGED  £m | Underlying  £m |
|  | | | | | | | |
| UK Electricity Transmission | 1,605 | — | 1,605 | 77 | — | — | 1,682 |
| UK Electricity Distribution | 1,122 | — | 1,122 | 116 | — | — | 1,238 |
| New England | 947 | 13 | 960 | (94) | — | — | 866 |
| New York | 1,184 | (12) | 1,172 | 537 | — | — | 1,709 |
| National Grid Ventures | 715 | (388) | 327 | — | — | — | 327 |
| Other | (142) | — | (142) | — | — | — | (142) |
| Total operating profit | 5,431 | (387) | 5,044 | 636 | — | — | 5,680 |
| Net finance costs | (1,325) | 54 | (1,271) | — | — | — | (1,271) |
| Share of post-tax results of  joint ventures and associates | 76 | — | 76 | — | — | — | 76 |
| Profit before tax | 4,182 | (333) | 3,849 | 636 | — | — | 4,485 |
| Tax | (939) | (16) | (955) | (168) | — | 499 | (624) |
| Profit after tax | 3,243 | (349) | 2,894 | 468 | — | 499 | 3,861 |

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 238 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Other unaudited financial information cont. | | |  |  |  |

|  |  |  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |  |  |
| Year ended 31 March 2025 | Statutory  £m | Exceptionals  and  remeasurements  £m | Adjusted  £m | Timing  £m | Major  storm  costs  £m | Deferred tax  on underlying  profits in  NGET and  NGED  £m | Underlying  £m |
|  | | | | | | | |
| UK Electricity Transmission | 1,277 | — | 1,277 | 151 | — | — | 1,428 |
| UK Electricity Distribution | 1,598 | 12 | 1,610 | (407) | — | — | 1,203 |
| UK Electricity System  Operator | (213) | (151) | (364) | 479 | — | — | 115 |
| New England | 1,008 | (26) | 982 | (61) | 3 | — | 924 |
| New York | 1,269 | (246) | 1,023 | 343 | 84 | — | 1,450 |
| National Grid Ventures | 5 | 375 | 380 | — | — | — | 380 |
| Other | (10) | (133) | (143) | — | — | — | (143) |
| Total operating profit | 4,934 | (169) | 4,765 | 505 | 87 | — | 5,357 |
| Net finance costs | (1,357) | (4) | (1,361) | — | — | — | (1,361) |
| Share of post-tax results of  joint ventures and associates | 73 | 2 | 75 | — | — | — | 75 |
| Profit before tax | 3,650 | (171) | 3,479 | 505 | 87 | — | 4,071 |
| Tax | (821) | (40) | (861) | (133) | (23) | 401 | (616) |
| Profit after tax | 2,829 | (211) | 2,618 | 372 | 64 | 401 | 3,455 |

|  |  |  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |  |  |
| Year ended 31 March 2024 | Statutory  £m | Exceptionals  and  remeasurements  £m | Adjusted  £m | Timing  £m | Major  storm  costs  £m | Deferred tax  on underlying  profits in  NGET and  NGED  £m | Underlying  £m |
|  | | | | | | | |
| UK Electricity Transmission | 1,674 | 3 | 1,677 | (363) | — | — | 1,314 |
| UK Electricity Distribution | 975 | 18 | 993 | 159 | — | — | 1,152 |
| UK Electricity System  Operator | 382 | 498 | 880 | (800) | — | — | 80 |
| New England | 641 | 2 | 643 | 69 | 90 | — | 802 |
| New York | 362 | 498 | 860 | 20 | 136 | — | 1,016 |
| National Grid Ventures | 558 | (89) | 469 | — | — | — | 469 |
| Other | (117) | 57 | (60) | — | — | — | (60) |
| Total operating profit | 4,475 | 987 | 5,462 | (915) | 226 | — | 4,773 |
| Net finance costs | (1,464) | (15) | (1,479) | — | — | — | (1,479) |
| Share of post-tax results of  joint ventures and associates | 37 | 64 | 101 | — | — | — | 101 |
| Profit before tax | 3,048 | 1,036 | 4,084 | (915) | 226 | — | 3,395 |
| Tax | (831) | (152) | (983) | 227 | (61) | 302 | (515) |
| Profit after tax | 2,217 | 884 | 3,101 | (688) | 165 | 302 | 2,880 |

Reconciliation of adjusted and underlying earnings from continuing operations

at constant currency

|  |  |  |  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |  |  |  |
|  |  |  | At constant currency | | | | | |
| Adjusted  at actual  exchange  rate  £m |  | Constant  currency  adjustment  £m | Adjusted  £m | Timing  £m | Major  storm  costs  £m | Deferred tax  on underlying  profits in  NGET and  NGED  £m | Underlying  £m |
| Year ended 31 March 2025 |  |
| UK Electricity Transmission | 1,277 |  | — | 1,277 | 151 | — | — | 1,428 |
| UK Electricity Distribution | 1,610 |  | — | 1,610 | (407) | — | — | 1,203 |
| UK Electricity System Operator | (364) |  | — | (364) | 479 | — | — | 115 |
| New England | 982 |  | (57) | 925 | (57) | 3 | — | 871 |
| New York | 1,023 |  | (58) | 965 | 323 | 79 | — | 1,367 |
| National Grid Ventures | 380 |  | — | 380 | — | — | — | 380 |
| Other | (143) |  | — | (143) | — | — | — | (143) |
| Total operating profit | 4,765 |  | (115) | 4,650 | 489 | 82 | — | 5,221 |
| Net finance costs | (1,361) |  | 53 | (1,308) | — | — | — | (1,308) |
| Share of post-tax results of  joint ventures and associates | 75 |  | (2) | 73 | — | — | — | 73 |
| Profit before tax | 3,479 |  | (64) | 3,415 | 489 | 82 | — | 3,986 |
| Tax | (861) |  | 15 | (846) | (130) | (20) | 401 | (595) |
| Profit after tax | 2,618 |  | (49) | 2,569 | 359 | 62 | 401 | 3,391 |
| Attributable to non-controlling  interests | (3) |  | — | (3) | — | — | — | (3) |
| Earnings | 2,615 |  | (49) | 2,566 | 359 | 62 | 401 | 3,388 |
| Earnings per share (pence) | 55.6 |  | (1.1) | 54.5 | 7.7 | 1.3 | 8.5 | 72.0 |

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 239 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Other unaudited financial information cont. | | |  |  |  |

|  |  |  |  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |  |  |  |
|  |  |  | At constant currency | | | | | |
| Adjusted  at actual  exchange  rate  £m |  | Constant  currency  adjustment  £m | Adjusted  £m | Timing  £m | Major  storm  costs  £m | Deferred tax  on underlying  profits in  NGET and  NGED  £m | Underlying  £m |
| Year ended 31 March 2024 |  |
| UK Electricity Transmission | 1,677 |  | — | 1,677 | (363) | — | — | 1,314 |
| UK Electricity Distribution | 993 |  | — | 993 | 159 | — | — | 1,152 |
| UK Electricity System Operator | 880 |  | — | 880 | (800) | — | — | 80 |
| New England | 643 |  | (38) | 605 | 65 | 84 | — | 754 |
| New York | 860 |  | (52) | 808 | 19 | 128 | — | 955 |
| National Grid Ventures | 469 |  | (1) | 468 | — | — | — | 468 |
| Other | (60) |  | (1) | (61) | — | — | — | (61) |
| Total operating profit | 5,462 |  | (92) | 5,370 | (920) | 212 | — | 4,662 |
| Net finance costs | (1,479) |  | 52 | (1,427) | — | — | — | (1,427) |
| Share of post-tax results of joint  ventures and associates | 101 |  | (2) | 99 | — | — | — | 99 |
| Profit before tax | 4,084 |  | (42) | 4,042 | (920) | 212 | — | 3,334 |
| Tax | (983) |  | 10 | (973) | 227 | (56) | 302 | (500) |
| Profit after tax | 3,101 |  | (32) | 3,069 | (693) | 156 | 302 | 2,834 |
| Attributable to non-controlling  interests | (1) |  | — | (1) | — | — | — | (1) |
| Earnings | 3,100 |  | (32) | 3,068 | (693) | 156 | 302 | 2,833 |
| Earnings per share (pence) | 77.7 |  | (0.8) | 76.9 | (17.4) | 3.9 | 7.6 | 71.0 |

Earnings per share calculations from continuing operations

The table below reconciles the profit after tax from continuing operations as per the previous tables back

to the earnings per share from continuing operations for each of the adjusted profit measures.

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
|  | Profit  after tax  £m | Non-  controlling  interest  £m | Profit after tax  attributable to  shareholders  £m | Weighted  average  number of  shares  millions | Earnings  per share  pence |
| Year ended 31 March 2026 |
| Statutory | 3,243 | (2) | 3,241 | 4,946 | 65.5 |
| Adjusted | 2,894 | (2) | 2,892 | 4,946 | 58.5 |
| Underlying | 3,861 | (2) | 3,859 | 4,946 | 78.0 |

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
|  | Profit  after tax  £m | Non-  controlling  interest  £m | Profit after tax  attributable to  shareholders  £m | Weighted  average  number of  shares  millions | Earnings  per share  pence |
| Year ended 31 March 2025 |
| Statutory | 2,829 | (3) | 2,826 | 4,707 | 60.0 |
| Adjusted | 2,618 | (3) | 2,615 | 4,707 | 55.6 |
| Underlying | 3,455 | (3) | 3,452 | 4,707 | 73.3 |
| Underlying at constant currency | 3,391 | (3) | 3,388 | 4,707 | 72.0 |

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
|  | Profit  after tax  £m | Non-  controlling  interest  £m | Profit after tax  attributable to  shareholders  £m | Weighted  average  number of  shares  millions | Earnings  per share  pence |
| Year ended 31 March 2024 |
| Statutory | 2,217 | (1) | 2,216 | 3,991 | 55.5 |
| Adjusted | 3,101 | (1) | 3,100 | 3,991 | 77.7 |
| Underlying | 2,880 | (1) | 2,879 | 3,991 | 72.1 |
| Underlying at constant currency | 2,834 | (1) | 2,833 | 3,991 | 71.0 |

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 240 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Other unaudited financial information cont. | | |  |  |  |

Timing and regulated revenue adjustments

As described on pages [220](#i2193c7e7fbee4753bdbe2d16888565c8_385) – [225](#i1db516796de743568156f5fd89cfea10_118416), our allowed revenues are set in accordance with our regulatory price controls or rate plans. We calculate the prices we charge our customers based on the estimated volume

of energy we expect will be delivered during the coming period. The actual volumes delivered will differ from the estimate. Therefore, our total actual revenue will be different from our total allowed revenue. These

differences are commonly referred to as timing differences. If we collect more than the allowed revenue, adjustments will be made to future prices to reflect this over‑recovery, and if we collect less than the allowed

level of revenue, adjustments will be made to future prices to reflect the under-recovery. In the US, a substantial portion of our costs are pass-through costs (including commodity and energy-efficiency costs) and

are fully recoverable from our customers. Timing differences between costs of this type being incurred and their recovery through revenue are also included in timing. The amounts calculated as timing differences

are estimates and subject to change until the variables that determine allowed revenue are final. Timing differences tend to be short-term in nature (typically less than two years) and are applicable where existing

regulatory recovery mechanisms are already in place, hence dependent on an operating company’s current rate plan or price control. Future revenue adjustments linked to mechanisms in rate plans that have not

yet been agreed are not normally considered to be timing.

New England and New York in-year over/(under)-recovery and all New England and New York balances have been translated using the average exchange rate of $1.34 for the year ended 31 March 2026.

|  |  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |  |
|  | UK Electricity  Transmission  £m | UK Electricity  Distribution  £m | UK Electricity  System Operator  £m | New England  £m | New York  £m | Total  £m |
| 1 April 2025 opening balance1 | 9 | 118 | — | (368) | 301 | 60 |
| (Under)/over-recovery | (77) | (116) | — | 94 | (537) | (636) |
| 31 March 2026 closing balance to (recover)/return2 | (68) | 2 | — | (274) | (236) | (576) |

|  |  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |  |
|  | UK Electricity  Transmission  £m | UK Electricity  Distribution  £m | UK Electricity  System Operator  £m | New England  £m | New York  £m | Total  £m |
| 1 April 2024 opening balance1 | 160 | (282) | 941 | (425) | 624 | 1,018 |
| (Under)/over-recovery | (151) | 407 | (479) | 57 | (323) | (489) |
| Disposal | — | — | (462) | — | — | (462) |
| 31 March 2025 closing balance to return/(recover)2 | 9 | 125 | — | (368) | 301 | 67 |

|  |  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |  |
|  | UK Electricity  Transmission  £m | UK Electricity  Distribution  £m | UK Electricity  System Operator  £m | New England  £m | New York  £m | Total  £m |
| 1 April 2023 opening balance1 | (213) | (124) | 77 | (360) | 643 | 23 |
| (Under)/over-recovery | 363 | (159) | 800 | (65) | (19) | 920 |
| 31 March 2024 closing balance to return/(recover)2 | 150 | (283) | 877 | (425) | 624 | 943 |

1. Opening balances have been restated to reflect the finalisation of calculated over/(under)-recoveries in both the UK and the US and also adjusted for the regulatory time value of money impact on opening balances, where appropriate, in the UK.

2. The closing balance at 31 March 2026 was £584 million under-recovered (translated at the closing rate of $1.32:£1). 31 March 2025 was £65 million over-recovered (translated at the closing rate of $1.29:£1). 31 March 2024 was £954 million over-recovered (including discontinued

operations and translated at the closing rate of $1.26:£1).

In addition to the (short-term) timing adjustments described above, other regulated revenue adjustments also exist. For example, as part of the RIIO price controls in the UK, outperformance against allowances as

a result of the totex incentive mechanism, together with changes in output-related allowances included in the original price control, will almost always be adjusted in future revenue recoveries, typically starting in two

years’ time. We also receive revenues in relation to certain costs incurred or expected to be incurred (for example pension deficit contributions), with differences between revenues received and cost incurred adjusted

in future revenue recoveries, e.g. after a triennial actuarial pension funding valuation has been concluded. Our current IFRS revenues and earnings include these amounts that relate to certain costs incurred in prior

years or that will need to be repaid or recovered in future periods. Such adjustments will form an important part of the continuing difference between reported IFRS results and underlying economic performance

based on our regulatory obligations. In the US, accumulated regulatory entitlements cover a range of different areas, with the most significant being environmental remediation and pension assets, as well as deferred

storm costs. All regulatory entitlements are recoverable (or repayable) over different periods, which are agreed with the regulators to match the expected payment profile for the liabilities.

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 241 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Other unaudited financial information cont. | | |  |  |  |

Capital investment at constant currency

Capital investment measures are presented at actual exchange rates, but are also shown on a constant

currency basis to show the year-on-year comparisons excluding any impact of foreign currency translation

movements.

|  |  |  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |  |  |
| Year ended 31 March | At actual exchange rates | | |  | At constant currency | | |
| 2026 | 2025 | change |  | 2026 | 2025 | change |
| £m | £m |  | £m | £m |
| UK Electricity  Transmission | 4,372 | 2,999 | 46% |  | 4,372 | 2,999 | 46% |
| UK Electricity Distribution | 1,617 | 1,426 | 13% |  | 1,617 | 1,426 | 13% |
| New England | 2,043 | 1,751 | 17% |  | 2,043 | 1,650 | 24% |
| New York | 3,428 | 3,289 | 4% |  | 3,428 | 3,101 | 11% |
| Capital investment  (regulated networks) | 11,460 | 9,465 | 21% |  | 11,460 | 9,176 | 25% |
| National Grid Ventures | 109 | 378 | (71%) |  | 109 | 362 | (70%) |
| Other | 7 | 4 | 75% |  | 7 | 4 | 75% |
| Group capital  investment – total | 11,576 | 9,847 | 18% |  | 11,576 | 9,542 | 21% |

Capital expenditure

Capital expenditure (for the purposes of measuring green capex aligned to the EU Taxonomy) comprises

additions to property, plant and equipment and intangible assets, but excludes capital prepayments

and equity contributions to joint ventures and associates during the period.

|  |  |  |
| --- | --- | --- |
|  |  |  |
|  | 2026 | 2025 |
|  | £m | £m |
| Asset type: |  |  |
| Property, plant and equipment | 9,924 | 8,894 |
| Non-current intangible assets | 693 | 478 |
| Transfers from prepayments | 501 | 87 |
| Group capital expenditure | 11,118 | 9,459 |
| Equity investments in joint ventures and associates | 27 | 116 |
| Capital expenditure prepayments | 932 | 359 |
| Transfers to capital expenditure additions | (501) | (87) |
| Group capital investment | 11,576 | 9,847 |

Net debt

See note 29 of the financial statements on page [190](#i2193c7e7fbee4753bdbe2d16888565c8_304) for the definition and reconciliation of net debt.

Funds from operations and interest cover

FFO are the cash flows generated by the operations of the Group. Credit rating metrics, including FFO,

are used as indicators of balance sheet strength.

|  |  |  |  |
| --- | --- | --- | --- |
|  |  |  |  |
|  | 2026 | 2025¹ | 2024¹ |
| Year ended 31 March | £m | £m | £m |
| Interest expense (income statement) | 1,649 | 1,810 | 1,723 |
| Hybrid interest reclassified as dividend | (13) | (37) | (38) |
| Capitalised interest | 424 | 294 | 251 |
| Pensions interest adjustment | 12 | 13 | 9 |
| Unwinding of discount on provisions | (123) | (130) | (102) |
| Pension interest | — | — | 94 |
| Adjusted interest expense | 1,949 | 1,950 | 1,937 |
| Net cash inflow from operating activities | 7,829 | 6,808 | 6,939 |
| Interest received on financial instruments | 231 | 332 | 148 |
| Interest paid on financial instruments | (1,932) | (1,920) | (1,627) |
| Dividends received | 105 | 126 | 176 |
| Working capital adjustment | (632) | (104) | 49 |
| Excess employer pension contributions | 16 | 26 | 27 |
| Hybrid interest reclassified as dividend | 13 | 37 | 38 |
| Add back accretions | 168 | 152 | 208 |
| Difference in net interest expense in income statement  to cash flow | 14 | (45) | (253) |
| Difference in current tax in income statement to cash flow | 186 | 145 | (24) |
| Current tax related to prior periods | (172) | — | — |
| Funds from operations (FFO) | 5,826 | 5,557 | 5,681 |
| FFO interest cover ((FFO + adjusted interest expense)/  adjusted interest expense) | 4.0x | 3.8x | 3.9x |

1. Numbers for 2025 and 2024 reflect the calculations for the total Group as based on the published accounts for the respective years.

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 242 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Other unaudited financial information cont. | | |  |  |  |

Funds from operations/adjusted net debt and retained cash flow/adjusted net debt

FFO/adjusted net debt and RCF/adjusted net debt are credit metrics that we monitor in order to

ensure the Group is generating sufficient cash to service its debts, consistent with maintaining a strong

investment-grade credit rating.

|  |  |  |  |
| --- | --- | --- | --- |
|  |  |  |  |
|  | 2026 | 2025 1 | 2024 1 |
| Year ended 31 March | £m | £m | £m |
| Funds from operations (FFO) | 5,826 | 5,557 | 5,681 |
| Hybrid interest reclassified as dividend | (13) | (37) | (38) |
| Ordinary dividends paid to shareholders | (1,623) | (1,529) | (1,718) |
| RCF | 4,190 | 3,991 | 3,925 |
| Borrowings | 46,755 | 47,539 | 47,072 |
| Less: |  |  |  |
| 50% hybrid debt | (328) | (814) | (1,034) |
| Cash and cash equivalents | (375) | (1,178) | (578) |
| Financial and other investments | (1,370) | (5,156) | (3,084) |
| Underfunded pension obligations | 237 | 247 | 266 |
| Borrowings in held for sale | — | — | 13 |
| Collateral – cash received under collateral agreements2 | — | — | — |
| Adjusted net debt (includes pension deficit) | 44,919 | 40,638 | 42,655 |
| FFO/adjusted net debt | 13.0% | 13.7% | 13.3% |
| RCF/adjusted net debt | 9.3% | 9.8% | 9.2% |

1. Numbers for 2025 and 2024 reflect the calculations for the total Group as based on the published accounts for that year.

2. Below agency threshold to adjust in 2026, 2025 and 2024.

#### Regulatory performance measures

Regulated financial performance – UK

Regulatory financial performance is a pre-interest and tax measure, starting at segmental operating profit

and making adjustments (such as the elimination of all pass-through items included in revenue allowances

and timing) to approximate regulatory profit for the UK regulated activities. This measure provides a bridge

for investors between a well-understood and comparable IFRS starting point and the key adjustments

required to approximate regulatory profit. This measure also provides the foundation to calculate

Group RoE.

Under the UK RIIO regulatory arrangements the Company is incentivised to deliver efficiencies against

cost targets set by the regulator. In total, these targets are set in terms of a regulatory definition of

combined total operating and capital expenditure, also termed ‘totex’. The definition of totex differs from

the total combined regulated controllable operating costs and regulated capital expenditure as reported

in this statement according to IFRS accounting principles. Key differences are capitalised interest, capital

contributions, exceptional costs, costs covered by other regulatory arrangements and unregulated costs.

For the reasons noted above, the table below shows the principal differences between the IFRS

operating profit and the regulated financial performance, but is not a formal reconciliation to an

equivalent IFRS measure.

UK Electricity Transmission

|  |  |  |  |
| --- | --- | --- | --- |
|  |  |  |  |
|  | 2026 | 2025 | 2024 |
| Year ended 31 March | £m | £m | £m |
| Adjusted operating profit | 1,605 | 1,277 | 1,677 |
| Movement in regulatory ‘IOUs’ | 278 | 256 | (363) |
| UK regulatory notional deferred taxation adjustment | 276 | 238 | 219 |
| RAV indexation – 2% CPIH long-run inflation | 410 | 368 | 343 |
| Regulatory vs IFRS depreciation difference | (622) | (575) | (553) |
| Fast money/other | (435) | (261) | (119) |
| Pensions | — | — | (2) |
| Performance RAV created | 76 | 65 | 68 |
| Regulated financial performance | 1,588 | 1,368 | 1,270 |

UK Electricity Distribution

|  |  |  |  |
| --- | --- | --- | --- |
|  |  |  |  |
|  | 2026 | 2025 | 2024 |
| Year ended 31 March | £m | £m | £m |
| Adjusted operating profit | 1,122 | 1,610 | 993 |
| Less non-regulated profits | (11) | (7) | (8) |
| Movement in regulatory ‘IOUs’ | 131 | (417) | 158 |
| UK regulatory notional deferred taxation adjustment | 36 | 15 | 38 |
| RAV indexation – 2% CPIH long-run inflation | 245 | 230 | 216 |
| Regulatory vs IFRS depreciation difference | (551) | (547) | (555) |
| Fast money/other | (72) | (46) | (36) |
| Performance RAV created | 5 | (1) | 50 |
| Regulated financial performance | 905 | 837 | 856 |

UK Electricity System Operator

|  |  |  |  |
| --- | --- | --- | --- |
|  |  |  |  |
|  | 2026 | 2025 | 2024 |
| Year ended 31 March | £m | £m | £m |
| Adjusted operating profit | — | (364) | 880 |
| Movement in regulatory ‘IOUs’ | — | 479 | (800) |
| UK regulatory notional deferred taxation adjustment | — | 3 | 2 |
| RAV indexation – 2% CPIH long-run inflation | — | 9 | 7 |
| Regulatory vs IFRS depreciation difference | — | (50) | (19) |
| Fast money/other | — | (44) | (29) |
| Regulated financial performance | — | 33 | 41 |

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 243 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Other unaudited financial information cont. | | |  |  |  |

Regulated financial performance – US

New England

|  |  |  |  |
| --- | --- | --- | --- |
|  |  |  |  |
|  | 2026 | 2025 | 2024 |
| Year ended 31 March | £m | £m | £m |
| Adjusted operating profit | 960 | 982 | 643 |
| Major storm costs | — | 3 | 90 |
| Timing | (94) | (61) | 69 |
| US GAAP pension adjustment and other 1 | 79 | 60 | 29 |
| Regulated financial performance | 945 | 984 | 831 |

1. £2 million unfavourable COVID-19 bad debt provision adjustment included in 2025 other.

New York

|  |  |  |  |
| --- | --- | --- | --- |
|  |  |  |  |
|  | 2026 | 2025 | 2024 |
| Year ended 31 March | £m | £m | £m |
| Adjusted operating profit | 1,172 | 1,023 | 860 |
| Provision for bad and doubtful debts (COVID-19),  net of recoveries  1 | (37) | (47) | (34) |
| Major storm costs | — | 84 | 136 |
| Timing | 537 | 343 | 20 |
| US GAAP pension adjustment | 43 | 48 | 42 |
| Regulated financial performance | 1,715 | 1,451 | 1,024 |

1. New York financial performance includes an adjustment reflecting our expectation for future recovery of COVID-19 related provisions

for bad and doubtful debts.

Total regulated financial performance

|  |  |  |  |
| --- | --- | --- | --- |
|  |  |  |  |
|  | 2026 | 2025 | 2024 |
| Year ended 31 March | £m | £m | £m |
| UK Electricity Transmission | 1,588 | 1,368 | 1,270 |
| UK Electricity Distribution | 905 | 837 | 856 |
| UK Electricity System Operator | — | 33 | 41 |
| New England | 945 | 984 | 831 |
| New York | 1,715 | 1,451 | 1,024 |
| Total regulated financial performance | 5,153 | 4,673 | 4,022 |

New England and New York timing, major storms costs and movement in UK regulatory ‘IOUs’ –

Revenue related to performance in one year may be recovered in later years. Where revenue received

or receivable exceeds the maximum amount permitted by our regulatory agreement, adjustments will

be made to future prices to reflect this over-recovery. No liability is recognised under IFRS, as such

an adjustment to future prices relates to the provision of future services. Similarly, no asset is recognised

under IFRS where a regulatory agreement permits adjustments to be made to future prices in respect of

an under-recovery. In the UK, this is calculated as the movement in other regulated assets and liabilities.

Performance RAV – UK performance efficiencies are in part remunerated by the creation of additional RAV

which is expected to result in future earnings under regulatory arrangements. This is calculated as in-year

totex outperformance multiplied by the appropriate regulatory capitalisation ratio and multiplied by the

retained company incentive sharing ratio.

Pension adjustment – Cash payments against pension deficits in the UK are recoverable under regulatory

contracts. In US regulated operations, US GAAP pension charges are generally recoverable through rates.

Revenue recoveries are recognised under IFRS but payments are not charged against IFRS operating

profits in the year. In the UK, this is calculated as cash payments against the regulatory proportion of

pension deficits in the UK regulated business, whereas in the US it is the difference between IFRS and

US GAAP pension charges.

2% CPIH and 3% RPI RAV indexation – Future UK revenues are expected to be set using an asset base

adjusted for inflation. This is calculated as UK RAV multiplied by 2% long-run CPIH inflation assumption

under RIIO-2 and a 3% long-run RPI inflation assumption under RIIO-1.

UK regulatory notional deferred taxation adjustment – Future UK revenues are expected to recover cash

taxation cost including the unwinding of deferred taxation balances created in the current year. This is the

difference between: (1) IFRS underlying EBITDA less other regulatory adjustments; and (2) IFRS underlying

EBITDA less other regulatory adjustments less current taxation (adjusted for interest tax shield) then

grossed up at full UK statutory tax rate.

Regulatory depreciation – US and UK regulated revenues include allowance for a return of regulatory capital

in accordance with regulatory assumed asset lives. This return does not form part of regulatory profit.

Fast/slow money adjustment – The regulatory remuneration of costs incurred is split between in-year

revenue allowances and the creation of additional RAV. This does not align with the classification of

operating costs and fixed asset additions under IFRS accounting principles. This is calculated as the

difference between IFRS classification of operating costs versus fixed asset additions and the regulatory

classification.

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 244 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Other unaudited financial information cont. | | |  |  |  |

Regulated asset base

The regulated asset base is a regulatory construct, based on predetermined principles not based on IFRS.

It effectively represents the invested capital on which we are authorised to earn a cash return. By investing

efficiently in our networks, we add to our regulated asset base over the long term, and this in turn

contributes to delivering shareholder value. Our regulated asset base comprises our regulatory asset

value in the UK plus our rate base in the US.

Maintaining efficient investment in our regulated asset base ensures we are well positioned to provide

consistently high levels of service to our customers and increases our revenue allowances in future years.

While we have no specific target, our overall aim is to achieve around 10% growth in regulated asset base

each year through continued investment in our networks in both the UK and US.

In the UK, the way in which our transactions impact RAV is driven by principles set out by Ofgem. In a

number of key areas these principles differ from the requirements of IFRS, including areas such as additions

and the basis for depreciation. Further, our UK RAV is adjusted annually for inflation. RAV in each of our

retained UK businesses has evolved over the period since privatisation in 1990 and, as a result, historical

differences between the initial determination of RAV and balances reported under UK GAAP at that time

still persist. In the case of UK ED, differences arise as the result of acquisition fair value adjustments

(where PP&E at acquisition has been valued above RAV). Due to the above, substantial differences exist

in the measurement bases between RAV and an IFRS balance metric, and therefore it is not possible

to provide a meaningful reconciliation between the two.

In the US, rate base is a regulatory measure determined for each of our main US operating companies.

It represents the value of property and other assets or liabilities on which we are permitted to earn a rate

of return, as set out by the regulatory authorities for each jurisdiction. The calculations are based on the

applicable regulatory agreements for each jurisdiction and include the allowable elements of assets and

liabilities from our US companies. For this reason, it is not practical to provide a meaningful reconciliation

from the US rate base to an equivalent IFRS measure.

‘Total regulated and other balances’ for our UK regulated businesses include the under- or over-recovery

of allowances that those businesses target to collect in any year, which are based on the regulator’s

forecasts for that year. Under the UK price control arrangements, revenues will be adjusted in future years

to take account of actual levels of collected revenue, costs and outputs delivered when they differ from

those regulatory forecasts. In the US, other regulatory assets and liabilities include regulatory assets and

liabilities which are not included in the definition of rate base, including working capital where appropriate.

‘Total regulated and other balances’ for NGV and other businesses includes assets and liabilities

as measured under IFRS, but excludes certain assets and liabilities such as pensions, tax, net debt

and goodwill.

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| Year ended 31 March  (£m at constant currency) | RAV, rate base or  other business assets | |  | Total regulated  and other balances | |
| 2026 | 2025¹ |  | 2026 2,3 | 2025 1,2,3 |
| £m | £m |  | £m | £m |
| UK Electricity Transmission | 23,847 | 20,525 |  | 23,786 | 20,186 |
| UK Electricity Distribution | 13,139 | 12,254 |  | 13,026 | 12,010 |
| New England | 10,289 | 9,198 |  | 12,059 | 11,060 |
| New York | 19,163 | 17,496 |  | 21,840 | 19,281 |
| Total regulated | 66,438 | 59,473 |  | 70,711 | 62,537 |
| National Grid Ventures and  other business balances | 5,545 | 7,266 |  | 3,955 | 6,477 |
| Total Group regulated and other balances | 71,983 | 66,739 |  | 74,666 | 69,014 |

1. Figures relating to prior periods have, where appropriate, been re-presented at constant currency, for segmental reorganisation, opening

balance adjustments following the completion of the UK regulatory reporting pack process and finalisation of US balances.

2. Includes totex-related regulatory IOUs of £105 million (2025: £250 million) and under-recovered timing balances of £568 million (2025:

£62 million over-recovered).

3. Includes assets for construction work-in-progress of £3,084 million (2025: £2,528 million), other regulatory assets related to timing and

other cost deferrals of £1,230 million (2025: £1,113 million) and net working capital assets of £134 million (2025: £95 million net working

capital assets).

New England and New York rate base and other total regulated and other balances for 31 March 2025

have been re-presented in the table above at constant currency. At actual currency the values were

£11.3 billion and £19.8 billion respectively.

Group RoE

Group RoE provides investors with a view of the performance of the Group as a whole compared with

the amounts invested by the Group in assets attributable to equity shareholders. It reflects the regulated

activities as well as the contribution from our non-regulated businesses together with joint ventures and

non‑controlling interests. We use Group RoE to measure our performance in generating value for our

shareholders, and targets for Group RoE are included in APP and LTPP incentive mechanisms for

Executive members. Group RoE is underpinned by our regulated asset base. Goodwill and indefinite-lived

intangible assets are amortised in the denominator over 20 years, to reflect the estimated period over

which the value related to the premium paid on acquisition would be realised. For the reasons noted

above, no reconciliation to IFRS has been presented, as we do not believe it would be practical.

Calculation: Regulatory financial performance including a long-run inflation assumption (2% CPIH for

RIIO-2), less adjusted interest and adjusted taxation divided by equity investment in assets:

– adjusted interest removes accretions above long-run inflation rates, interest on pensions, capitalised

interest in regulated operations and unwind of discount rate on provisions;

– adjusted taxation adjusts the Group taxation charge (before exceptional items and remeasurements) for

differences between IFRS profit before tax and regulated financial performance less adjusted interest; and

– equity investment in assets is calculated as opening UK RAV, opening US rate base, goodwill and

indefinite-lived intangibles (adjusted for ‘asset swap’ transactions and the ‘value realisation’ of goodwill

over 20 years), plus opening net book value of NGV and other activities (excluding certain pensions, tax

and commodities balances) and our share of JVs and associates, minus opening net debt as reported

under IFRS restated to the weighted average sterling–dollar exchange rate for the year.

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 245 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Other unaudited financial information cont. | | |  |  |  |

|  |  |  |  |
| --- | --- | --- | --- |
|  |  |  |  |
| Year ended 31 March | 2026 | 2025 | 2024 |
| £m | £m | £m |
| Regulated financial performance | 5,153 | 4,673 | 4,022 |
| Operating profit of other activities – continuing  and discontinued operations | 231 | 275 | 467 |
| Group financial performance | 5,384 | 4,948 | 4,489 |
| Share of post-tax results of joint ventures and associates 1 | 76 | 100 | 174 |
| Non-controlling interests | (2) | (3) | (1) |
| Adjusted total Group interest charge (including discontinued) | (1,633) | (1,590) | (1,613) |
| Total Group tax charge (including discontinued) | (955) | (861) | (983) |
| Tax on adjustments | (4) | 8 | 270 |
| Total Group financial performance after interest and tax | 2,866 | 2,602 | 2,336 |
|  |  |  |  |
| Opening rate base/RAV | 59,071 | 55,326 | 50,806 |
| Opening other balances | 7,212 | 8,223 | 7,973 |
| Opening RAV, rate base and other balances | 66,283 | 63,549 | 58,779 |
| Opening goodwill | 11,145 | 11,430 | 11,444 |
| Opening goodwill adjustment (realisation of value over 20 years) | (4,599) | (4,441) | (4,053) |
| Opening strategic pivot (asset swap) adjustment 2 | (3,387) | (3,450) | (3,464) |
| Opening capital employed | 69,442 | 67,088 | 62,706 |
| Opening net debt | (40,343) | (43,509) | (40,505) |
| Rights Issue adjustment (£6.8 billion net proceeds pro-rated  from June 2024) | — | 5,471 | — |
| Opening equity | 29,099 | 29,050 | 22,201 |
| Group RoE | 9.8% | 9.0% | 10.5% |

1. 2026 includes £nil (2025: £25 million; 2024: £73 million) in respect of the Group’s minority interest in National Gas Transmission, which

was fully divested during 2024/25.

2. The regulatory gains on disposal of NECO and UK Gas Transmission (proceeds received less RAV, rate base and other related balances

used to calculate the Group RoE denominator) deducted against IFRS goodwill and indefinite-lived intangibles recognised on acquisition

of NGED. For this metric, the purchase of NGED and sales of NECO and UK Gas Transmission were deemed to be linked transactions

with the opening equity reflecting the impact of these as asset swaps rather than as unrelated transactions.

Group RoE three-year average calculation

The Group RoE metrics for each of the years 2025/26, 2024/25 and 2023/24 are provided in the table

above, resulting in a historical three-year average Group RoE of 9.8% (2025: 11.0%).

UK and US regulated RoE

|  |  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |  |
| Year ended 31 March | Regulatory Debt:  Equity assumption | Achieved  Return on Equity | |  | Base or Allowed  Return on Equity | |
| 2026 | 2025 |  | 2026 | 2025 |
| % | % |  | % | % |
| UK Electricity Transmission | 55/45 | 8.2 | 8.3 |  | 7.2 | 7.3 |
| UK Electricity Distribution | 60/40 | 8.1 | 7.9 |  | 7.6 | 7.7 |
| New England | Avg. 45/55 | 9.2 | 9.1 |  | 9.6 | 9.9 |
| New York | Avg. 52/48 | 9.0 | 8.7 |  | 9.4 | 9.2 |

UK businesses’ regulated RoEs

UK regulated businesses’ RoEs are a measure of how the businesses are performing against the

assumptions used by our UK regulator. These returns are calculated using the assumption that the

businesses are financed in line with the regulatory adjudicated capital structure, at the cost of debt

assumed by the regulator, and that inflation is equal to a long-run assumption of 2% CPIH under RIIO-2.

They are calculated by dividing elements of out/under-performance versus the regulatory contract (i.e.

regulated financial performance disclosed above) by the average equity RAV in line with the regulatory

assumed capital structure and adding to the base allowed RoE.

These are important measures of UK regulated businesses’ performance, and our operational strategy

continues to focus on these metrics. These measures can be used to determine how we are performing

under the RIIO framework and also help investors to compare our performance with similarly regulated

UK entities. Reflecting the importance of these metrics, they are also key components of the APP scheme.

The respective businesses’ UK RoEs are underpinned by their RAVs. For the reasons noted above, no

reconciliation to IFRS has been presented, as we do not believe it would be practical.

US businesses’ regulated RoEs

US regulated businesses’ RoEs are a measure of how the businesses are performing against the

assumptions used by the US regulators. This US operational return measure is calculated using the

assumption that the businesses are financed in line with the regulatory adjudicated capital structure

and allowed cost of debt. The returns are divided by the average rate base (or where a reported rate

base is not available, an estimate based on rate base calculations used in previous rate filings)

multiplied by the adjudicated equity portion in the regulatory adjudicated capital structure.

These are important measures of our New England and New York regulated businesses’ performance,

and our operational strategy continues to focus on these metrics. This measure can be used to determine

how we are performing and also helps investors compare our performance with similarly regulated US

entities. Reflecting the importance of these metrics, they are also key components of the APP scheme.

The New England and New York businesses’ returns are based on a calculation which gives

proportionately more weighting to those businesses which have a greater rate base. For the reasons

noted above, no reconciliations to IFRS for the RoE measures have been presented, as we do not believe

it would be practical to reconcile our IFRS balance sheet to the equity base.

The table below shows the principal differences between the IFRS result of the New England and

New York segments, and the ‘returns’ used to derive their respective US jurisdictional RoEs. In outlining

these differences, we also include the aggregated business results under US GAAP for New England

and New York jurisdictions.

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 246 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Other unaudited financial information cont. | | |  |  |  |

In respect of 2024/25 and 2023/24, this measure is the aggregate operating profit of our US OpCo

entities’ publicly available financial statements prepared under US GAAP for the New England and

New York jurisdictions respectively. For 2025/26, this measure represents our current estimate, since

local financial statements have yet to be prepared.

|  |  |  |  |
| --- | --- | --- | --- |
|  |  |  |  |
|  | 2026 | 2025 | 2024 |
|  | £m | £m | £m |
| Underlying IFRS operating profit for New England segment | 866 | 924 | 802 |
| Underlying IFRS operating profit for New York segment | 1,709 | 1,450 | 1,016 |
| Weighted average £/$ exchange rate | $1.343 | $1.266 | $1.262 |

|  |  |  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |  |  |
|  | New England | | |  | New York | | |
|  | 2026 | 2025 | 2024 |  | 2026 | 2025 | 2024 |
|  | $m | $m | $m |  | $m | $m | $m |
| Underlying IFRS operating profit  for US segments | 1,164 | 1,170 | 1,013 |  | 2,296 | 1,836 | 1,283 |
| Adjustments to convert to US GAAP as applied  in our US OpCo entities |  |  |  |  |  |  |  |
| Adjustment in respect of customer contributions | (31) | (30) | (29) |  | (44) | (51) | (37) |
| Pension accounting differences1 | 108 | 78 | 43 |  | 59 | 61 | 63 |
| Environmental charges recorded under US GAAP | 11 | 5 | 10 |  | (140) | (144) | 21 |
| Storm costs and recoveries recorded under  US GAAP | (98) | (59) | (56) |  | 57 | (7) | 6 |
| Other regulatory deferrals, amortisation  and other items | (402) | (314) | (139) |  | (833) | (518) | (155) |
| Results for US regulated OpCo entities,  aggregated under US GAAP 2 | 752 | 850 | 842 |  | 1,395 | 1,177 | 1,181 |
| Adjustments to determine regulatory operating  profit used in US RoE |  |  |  |  |  |  |  |
| Levelisation of rate increases | — | — | — |  | 184 | 196 | — |
| FERC RoE order3 | 157 | — | — |  | — | — | — |
| Net other | 116 | 96 | 14 |  | 157 | 178 | 151 |
| Regulatory operating profit | 1,025 | 946 | 856 |  | 1,736 | 1,551 | 1,332 |
| Pensions1 | 95 | 70 | 60 |  | 308 | 169 | 159 |
| Regulatory interest charge | (241) | (219) | (199) |  | (588) | (459) | (374) |
| Regulatory tax charge | (240) | (218) | (196) |  | (404) | (351) | (305) |
| Regulatory earnings used to determine  US RoE | 639 | 579 | 521 |  | 1,052 | 910 | 812 |

1. An element of the pensions charge is reported outside operating profit under US GAAP.

2. Based on US GAAP accounting policies as applied by our US regulated OpCo entities.

3. The US GAAP impact of the FERC rate order in March 2026 is not included in New England’s reported RoE for 2025/26 (as our US RoEs

are a measure of our current year performance against current year allowances) and the FERC rate order relates to complaints filed against

FERC allowed RoE rates dating back to 2011 in relation to reductions in historical years’ revenues. The impact of lower rates did not have

a significant impact as applied to current year allowed revenues.

In addition to the regulatory earnings used to determine US RoE, our US regulated businesses also earn

a return on assets outside of rate base (principally construction work-in-progress) of $2.3 billion (2025:

$2.5 billion) in New England and $3.5 billion (2025: $2.4 billion) in New York. In 2025/26, this additional

return amounted to $77 million (2025: $75 million) in New England and $153 million (2025: $118 million)

in New York. The aggregate of regulatory earnings used to determine US RoE and the return on assets

outside of rate base for the year was $716 million (2025: $654 million) for New England and $1,205 million

(2025: $1,029 million) for New York.

|  |  |  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |  |  |
|  | New England | | |  | New York | | |
|  | 2026 | 2025 | 2024 |  | 2026 | 2025 | 2024 |
|  | $m | $m | $m |  | $m | $m | $m |
| Average US equity base | 6,988 | 6,352 | 5,645 |  | 11,637 | 10,512 | 9,517 |
| US jurisdiction RoE | 9.2% | 9.1% | 9.2% |  | 9.0% | 8.7% | 8.5% |

Information on differences between IFRS and regulatory balances

There are certain significant assets and liabilities included in our IFRS balance sheet, which are treated

differently in the analysis below and to which we draw readers’ attention. Our UK OpCo RAVs are different

to the IFRS carrying value of PP&E and intangibles in these entities. For example, the annual indexation

(inflationary uplift) adjustment applied to RAV compared with the IFRS value of these assets (which are

held at amortised cost), borrowing costs included as part of capital investment under IFRS are not added

to RAV but are recovered by means of a ‘cost of debt allowance’ in allowed regulatory revenues, additions

to RAV are based on a ‘slow money’ capitalisation percentage (set by the regulator) which is then applied

to ‘totex’ (i.e. capex plus opex) or in the case of UK ED, the result of acquisition fair value adjustments

(where PP&E at acquisition has been valued above RAV). In addition, under IFRS we recognise liabilities

in respect of US environmental remediation costs, and pension and OPEB costs. For regulatory purposes,

these are not shown as obligations because we are entitled to full recovery of costs through our existing

rate plans. The impact of US tax reform in 2017/18 which resulted in a reduction in IFRS deferred tax

liabilities, and from a regulatory perspective remains as a future obligation, results in a regulatory liability

within US rate base. Regulatory IOUs which reflect net over- or under-recoveries compared with our

regulatory allowances are treated within this table as obligations (or rights) but do not qualify for

recognition as liabilities (or assets) under IFRS.

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 247 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Other unaudited financial information cont. | | |  |  |  |

Asset growth and regulated asset growth

To help readers’ assessment of the financial position of the Group, the table below shows an aggregated

position for the Group, as viewed from a regulatory perspective. The asset growth and regulated asset

growth measures included in the table below are calculated in part from financial information used to

derive measures sent to and used by our regulators in the UK and US, and accordingly inform certain

of the Group’s regulatory performance measures, but are not derived from, and cannot be reconciled

to, IFRS. These alternative performance measures include regulatory assets and liabilities and certain

IFRS assets and liabilities of businesses that were classified as held for sale under IFRS 5.

Asset growth is the annual percentage increase in our RAV and US rate base and other non-regulated

business balances (including our investments in NGV, UK property and other assets and US other assets)

calculated at constant currency.

Regulated asset growth is the annual percentage increase in our RAV and US rate base (calculated

at constant currency), but does not include other non-regulated business balances.

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
|  | 2025/26 | | | | |
| £m | 31 March  2026 | Sale of  Grain LNG  and NG  Renewables | 31 March  2025 | Increase | Asset  growth |
| UK RAV | 36,986 | — | 32,779 | 4,207 | 12.8% |
| US rate base | 29,452 | — | 26,694 | 2,758 | 10.3% |
| Total RAV and rate base (used to  calculate regulated asset growth) | 66,438 | — | 59,473 | 6,965 | 11.7% |
| National Grid Ventures and other | 5,545 | (2,032) | 7,266 | 311 | 4.3% |
| Total assets (used to calculate  asset growth) | 71,983 | (2,032) | 66,739 | 7,276 | 10.9% |

For 2025/26, asset growth was 10.9% and regulated asset growth was 11.7%, which excludes the

impact of the reduction in assets from the sales of NG Renewables and Grain LNG during the year

(2024/25: excluding the reduction in RAV as a result of the sale of the UK Electricity System Operator

business, based on an estimated RAV value at the date of disposal).

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
|  | 2024/25 | | | | |
| £m | 31 March  2025 | Sale of ESO | 31 March  2024 | Increase | Asset  growth |
| UK RAV | 32,805 | (469) | 30,310 | 2,964 | 9.8% |
| US rate base | 27,345 | — | 24,527 | 2,818 | 11.5% |
| Total RAV and rate base (used to  calculate regulated asset growth) | 60,150 | (469) | 54,837 | 5,782 | 10.5% |
| National Grid Ventures and other | 7,352 | — | 7,509 | (157) | (2.1)% |
| Total assets (used to calculate  asset growth) | 67,502 | (469) | 62,346 | 5,625 | 9.0% |

Figures relating to prior periods have, where appropriate, been re-presented at constant currency, for

opening balance adjustments following the completion of the UK regulatory reporting pack process and

finalisation of US balances.

Regulatory gearing

Regulatory gearing is a measure of how much of our investment in RAV and rate base and other elements

of our invested capital (including our investments in NGV, UK property and UK other assets and US other

assets) is funded through debt. Comparative amounts as at 31 March 2025 are presented at historical

exchange rates and have not been restated for opening balance adjustments.

|  |  |  |  |
| --- | --- | --- | --- |
|  |  |  |  |
|  | 2026 | 2025 |  |
| As at 31 March | £m | £m |  |
| UK RAV | 36,986 | 32,805 |  |
| US rate base | 29,452 | 27,345 |  |
| Other invested capital included in gearing calculation | 5,545 | 7,352 |  |
| Total assets included in gearing calculation | 71,983 | 67,502 |  |
| Net debt (including 100% of hybrid debt and held for sale) | (44,160) | (41,316) | change |
| Group gearing (based on 100% of net debt including held  for sale) | 61% | 61% | —% pts |
| Group gearing (excluding 50% of hybrid debt from net debt)  including held for sale | 61% | 60% | 1% pts |

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 248 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Commentary on consolidated financial statements  for the year ended 31 March 2025 | | |  |  |  |

![]()

|  |  |  |
| --- | --- | --- |
|  |  |  |
|  |  |  |
|  | In compliance with SEC rules, we present a summarised analysis of movements in the income  statement and an analysis of movements in adjusted operating profit (for the continuing Group) by  operating segment. This should be read in conjunction with the 31 March 2025 Financial review  included on pages [69](#i2193c7e7fbee4753bdbe2d16888565c8_127) – [84](#ib9ca2c5b72fb4936a9d458c7bb253318_286544). |  |
|  |  |  |

#### Analysis of the income statement for the year ended31 March 2025

Revenue

Revenue from continuing operations for the year ended  31 March 2025   decreased by  £1,472 million

to  £18,378 million . Lower revenues were primarily the result of £771 million lower pass-through costs and

a timing under-recovery of £505 million compared with an over-recovery of £915 million in the prior year.

This mostly related to the UK Electricity System Operator business sold mid-year and also US commodity

pass-through costs in New York and New England. Underlying net revenues increased £719 million driven

by increased rates and higher returns on our investment in our regulated businesses.

Operating costs

Operating costs from continuing activities for the year ended  31 March 2025 of £13,613 million were

£787 million lower than prior year. This decrease in costs excluded exceptional items and remeasurements

impacts, discussed below. Operating costs were driven by lower UK Electricity System Operator balancing

service pass-through costs down £1,343 million  (business was sold mid-way through 2024/25) partly

offset by increased gas and electricity purchases (mostly on behalf of our US customers, which are pass-

through in nature) up £324 million. Higher depreciation as a result of continued asset investment was

up £114 million compared with 2023/24.

Net finance costs

Net finance costs (excluding remeasurements) for 2024/25 were £1,361 million, down from

£1,479 million in the prior year, driven by the Rights Issue in June 2024, which raised net proceeds

of £6.8 billion. The beneficial impact of this was partly offset by outflows for higher levels of capital

investment and higher interest rates on new borrowings, partly mitigated by higher levels of capitalised

interest compared with 2023/24.

Tax

The tax charge on profits before exceptional items and remeasurements of £861 million was £122 million

lower than 2023/24. This was primarily driven by lower taxable profits (principally related to a £1.3 billion

year-on-year adverse timing swing in our UK Electricity System Operator business which was sold

during 2024/25).

Exceptional items and remeasurements

Exceptional items in 2024/25 included £146 million of credits for environmental provisions (2023/24:

£496 million charge), a £151 million partial reversal of a £498 million provision made in 2023/24 for the

return of over-collected revenues related to UK electricity balancing costs, a £187 million gain on disposal

of our UK Electricity System Operator business; and a £303 million impairment of our Community Offshore

Wind joint venture. Transaction, separation and integration costs increased to £65 million from £44 million

in 2023/24. Major transformation costs of £74 million were incurred in 2024/25. In 2023/24, exceptional

items included £92 million of gains related to insurance recoveries related to a fire and £65 million of costs

relating to our cost efficiency programme that ended in 2023/24.

Remeasurement gains of £127 million  were recognised on commodity contracts in 2024/25 compared

with gains of £24 million in 2023/24.

Finance costs for the year ended  31 March 2025 included a net gain of £4 million on financial

remeasurements of derivative financial instruments and financial assets at fair value through profit

or loss, compared to a net gain of  £15 million  on financial remeasurements in 2023/24.

Joint ventures and associates

Share of post-tax results of joint ventures and associates before exceptional items for 2024/25 were

£75 million compared with £101 million in 2023/24, principally due to lower revenues in our BritNed

interconnector joint venture in the UK, mostly reflecting lower auction prices. Joint ventures and

associates’ share of remeasurement losses were £2 million compared with £64 million in 2023/24.

Profit after tax from discontinued operations

On 26 September 2024, we sold our residual 20% interest in National Gas Transmission for proceeds

of £686 million, that resulted in a gain on disposal after transaction costs of £25 million. The Group did

not apply equity accounting to this asset held for sale since 31 January 2023 (the date of sale of our

60% interest), which resulted in no profits being recognised from that date onwards.

Adjusted earnings and EPS from continuing operations

Adjusted earnings and adjusted EPS, which exclude exceptional items and remeasurements, are provided

to reflect the Group’s results on an ‘adjusted profit’ basis, described further in note 8. See page [163](#i2193c7e7fbee4753bdbe2d16888565c8_238)

for a reconciliation of adjusted basic EPS to EPS.

The above earnings performance translated into adjusted EPS in 2024/25 of 55.6p, compared with 77.7p

in 2023/24. Including discontinued operations, adjusted EPS in 2024/25 of 55.6p, compared with 78.0p

in 2023/24.

Exchange rates

Our financial results are reported in sterling. Transactions for our US operations are denominated in

dollars, so the related amounts that are reported in sterling depend on the dollar to sterling exchange rate.

The table below shows the average and closing exchange rates of sterling to US dollars.

|  |  |  |  |
| --- | --- | --- | --- |
|  |  |  |  |
|  | 2024/25 | 2023/24 | % change |
| Weighted average (income statement) | 1.27 | 1.26 | —% |
| Year end (statement of financial position) | 1.29 | 1.26 | 2% |

The movement in foreign exchange during 2024/25 has resulted in a £34 million decrease in revenue, a

£4 million decrease in adjusted operating profit and a £5 million decrease in underlying operating profit.

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 249 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Commentary on consolidated financial statements cont.  for the year ended 31 March 2025 | | |  |  |  |

#### Analysis of the adjusted operating profit by segment for the year ended

#### 31 March 2025

UK Electricity Transmission

For 2024/25, revenue in the UK Electricity Transmission segment decreased by £116 million to £2,619

million  and adjusted operating profit decreased by £400 million to £ 1,277 million. Revenue was lower due

to adverse timing, driven by a higher return prior year balances. Regulated controllable costs including

pensions were higher from inflation and workload increases mostly offset by efficiency savings. The

increase in depreciation and amortisation is a result of having higher asset base and asset commissioning.

Capital investment increased by £1,087 million compared with 2023/24 to £2,999 million primarily due

to the ASTI projects (including capacity payments to secure the supply chain), and customer connections.

UK Electricity Distribution

For 2024/25 revenue in UK Electricity Distribution segment increased by £629 million and adjusted

operating profit increased by £617 million to £1,610 million. Revenue was higher due to favourable

timing, driven by a higher inflation true-up and volume related over-recoveries. Regulated controllable

costs including pensions were higher due to inflationary and workload increases, partly offset by

efficiencies. Other costs were higher, primarily due to Storm Darragh related costs.

Capital investment for the period  2024/25 was £1,426 million, an increase of £179 million from

2023/24 due to additional asset replacement and refurbishment, growth in connections and higher

reinforcement works.

UK Electricity System Operator

This business was purchased by the UK Government on 1 October 2024, resulting in only six months’

ownership in 2024/25 compared with the previous year. For 2024/25, revenue in the UK Electricity

System Operator segment decreased by £2,759 million to £1,029 million principally as a result of lower

pass-through costs and the mid-year disposal. Net underlying revenue was £92 million lower driven

by a shorter ownership period, partly offset by recovery of Future System Operator costs. Timing was

£1,279 million adverse compared with 2023/24, related to BSUoS over-collections in the comparative

period and the subsequent return of these during 2024/25. Regulated controllable costs including

pensions were £64 million higher due to higher volume of work under RIIO-2 and additional NESO

costs ahead of separation. Depreciation and amortisation was £61 million lower due to the business

being classified as ‘held for sale’.

Capital investment was £nil in 2024/25 compared to £85 million in 2023/24 as a result of the

business being classified as HFS and therefore only seven months of capital investment is included

for the comparative year.

New England

Revenue in the New England segment increased by £358 million to  £4,306 million. Adjusted operating

profit increased by £339 million to £982 million. Underlying net revenue increased by £223 million

principally reflecting increased rate case increments in Massachusetts Gas and Massachusetts Electric

and the impact of capital trackers (GSEP and GridMod). Regulated controllable costs increased by

£5 million with inflation and increased workload largely offset by efficiency savings. Provisions for bad

and doubtful debts were £17 million lower as a result of higher accounts receivable cash recoveries.

Depreciation and amortisation was £49 million higher as a result of increased capital investment.

Other costs were £37 million lower due to a reduced impact from deferrable storm costs, partly offset

by investment-related expense, property taxes and customer-funded works, and no repeat of the benefit

of a gain on a pension buyout in 2023/24.

Capital investment increased by £78 million to £1,751 million primarily due to higher electric capital

investment driven by asset conditioning and Advanced Metering Infrastructure (AMI) spend.

New York

Revenue in the New York segment increased by £595 million to £6,689 million. Adjusted operating

profit increased by £163 million to £1,023 million. Underlying net revenue increased by £488 million

predominately driven by increased rates in KEDNY/KEDLI and in NIMO. Regulated controllable costs

were lower mainly due to workload and inflation increases being more than offset by cost efficiency

savings. Provisions for bad and doubtful debts increased by £45 million, driven by increased receivables,

in line with revenue increases. Depreciation and amortisation increased due to the growth in assets.

Other costs (on an underlying basis) decreased due to lower environmental costs, partially offset by

higher property taxes, driven by a higher asset base. Major storm costs were £52 million lower, but

still above our threshold to be excluded from underlying results.

Capital investment increased by £635 million to £3,289 million, due to a step up in gas capital investment

in KEDNY and KEDLI following increases approved in the rate case (mains replacement and other

mandated works) and along with higher electric investment in NIMO driven by the Climate Leadership

and Community Protection Act programme spend, in addition to higher AMI investment.

National Grid Ventures (NGV)

Revenue in the NGV segment increased by £8 million to £1,397 million. Adjusted operating profit

decreased by £89 million, as a result of lower UK interconnector performance and fewer renewable

projects being sold to our Emerald joint venture in the US.

Capital investment in NGV was £284 million lower than 2023/24 after completing Viking Link in the

comparative year along with no investment in NG Renewables or Grain LNG following the classification

of those businesses as ‘held for sale’ in 2023/24.

Other activities

In 2024/25, adjusted operating loss (including corporate costs) increased by £83 million to a £143 million

loss, primarily driven by higher fair value losses within our NG Partners portfolio and lower captive

insurance profits.

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 250 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Shareholder information | | |  |  |  |

#### Equiniti

For queries about ordinary shares:

|  |  |
| --- | --- |
|  |  |
|  | Visit eq.shareview.co.uk/help for information regarding  your shareholding (from here you will also be able to email  a query securely). |
|  |  |
|  | 0800 169 7775  This is a Freephone number from landlines within the UK;  mobile costs may vary. Lines are open 8:30am to  5:30pm, Monday to Friday, excluding public holidays.  If calling from outside the UK: +44 (0) 800 169 7775. Calls  from outside the UK will be charged at the applicable  international rate. |
|  |  |
|  | National Grid Share Register  Equiniti, Highdown House,  Yeoman Way, Worthing,  BN99 6DA |

#### The Bank of New York Mellon

For queries about ADSs:

|  |  |
| --- | --- |
|  |  |
|  | 1-888-269-2377  If calling from outside the US: +1-201-680-6825 |
|  |  |
|  | computershare.com/investor  Email: shrrelations@cpushareownerservices.com |
|  | BNY Shareowner Services  P.O. Box 43006  Providence RI 02940-3078 |

Further information about National Grid, including share price and

interactive tools, can be found on our website nationalgrid.com/

investors

#### Beware of share fraud

Investment scams are often sophisticated and difficult to spot.

Shareholders are advised to be wary of any unsolicited advice or

offers, whether over the telephone, through the post or by email. If

you receive any unsolicited communication, please check that the

company or person contacting you is properly authorised by the

Financial Conduct Authority (FCA) before getting involved. Be

ScamSmart and visit fca.org.uk/consumers/protect-yourself-scams.

You can report calls from unauthorised firms to the FCA by calling

0800 111 6768.

#### Financial calendar

The following dates have been announced or are indicative:

|  |  |  |
| --- | --- | --- |
|  |  |  |
| 14 May 2026 |  | 2025/26 full-year results |
| 28 May 2026 |  | Ex-dividend date for 2025/26 final  dividend – ordinary shares |
| 29 May 2026 |  | Ex-dividend date for 2025/26 final  dividend – ADRs |
| 29 May 2026 |  | Record date for 2025/26 final dividend |
| 4 June 2026 |  | Scrip reference price announced for  2025/26 final dividend |
| 15 June 2026  (5:00 pm EDT) |  | Scrip election date for 2025/26 final  dividend – ADRs |
| 18 June 2026  (5.00 pm BST) |  | Scrip election date for 2025/26 final  dividend – ordinary shares |
| 14 July 2026 |  | 2026 AGM |
| 23 July 2026 |  | 2025/26 final dividend paid to qualifying  shareholders |
| 05 November 2026 |  | 2026/27 half-year results |
| 19 November 2026 |  | Ex-dividend date for 2026/27  interim dividend – ordinary shares |
| 20 November 2026 |  | Ex-dividend date for 2026/27 interim  dividend – ADRs |
| 20 November 2026 |  | Record date for 2026/27 interim  dividend |
| 26 November 2026 |  | Scrip reference price announced for  2026/27 interim dividend |
| 07 December 2026  (5:00 pm EST) |  | Scrip election date for 2026/27 interim  dividend – ADRs |
| 10 December 2026  (5.00 pm GMT) |  | Scrip election date for 2026/27 interim  dividend – ordinary shares |
| 12 January 2027 |  | 2026/27 interim dividend paid to  qualifying shareholders |

#### Dividends

The Directors are recommending a final dividend of 32.14 pence per

ordinary share ($2.1738 per ADS) to be paid on 23 July 2026 to

shareholders on the register as at 29 May 2026. Further details on

dividend payments can be found on page [164](#i2193c7e7fbee4753bdbe2d16888565c8_241). If you live outside the

UK, you may be able to request that your dividend payments are

converted into your local currency.

Under the Deposit agreement, a fee of up to $0.05 per ADS can be

charged for any cash distribution made to ADS holders, including

cash dividends. ADS holders who receive cash in relation to the

2025/26 final dividend will be charged a fee of $0.02 per ADS by the

Depositary prior to the distribution of the cash dividend.

Chequeless dividends: Since August 2022, all National Grid

dividends will be paid directly into bank or building society accounts

for ordinary shareholders. Please make sure you have completed and

returned a bank mandate form.

Benefits include the following:

– your dividend reaches your account on the payment day;

– it is a more efficient and secure way of receiving your payment;

and

– it helps reduce the volume of paper in dividend mailing.

Scrip dividends – elect to receive your dividends as additional

shares: Join our Scrip Dividend Scheme; no stamp duty or

commission to pay. Further information can be found on our website

nationalgrid.com/investors/shareholder-information/dividends/scrip-

dividend-scheme

#### Electronic communications

Please register at [shareview.co.uk](https://www.shareview.co.uk/4/Info/Portfolio/Default/en/Home/Pages/Home.aspx). It only takes a few minutes to

register – just have your 11-digit Shareholder Reference Number to

hand. You will be sent an Activation Code to complete registration.

Once you have registered, you can elect to receive your shareholder

communications electronically.

#### Registered office

National Grid plc was incorporated on 11 July 2000. The Company is

registered in England and Wales No. 4031152, with its registered

office at 1–3 Strand, London, WC2N 5EH.

#### Share dealing

Postal share dealing: Equiniti offers our European Economic Area

resident shareholders a share dealing service by post. This service is

available to private shareholders resident within the European

Economic Area, the Channel Islands or the Isle of Man. If you hold

your shares in CREST, you are not eligible to use this service. For

more information and to obtain a form, please visit shareview.co.uk or

call Equiniti on 0800 169 7775.

Internet and telephone share dealing: Equiniti also offers

telephone and online share dealing at live prices. For full details,

together with terms and conditions, please visit shareview.co.uk. You

can call Equiniti on 0345 603 7037 for further details, or to arrange a

trade. Lines are open Monday to Friday, 8:00am to 4:30pm for

dealing, and until 5:30pm for enquiries.

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 251 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Shareholder information cont. | | |  |  |  |

ShareGift: If you only have a small number of shares that would cost

more for you to sell than they are worth, you may wish to consider

donating them to ShareGift. ShareGift is a registered charity (No.

1052686) which specialises in accepting such shares as donations.

For more information, visit [sharegift.org](https://www.sharegift.org/) or contact Equiniti.

Individual Savings Accounts (ISAs): ISAs for National Grid shares

are available from Equiniti. For more information, [visit eqi.co.uk](https://eqi.co.uk/) or

contact Equiniti.

#### Articles of Association

The following description is a summary of the material terms of our

Articles of Association (Articles) and applicable English law. It is

a summary only and is qualified in its entirety by reference to the

Articles.

The Company is proposing at the 2026 AGM to update the Articles to

take account of recent market changes, including in particular

reducing the time periods in respect of the sale of shares of

shareholders who cannot be traced and the forfeiture of unclaimed

dividends as well as to increase the borrowing limit in line with the

resolution approved by the Company’s shareholders at the 2025

AGM. The Notice of Meeting for the 2026 AGM, which sets out

details of the proposed updates to the Articles, and the proposed

form of the updated Articles are available on the Company’s website.

The Articles set out the Company’s internal regulations. Copies are

available on our website at  nationalgrid.com/corporate-governance

and upon request. Updates to the Articles have to be approved by at

least 75% of those voting at a general meeting of the Company.

Subject to company law and the Articles, the Directors may exercise

all the powers of the Company. They may delegate authorities and

decision-making and the day-to-day management to individual

Executive Directors and Committees on page  [89](#i2193c7e7fbee4753bdbe2d16888565c8_142).

General

The Company is incorporated under the name National Grid plc and is

registered in England and Wales with registered number 4031152. Under

the Companies Act 2006, the Company’s objects are unrestricted.

Directors

Under the Articles, a Director must disclose any personal interest in a

matter and may not vote in respect of that matter, subject to certain

limited exceptions. As permitted under the Companies Act 2006, the

Articles allow non-conflicted Directors to authorise a conflict

or potential conflict for a particular matter. In doing so, the non-

conflicted Directors must act in a way they consider, in good faith, will

most likely promote the success of the Company for the benefit of

the shareholders as a whole.

The Directors (other than a Director acting in an executive capacity)

are paid fees for their services. In total, these fees must not exceed

£2 million per year, or any higher sum decided by an ordinary

resolution at a general meeting of shareholders. In addition, special

pay may be awarded to a Director who acts in an executive capacity,

serves on a committee, performs services which the Directors

consider to extend beyond the ordinary duties of a Director, devotes

special attention to the business of the Company, or goes or

lives abroad on the Company’s behalf. Directors may also receive

reimbursement for expenses properly incurred and may be awarded

pensions and other benefits. The compensation awarded to the

Executive Directors is determined by the People & Remuneration

Committee. Further details of Directors’ remuneration are set out in

the Directors’ Remuneration Report (see pages [107](#i2193c7e7fbee4753bdbe2d16888565c8_175)-126).

The Directors may exercise all the powers of National Grid to borrow

money. However, the aggregate principal amount of all the Group’s

borrowings outstanding at any time must not exceed £70 billion or

any other amount approved by shareholders by an ordinary resolution

at a general meeting.

Directors can be appointed or removed by the Board or shareholders

at a general meeting. Directors must stand for election at the first

AGM following their appointment to the Board. The Articles provide

that they must be recommended by the Board or the Company must

have received written confirmation of their willingness to act as

Director. Under the Articles, each Director must retire at least every

three years and be eligible for re-election should they wish to

continue to serve. In accordance with the Code, all Directors wishing

to continue in office currently offer themselves for re-election annually.

No person is disqualified from being a Director or is required to

vacate that office by reason of attaining a maximum age.

A Director is not required to hold shares in National Grid plc in order

to qualify as a Director.

Rights, preferences and restrictions

Dividend rights

National Grid may not pay any dividend otherwise than out of profits

available for distribution under the Companies Act 2006 and other

applicable provisions of English law. In addition, as a public company, the

Company may only make a distribution if, at the time of the distribution,

the amount of its net assets is not less than the aggregate of its called-up

share capital and undistributable reserves (as defined in the Companies

Act 2006), and to the extent that the distribution does not reduce the

amount of those assets to less than that aggregate. Ordinary

shareholders and ADS holders receive dividends.

Subject to these points, shareholders may, by ordinary resolution,

declare dividends in accordance with the respective rights of the

shareholders, but not exceeding the amount recommended by the

Board. The Board may pay interim dividends if it considers that the

Company’s financial position justifies the payment. Any dividend or

interest unclaimed for 12 years from the date when it was declared or

became due for payment will be forfeited and revert to the Company,

and the Articles clarify that the Company may use such unclaimed

dividends for the Company’s benefit as the Directors may think fit.

Voting rights

Subject to any rights or restrictions attached to any shares and to any

other provisions of the Articles, at any general meeting on a show of

hands, every shareholder who is present in person will have one vote

and, on a poll, every shareholder will have one vote for every share

they hold. On a show of hands or poll, shareholders may cast votes

either personally or by proxy. A proxy need not be a shareholder.

Under the Articles, all substantive resolutions at a general meeting

must be decided on a poll and the Articles further provide that voting

on resolutions at a general meeting that is held at least in part using

an electronic platform must be decided on a poll. Ordinary

shareholders and ADS holders can vote at general meetings.

Liquidation rights

In a winding up, a liquidator may (in each case with the sanction of a

special resolution passed by the shareholders and any other sanction

required under English law): (1) divide among the shareholders the whole

or any part of National Grid’s assets (whether the assets are of the same

kind or not) – the liquidator may, for this purpose, value any assets and

determine how the division should be carried out as between

shareholders or different classes of shareholders; or (2) transfer any

part of the assets to Trustees on trust for the benefit of the shareholders

as the liquidator determines. In neither case will a shareholder be

compelled to accept assets upon which there is a liability.

Restrictions

There are no restrictions on the transfer or sale of ordinary shares. Some

of the Company’s employee share plans, details of which are contained in

the Directors’ Remuneration Report starting on page [107](#i2193c7e7fbee4753bdbe2d16888565c8_175), include

restrictions on the transfer of ordinary shares while the ordinary shares are

subject to the plan. Where, under an employee share plan operated by

the Company, participants are the beneficial owners of the ordinary

shares but not the registered owner, the voting rights may be exercised

by the registered owner at the direction of the participant. Treasury shares

do not attract a vote or dividends.

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 252 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Shareholder information cont. | | |  |  |  |

Variation of rights

Subject to applicable provisions of English law, the rights attached to

any class of shares of National Grid may be varied or cancelled. This

must be with the written consent of the holders of three quarters in

nominal value of the issued shares of that class, or with the sanction

of a special resolution passed at a separate meeting of the holders of

the shares of that class.

General meetings

AGMs must be convened each year within six months of the

Company’s accounting reference date upon 21 clear days’ advance

written notice. Under the Articles, any other general meeting may

be convened provided at least 14 clear days’ written notice is given,

subject to annual approval of shareholders. In certain limited

circumstances, the Company can convene a general meeting by

shorter notice. The notice must specify, among other things, the

nature of the business to be transacted and the place, the date and

the time of the meeting. The 2026 AGM will be held as a combined

physical and electronic meeting. Shareholders should monitor our

website at nationalgrid.com/investors for any updates to the

arrangements for the AGM.

Rights of non-residents

There are no restrictions under the Articles that would limit the rights of

persons not resident in the UK to vote in relation to ordinary shares.

#### Depositary payments to the Company

The Bank of New York Mellon (the ‘Depositary’) reimburses the Company

for certain expenses it incurs in relation to the ADS programme, which

consist of the expenses for the mailing of annual financial reports, printing

and distributing dividend cheques, the electronic filing of US federal tax

information, mailing required tax forms, stationery, postage, facsimiles

and telephone calls. It also reimburses the Company for certain investor

relationship programmes or special investor relations promotional

activities. There are limits on the amount of expenses for which the

Depositary will reimburse the Company, but the amount of

reimbursement is not necessarily tied to the amount of fees the

Depositary collects from investors.

For the period 15 May 2025 to 13 May 2026, the Company received

a total of $2,941,910.67 in reimbursements from the Depositary

consisting of $1,346,701.21, $437,071.50, $740,074.46 and

$418,063.50 received on 3 September 2025, 17 November 2025, 5

February 2026 and 15 April 2026 respectively. Fees that are charged

on cash dividends will be apportioned between the Depositary and

the Company. Any questions from ADS holders should be directed to

the Depositary at the contact details on page [250](#i2193c7e7fbee4753bdbe2d16888565c8_391).

Description of securities other than equity securities:

Depositary fees and charges

The Depositary collects fees by deducting them from the amounts

distributed or by selling a portion of distributable property for:

– delivery and surrender of ADSs directly from investors depositing

shares or surrendering ADSs for the purpose of withdrawal or from

intermediaries acting for them; and

– making distributions to investors (including, it is expected, cash

dividends).

The Depositary may generally refuse to provide fee-attracting services

until its fees for those services are paid.

The Company’s Deposit agreement under which the ADSs are issued

allows a fee of up to $0.05 per ADS to be charged for any cash

distribution made to ADS holders, including cash dividends. ADS

holders who receive cash in relation to the 2025/26 final dividend will

be charged a fee of $0.02 per ADS by the Depositary prior to

distribution of the cash dividend.

|  |  |  |
| --- | --- | --- |
|  |  |  |
| Persons depositing or  withdrawing shares must pay: |  | For: |
| $5.00 per 100 ADSs  (or portion of 100 ADSs) |  | Issuance of ADSs, including issuances  resulting from a distribution of shares or  rights or other property; cancellation of  ADSs for the purpose of withdrawal,  including if the Deposit agreement  terminates; and distribution of securities  distributed to holders of deposited  securities that are distributed by the  Depositary to ADS holders. |
| Registration or transfer fees |  | Transfer and registration of shares on  our share register to or from the name of  the Depositary or its agent when they  deposit or withdraw shares. |
| Expenses of the Depositary |  | Cable, telex and facsimile transmissions  (when expressly provided in the Deposit  agreement); and converting foreign  currency to dollars. |
| Taxes and other governmental  charges the Depositary or the  Custodian has to pay on any  ADS or share underlying an  ADS – for example, stock  transfer taxes, stamp duty or  withholding taxes |  | As necessary. |

#### Documents on display

National Grid is subject to the US SEC reporting requirements for

foreign companies. The Company’s Form 20-F and other filings can

be viewed on the website as well as the SEC website at sec.gov.

#### Events after the reporting period

A post balance sheet event occurred. Please see note 36 on page

[211](#i2193c7e7fbee4753bdbe2d16888565c8_325) for details.

#### Exchange controls

There are currently no UK laws, decrees or regulations that restrict

the export or import of capital, including, but not limited to, foreign

exchange control restrictions, or that affect the remittance of

dividends, interest or other payments to non-UK resident holders of

ordinary shares except as otherwise set out in Taxation on pages [253](#i01de1c16a17046d497a42f2f76dda2a5_32900)

to [255](#i01de1c16a17046d497a42f2f76dda2a5_32901) and except in respect of the governments of and/or certain

citizens, residents or bodies of certain countries (described in

applicable Bank of England Notices or European Union Council

Regulations in force as at the date of this document).

#### Share information

National Grid ordinary shares are listed on the London Stock

Exchange under the symbol NG. The ADSs are listed on the New

York Stock Exchange under the symbol NGG.

As at 13 May 2026, the share capital of the Company consists of

5,198,968,690 ordinary shares of 12204⁄473 pence nominal value each

and ADSs, which represent five ordinary shares each.

Disclosure of interests

Under the Companies Act 2006, National Grid may, by written notice,

require a person whom it has reasonable cause to believe to be or to

have been, in the last three years, interested in its shares to provide

additional information relating to that interest. Under the Articles,

failure to provide such information may result in a shareholder losing

their rights to attend, vote or exercise any other right in relation to

shareholders’ meetings.

Other than as stated below as far as we are aware, there are no

persons with significant direct or indirect holdings in the Company.

Information provided pursuant to FCA’s DTR is published on the

Regulatory Information Service and on the Company’s website.

The UK City Code on Takeovers and Mergers imposes strict

disclosure requirements regarding dealings in the securities of an

offeror or offeree company, and also on their respective associates,

during the course of an offer period. Other regulators in the UK, US

and elsewhere may have, or assert, notification or approval rights

over acquisitions or transfers of shares.

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 253 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Shareholder information cont. | | |  |  |  |

#### Material interests in shares

As at 31 March 2026, National Grid plc had received notice, under

the DTRs, in respect of the following holdings of 3% or more of the

voting rights in its issued ordinary share capital:

|  |  |  |  |
| --- | --- | --- | --- |
|  |  |  |  |
|  | Number of  ordinary shares | % of voting  rights 1 | Date of last notification of  interest |
| BlackRock, Inc. | 406,584,816 | 8.17 | 25 November 2025 |
| The Capital Group  Companies, Inc. | 182,521,721 | 4.99 | 7 September 2022 |

1. This number is calculated in relation to the issued share capital at the time the holding

was disclosed.

As at 13 May 2026, no further notifications have been received.

The rights attached to ordinary shares are detailed on page [251](#i01de1c16a17046d497a42f2f76dda2a5_59276). All

ordinary shares and all major shareholders have the same voting

rights. The Company is not, to the best of its knowledge, directly or

indirectly controlled.

Authority to purchase shares

Shareholder approval was given at the 2025 AGM to purchase up to

10% of the Company’s share capital (being 490,143,652 ordinary

shares). The Directors will seek shareholder approval to renew this

authority at the 2026 AGM.

In some circumstances, the Company may find it advantageous to

have the authority to purchase its own shares in the market, where

the Directors believe this would be in the interests of shareholders

generally. The Directors believe that it is an important part of the

financial management of the Company to have the flexibility to

repurchase issued shares to manage its capital base, including

actively managing share issuances from the operation of the Scrip

Dividend Scheme. It is expected that repurchases to manage share

issuances under the Scrip Dividend Scheme will not exceed 2.5% of

the issued share capital (excluding treasury shares) per annum.

When purchasing shares, the Company has taken, and will continue

to take, into account market conditions prevailing at the time, other

investment and financing opportunities, and the overall financial

position of the Company.

At the 2025 AGM, the Company sought authority to purchase

ordinary shares in the capital of the Company as part of the

management of the dilutive effect of share issuances under the Scrip

Dividend Scheme. During the year, the Company did not purchase

any of its own shares, and does not expect to do so while delivering

strong asset growth.

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
|  | Number of  shares | Total  nominal  value |  | % of called  up share  capital |  |
| Shares held in  Treasury purchased  in prior years  1 | 235,493,935 | £29,274,933.15 | 2 | 4.59 | 1 |
| Shares purchased  and held in Treasury  during the year | — | — |  | — |  |
| Shares transferred  from Treasury during  the year  (to employees under  employee share  plans) | 9,952,077 | £1,237,171.52 | 2 | 0.19 | 3 |
| Maximum number of  shares held in  Treasury during the  year4 | 235,493,935 | £29,274,933.15 | 2 | 4.53 | 3 |

1. Called-up share capital: 5,132,617,708, ordinary shares as at 31 March 2025.

2. Nominal value: 12 204⁄473 pence per ordinary share.

3. Called-up share capital: 5,198,968,690 ordinary shares as at the date of this report.

4. Maximum number of shares held in Treasury during the year as at 31 March 2026.

As at 13 May 2026, the Company’s issued share capital comprised

5,198,968,690 ordinary shares including 223,323,555 ordinary

shares held in treasury. This represented 4.30% of the Company’s

called-up share capital.

Authority to allot shares

Shareholder approval was given at the 2025 AGM to allot shares of

up to one third of the Company’s share capital. The Directors are

seeking a similar authority this year. The Directors consider that the

Company will have sufficient flexibility with this level of authority to

respond to market developments and that this authority is in line with

investor guidelines.

The Directors currently have no intention of issuing new shares, or of

granting rights to subscribe for or to convert any security into shares,

except in relation to, or in connection with, the operation and

management of the Company’s Scrip Dividend Scheme and the

exercise of options under the Company’s employee share plans. No

issue of shares will be made that would effectively alter control of the

Company without the sanction of shareholders in a general meeting.

The Company expects to actively manage the dilutive effect of share

issuance arising from the operation of the Scrip Dividend Scheme. In

some circumstances, additional shares may be allotted to the market

for this purpose under the authority provided by this resolution. Under

these circumstances, it is expected that the associated allotment of

new shares (or rights to subscribe for or convert any security into

shares) will not exceed 1% of the issued share capital (excluding

treasury shares) per annum.

Dividend waivers

The Trustee of the National Grid Employee Share Trust, which is

independent of the Company, waived the right to dividends paid during

the year. They have also agreed to waive the right to future dividends, in

relation to the ordinary shares and ADSs held by the Trust.

Under the Company’s ADS programme, the right to dividends in

relation to the ordinary shares underlying the ADSs was waived

during the year, under an arrangement whereby the Company pays

the monies to satisfy any dividends separately to the Depositary for

distribution to ADS holders entitled to the dividend. This arrangement

is expected to continue for future dividends.

#### Shareholder analysis

The following table includes a brief analysis of shareholder numbers

and shareholdings as at 31 March 2026:

|  |  |  |  |  |
| --- | --- | --- | --- | --- |
|  |  |  |  |  |
|  | Number of  shareholders | % of  shareholders  1 | Number  of shares | % of  shares 1 |
| 1 – 50 | 110,405 | 19.40 | 3,400,650 | 0.07 |
| 51 – 100 | 139,365 | 24.49 | 9,787,504 | 0.19 |
| 101 – 500 | 240,965 | 42.35 | 51,388,316 | 0.99 |
| 501 – 1,000 | 37,655 | 6.62 | 26,132,299 | 0.50 |
| 1,001 – 10,000 | 37,516 | 6.59 | 93,592,577 | 1.80 |
| 10,001 – 50,000 | 1,830 | 0.32 | 33,774,743 | 0.65 |
| 50,001 – 100,000 | 237 | 0.04 | 16,867,357 | 0.32 |
| 100,001 – 500,000 | 476 | 0.08 | 116,492,275 | 2.24 |
| 500,001 –  1,000,000 | 175 | 0.03 | 125,170,494 | 2.41 |
| 1,000,001+ | 358 | 0.06 | 4,722,362,475 | 90.83 |
| Total | 568,982 | 100 | 5,198,968,690 | 100 |

1. Percentages have been rounded to two decimal places.

#### Taxation

This section provides information about certain US federal income tax

and UK tax consequences for US Holders (defined below) of owning

ADSs and ordinary shares. A US Holder is the beneficial owner of

ADSs or ordinary shares who:

– is for US federal income tax purposes (1) an individual citizen or

resident of the US; (2) a corporation created or organised under

the laws of the US, any state thereof or the District of Columbia;

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 254 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Shareholder information cont. | | |  |  |  |

(3) an estate, the income of which is subject to US federal income

tax without regard to its source; or (4) a trust, if a court within the

US is able to exercise primary supervision over the administration

of the trust and one or more US persons have the authority to

control all substantial decisions of the trust, or the trust has elected

to be treated as a domestic trust for US federal income tax

purposes;

– is not resident in the UK for UK tax purposes; and

– does not hold ADSs or ordinary shares in connection with the

conduct of a business or the performance of services in the UK

or otherwise in connection with a branch, agency or permanent

establishment in the UK.

This section is not a comprehensive description of all the US federal

income tax and UK tax considerations that may be relevant to any

particular investor (including consequences under the US alternative

minimum tax or net investment income tax). Neither does it address

state, local or other tax laws. National Grid has assumed that

shareholders, including US Holders, are familiar with the tax rules

applicable to investments in securities generally and with any special

rules to which they may be subject. This discussion deals only with

US Holders who hold ADSs or ordinary shares as capital assets. It

does not address the tax treatment of investors who are subject to

special rules. Such investors may include:

– financial institutions;

– insurance companies;

– dealers in securities or currencies;

– investors who elect mark-to-market treatment;

– entities treated as partnerships or other pass-through entities and

their partners;

– individual retirement accounts and other tax-deferred accounts;

– tax-exempt organisations;

– investors who own (directly or indirectly) 10% or more of our

shares (by vote or value);

– investors who hold ADSs or ordinary shares as a position in a

straddle, hedging transaction or conversion transaction;

– individual investors who have ceased to be resident in the UK for a

period of five years or less;

– persons who have ceased to be US citizens or lawful permanent

residents of the US; and

– US Holders whose functional currency is not the US dollar.

The statements regarding US and UK tax laws and administrative

practices set forth below are based on laws, treaties, judicial

decisions and regulatory interpretations that were in effect on the

date of this document. These laws and practices are subject to

change without notice, potentially with retroactive effect. In addition,

the statements set forth below are based on the representations of

the Depositary and assume that each party to the Deposit agreement

will perform its obligations thereunder in accordance with its terms.

US Holders of ADSs generally will be treated as the owners of the

ordinary shares represented by those ADSs for US federal income tax

purposes. For the purposes of the Tax Convention, the Estate Tax

Convention and UK tax considerations, this discussion assumes that

a US Holder of ADSs will be treated as the owner of the ordinary

shares represented by those ADSs. HMRC has stated that it will

continue to apply its longstanding practice of treating a holder of

ADSs as holding the beneficial interest in the ordinary shares

represented by the ADSs; however, we note that this is an area of

some uncertainty and may be subject to change.

US Holders should consult their own advisors regarding the tax

consequences of buying, owning and disposing of ADSs or ordinary

shares depending on their particular circumstances, including the

effect of any state, local or other tax laws.

Taxation of dividends

The UK does not currently impose a withholding tax on dividends

paid to US Holders.

US Holders should assume that any cash distribution paid by the

Depositary for ADSs with respect to ADSs or ordinary shares will be

reported as dividend income for US federal income tax purposes.

While dividend income received from non-US corporations is

generally taxable to a non-corporate US Holder as ordinary income

for US federal income tax purposes, dividend income received by a

non-corporate US Holder from us generally will be taxable at the

same favourable rates applicable to long-term capital gains provided

(1) either: (a) we are eligible for the benefits of the Tax Convention or

(b) ADSs or ordinary shares are treated as ‘readily tradable’ on an

established securities market in the US; and (2) we are not, for our

taxable year during which the dividend is paid or the prior year, a

passive foreign investment company for US federal income

tax purposes, and certain other requirements are met. We expect

that our shares will be treated as ‘readily tradable’ on an established

securities market in the US as a result of the trading of ADSs on the

New York Stock Exchange (NYSE). We also believe we are eligible for

the benefits of the Tax Convention.

Based on our audited financial statements and the nature of our business

activities, we believe that we were not treated as a Passive Foreign

Investment Company (PFIC) for US federal income tax purposes with

respect to our taxable year ended 31 March 2026. In addition, based on

our current expectations regarding the value and nature of our assets, the

sources and nature of our income, and the nature of our business

activities, we do not anticipate becoming a PFIC in the foreseeable future.

Dividends received by corporate US Holders with respect to ADSs or

ordinary shares will not be eligible for the dividends-received

deduction that is generally allowed to corporations.

Taxation of capital gains

Subject to specific rules relating to assets that derive at least 75% of

their value from UK land, US Holders will not be subject to UK

taxation on any capital gain realised on the sale or other disposition of

ADSs or ordinary shares.

Provided that we are not a PFIC for any taxable year during which a

US Holder holds their ADSs or ordinary shares, upon a sale or other

taxable disposition of ADSs or ordinary shares, a US Holder generally

will recognise a capital gain or loss for US federal income tax

purposes that is equal to the difference between the US dollar value

of the amount realised on the sale or other taxable disposition and

the US Holder’s adjusted tax basis in the ADSs or ordinary shares.

Such capital gain or loss generally will be long-term capital gain or

loss if the ADSs or ordinary shares were held for more than one year.

For non-corporate US Holders, long-term capital gain is generally

taxed at a lower rate than ordinary income. A US Holder’s ability to

deduct capital losses is subject to significant limitations.

US information reporting and backup withholding tax

Dividend payments made to US Holders and proceeds paid from the

sale or other taxable disposition of ADSs or ordinary shares to US

Holders may be subject to information reporting to the US Internal

Revenue Service. Such payments may be subject to backup

withholding taxes if the US Holder fails to provide an accurate

taxpayer identification number or certification of exempt status or fails

to comply with applicable certification requirements.

US Holders should consult their tax advisors about these rules and

any other reporting obligations that may apply to the ownership

or disposition of ADSs or ordinary shares. Such obligations include

reporting requirements related to the holding of certain foreign

financial assets.

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 255 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Shareholder information cont. | | |  |  |  |

#### UK stamp duty and stamp duty reserve tax (SDRT)

Transfers of ordinary shares

SDRT at the rate of 0.5% of the amount or value of the consideration

will generally be payable on any agreement to transfer ordinary

shares that is not completed using a duly stamped instrument of

transfer (such as a stock transfer form).

The SDRT liability will be cancelled where an instrument of transfer is

executed and duly stamped before the expiry of the six-year period

beginning with the date on which the agreement is made. If a claim is

made within the specified period, any SDRT which has been paid will

be refunded. SDRT is due whether or not the agreement or transfer is

made or carried out in the UK and whether or not any party to that

agreement or transfer is a UK resident.

Purchases of ordinary shares completed using a stock transfer form

will generally result in a UK stamp duty liability at the rate of 0.5%

(rounded up to the nearest £5) of the amount or value of the

consideration. Paperless transfers under the CREST paperless

settlement system will generally be liable to SDRT at the rate of 0.5%,

and not stamp duty. SDRT is generally the liability of the purchaser,

and UK stamp duty is usually paid by the purchaser or transferee.

Transfers of ADSs

No UK stamp duty will be payable on the acquisition or transfer of

existing ADSs or beneficial ownership of ADSs (in each case in the

form of ADRs), provided that any instrument of transfer or written

agreement to transfer is executed outside the UK and remains at all

times outside the UK.

An agreement for the transfer of ADSs in the form of ADRs will not

result in an SDRT liability. A charge to stamp duty or SDRT may arise

on the transfer of ordinary shares to the Depositary or The Bank of

New York Mellon as agent of the Depositary (the ‘Custodian’).

The rate of stamp duty or SDRT will generally be 1.5% of the value of

the consideration or, in some circumstances, the value of the ordinary

shares concerned. However, there is no 1.5% SDRT charge on the

issue of ordinary shares (or, where a transfer is made in the course of

a ‘capital raising arrangement’, being arrangements pursuant to

which securities are issued by a company for the purpose of raising

new capital) to the Depositary or the Custodian.

The Depositary will generally be liable for the stamp duty or SDRT. Under

the terms of the Deposit agreement, the Depositary will charge any tax

payable by the Depositary or the Custodian (or their nominees) on the

deposit of ordinary shares to the party to whom the ADSs are delivered

against such deposits. If the stamp duty is not a multiple of £5, the duty

will be rounded up to the nearest multiple of £5.

UK inheritance tax

An individual who is domiciled in the US for the purposes of the

Estate Tax Convention and who is not a UK national for the purposes

of the Estate Tax Convention will generally not be subject to UK

inheritance tax in respect of (1) the ADSs or ordinary shares on the

individual’s death or (2) a gift of the ADSs or ordinary shares during

the individual’s lifetime. This is not the case where the ADSs

or ordinary shares are part of the business property of the individual’s

permanent establishment in the UK or relate to a fixed base in the UK

of an individual who performs independent personal services.

Special rules apply to ADSs or ordinary shares held in trust. In the

exceptional case where the ADSs or shares are subject both to UK

inheritance tax and to US federal gift or estate tax, the Estate Tax

Convention generally provides for the tax paid in the UK to be

credited against tax paid in the US or vice versa.

Capital Gains Tax (CGT) for UK resident shareholders

You can find CGT information relating to National Grid shares for UK

resident shareholders on the investors section of our website

nationalgrid.com/investors.

Share prices on specific dates are also available on our website.

#### All-employee share plans

The Company has a number of all-employee share plans as

described below, which operated during the year. These allow UK-

or US-based employees to participate in tax-advantaged plans and

to become shareholders in National Grid.

UK Sharesave

UK employees are eligible to participate in the Sharesave Plan. Under

this plan, participants may contribute between £5 and £500 each

month, for a fixed period of three years, five years, or both.

Contributions are taken from net salary. At the end of the fixed

period, participants may use their savings to purchase ordinary

shares in National Grid plc at a 20% discounted option price, which is

set at the time of each Sharesave launch.

UK Share Incentive Plan (SIP)

UK employees are eligible to participate in the SIP. Contributions up

to £150 per month are deducted from participants’ gross salary and

used to purchase National Grid plc ordinary shares each month. The

shares are placed in a UK resident trust and are available to

the individual with tax advantages after a five-year period.

US Employee Stock Purchase Plan (ESPP)

Employees of National Grid’s participating US companies are eligible

to participate in the ESPP (commonly referred to as a 423(b) plan).

Eligible employees have the opportunity to purchase ADSs in National

Grid on a monthly basis at a 15% discount to the Fair Market Value

(FMV). Under the plan, employees may contribute up to 20% of

base pay each year, up to a maximum annual contribution of

$21,250, to purchase $25,000 worth of ADSs at FMV.

US Incentive Thrift Plan

The Thrift Plan is open to substantially all US employees of

participating National Grid companies; this is a tax-advantaged

savings plan (commonly referred to as a 401(k) plan). This is a defined

contribution pension plan that gives participants the opportunity to

invest up to applicable federal salary limits. Contribution limits for

calendar year 2025 were: for pre-tax contributions or Roth 401(k)

after tax contributions, a maximum of 50% of salary limited to

$23,500 for those under the age of 50 and $31,000 for those aged

50 and above (except this limit was $34,750 for those aged 60-63);

and for post-tax contributions, up to 15% of salary. The total amount

of employee contributions (pre-tax, Roth 401(k) and post-tax) could

not exceed 50% of compensation. The total amount of employee and

employer contributions collectively were subject to the federal annual

contribution limit of $70,000 for those under the age of 50 and

$77,500 for those aged 50 and above (except this limit is $81,250 for

those aged 60 to 63). For calendar year 2026, participants may

contribute, up to the applicable federal salary limits: for pre-tax

contributions or Roth 401(k) after tax contributions, a maximum of

50% of salary limited to $24,500 for those under the age of 50 and

$32,500 for those aged 50 and above (except this limit is $35,750 for

those aged 60 to 63); and for post-tax contributions, up to 15% of

salary. The total amount of employee contributions (pre-tax, Roth

401(k) and post-tax) may not exceed 50% of compensation. The total

amount of employee and employer contributions collectively, in 2026,

are subject to the federal annual contribution limit of $72,000 for

those under the age of 50, and $80,000 for those aged 50 and above

(except this limit is $83,250 for those aged 60 to 63).

New contributions or exchanges into the National Grid ADR Fund

within the plan are limited to 20% of a participant’s account balance.

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 256 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Definitions and glossary of terms | | |  |  |  |

Our aim is to use plain English in this

Annual Report and Accounts. However,

where necessary, we do use a number of

technical terms and abbreviations.

We summarise the principal ones below,

together with an explanation of their

meanings. The descriptions below are not

formal legal definitions. Alternative

and regulatory performance measures are

defined on pages [236](#i2193c7e7fbee4753bdbe2d16888565c8_400) to [247](#i4d298f0c87f34766961e584275cfa183_101333).

A

#### Adjusted interest

A measure of the interest charge of the Group, calculated by making

adjustments to the Group reported interest charge.

#### Adjusted net debt

A measure of the indebtedness of the Group, calculated by making

adjustments to the Group reported borrowings, including

adjustments made to include elements of pension deficits and

exclude elements of hybrid debt financing.

#### Adjusted results

Financial results excluding the impact of exceptional items and

remeasurements that are treated as discrete transactions under

IFRS and can accordingly be classified as such.

#### American Depositary Shares (ADSs)

Securities of National Grid listed on the NYSE each of which

represents five ordinary shares. They are evidenced by American

Depositary Receipts or ADRs.

#### Annual General Meeting (AGM)

Meeting of shareholders of the Company held each year to consider

ordinary and special business as provided in the Notice of AGM.

#### ASTI

The Accelerated Strategic Transmission Investment framework to

connect 50GW of offshore generation by 2030, announced by Ofgem

in December 2022. The six Wave 1 ASTI projects, currently in

construction, comprise Eastern Green Link 1, Eastern Green Link 2,

Bramford to Twinstead, Yorkshire Green, North London

Reinforcements and Tilbury to Grain.

B

#### bps

Basis point (bp) is a unit that is equal to 1/100th of 1% and is typically

used to denote the movement in a percentage-based metric such as

interest rates or RoE. A 0.1% change in a percentage represents 10

basis points.

#### Board

The Board of Directors of the Company (for more information, see

pages [91](#i2193c7e7fbee4753bdbe2d16888565c8_145) to [93](#i4997ac40020447c895a078c99bce5833_0-0-1-1-921425)).

#### BritNed

BritNed Development Limited, the joint venture company operating

the BritNed interconnector between The Netherlands and Great

Britain, commissioned in 2011, in which National Grid and TenneT,

the Dutch national transmission operator, each hold 50% of the

shares.

#### BSUoS

Balancing Service Use of System (charges) are revenues collected by

NESO and regulated by Ofgem.

C

#### Called-up share capital

Shares (common stock) that have been issued and have been fully

paid for.

#### Capital tracker

In the context of our US rate plans, this is a mechanism that allows

the recovery of the revenue requirement of incremental capital

investment above that embedded in base rates, including

depreciation, property taxes and a return on the incremental

investment.

#### Carrying value

The amount at which an asset or a liability is recorded in the Group’s

statement of financial position and the Company’s balance sheet.

#### Clean energy, clean power, clean generation

We use these terms in relation to energy, power or generation which

when used or produced, creates little or no GHG emissions.

#### Climate Transition Plan (CTP)

The plan sets out our actions to meet our Group GHG reduction

targets by 2030. We have committed to update the plan every three

years (minimum).

#### The Company, the Group, National Grid, we, our or us

We use these terms to refer to either National Grid plc itself or to

National Grid plc and/or all or certain of its subsidiaries, depending

on context.

#### Compound annual growth rate (CAGR)

The annualised rate of return representing the growth of an

investment from its initial value to its final value over a defined period,

assuming reinvestment of returns.

#### Consolidated financial statements

Financial statements that include the results and financial position of

the Company and its subsidiaries together as if they were

a single entity.

#### Constant currency

Constant currency basis refers to the reporting of the actual results

against the results for the same period last year, which, in respect of

any US$ currency denominated activity, have been translated using

the average US$ exchange rate for the year ended 31 March 2026,

which was $1.34332 to £1. The average rate for the year ended 31

March 2025 was $1.26637 to £1, for the year ended 31 March 2024

was $1.2624 to £1, and for the year ended 31 March 2023 was

$1.2156 to £1. Assets and liabilities as at 31 March 2025 have been

retranslated at the closing rate at 31 March 2026 of $1.3231 to £1.

The closing rate for the balance sheet date 31 March 2025 was

$1.29160 to £1.

#### Contingent liabilities

Possible obligations or potential liabilities arising from past events for

which no provision has been recorded, but for which disclosure in the

financial statements is made.

#### COP30

The 30th UN Climate Change Conference of the Parties held in

Belém, in Brazil, in November 2025 at which the Company gave

various keynote speeches.

#### CPIH

The UK Consumer Prices Index including Owner Occupiers’ Housing

Costs as published by the Office for National Statistics.

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 257 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Definitions and glossary of terms cont. | | |  |  |  |

D

DB

Defined benefit, relating to our UK or US (as the context requires) final

salary pension schemes.

#### Deferred tax

For most assets and liabilities, deferred tax is the amount of tax that

will be payable or receivable in respect of that asset or liability

in future tax returns as a result of a difference between the carrying

value for accounting purposes in the statement of financial position or

balance sheet and the value for tax purposes of the same asset or

liability.

#### Deposit agreement

The amended and restated Deposit agreement entered into between

National Grid plc, the Depositary and all the registered holders of

ADRs, pursuant to which ADSs have been issued, dated 23 May

2013, and any related agreement.

#### Depositary

The Bank of New York Mellon acting as ADS Depositary.

#### Derivative

A financial instrument or other contract where the value is linked to an

underlying index, such as exchange rates, interest rates or

commodity prices. In most cases, we exclude contracts for the sale

or purchase of commodities that are used to supply customers or for

our own needs from this definition.

#### DESNZ

The Department for Energy Security and Net Zero, the UK

Government department established in February 2023 and focused

on energy security, climate change and the transition to a low-carbon

economy.

#### Directors/Executive Directors/Non-executive Directors

The Directors, Executive Directors and Non-executive Directors of

the Company, whose names are set out on pages [91](#i2193c7e7fbee4753bdbe2d16888565c8_145) to [93](#i4997ac40020447c895a078c99bce5833_0-0-1-1-921425) of

this document.

#### Distributed energy resources (DER)

Decentralised assets, generally located behind the meter, covering a

range of technologies including solar, storage, electric vehicle

charging, district heating, smart street lighting and combined heat

and power.

#### Dollars or $

Except as otherwise noted, all references to dollars or $ in this Annual

Report and Accounts relate to the US currency.

#### DSO

Distribution System Operator.

#### Dth

Decatherm, being an amount of energy equal to 1 million British

thermal units (BTUs), equivalent to approximately 293 kWh.

E

#### Earnings per share (EPS)

Profit for the year attributable to equity shareholders of the Company

allocated to each ordinary share.

#### Employee engagement

A key performance indicator (KPI), based on the percentage of

favourable responses to certain indicator questions repeated in each

employee survey. We currently perform two Company-wide

employee surveys each year. It is used to measure how employees

think, feel and act in relation to National Grid. Research shows that a

highly engaged workforce leads to increased productivity and

employee retention. We use employee engagement as a measure of

organisational health in relation to business performance.

#### Employee Resource Group (ERG)

A voluntary, employee-led group whose aim is to foster an inclusive

workplace, aligned with the organisations they serve.

#### Estate Tax Convention

The convention between the US and the UK for the avoidance of

double taxation with respect to estate and gift taxes.

F

#### FERC

The US Federal Energy Regulatory Commission.

#### Financial year

For National Grid this is an accounting year ending on 31 March.

Also known as a fiscal year.

#### FRS

A UK Financial Reporting Standard as issued by the UK Financial

Reporting Council (FRC). It applies to the Company’s individual

financial statements on pages [212](#i2193c7e7fbee4753bdbe2d16888565c8_328) to 218, which are prepared in

accordance with FRS 101.

#### Funds from Operations (FFO)

A measure used by the credit rating agencies of the operating cash

flows of the Group after interest and tax but before capital

investment.

G

#### Grain LNG

Grain LNG Limited, which together with another former National Grid

Subsidiary, Thamesport Interchange Limited, was sold to a joint

venture of Centrica plc and Energy Capital Partners, part of

Bridgepoint Group plc, effective 28 November 2025.

#### Great Britain (GB)

England, Wales and Scotland.

#### Green capital expenditure (green capex)

Capital expenditure invested in decarbonisation of energy systems

and considered to be aligned with the principles of the EU Taxonomy

legislation at the date of reporting for climate change mitigation and

adaptation activities. Green capital expenditure excludes any capital

prepayments and equity investments in joint ventures and associates.

#### Green

Green refers to any economic activity aligned to the EU Taxonomy

Climate Change Delegation Act, which includes climate change

adaptation and mitigation requirements. (Full alignment assessment

can be found in our latest EU Taxonomy report.)

#### Grid for Good

Our flagship programme wherein we work with our supply chain and

other partners to benefit local communities.

#### Gridtern

This is the term we use to describe our paid summer interns who

work for the Company in the US from May/June through to August

each year.

#### Group Principal Risk (GPR)

A principal risk faced by the Company as monitored and assessed by

the Board, details of which are set out on pages [31](#i2193c7e7fbee4753bdbe2d16888565c8_4318) to [36](#i5b716aa667c3427e93e3ed5359a2f216_69378).

GW

Gigawatt, an amount of power equal to 1 billion watts (109 watts).

#### GWh

Gigawatt hours, an amount of energy equivalent to delivering 1 billion

watts (109 watts) of power for a period of one hour.

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 258 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Definitions and glossary of terms cont. | | |  |  |  |

H

#### HMRC

HM Revenue & Customs, the UK tax authority.

#### HVDC

High-voltage, direct-current electric power transmission that uses

direct current for the bulk transmission of electrical power, in contrast

to the more common alternating current systems.

I

#### IFA

Interconnection France Angleterre, also referred to as IFA1, the first

interconnector between France and Great Britain which was

commissioned in 1986, operated by National Grid and RTE, the

French national transmission operator.

#### IFA2

The second interconnector between France and Great Britain, which

was commissioned in 2020, operated by National Grid and RTE, the

French national transmission operator.

#### IAS or IFRS

An International Accounting Standard (IAS) or International Financial

Reporting Standard (IFRS), as issued by the International Accounting

Standards Board (IASB). IFRS is also used as the term to describe

international generally accepted accounting principles as a whole.

#### Individual financial statements

Financial statements of a company on its own, not including its

subsidiaries or joint ventures and associates.

#### Interest cover

A measure used by the credit rating agencies, calculated as FFO plus

adjusted interest, divided by adjusted interest.

J

#### Joint venture (JV)

A company or other entity that is controlled jointly with other parties.

K

#### KEDLI

KeySpan Gas East Corporation, also known as KeySpan Energy

Delivery Long Island.

#### KEDNY

The Brooklyn Union Gas Company, also known as KeySpan Energy

Delivery New York.

#### KPI

Key performance indicator.

kW

Kilowatt, an amount of power equal to 1,000 watts.

L

#### LIPA

The Long Island Power Authority.

#### LNG

Liquefied natural gas is natural gas that has been condensed into a

liquid form, typically at temperatures at or below -161°C (-258°F).

#### Lost time injury (LTI)

An incident arising out of National Grid’s operations that leads to an

injury where the employee or contractor normally has time off for the

following day or shift following the incident. It relates to one specific

(acute) identifiable incident which arises as a result of National Grid’s

premises, plant or activities, and was reported to the supervisor at

the time and was subject to appropriate investigation.

#### Lost time injury frequency rate (LTIFR)

The number of lost time injuries (LTIs) per 100,000 hours worked in a

12-month period.

M

#### MADPU

The Massachusetts Department of Public Utilities.

MW

Megawatt, an amount of power equal to 1 million watts (106 watts).

#### MWh

Megawatt hours, an amount of energy equivalent to delivering

1 million watts (106 watts) of power for a period of one hour.

N

#### National Energy System Operator (NESO)

The party responsible for the long-term strategy and planning of

electricity and gas systems and the real-time operation (balancing

supply and demand) of the electricity system in Great Britain. NESO,

formerly National Grid Electricity System Operator Limited, was

divested by National Grid to the UK Government, effective 1 October

2024.

#### National Gas Transmission

National Gas Transmission plc, the gas transmission operator for

England and Wales, formerly owned by the Company and sold to a

consortium comprising, inter alia, Macquarie Asset Management and

British Columbia Investment Management Corporation. The final

stake in this business was sold in September 2024.

#### National Grid Electricity Distribution (NGED/UK ED)

National Grid’s UK electricity distribution business, comprising

National Grid Electricity Distribution Holdings Limited and its

subsidiaries.

#### National Grid Electricity Transmission (NGET/UK ET)

National Grid’s UK electricity transmission business.

#### National Grid Renewables

National Grid’s US renewables development business, including the

company formerly known as Geronimo, a leading developer of wind

and solar generation based in Minneapolis, which was sold to

Brookfield Asset Management effective 30 May 2025.

#### National Grid Ventures (NGV)

The Group’s division that operates outside its core UK and US

Regulated businesses, comprising a broad range of activities in the

UK and US, including electricity interconnectors and energy metering,

as well as being tasked with investment in adjacent businesses and

distributed energy opportunities.

#### Net zero

Net zero means that a person, legal entity (such as a company),

country or other body’s own emissions of greenhouse gases are

either zero or that its remaining greenhouse gas emissions are

balanced by schemes to offset, through the removal of an equivalent

amount of greenhouse gases from the atmosphere, such as planting

trees or using technologies like carbon capture and storage.

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 259 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Definitions and glossary of terms cont. | | |  |  |  |

#### Nemo Link

Nemo Link Limited, the joint venture company operating the Nemo

Link interconnector between Great Britain and Belgium,

commissioned in 2019, in which National Grid and Elia Transmission,

the Belgian national transmission operator, each hold 50% of the

shares.

New England

The term refers to a region within the Northeastern US that includes

the states of Connecticut, Maine, Massachusetts, New Hampshire,

Rhode Island and Vermont. National Grid’s New England operations

are primarily in the state of Massachusetts.

#### NIMO

Niagara Mohawk Power Corporation.

#### Northeastern US

The Northeastern region of the US, comprising the states of

Connecticut, Maine, Massachusetts, New Hampshire, New Jersey,

New York, Pennsylvania, Rhode Island and Vermont.

#### NSL

North Sea Link, the interconnector between Norway and Great

Britain, which was commissioned in 2021, operated by National Grid

and Statnett, the Norwegian national transmission operator.

#### NYPSC

The New York Public Service Commission.

O

#### Ofgem

The UK Office of Gas and Electricity Markets is part of the UK Gas

and Electricity Markets Authority (GEMA), which regulates the energy

markets in the UK.

#### OPEB

Other post-employment benefits.

#### Ordinary shares

Voting shares entitling the holder to part ownership of a company.

Also known as common stock. National Grid’s ordinary shares have a

nominal value of 12204⁄473 pence.

P

#### Paris Agreement

The agreement, also known as the Paris Climate Accord, within the

United Nations Framework Convention on Climate Change, dealing

with greenhouse gas emissions mitigation, adaptation and finance

starting in 2020, and adopted by consensus on 12 December 2015.

#### Price control

The mechanism by which Ofgem sets restrictions on the amounts of

revenue we are allowed to collect from customers in our UK

businesses. The allowed revenues are intended to cover efficiently

incurred operational expenditure, capital expenditure and financing

costs, including a Return on Equity invested.

R

#### Rate base

The base investment on which the utility is authorised to earn a cash

return. It includes the original cost of facilities, minus depreciation, an

allowance for working capital and other accounts.

#### Rate plan

The term given to the mechanism by which a US utility regulator sets

terms and conditions for utility service, including, in particular, tariffs

and rate schedules. The term can mean a multi-year plan that is

approved for a specified period, or an order approving tariffs and rate

schedules that remain in effect until changed as a result of future

regulatory proceedings. Such proceedings can be commenced

through a filing by the utility or on the regulator’s own initiative.

#### Regulated controllable costs

Total operating costs under IFRS less depreciation and certain

regulatory costs where, under our regulatory agreements,

mechanisms are in place to recover such costs in current or future

periods.

#### Regulatory asset value (RAV)

The value ascribed by Ofgem to the capital employed in the relevant

licensed business. It is an estimate of the initial market value of

the regulated asset base at privatisation, plus subsequent allowed

additions at historical cost, less the deduction of annual regulatory

depreciation. Deductions are also made to reflect the value realised

from the disposal of certain assets that formed part of the regulatory

asset base. It is also indexed to the RPI to allow for the effects of

inflation.

#### Regulatory IOUs

Net under/over-recoveries of revenue from output-related allowance

changes, the totex incentive mechanism, legacy price control cost

true-up and differences between allowed and collected revenues.

#### Renewable energy

Renewable energy is usable energy derived from replenishable

sources such as the sun (solar energy), wind (wind power), rivers

(hydroelectric power), hot springs (geothermal energy), tides (tidal

power) and biomass (biofuels).

#### Retained cash flow (RCF)

A measure of the cash flows of the Group used by the credit rating

agencies. It is calculated as funds from operations less dividends

paid and costs of repurchasing scrip shares.

#### Revenue decoupling

The term given to the elimination of the dependency of a utility’s

revenue on the volume of gas or electricity transported. The purpose

of decoupling is to encourage energy-efficiency programmes by

eliminating the disincentive a utility otherwise has to

such programmes.

#### Rights Issue

The Company’s latest equity rights issue, announced on 23 May

2024 and completed on 12 June 2024, successfully raising c.£7

billion by way of a fully underwritten issue of 1,085,448,980 new

shares at 645 pence per new share on the basis of 7 new shares for

every 24 existing shares. The Rights Issue price of 645 pence

represented a 34.7% discount to the theoretical ex-rights price of

988 pence per ordinary share based on the closing middle-market

price on 22 May 2024, adjusted for the recommended final dividend

for 2023/24 of 39.12 pence per ordinary share.

#### RIIO

Revenue = Incentives + Innovation + Outputs, the regulatory

framework for energy networks issued by Ofgem.

#### RIIO-ED1

The eight-year regulatory framework for electricity distribution

networks issued by Ofgem which started on 1 April 2015.

#### RIIO-ED2

The five-year regulatory framework for electricity distribution networks

issued by Ofgem which started on 1 April 2023.

#### RIIO-ED3

The five-year regulatory framework for electricity distribution networks

issued by Ofgem, which is expected to start on 1 April 2028.

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 260 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Definitions and glossary of terms cont. | | |  |  |  |

#### RIIO-T1

The eight-year regulatory framework for transmission networks that

was implemented in the eight-year price controls which started on

1 April 2013.

#### RIIO-T2

The five-year regulatory framework for transmission networks issued

by Ofgem which started on 1 April 2021.

#### RIIO-T3

The five-year regulatory framework for transmission networks issued

by Ofgem which started on 1 April 2026.

#### RPI

The UK retail price index as published by the Office for National

Statistics.

S

#### Science-Based Targets (SBTs)

SBTs provide companies with a clearly defined path to reduce

greenhouse gas emissions in line with the Paris Agreement goals.

More than 4,000 businesses around the world are already working

with the Science Based Targets initiative (SBTi).

#### Science Based Targets initiative (SBTi) validation

To achieve SBTi validation, a company’s emissions reduction targets

must align with the latest climate science, be ambitious in

contributing to limiting global warming, and use a robust

methodology. The SBTi reviews submissions to assess compliance,

and validated targets receive official recognition. This validation

showcases the company’s commitment to addressing climate

change and aligning with global climate goals.

#### Scope 1 greenhouse gas emissions

Scope 1 emissions are direct greenhouse gas emissions that occur

from sources that are owned or controlled by the Company.

Examples include emissions from combustion in owned or controlled

boilers, furnaces, vehicles, etc.

#### Scope 2 greenhouse gas emissions

Scope 2 emissions are greenhouse gas emissions from the

generation of purchased electricity consumed by the Company.

Purchased electricity is defined as electricity, heat, steam or cooling

that is purchased or otherwise brought into the organisational

boundary of the Company. Scope 2 emissions physically occur at the

facility where electricity is generated.

#### Scope 3 greenhouse gas emissions

Scope 3 emissions are indirect greenhouse gas emissions as a

consequence of the operations of the Company, but are not

owned or controlled by the Company, such as emissions from third-

party logistics providers, waste management suppliers, travel

suppliers, employee commuting and combustion of sold gas by

customers.

#### SEC

The US Securities and Exchange Commission, the financial regulator

for companies with registered securities in the US, including National

Grid and certain of its subsidiaries.

SF6

Sulphur hexafluoride is an inorganic, colourless, odourless and non-

flammable greenhouse gas. SF6 is used in the electricity industry as a

gaseous dielectric medium for high-voltage circuit breakers,

switchgear and other electrical equipment. The Kyoto Protocol

estimated that the global warming potential over 100 years of SF6 is

23,900 times more potent than that of CO2.

#### Share premium

The difference between the amount shares are issued for and the

nominal value of those shares.

#### Subsidiary

A company or other entity that is controlled by National Grid plc.

#### Sustainable Development Goals (SDGs)

The United Nations SDGs are 17 goals, established by the United

Nations General Assembly in 2015, that are aimed at improving the

planet and the quality of human life around the world by 2030. The

goals clearly define the world we want, and they apply to all nations

to ensure no one is left behind.

T

#### Task Force on Climate-related Financial Disclosures

#### (TCFD)

A body established in 2015 comprising 31 members from across the

G20. In 2017 the TCFD released its climate-related disclosure

recommendations and in 2022 TCFD disclosures became mandatory

for UK premium listed companies. In 2023 the task force disbanded,

with its monitoring responsibilities taken over by the IFRS Foundation,

whose role is to develop recommendations for more informed

investment and enable stakeholders to better understand the

concentrations of carbon-related assets in the financial sector and

the financial system’s exposures to climate-related risk.

#### Tax convention

The income tax convention between the US and the UK.

#### Taxes borne

Those taxes that represent a cost to the Company and are reflected

in our results.

#### Taxes collected

Those taxes that are generated by our operations but do not affect

our results. We generate the commercial activity giving rise to these

taxes and then collect and administer them on behalf of tax

authorities.

#### TCFD recommendations or recommended disclosures

The 11 recommended disclosures set out in the June 2017 TCFD

report entitled ‘Recommendations of the Task Force on Climate-

related Financial Disclosures’.

#### Tonne

A unit of mass equal to 1,000 kilogrammes, equivalent to

approximately 2,205 pounds.

#### Tonnes carbon dioxide equivalent (tCO

2e)

A measure of greenhouse gas emissions in terms of the equivalent

amount of carbon dioxide.

#### Totex

Total expenditure, comprising capital and operating expenditure.

#### Treasury shares

Shares that have been repurchased but not cancelled. These shares

can then be allotted to meet obligations under the Company’s

employee share schemes.

#### TWh

Terawatt hours, an amount of energy equivalent to delivering 1 trillion

watts (1012 watts) of power for a period of one hour.

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 261 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Definitions and glossary of terms cont. | | |  |  |  |

U

UK

The United Kingdom, comprising England, Wales, Scotland and

Northern Ireland.

#### UK Corporate Governance Code (the ‘2024 Code’)

Guidance, issued by the Financial Reporting Council in 2024, on how

companies should be governed, applicable to UK listed companies,

including National Grid, in respect of reporting periods starting on or

after 1 January 2025, with Provision 29 applicable to financial years

beginning on or after 1 January 2026.

#### UK Electricity Distribution (UK ED/NGED)

National Grid’s UK electricity distribution business, formerly known as

WPD, comprising Western Power Distribution Holding Company

Limited and its subsidiaries.

#### UK Electricity Transmission (UK ET/NGET)

National Grid’s UK electricity transmission business.

#### UK GAAP

Generally accepted accounting practices in the UK. These differ from

IFRS and from US GAAP.

#### Underlying Earnings per Share

Underlying results for the year attributable to equity shareholders of

the Company allocated to each ordinary share.

#### Underlying results

The financial results of the Company, adjusted to exclude the impact

of exceptional items and remeasurements that are treated as discrete

transactions under IFRS and can accordingly be classified as such,

and to take account of volumetric and other revenue timing

differences arising due to the in-year difference between allowed and

collected revenues, major storm costs (where these are above $100

million threshold in a given year) as well as excluding deferred tax on

underlying profits in our UK regulated businesses (NGET and NGED).

US

The United States of America, its territories and possessions; any

state of the United States and the District of Columbia.

#### US GAAP

Generally accepted accounting principles in the US. These differ from

IFRS and from UK GAAP.

#### US state regulators (state utility commissions)

In the US, public utilities’ retail transactions are regulated by state

utility commissions, including the New York Public Service

Commission (NYPSC) and the Massachusetts Department of Public

Utilities (MADPU).

V

#### Viking Link

The interconnector between Denmark and Great Britain, which was

commissioned in 2023, operated by National Grid and Energinet, the

Danish national transmission operator.

|  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
|  |  |  |  |  |  |
| National Grid plc  Annual Report and Accounts  2025/26 | 262 | Strategic Report | Corporate Governance | Financial Statements | Additional Information |
|  |  |  |  |  |  |
| Cautionary statement | | |  |  |  |

This document comprises the Annual Report and Accounts for the year ended 31 March 2026 for

National Grid plc and its subsidiaries.

It contains the Directors’ Report and Financial Statements, together with the independent auditor’s report

thereon, as required by the Companies Act 2006. The Directors’ Report, comprising pages  [1](#i2193c7e7fbee4753bdbe2d16888565c8_10) to [126](#i42605b1d6ef943038816b8b341a1e2a7_29881) and

[219](#i2193c7e7fbee4753bdbe2d16888565c8_382) to [261](#ibba07c05a16c49419b97ca277adc2fa7_45599), has been drawn up in accordance with the requirements of English law, and liability in respect

thereof is also governed by English law. In particular, the liability of the Directors for these reports is solely

to National Grid.

This document contains certain statements that are neither reported financial results nor other historical

information. These statements are forward-looking statements within the meaning of section 27A of the

Securities Act of 1933, as amended, and section 21E of the Securities Exchange Act of 1934, as

amended. These statements include information with respect to our financial condition, our results of

operations and businesses, strategy, plans and objectives. Words such as ‘aims’, ‘anticipates’, ‘expects’,

‘should’, ‘intends’, ‘plans’, ‘believes’, ‘outlook’, ‘seeks’, ‘estimates’, ‘targets’, ‘may’, ‘will’, ‘continue’,

‘project’ and similar expressions, as well as statements in the future tense, identify forward-looking

statements. This document also references sustainability-related targets and sustainability-related risks

(including climate-related targets and climate-related risks) which differ from conventional financial risks in

that they are complex, novel and tend to involve projection over long-term scenarios which are subject to

significant uncertainty and change.

These forward-looking statements and targets are not guarantees of our future performance and are

subject to assumptions, risks and uncertainties that could cause actual future results to differ materially

from those expressed in or implied by such forward-looking statements and targets. Many of these

assumptions, risks and uncertainties relate to factors that are beyond our ability to control or estimate

precisely, such as changes in laws or regulations; and decisions by governmental bodies or regulators,

including those relating to current and upcoming price controls in the UK and rate cases in the US; the

timing of construction and delivery by third parties of new generation projects requiring connection;

breaches of, or changes in, environmental, climate change, and health and safety laws or regulations,

including breaches or other incidents arising from the potentially harmful nature of our activities; network

failure or interruption, the inability to carry out critical non-network operations, and damage to

infrastructure, due to adverse weather conditions, including the impact of major storms as well as the

results of climate change, or due to counterparties being unable to deliver physical commodities; reliability

of and access to IT systems, including due to the failure of or unauthorised access to or deliberate

breaches of our systems and supporting technology; failure to adequately forecast and respond to

disruptions in energy supply; performance against regulatory targets and standards and against our peers

with the aim of delivering stakeholder expectations regarding costs and efficiency savings including

affordability considerations, as well as against targets and standards designed to support our role in the

energy transition; and customers and counterparties (including financial institutions) failing to perform their

obligations to the Company.

Other factors that could cause actual results to differ materially from those described in this document

include fluctuations in exchange rates, interest rates and commodity price indices; restrictions and

conditions (including filing requirements) in our borrowing and debt arrangements, funding costs and

access to financing; regulatory requirements for us to maintain financial resources in certain parts of our

business and restrictions on some subsidiaries’ transactions, such as paying dividends, lending or levying

charges; the delayed timing of recoveries and payments in our regulated businesses and whether aspects

of our activities are contestable; the funding requirements and performance of our pension schemes and

other post-retirement benefit schemes; the failure to attract, develop and retain employees with the

necessary competencies, including leadership and business capabilities, and any significant disputes

arising with our employees or breaches of laws or regulations by our employees; the failure to respond to

market developments, including competition for onshore transmission; the threats and opportunities

presented by emerging technology, including AI; the risk that global actions may not be effective in

transitioning to net zero and in managing relevant ESG risks, including in particular climate, nature-related

and human rights risks; the failure by the Company to respond to, or meet its own commitments

as a leader in relation to, climate change development activities relating to energy transition, including the

integration of distributed energy resources, which may result in the Company’s failure to achieve the

expected benefits of its strategic priorities; and the need to grow our business to deliver our strategy, as

well as incorrect or unforeseen assumptions or conclusions (including unanticipated costs and liabilities)

relating to business development activity, our strategic infrastructure projects and joint ventures.

Furthermore, in preparing the ESG-related information contained in this document, National Grid has

made a number of key judgements, estimations and assumptions, and the processes and issues involved

are complex. The ESG data, models and methodologies used are often relatively new, are rapidly evolving

and are not of the same standard as those available in the context of other financial information, nor are

they subject to the same or equivalent disclosure standards, historical reference points, benchmarks or

globally accepted accounting principles. In addition, the climate scenarios and the models that analyse

such scenarios, have limitations that are sensitive to key assumptions and parameters, which are

themselves subject to some uncertainty, and cannot fully capture all of the potential effects of climate,

policy and technology driven outcomes. Outputs of models, processed data and methodologies are also

likely to be affected by underlying data quality, which can be hard to assess, and our disclosures are

limited by the consistent availability of high-quality data. Whilst we expect data quality to improve over

time, there may be unexpected fluctuations year-on-year, and/or differences between the quality of the

data obtained, which could result in revisions to reported data going forward, meaning that such data may

not be reconcilable or comparable year-on-year. We expect industry guidance, market practice, and

regulations in this field to continue to change. There are also challenges faced in relation to the ability to

access data on a timely basis and the lack of consistency and comparability between data that is

available. This means the ESG-related forward-looking statements and ESG metrics discussed in this

document carry an additional degree of inherent risk and uncertainty.

In the light of uncertainty as to the nature of future policy and market response to climate change,

including between regions, and the effectiveness of any such response, National Grid may have to re-

evaluate its progress towards its ESG ambitions, commitments and targets in the future, update the

methodologies it uses or alter is approach to ESG and climate analysis and may be required to amend,

update and recalculate its ESG disclosures and assessments in the future, as market practice and data

quality and availability develops rapidly. In addition, the methodologies National Grid uses may develop

over time in line with market practice, regulation and/or developments in science, where applicable. Such

developments could result in revisions to reported data and lack of reconcilability or comparability.

For further details regarding these and other assumptions, risks and uncertainties that may affect National

Grid, please read the Strategic Report and the risk factors on pages [226](#i2193c7e7fbee4753bdbe2d16888565c8_388) to [232](#i72a93cacb719482cadc6ab9717fa311e_1-0-1-1-944541) of this document. In

addition, new factors emerge from time to time, and we cannot assess the potential impact of any such

factor on our activities or the extent to which any factor, or combination of factors, may cause actual

future results to differ materially from those contained in any forward-looking statement. Except as may be

required by law or regulation, the Company undertakes no obligation to update any of its forward-looking

statements, which speak only as of the date of this document.

The contents of any website references in this document do not form part of this document.

|  |
| --- |
|  |
|  |

|  |  |
| --- | --- |
|  |  |
| New_MIX_Portrait_White.svg | Logo-White_CBP030963.gif |

Printed by a CarbonNeutral  ® Company certified to ISO 14001

environmental management system.

Printed on material from well-managed, FSC  ® certified forests and

other controlled sources.

100% of the inks used are vegetable oil based, 95% of press

chemicals are recycled for further use and, on average 99% of any

waste associated with this production will be recycled and the

remaining 1% used to generate energy.

The paper is Carbon Balanced with World Land Trust, an

international conservation charity, who offset carbon emissions

through the protection and preservation of high conservation value

land. Through protecting standing forests under threat of clearance,

carbon is locked-in that would otherwise be released.

![Emperor_Imprint_White.gif]()

|  |
| --- |
|  |
|  |

National Grid plc

1–3 Strand

London WC2N 5EH

United Kingdom

nationalgrid.com